B&H – Quarterly Opex Review 1
Project Title : Indigenous Development on Projection
welding machine to cater 7m finning length
Start Date :16th Nov 2015 End Date : 15th Feb 2016
Project Leader : Kiran Sirsath
Department : MED ( B & H )
Team Members:Vaibhav K. Shah , Sanjay Madhav, Tarak
Mankad, Ranba Waingade, Jagannath Kulkarni.
B&H – Quarterly Opex Review 2
Background of Project :
• Capability of Projection Fin welding machine is to weld upto
max 4.5m tube length.
• For recent order of Tata Steel & Nippon steel – as per design
engineering – Fin tube length is of 7m.
• In order to overcome the capability constraint , engineering
has put additional tube to tube butt joint for the same.
• Considering the volume of additional butt joints and its work
content , it is time consuming and laborious task. ( Appr. 7400
butt joints for both projects)
B&H – Quarterly Opex Review 3
Problem Definition :
• Requirement of finning for 7meter long tube.
• Increase in cycle time & work content to great extent for
finning of 7meter tube with additional butt joint.
• Existing Projection welding m/c is able to perform finning up
to 4.5 meter length because of constraint of bed length.
• Position of Electric motor on m/c restricting finning of tube
longer than 4.5meter.
• Old fixtures was not compatible for new requirement
because of following reasons
1) As per drawing, Finning starts at 110mm for bent tube.
2) Clamping of Tube was not possible in between finned
portion.
B&H – Quarterly Opex Review 4
Old Fixture photo ( 4.5 m length)
B&H – Quarterly Opex Review 5
Outcome Desired :
• Make 7meter long tube finning feasible on existing
projection welding m/c.
• Eliminate additional weld joint for finning 7meter long tube.
• Reduce cycle time & work content required for finning of
7meter long tube with additional butt joint i.e Tube cutting,
Tube chamfering, Tube set-up, Butt Joint welding,
correction after welding, RT, Ball Pass Test after welding.
B&H – Quarterly Opex Review 6
New Fixture photo ( 7 m length)
B&H – Quarterly Opex Review 7
Actions planned / implemented:
• New fixture designed to accommodate 7m Finning tube
length on existing bed length
• Servo motor for driving carriage was restricting additional
finning length so it was relocated on new fixture.
• Water cooling path was modified on the jaws to
accommodate minimum fin start position.
• PLC program was modified to cater 7m finning length
B&H – Quarterly Opex Review 8
Results Achieved :
• Successfully achieved 7m finning length on existing
machine of 4.5 meter bed.
• Successfully Eliminated additional weld joint for finning 7
meter long tube.
• Reduce cycle time & work content required for finning of
7meter long tube with additional butt joint i.e Tube cutting,
Tube chamfering, Tube set-up, Butt Joint welding,
correction after welding, RT, Ball Pass Test after welding.
• Total 3744 number of butt joint are eliminated
(Eco: 2944,Evap:800)
B&H – Quarterly Opex Review 9
Way Forward :
• This system works on two PLC programs to accommodate
7m finning length. Further this can be modified with bed
extension.
• Tube support system need to be modified to cater future
tube length requirement.
• Modification in servo motor & carriage mechanism to
withstand future finning length.
B&H – Quarterly Opex Review 10
B&H – Quarterly Opex Review 11
B&H – Quarterly Opex Review 12
B&H – Quarterly Opex Review 13
Thank You

More Related Content

What's hot

Projects - consulting engineer
Projects - consulting engineerProjects - consulting engineer
Projects - consulting engineerChris Owen
 
RV Thuwal - Refit project overview by Maritime Survey Australia
RV Thuwal - Refit project overview by Maritime Survey AustraliaRV Thuwal - Refit project overview by Maritime Survey Australia
RV Thuwal - Refit project overview by Maritime Survey AustraliaMichaelUberti
 
Method of Statement - Pavement works
Method of Statement - Pavement worksMethod of Statement - Pavement works
Method of Statement - Pavement worksMohd Nizam Mohd Zan
 
UNIQUE AND ECONOMIC WELL REVITALIZATION SOLUTION
UNIQUE AND ECONOMIC WELL REVITALIZATION SOLUTIONUNIQUE AND ECONOMIC WELL REVITALIZATION SOLUTION
UNIQUE AND ECONOMIC WELL REVITALIZATION SOLUTIONref-iqhub
 

What's hot (8)

Ajay123 ppt
Ajay123 pptAjay123 ppt
Ajay123 ppt
 
mycvv
mycvvmycvv
mycvv
 
Concrete
ConcreteConcrete
Concrete
 
Montrose BLP
Montrose BLPMontrose BLP
Montrose BLP
 
Projects - consulting engineer
Projects - consulting engineerProjects - consulting engineer
Projects - consulting engineer
 
