SARNATH
CORPORATE PROFILE
CLIENTS WORKED WITH AT L&T
 M/s. ADANI LTD.,
 M/s. NTPC
 M/s. SAIL INDIA
 M/s. M N DASTUR
 M/s. BMT WBM AUSTRALIA
 M/s. NINE DOT SOUTH AFRICA
MACHINE DESIGN AND
ENGINEERING CAPABILITIES:
 STACKER AND RECLAIMER
 Bucket Wheel Stacker cum Reclaimer
 Bucket Wheel Reclaimer
 Slewing and Non-Slewing Stacker
 Twin Boom Stacker
 Tripper, Elevator and Tail house.
Design Process for Stacker,
Reclaimer and Ship Unloader
 Design Basis (ISO, FEM, AS)
 Input Design Document (Design
Specification)
 Preliminary Calculations
 FEA
BWSR MACHINE
Input Document
 BASIC DATAS
 ENVIRONMENT, DUTY & DESIGN PARAMETERS
 STANDARDS, RULES & LOADS
 LOAD CASES / COMBINATIONS
 MATERIAL
 MECHANICAL PROPERTIES
 ALLOWABLE STRESSES
 MATERIAL LOADS
 LIVE LOADS ON BOOM CONVEYOR
 INCRUSTATION (DIRT ACCUMULATION) ON BOOM
 BELT TENSIONS
 RESISTANCES DUE TO FRICTION AND TRAVEL
 WIND LOAD
 DEAD LOADS
 LIVE LOADS
 LATERAL COLLISION
 SEISMIC LOAD
Standards
 ISO 5049 & ISO 5048
 FEM Section II
 IS 800
 BS 2573 part 1 & 2
 AS 4324,AS4100, AS 1170
 DIN ISO 281
CALCULATIONS
 Slew Bearing Calculation
 Wheel and Rail Calculation
 Bucket Wheel / Screw Calculation
 Drive Calculation (conveyor, Travel, Bucket Wheel, Slew)
 Conveyor Calculation
 Pin, Shaft, Bearing Calculation
 Wheel Load Calculation
 Stability Calculation
 Cylinder Calculation
 Guy and Boom Calculation
 Splice Joint Calculation
 Weld Calculation
FEA Calculation
 Structural Analysis
 Buckling Analysis
 Modal analysis
POST FEA CALCULATION
 Fatigue Calculations
 Buckling Calculation –Plate and Column
 Pin Calculation
 Joint calculation
 Bearing Calculation
 Buffer Calculation
A
B
C
Fixed and Floating Bearings
Base Frame
Boom Structure
Bucket Wheel Assembly.
Slew Drive Assembly
LOAD CASES & LOAD COMBINATIONS
Load
combinatio
n Ref No
ISO 5049
Load
combinatio
n Case
DESCRIPTION OF LOAD
COMBINATION
& LOADS
Case
type
Stress
Factor
FEA
Req'd
Luff
Angle
Boom
Slew
Posn
FEA
Load
Case
1 I
DEAD LOADS ONLY
(A+I)
STRENG
TH
1.5 YES
Fully
Raised
2 1
2 I
NORMAL DIGGING
(A+B1+C1+C3+D+E+I+Fu+
Fs+G+N1)
STRENG
TH
1.5 YES
Fully
Lowere
d
2 2
2.1 I
NORMAL DIGGING
(A+B1+C1+C3+D+E+I+Fu+
Fs+G+N1)
STRENG
TH
1.5 YES
Horizo
ntal
2 2.1
3 I
NORMAL STACKING
(A+B2+X+D+E+I+G)
STRENG
TH
1.5 YES
Fully
Lowere
d
2 3
4 I
FATIGUE ANALYSIS
(Load Comb'n rf.No.1 -
Load Comb'n rf.No.2)
OR
(Load Comb'n rf.No.1 -
Load Comb'n rf.No.3)
FATIGUE NA NA NA NA NA
5 II
ABNORMAL DIGGING +
TAIL WIND
(A+B1+C1+C3+D+E+I+G+H
4+Ju+Js+K+L+N2)
STRENG
TH
1.333 YES
Fully
Lowere
d
2 4
5.1 II
ABNORMAL DIGGING +
SIDE WIND
(A+B1+C1+C3+D+E+I+G+H
1+Ju+Js+K+L+N2)
STRENG
TH
1.333 YES
Horizo
ntal
2 4.1
6 III/1
BLOCKED CHUTE + TAIL
WIND
(A+B1+M1+C1+D+E+I+Fu+
Fs+G+H4+N3)
STRENG
TH
1.2 YES
Fully
Lowere
d
2 5
7 III/2
BW RESTING + HEAD/TAIL
