Welcome
To
My Presentation
Engr.Md. Sarwar Islam
Maintenance Engineer
CRP, Chapain, Savar.
Staff of Maintenance Department
• 1) Engr. Md.sarwar Islam (Maintenance Engineer)
• 2) Md. Suruz Ahmed ( Project Engineer)
• 3) Md. Ripon Reza ( Electrical Engineer)
• 4) Md.Razib Hossain ( Sub-Assistant Engineer)
• 5) Sribas chandra mollick ( Sub-Assistant Engineer)
• 6) Md. Al-Mamun ( Senior Electrician )
• 7) Md. Sohel rana ( junior electrician )
• 8) Md. Kamal Hossain ( Maintenance helper )
• 9) Md.Abu Taher (Plumber )
• 10) Md. Alomgir hossain ( Electrician ,Gonokbari)
The overview of our Handover
project,
Ongoing project and Upcoming
project.
Handover project
We have been successfully complete the Afser Hossain CRP
project in Rajshahi
•Completed project at outside the Dhaka
1) Semi –Permanent patient accommodation
building at chittagong.
2) Renovation work at Moulovibazar ,sylhet
3) Installment of 30 kva generator at Rajshahi,
60 kva generator at chittagong, 30 kva
generator at Barisal.
Handover project at Gonokbari
• Office & staff accommodation building (two
storied ) at gonokbari,CRP
• One –storied wheelchair workshop building at
CRP,Gonokbari.
• Vertical extension of accommodation building
for rana plaza victims ,CRP,Gonobari.
• Semi-permanent family quarter at
CRP,gonokbari
• Extention of Printing press at CRP ,Gonokbari
Handover project at Gonokbari
• RCC pipe line work at CRP,Gonokbari (1st
phase)
• Construction of Sub-station room at
CRP,Gonokbari.
• Construction of Steel ramp at CRP,Gonokbari
• Boundary wall with GI wire at CRP ,Gonokbari
• Installment of substation at Gonokbari
Handover project at Savar,CRP
• Retrofitting work at O& P building.
• Vertical extension (2nd & 3rd floor ) at O&P
building.
• Store room at CRP,Savar
• Semi parmanent patient room .
• Vertical extension of W&T school for BHPI
class room
• Construction of library room at W&T school.
Handover project at Savar,CRP
• One storied ramp at front of W&T school.
• Lime tracing work whole CRP roof.
• Peer support room at reddaway hall.
• Aware shop at front of CRP gate.
• Construction of oxidation pond.
• PVC pipe line work for whole CRP sanitary system
.(1st & 2nd phase)
• Paint whole CRP for ASCON.
• Store room for Maintenance damage material
On-going Project
On going project at outside the Dhaka
• Patient accommodation building at
CRP,Rajshahi
• Boundary wall manikgonj,CRP
• Sand filling work at Bandutia,CRP,Manikgonj
On going project at Gonokbari,CRP
• Semi-permanent Family quarter .
• Semi-permanent Training &
conference building
On going project at Savar
• Disable children & patient accommodation
building, CRP,savar
• Renovation of ground & 1st floor at O&P
building.
• Connecting road with O&P building .
• Renovation work at guest house both 1 & 2.
(2nd phase )
• Tin shed repair work at vocational .
Disable children & patient
accommodation building
Renovation work at O&P building
Renovation work at O&P building
Tin shed repair work
Future Project
Future project at CRP
• International Hostel (G+5) at CRP,Savar
• Nursing college (B+G+7),Savar
• Hostel building at lalteck (B+G+7),Savar
• Vertical extension at CRP,Rajshahi
• Boundary wall (brick ) at CRP,gonokbari
• Road carpeting at CRP,Gonokbari
• Vertical extension for shop at CRP,gonokbari
Future project at CRP
Chittagong
• 1)New patient building (3600sft)
• 2) New canteen
• 3) vocational training room
• 4) Basket ball ground
• 5) Heat treatment work
Regular Maintenance Work
• All the plumbing related work, like as toilet, pipe line
collging , water problem, drain ,septic tank, water tank,
wastage disposal ,basin etc everything including savar
& gonokbari. Total toilet in CRP is more than 450.
• All regular work of repair (civil work), like as building
repair, paint, grill,thai, gi wire .
• Regular maintain of all electrical work like as light,fan,
switch etc not only in savar also in gonokbari.
• Ac (total 42 ),genarator ,sub-station all repair &
maintenance work including gonokbari.
*We try to solve problem as soon
as possible, if we have parts in our
store for that specified problem.
*Sometimes a few works are done
lately due to waiting other works
or lack of available equipments,
parts in our store.
Thanks

More Related Content

Similar to Presentation of Sarwar

High level cancer institute,
High level cancer institute,High level cancer institute,
High level cancer institute,Krishan Kumar
 
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017Crosstown TO
 
Leaside - Laird Construction Liaison Committee Meeting - July 2017
Leaside - Laird Construction Liaison Committee Meeting  - July 2017Leaside - Laird Construction Liaison Committee Meeting  - July 2017
Leaside - Laird Construction Liaison Committee Meeting - July 2017Crosstown TO
 