RV Thuwal - Refit project overview by Maritime Survey Australia
RV Thuwal - Refit project overview by Maritime Survey AustraliaRV Thuwal - Refit project overview by Maritime Survey Australia
RV Thuwal - Refit project overview by Maritime Survey Australia
 
Method of Statement - Pavement works
Method of Statement - Pavement worksMethod of Statement - Pavement works
Method of Statement - Pavement works
 
UNIQUE AND ECONOMIC WELL REVITALIZATION SOLUTION
UNIQUE AND ECONOMIC WELL REVITALIZATION SOLUTIONUNIQUE AND ECONOMIC WELL REVITALIZATION SOLUTION
UNIQUE AND ECONOMIC WELL REVITALIZATION SOLUTION
 

Similar to PPT on projection mc

Barbil Angul Slurry Pipe line
Barbil Angul Slurry Pipe lineBarbil Angul Slurry Pipe line
Barbil Angul Slurry Pipe lineRakesh Saxena
 
Piping & Pipeline Designer
Piping & Pipeline DesignerPiping & Pipeline Designer
Piping & Pipeline Designerbharath kumar
 
Portfolio (Sunil Basnet )
Portfolio (Sunil Basnet )Portfolio (Sunil Basnet )
Portfolio (Sunil Basnet )tensab_linus419
 
Overview of Technology Development _ S_ F _Vhora
Overview of Technology Development _ S_ F _VhoraOverview of Technology Development _ S_ F _Vhora
Overview of Technology Development _ S_ F _VhoraProSIM R & D Pvt. Ltd.
 
R.muthukumar piping design engineer.doc
R.muthukumar piping design engineer.docR.muthukumar piping design engineer.doc
R.muthukumar piping design engineer.docMuthukumar RajaGounder
 
Subsea689_FinalSubmission_Ashwin_Kim_Thomas
Subsea689_FinalSubmission_Ashwin_Kim_ThomasSubsea689_FinalSubmission_Ashwin_Kim_Thomas
Subsea689_FinalSubmission_Ashwin_Kim_ThomasAshwin Gadgil
 
Case study bridge construction upto pier and road construction
Case study   bridge construction upto pier and road constructionCase study   bridge construction upto pier and road construction
Case study bridge construction upto pier and road constructionSatish Kambaliya
 
BOE+Brochure+-+Rotajet+150326
BOE+Brochure+-+Rotajet+150326BOE+Brochure+-+Rotajet+150326
BOE+Brochure+-+Rotajet+150326Danny Flett
 
Portfolio Presentation
Portfolio PresentationPortfolio Presentation
Portfolio Presentationshanged
 
Summer Internship in Jaypee Group
Summer Internship in Jaypee Group Summer Internship in Jaypee Group
Summer Internship in Jaypee Group Abhimanyu Saraswat
 
Resume_Nitin Lonkar (1)
Resume_Nitin Lonkar (1)Resume_Nitin Lonkar (1)
Resume_Nitin Lonkar (1)Nitin Lonkar
 

Similar to PPT on projection mc (20)

Barbil Angul Slurry Pipe line
Barbil Angul Slurry Pipe lineBarbil Angul Slurry Pipe line
Barbil Angul Slurry Pipe line
 
Piping & Pipeline Designer
Piping & Pipeline DesignerPiping & Pipeline Designer
Piping & Pipeline Designer
 
Portfolio (Sunil Basnet )
Portfolio (Sunil Basnet )Portfolio (Sunil Basnet )
Portfolio (Sunil Basnet )
 
THARANG A KUTTY
THARANG A KUTTYTHARANG A KUTTY
THARANG A KUTTY
 
Engineering & Design - January
Engineering & Design - JanuaryEngineering & Design - January
Engineering & Design - January
 
Overview of Technology Development _ S_ F _Vhora
Overview of Technology Development _ S_ F _VhoraOverview of Technology Development _ S_ F _Vhora
Overview of Technology Development _ S_ F _Vhora
 
R.muthukumar piping design engineer.doc
R.muthukumar piping design engineer.docR.muthukumar piping design engineer.doc
R.muthukumar piping design engineer.doc
 
Engineering & Design of Pipe Supports
Engineering & Design of Pipe SupportsEngineering & Design of Pipe Supports
Engineering & Design of Pipe Supports
 
Subsea689_FinalSubmission_Ashwin_Kim_Thomas
Subsea689_FinalSubmission_Ashwin_Kim_ThomasSubsea689_FinalSubmission_Ashwin_Kim_Thomas
Subsea689_FinalSubmission_Ashwin_Kim_Thomas
 