WIND
(A+B2+X+D+E+I+G+H4+BR
)
STRENG
TH
1.2 YES
Fully
Lowere
d
2 6
8 III/5
BW LATERAL COLLISION
WITH STOCKPILE
(A+B1+C1+D+E+I+Fu+Fs+
G+H1+N1+R+R2)
STRENG
TH
1.2 YES
Horizo
ntal
2 7
9 III/6 TRAVEL TO STORM TIE STRENG 1.2 YES Fully 1 8
Machine Configurations
Boom Fully Raised - Slew Position 2 –
35 degrees to Main Track
Boom Fully Lowered - Slew Position 2 – 35
degrees to Main Track
Boom Horizontal - Slew Position 2 – 35 degrees
to Main Track
Boom Fully Raised - Slew Position 1 – Zero
degrees to Main Track
Link Type S/R
High Capacity S/R
Nodes:
51290
Elements:
54506
High Capacity S/R
Boom Girder with Rear Luff
cylinder
Tripper Structure
Nodes:
95481
Elements:
93346
Tripper Structure
C Frame Type S/R
Nodes:
91842
Elements:
96432
C Frame Type S/R
Stress Plots
Stress Plots
LARSEN & TOUBRO
LTD
MACHINE DESIGN AND
ENGINEERING
PROJECT ROLE TEAM SIZE MAN DAYS
ADANI VIZAG DESIGN REVIEW 2 200
ADANI MUNDRA PHASE II PROJECT LEAD 8 800
ADANI PARSAKENTE DESIGN REVIEW 2 100
10,000TPH BWSR
DEVELOPMENT
DESIGN REVIEW 2 100
ADANI DHAMRA 45m DESIGN LEAD 8 100
ADANI DHAMRA 51m DESIGN LEAD 8 125
KHARGONE 41m BWR DESIGN LEAD 7 600
KHARGONE 41m BWSR &
ELEVATOR, TRIPPER AND
TAILHOUSE
DESIGN LEAD 8 900
RECLAIMER
DEVELOPEMNT
DESIGN LEAD 3 200
Adani Mundra Phase II
Tech Spec
Material Handled : Coal
Stacking Capacity : 6800 TPH
Reclaiming Capacity: 3500 TPH
Boom Length : 41m
Stock pile : 44m x 15m
No of Wheels : 48+8
ADANI VIZAG
Tech Spec
Material Handled : Coal
Stacking Capacity : 3600 TPH
Reclaiming Capacity: 3350 TPH
Boom Length : 51m
Stock pile : 44m x 15m
No of Wheels : 36+10
Achievement
 India’s first C-Frame machine
 The C-Frame Design of Stacker Reclaimer
is realized in Adani Vizag and in Dhamra
10000TPH BWSR
DEVELOPMENT
Technology provider :
Ashton Bulk UK
 MAST CONSTRUCTION : C-FRAME WITH DETACHABLE
TOWED STRUCTURE
 BOOM LENGTH : 60 M LATTICE GIRDER
 CAPACITY : 10000 TPH STACKING
10000 TPH RECLAIMING
 BOOM BELT WIDTH : 2500 MM
 BOOM BELT SPEED : 4.7 M/S
 BUCKET WHEEL : 11 M CUTTING DIAMETER, 10
NOS. OF BUCKETS EACH OF 3850 LITRE VOLUME
 DESIGN STANDARD : AS-4324.1, AS-3990,AS-4100
Scope
 Maintain Single point contact with AB
 To Review Design of AB as per AS
standards
 Codes used : AS4324, AS4100, AS1403,
AS1418, AS1170, BS 2573 1&2, FEM
Sec-II
 Check the Loads, Load Cases and all
calculations
KHARGONE
Tech Spec
 MAST CONSTRUCTION : LINK TYPE
 BOOM LENGTH : 41 M
 STACKING CAP : 1760 TPH
 RECLAIMING CAP : 2000 TPH (PEAK)
 BELT SPEED : 3.2 m/s
 MATERIAL HANDLED : COAL
 Designed as per ISO 5049/1
 Reviewed by: NTPC
Achievement
 Reduced the weight of the Reclaimer
Machine by 30T, i.e., reduced weight of
structure by 15%.
 Reduced Elevator, Tripper and Tail house
weight by 10T.
Tripper , Elevator and Tail
House
Thank You