Practicum Report - Angela Subedi
Practicum Report - Angela SubediPracticum Report - Angela Subedi
Practicum Report - Angela SubediAngela Subedi
 
Mount Dennis Station and EMSF Open House - March 2017
Mount Dennis Station and EMSF Open House - March 2017Mount Dennis Station and EMSF Open House - March 2017
Mount Dennis Station and EMSF Open House - March 2017Crosstown TO
 
PPT on projection mc
PPT on projection mcPPT on projection mc
PPT on projection mcKIRAN SIRSATH
 
Eglinton Crosstown LRT Project Virtual Open House - East - Science Centre to ...
Eglinton Crosstown LRT Project Virtual Open House - East - Science Centre to ...Eglinton Crosstown LRT Project Virtual Open House - East - Science Centre to ...
Eglinton Crosstown LRT Project Virtual Open House - East - Science Centre to ...Crosstown TO
 
Leaside Station Open House - March 2017
Leaside Station Open House - March 2017Leaside Station Open House - March 2017
Leaside Station Open House - March 2017Crosstown TO
 
Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017
Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017
Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017Crosstown TO
 
4 week summer training report
4 week summer training report4 week summer training report
4 week summer training reportanand bhatnagar
 
Presentation.pptx
Presentation.pptxPresentation.pptx
Presentation.pptxKhemrajOli
 
AEPL Presentation Rev_2 -O&G.pdf
AEPL Presentation Rev_2 -O&G.pdfAEPL Presentation Rev_2 -O&G.pdf
AEPL Presentation Rev_2 -O&G.pdfAayoghEngineering
 
Leaside & Laird Construction Liaison Committee Meeting - September 2017
Leaside & Laird Construction Liaison Committee Meeting - September 2017Leaside & Laird Construction Liaison Committee Meeting - September 2017
Leaside & Laird Construction Liaison Committee Meeting - September 2017Crosstown TO
 
Gudekar Mitesh Dilipbhai
Gudekar Mitesh DilipbhaiGudekar Mitesh Dilipbhai
Gudekar Mitesh DilipbhaiMitesh Gudekar
 
Desain umum wtp rumah sakit
Desain umum wtp rumah sakitDesain umum wtp rumah sakit
Desain umum wtp rumah sakitMuhammad Sirod
 
Nu Flow Presentation Eric VA and YMCA
Nu Flow Presentation Eric VA and YMCANu Flow Presentation Eric VA and YMCA
Nu Flow Presentation Eric VA and YMCAEric Hopkins
 

Similar to Presentation of Sarwar (20)

High level cancer institute,
High level cancer institute,High level cancer institute,
High level cancer institute,
 
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
 
Leaside - Laird Construction Liaison Committee Meeting - July 2017
Leaside - Laird Construction Liaison Committee Meeting  - July 2017Leaside - Laird Construction Liaison Committee Meeting  - July 2017
Leaside - Laird Construction Liaison Committee Meeting - July 2017
 
Arun Kumar
Arun KumarArun Kumar
Arun Kumar
 
Practicum Report - Angela Subedi
Practicum Report - Angela SubediPracticum Report - Angela Subedi
Practicum Report - Angela Subedi
 
Mount Dennis Station and EMSF Open House - March 2017
Mount Dennis Station and EMSF Open House - March 2017Mount Dennis Station and EMSF Open House - March 2017
Mount Dennis Station and EMSF Open House - March 2017
 
kishore (1)
kishore (1)kishore (1)
kishore (1)
 
PPT on projection mc
PPT on projection mcPPT on projection mc
PPT on projection mc
 
Eglinton Crosstown LRT Project Virtual Open House - East - Science Centre to ...
Eglinton Crosstown LRT Project Virtual Open House - East - Science Centre to ...Eglinton Crosstown LRT Project Virtual Open House - East - Science Centre to ...
Eglinton Crosstown LRT Project Virtual Open House - East - Science Centre to ...
 
Leaside Station Open House - March 2017
Leaside Station Open House - March 2017Leaside Station Open House - March 2017
Leaside Station Open House - March 2017
 
Sarvesh_CV (2)
Sarvesh_CV (2)Sarvesh_CV (2)
Sarvesh_CV (2)
 
Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017
Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017
Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017
 
4 week summer training report
4 week summer training report4 week summer training report
4 week summer training report
 
Presentation.pptx
Presentation.pptxPresentation.pptx
Presentation.pptx
 
AEPL Presentation Rev_2 -O&G.pdf
AEPL Presentation Rev_2 -O&G.pdfAEPL Presentation Rev_2 -O&G.pdf
AEPL Presentation Rev_2 -O&G.pdf
 
Leaside & Laird Construction Liaison Committee Meeting - September 2017
Leaside & Laird Construction Liaison Committee Meeting - September 2017Leaside & Laird Construction Liaison Committee Meeting - September 2017
Leaside & Laird Construction Liaison Committee Meeting - September 2017
 
Gudekar Mitesh Dilipbhai
Gudekar Mitesh DilipbhaiGudekar Mitesh Dilipbhai
Gudekar Mitesh Dilipbhai
 