Pipe Support Engineering & Design - June
Pipe Support Engineering & Design - JunePipe Support Engineering & Design - June
Pipe Support Engineering & Design - June
 
Engineering & Design - April
Engineering & Design - April Engineering & Design - April
Engineering & Design - April
 
Chetan_Patil
Chetan_PatilChetan_Patil
Chetan_Patil
 
Sarvesh_CV (2)
Sarvesh_CV (2)Sarvesh_CV (2)
Sarvesh_CV (2)
 
Case study bridge construction upto pier and road construction
Case study   bridge construction upto pier and road constructionCase study   bridge construction upto pier and road construction
Case study bridge construction upto pier and road construction
 
BOE+Brochure+-+Rotajet+150326
BOE+Brochure+-+Rotajet+150326BOE+Brochure+-+Rotajet+150326
BOE+Brochure+-+Rotajet+150326
 
Abhishek Resume
Abhishek ResumeAbhishek Resume
Abhishek Resume
 
Engineering and Design Webinar - September
Engineering and Design Webinar - SeptemberEngineering and Design Webinar - September
Engineering and Design Webinar - September
 
Portfolio Presentation
Portfolio PresentationPortfolio Presentation
Portfolio Presentation
 
Summer Internship in Jaypee Group
Summer Internship in Jaypee Group Summer Internship in Jaypee Group
Summer Internship in Jaypee Group
 
Resume_Nitin Lonkar (1)
Resume_Nitin Lonkar (1)Resume_Nitin Lonkar (1)
Resume_Nitin Lonkar (1)
 

More from KIRAN SIRSATH

ASQ member Certificate
ASQ member CertificateASQ member Certificate
ASQ member CertificateKIRAN SIRSATH
 
A3-496(SHT.6-6) -FIN TUBE CLAMPING JWA -Model
A3-496(SHT.6-6) -FIN TUBE CLAMPING JWA -ModelA3-496(SHT.6-6) -FIN TUBE CLAMPING JWA -Model
A3-496(SHT.6-6) -FIN TUBE CLAMPING JWA -ModelKIRAN SIRSATH
 
A3-496(SHT.4-6) -FIN TUBE CLAMPING JWA -Model
A3-496(SHT.4-6) -FIN TUBE CLAMPING JWA -ModelA3-496(SHT.4-6) -FIN TUBE CLAMPING JWA -Model
A3-496(SHT.4-6) -FIN TUBE CLAMPING JWA -ModelKIRAN SIRSATH
 
A3-496 (SHT.3-6) -FIN TUBE CLAMPING JWA -Model
A3-496 (SHT.3-6) -FIN TUBE CLAMPING JWA -ModelA3-496 (SHT.3-6) -FIN TUBE CLAMPING JWA -Model
A3-496 (SHT.3-6) -FIN TUBE CLAMPING JWA -ModelKIRAN SIRSATH
 
A3-496(SHT.2-6) -FIN TUBE CLAMPING JWA -Model
A3-496(SHT.2-6) -FIN TUBE CLAMPING JWA -ModelA3-496(SHT.2-6) -FIN TUBE CLAMPING JWA -Model
A3-496(SHT.2-6) -FIN TUBE CLAMPING JWA -ModelKIRAN SIRSATH
 
A3-496 (SH.1-6) FIN TUBE CLAMPING JWA -Model
A3-496 (SH.1-6) FIN TUBE CLAMPING JWA -ModelA3-496 (SH.1-6) FIN TUBE CLAMPING JWA -Model
A3-496 (SH.1-6) FIN TUBE CLAMPING JWA -ModelKIRAN SIRSATH
 
Engineering Marksheet
Engineering MarksheetEngineering Marksheet
Engineering MarksheetKIRAN SIRSATH
 

More from KIRAN SIRSATH (9)

ASQ member Certificate
ASQ member CertificateASQ member Certificate
ASQ member Certificate
 
A3-496(SHT.6-6) -FIN TUBE CLAMPING JWA -Model
A3-496(SHT.6-6) -FIN TUBE CLAMPING JWA -ModelA3-496(SHT.6-6) -FIN TUBE CLAMPING JWA -Model
A3-496(SHT.6-6) -FIN TUBE CLAMPING JWA -Model
 
A3-496(SHT.4-6) -FIN TUBE CLAMPING JWA -Model
A3-496(SHT.4-6) -FIN TUBE CLAMPING JWA -ModelA3-496(SHT.4-6) -FIN TUBE CLAMPING JWA -Model
A3-496(SHT.4-6) -FIN TUBE CLAMPING JWA -Model
 