More Related Content

What's hot

Aircraft Design for Boeing Phantom Works
Aircraft Design for Boeing Phantom WorksAircraft Design for Boeing Phantom Works
Aircraft Design for Boeing Phantom Workssimoalb88
 
Stable platform inertial guidance
Stable platform inertial guidanceStable platform inertial guidance
Stable platform inertial guidanceDon Blanchet
 
Vehicle load transfer part III 2021
Vehicle load transfer part III 2021Vehicle load transfer part III 2021
Vehicle load transfer part III 2021William Harbin
 
C3 Corvette chassis upgrade 2021
C3 Corvette chassis upgrade 2021C3 Corvette chassis upgrade 2021
C3 Corvette chassis upgrade 2021William Harbin
 
Vehicle load transfer part II 2021
Vehicle load transfer part II 2021Vehicle load transfer part II 2021
Vehicle load transfer part II 2021William Harbin
 
Analysis and design of 15 storey office and
Analysis and design of 15 storey office andAnalysis and design of 15 storey office and
Analysis and design of 15 storey office andMasroor Alam
 
Vehicle load transfer part I 2021
Vehicle load transfer part I 2021Vehicle load transfer part I 2021
Vehicle load transfer part I 2021William Harbin
 
Team Kashpiers "Baja 2013"
Team Kashpiers "Baja 2013"Team Kashpiers "Baja 2013"
Team Kashpiers "Baja 2013"Mohit Mahaldar
 
Baja project 2010 report by bangalore institue of tech
Baja project 2010 report by bangalore institue of techBaja project 2010 report by bangalore institue of tech
Baja project 2010 report by bangalore institue of techKapil Singh
 
Fabrication and testing of engine and drive train
Fabrication and testing of engine and drive trainFabrication and testing of engine and drive train
Fabrication and testing of engine and drive trainShivam Singh
 
BAJA 2013 final year project report
BAJA 2013 final year project reportBAJA 2013 final year project report
BAJA 2013 final year project reportKalyan Potukuchi
 
University Final Project
University Final ProjectUniversity Final Project
University Final ProjectReinaldo Wiener
 
Baja SAE USB 2010-2011 Portfolio
Baja SAE USB 2010-2011 PortfolioBaja SAE USB 2010-2011 Portfolio
Baja SAE USB 2010-2011 PortfolioReinaldo Wiener
 

What's hot (20)

Aircraft Design for Boeing Phantom Works
Aircraft Design for Boeing Phantom WorksAircraft Design for Boeing Phantom Works
Aircraft Design for Boeing Phantom Works
 
MSC-VPD04 ArvinMeritor_01
MSC-VPD04 ArvinMeritor_01MSC-VPD04 ArvinMeritor_01
MSC-VPD04 ArvinMeritor_01
 