Desain umum wtp rumah sakit
Desain umum wtp rumah sakitDesain umum wtp rumah sakit
Desain umum wtp rumah sakit
 
paramasivam resume
paramasivam resume paramasivam resume
paramasivam resume
 
Nu Flow Presentation Eric VA and YMCA
Nu Flow Presentation Eric VA and YMCANu Flow Presentation Eric VA and YMCA
Nu Flow Presentation Eric VA and YMCA
 

Presentation of Sarwar

  • 1. Welcome To My Presentation Engr.Md. Sarwar Islam Maintenance Engineer CRP, Chapain, Savar.
  • 2. Staff of Maintenance Department • 1) Engr. Md.sarwar Islam (Maintenance Engineer) • 2) Md. Suruz Ahmed ( Project Engineer) • 3) Md. Ripon Reza ( Electrical Engineer) • 4) Md.Razib Hossain ( Sub-Assistant Engineer) • 5) Sribas chandra mollick ( Sub-Assistant Engineer) • 6) Md. Al-Mamun ( Senior Electrician ) • 7) Md. Sohel rana ( junior electrician ) • 8) Md. Kamal Hossain ( Maintenance helper ) • 9) Md.Abu Taher (Plumber ) • 10) Md. Alomgir hossain ( Electrician ,Gonokbari)
  • 3. The overview of our Handover project, Ongoing project and Upcoming project.
  • 4. Handover project We have been successfully complete the Afser Hossain CRP project in Rajshahi
  • 5. •Completed project at outside the Dhaka 1) Semi –Permanent patient accommodation building at chittagong. 2) Renovation work at Moulovibazar ,sylhet 3) Installment of 30 kva generator at Rajshahi, 60 kva generator at chittagong, 30 kva generator at Barisal.
  • 6. Handover project at Gonokbari • Office & staff accommodation building (two storied ) at gonokbari,CRP • One –storied wheelchair workshop building at CRP,Gonokbari. • Vertical extension of accommodation building for rana plaza victims ,CRP,Gonobari. • Semi-permanent family quarter at CRP,gonokbari • Extention of Printing press at CRP ,Gonokbari
  • 7. Handover project at Gonokbari • RCC pipe line work at CRP,Gonokbari (1st phase) • Construction of Sub-station room at CRP,Gonokbari. • Construction of Steel ramp at CRP,Gonokbari • Boundary wall with GI wire at CRP ,Gonokbari • Installment of substation at Gonokbari
  • 8. Handover project at Savar,CRP • Retrofitting work at O& P building. • Vertical extension (2nd & 3rd floor ) at O&P building. • Store room at CRP,Savar • Semi parmanent patient room . • Vertical extension of W&T school for BHPI class room • Construction of library room at W&T school.
  • 9. Handover project at Savar,CRP • One storied ramp at front of W&T school. • Lime tracing work whole CRP roof. • Peer support room at reddaway hall. • Aware shop at front of CRP gate. • Construction of oxidation pond. • PVC pipe line work for whole CRP sanitary system .(1st & 2nd phase) • Paint whole CRP for ASCON. • Store room for Maintenance damage material
  • 11. On going project at outside the Dhaka • Patient accommodation building at CRP,Rajshahi • Boundary wall manikgonj,CRP • Sand filling work at Bandutia,CRP,Manikgonj
  • 12. On going project at Gonokbari,CRP • Semi-permanent Family quarter . • Semi-permanent Training & conference building
  • 13. On going project at Savar • Disable children & patient accommodation building, CRP,savar • Renovation of ground & 1st floor at O&P building. • Connecting road with O&P building . • Renovation work at guest house both 1 & 2. (2nd phase ) • Tin shed repair work at vocational .
  • 14. Disable children & patient accommodation building
  • 15. Renovation work at O&P building
  • 16. Renovation work at O&P building
  • 19. Future project at CRP • International Hostel (G+5) at CRP,Savar • Nursing college (B+G+7),Savar • Hostel building at lalteck (B+G+7),Savar • Vertical extension at CRP,Rajshahi • Boundary wall (brick ) at CRP,gonokbari • Road carpeting at CRP,Gonokbari • Vertical extension for shop at CRP,gonokbari
  • 20. Future project at CRP Chittagong • 1)New patient building (3600sft) • 2) New canteen • 3) vocational training room • 4) Basket ball ground • 5) Heat treatment work
  • 21. Regular Maintenance Work • All the plumbing related work, like as toilet, pipe line collging , water problem, drain ,septic tank, water tank, wastage disposal ,basin etc everything including savar & gonokbari. Total toilet in CRP is more than 450. • All regular work of repair (civil work), like as building repair, paint, grill,thai, gi wire . • Regular maintain of all electrical work like as light,fan, switch etc not only in savar also in gonokbari. • Ac (total 42 ),genarator ,sub-station all repair & maintenance work including gonokbari.
  • 22. *We try to solve problem as soon as possible, if we have parts in our store for that specified problem.
  • 23. *Sometimes a few works are done lately due to waiting other works or lack of available equipments, parts in our store.