A3-496 (SHT.3-6) -FIN TUBE CLAMPING JWA -Model
A3-496 (SHT.3-6) -FIN TUBE CLAMPING JWA -ModelA3-496 (SHT.3-6) -FIN TUBE CLAMPING JWA -Model
A3-496 (SHT.3-6) -FIN TUBE CLAMPING JWA -Model
 
A3-496(SHT.2-6) -FIN TUBE CLAMPING JWA -Model
A3-496(SHT.2-6) -FIN TUBE CLAMPING JWA -ModelA3-496(SHT.2-6) -FIN TUBE CLAMPING JWA -Model
A3-496(SHT.2-6) -FIN TUBE CLAMPING JWA -Model
 
A3-496 (SH.1-6) FIN TUBE CLAMPING JWA -Model
A3-496 (SH.1-6) FIN TUBE CLAMPING JWA -ModelA3-496 (SH.1-6) FIN TUBE CLAMPING JWA -Model
A3-496 (SH.1-6) FIN TUBE CLAMPING JWA -Model
 
0A7329
0A73290A7329
0A7329
 
Engineering Marksheet
Engineering MarksheetEngineering Marksheet
Engineering Marksheet
 
Diploma Marksheet
Diploma MarksheetDiploma Marksheet
Diploma Marksheet
 

PPT on projection mc

  • 1. B&H – Quarterly Opex Review 1 Project Title : Indigenous Development on Projection welding machine to cater 7m finning length Start Date :16th Nov 2015 End Date : 15th Feb 2016 Project Leader : Kiran Sirsath Department : MED ( B & H ) Team Members:Vaibhav K. Shah , Sanjay Madhav, Tarak Mankad, Ranba Waingade, Jagannath Kulkarni.
  • 2. B&H – Quarterly Opex Review 2 Background of Project : • Capability of Projection Fin welding machine is to weld upto max 4.5m tube length. • For recent order of Tata Steel & Nippon steel – as per design engineering – Fin tube length is of 7m. • In order to overcome the capability constraint , engineering has put additional tube to tube butt joint for the same. • Considering the volume of additional butt joints and its work content , it is time consuming and laborious task. ( Appr. 7400 butt joints for both projects)
  • 3. B&H – Quarterly Opex Review 3 Problem Definition : • Requirement of finning for 7meter long tube. • Increase in cycle time & work content to great extent for finning of 7meter tube with additional butt joint. • Existing Projection welding m/c is able to perform finning up to 4.5 meter length because of constraint of bed length. • Position of Electric motor on m/c restricting finning of tube longer than 4.5meter. • Old fixtures was not compatible for new requirement because of following reasons 1) As per drawing, Finning starts at 110mm for bent tube. 2) Clamping of Tube was not possible in between finned portion.
  • 4. B&H – Quarterly Opex Review 4 Old Fixture photo ( 4.5 m length)
  • 5. B&H – Quarterly Opex Review 5 Outcome Desired : • Make 7meter long tube finning feasible on existing projection welding m/c. • Eliminate additional weld joint for finning 7meter long tube. • Reduce cycle time & work content required for finning of 7meter long tube with additional butt joint i.e Tube cutting, Tube chamfering, Tube set-up, Butt Joint welding, correction after welding, RT, Ball Pass Test after welding.
  • 6. B&H – Quarterly Opex Review 6 New Fixture photo ( 7 m length)
  • 7. B&H – Quarterly Opex Review 7 Actions planned / implemented: • New fixture designed to accommodate 7m Finning tube length on existing bed length • Servo motor for driving carriage was restricting additional finning length so it was relocated on new fixture. • Water cooling path was modified on the jaws to accommodate minimum fin start position. • PLC program was modified to cater 7m finning length
  • 8. B&H – Quarterly Opex Review 8 Results Achieved : • Successfully achieved 7m finning length on existing machine of 4.5 meter bed. • Successfully Eliminated additional weld joint for finning 7 meter long tube. • Reduce cycle time & work content required for finning of 7meter long tube with additional butt joint i.e Tube cutting, Tube chamfering, Tube set-up, Butt Joint welding, correction after welding, RT, Ball Pass Test after welding. • Total 3744 number of butt joint are eliminated (Eco: 2944,Evap:800)
  • 9. B&H – Quarterly Opex Review 9 Way Forward : • This system works on two PLC programs to accommodate 7m finning length. Further this can be modified with bed extension. • Tube support system need to be modified to cater future tube length requirement. • Modification in servo motor & carriage mechanism to withstand future finning length.
  • 10. B&H – Quarterly Opex Review 10
  • 11. B&H – Quarterly Opex Review 11
  • 12. B&H – Quarterly Opex Review 12
  • 13. B&H – Quarterly Opex Review 13 Thank You