SAE 2007-NVC-180
SAE 2007-NVC-180SAE 2007-NVC-180
SAE 2007-NVC-180
 
Frequency-Dependent Rubber Bushing Model
Frequency-Dependent Rubber Bushing ModelFrequency-Dependent Rubber Bushing Model
Frequency-Dependent Rubber Bushing Model
 
ARM_Target_Setting_Procedure
ARM_Target_Setting_ProcedureARM_Target_Setting_Procedure
ARM_Target_Setting_Procedure
 
Stable platform inertial guidance
Stable platform inertial guidanceStable platform inertial guidance
Stable platform inertial guidance
 
Vehicle load transfer part III 2021
Vehicle load transfer part III 2021Vehicle load transfer part III 2021
Vehicle load transfer part III 2021
 
C3 Corvette chassis upgrade 2021
C3 Corvette chassis upgrade 2021C3 Corvette chassis upgrade 2021
C3 Corvette chassis upgrade 2021
 
Vehicle load transfer part II 2021
Vehicle load transfer part II 2021Vehicle load transfer part II 2021
Vehicle load transfer part II 2021
 
Analysis and design of 15 storey office and
Analysis and design of 15 storey office andAnalysis and design of 15 storey office and
Analysis and design of 15 storey office and
 
Vehicle load transfer part I 2021
Vehicle load transfer part I 2021Vehicle load transfer part I 2021
Vehicle load transfer part I 2021
 
Team Kashpiers "Baja 2013"
Team Kashpiers "Baja 2013"Team Kashpiers "Baja 2013"
Team Kashpiers "Baja 2013"
 
CTA - LST - AZIMUTH SYSTEM 20160607
CTA - LST - AZIMUTH SYSTEM 20160607CTA - LST - AZIMUTH SYSTEM 20160607
CTA - LST - AZIMUTH SYSTEM 20160607
 
MSC_2011_Conf_Meritor_Inc
MSC_2011_Conf_Meritor_IncMSC_2011_Conf_Meritor_Inc
MSC_2011_Conf_Meritor_Inc
 
Baja project 2010 report by bangalore institue of tech
Baja project 2010 report by bangalore institue of techBaja project 2010 report by bangalore institue of tech
Baja project 2010 report by bangalore institue of tech
 
Fabrication and testing of engine and drive train
Fabrication and testing of engine and drive trainFabrication and testing of engine and drive train
Fabrication and testing of engine and drive train
 
BAJA 2013 final year project report
BAJA 2013 final year project reportBAJA 2013 final year project report
BAJA 2013 final year project report
 
University Final Project
University Final ProjectUniversity Final Project
University Final Project
 
LuGre_Tire_Model
LuGre_Tire_ModelLuGre_Tire_Model
LuGre_Tire_Model
 
Baja SAE USB 2010-2011 Portfolio
Baja SAE USB 2010-2011 PortfolioBaja SAE USB 2010-2011 Portfolio
Baja SAE USB 2010-2011 Portfolio
 

Viewers also liked

Jain architecture final 1
Jain architecture final 1Jain architecture final 1
Jain architecture final 1aziz khan
 
Buddhist architectue
Buddhist architectueBuddhist architectue
Buddhist architectueAditi Goyal
 
Chaityas and viharas Architecture
Chaityas and viharas ArchitectureChaityas and viharas Architecture
Chaityas and viharas ArchitecturePragya Shukla
 

Viewers also liked (7)

Architecture of sarnath
Architecture of sarnathArchitecture of sarnath
Architecture of sarnath
 
Stupas
StupasStupas
Stupas
 
Jain architecture
Jain architectureJain architecture
Jain architecture
 
Jain architecture final 1
Jain architecture final 1Jain architecture final 1
Jain architecture final 1
 
Jainism
JainismJainism
Jainism
 
Buddhist architectue
Buddhist architectueBuddhist architectue
Buddhist architectue
 
Chaityas and viharas Architecture
Chaityas and viharas ArchitectureChaityas and viharas Architecture
Chaityas and viharas Architecture
 

Similar to SARNATH-PROFILE-at LNT

introduction, drawing, calculation for winch design
introduction, drawing, calculation for winch designintroduction, drawing, calculation for winch design
introduction, drawing, calculation for winch designAman Huri
 
MAIN CANOPY BAJAJ HR(22.09.2016)
MAIN CANOPY BAJAJ HR(22.09.2016)MAIN CANOPY BAJAJ HR(22.09.2016)
MAIN CANOPY BAJAJ HR(22.09.2016)sufiyan shaikh
 
Design and analysis of scissor jack final report 8 sem (1)
Design and  analysis of scissor jack final report 8 sem (1)Design and  analysis of scissor jack final report 8 sem (1)
Design and analysis of scissor jack final report 8 sem (1)RAHMATULLAH MERCY FEAT
 
Aircraft tyre technology
Aircraft tyre technologyAircraft tyre technology
Aircraft tyre technologygsiaf
 
Fabrication Gate Valve ckb presentation
Fabrication Gate Valve ckb presentationFabrication Gate Valve ckb presentation
Fabrication Gate Valve ckb presentationckbgroup
 
trainingonchp-170107190647.pdf
trainingonchp-170107190647.pdftrainingonchp-170107190647.pdf
trainingonchp-170107190647.pdfDINESHRANJANPAL
 
2014 CRW - How to Effectively Utilize Hydraulic Platform Transporters in the...
 2014 CRW - How to Effectively Utilize Hydraulic Platform Transporters in the... 2014 CRW - How to Effectively Utilize Hydraulic Platform Transporters in the...
2014 CRW - How to Effectively Utilize Hydraulic Platform Transporters in the...Specialized Carriers & Rigging Association
 
Static analysis xyz wellhead platform portofolio
Static analysis xyz wellhead platform portofolioStatic analysis xyz wellhead platform portofolio
Static analysis xyz wellhead platform portofolioKristoforusAnggara
 
INDUSTRIAL TRAINING REPORT BY ShRiDhAR KaDaM
INDUSTRIAL TRAINING REPORT BY ShRiDhAR KaDaMINDUSTRIAL TRAINING REPORT BY ShRiDhAR KaDaM
INDUSTRIAL TRAINING REPORT BY ShRiDhAR KaDaMshridharthecyberdude
 
LIFTING PLAN FLARE-KRB.pdf
LIFTING PLAN FLARE-KRB.pdfLIFTING PLAN FLARE-KRB.pdf
LIFTING PLAN FLARE-KRB.pdfNanangArief2
 
Piling work method statement cm- ms- bw - 002
Piling work method statement   cm- ms- bw - 002Piling work method statement   cm- ms- bw - 002
Piling work method statement cm- ms- bw - 002Minh Bui Si
 
International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)IJERD Editor
 
Kr Offshore PQ Ver.2
Kr Offshore PQ Ver.2Kr Offshore PQ Ver.2
Kr Offshore PQ Ver.2richard kim
 
Analytical Optimization of Chassis Frame for 40ft Dual-Axle Flatbed Trailer D...
Analytical Optimization of Chassis Frame for 40ft Dual-Axle Flatbed Trailer D...Analytical Optimization of Chassis Frame for 40ft Dual-Axle Flatbed Trailer D...
Analytical Optimization of Chassis Frame for 40ft Dual-Axle Flatbed Trailer D...IOSR Journals
 
Caterpillar Cat D6N TRACK-TYPE TRACTOR (Prefix GB6) Service Repair Manual Ins...
Caterpillar Cat D6N TRACK-TYPE TRACTOR (Prefix GB6) Service Repair Manual Ins...Caterpillar Cat D6N TRACK-TYPE TRACTOR (Prefix GB6) Service Repair Manual Ins...
Caterpillar Cat D6N TRACK-TYPE TRACTOR (Prefix GB6) Service Repair Manual Ins...onyvzcwadtu05
 
Caterpillar Cat D6N TRACK-TYPE TRACTOR (Prefix GB6) Service Repair Manual Ins...
Caterpillar Cat D6N TRACK-TYPE TRACTOR (Prefix GB6) Service Repair Manual Ins...Caterpillar Cat D6N TRACK-TYPE TRACTOR (Prefix GB6) Service Repair Manual Ins...
Caterpillar Cat D6N TRACK-TYPE TRACTOR (Prefix GB6) Service Repair Manual Ins...f8ioseoodkmmd
 

Similar to SARNATH-PROFILE-at LNT (20)

introduction, drawing, calculation for winch design
introduction, drawing, calculation for winch designintroduction, drawing, calculation for winch design
introduction, drawing, calculation for winch design
 
MAIN CANOPY BAJAJ HR(22.09.2016)
MAIN CANOPY BAJAJ HR(22.09.2016)MAIN CANOPY BAJAJ HR(22.09.2016)
MAIN CANOPY BAJAJ HR(22.09.2016)
 
Strauto 2015
Strauto 2015Strauto 2015
Strauto 2015
 
Design and analysis of scissor jack final report 8 sem (1)
Design and  analysis of scissor jack final report 8 sem (1)Design and  analysis of scissor jack final report 8 sem (1)
Design and analysis of scissor jack final report 8 sem (1)
 
Aircraft tyre technology
Aircraft tyre technologyAircraft tyre technology
Aircraft tyre technology
 
Fabrication Gate Valve ckb presentation
Fabrication Gate Valve ckb presentationFabrication Gate Valve ckb presentation
Fabrication Gate Valve ckb presentation
 
trainingonchp-170107190647.pdf
trainingonchp-170107190647.pdftrainingonchp-170107190647.pdf
trainingonchp-170107190647.pdf
 
2014 CRW - How to Effectively Utilize Hydraulic Platform Transporters in the...
 2014 CRW - How to Effectively Utilize Hydraulic Platform Transporters in the... 2014 CRW - How to Effectively Utilize Hydraulic Platform Transporters in the...
2014 CRW - How to Effectively Utilize Hydraulic Platform Transporters in the...
 
CHP
CHP CHP
CHP
 
Final pre.ppt
Final pre.pptFinal pre.ppt
Final pre.ppt
 
Static analysis xyz wellhead platform portofolio
Static analysis xyz wellhead platform portofolioStatic analysis xyz wellhead platform portofolio
Static analysis xyz wellhead platform portofolio
 
INDUSTRIAL TRAINING REPORT BY ShRiDhAR KaDaM
INDUSTRIAL TRAINING REPORT BY ShRiDhAR KaDaMINDUSTRIAL TRAINING REPORT BY ShRiDhAR KaDaM
INDUSTRIAL TRAINING REPORT BY ShRiDhAR KaDaM
 
LIFTING PLAN FLARE-KRB.pdf
LIFTING PLAN FLARE-KRB.pdfLIFTING PLAN FLARE-KRB.pdf
LIFTING PLAN FLARE-KRB.pdf
 
sandwik calculos.pdf
sandwik calculos.pdfsandwik calculos.pdf
sandwik calculos.pdf
 
Piling work method statement cm- ms- bw - 002
Piling work method statement   cm- ms- bw - 002Piling work method statement   cm- ms- bw - 002
Piling work method statement cm- ms- bw - 002
 
International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)
 
Kr Offshore PQ Ver.2
Kr Offshore PQ Ver.2Kr Offshore PQ Ver.2
Kr Offshore PQ Ver.2
 
Analytical Optimization of Chassis Frame for 40ft Dual-Axle Flatbed Trailer D...
Analytical Optimization of Chassis Frame for 40ft Dual-Axle Flatbed Trailer D...Analytical Optimization of Chassis Frame for 40ft Dual-Axle Flatbed Trailer D...
Analytical Optimization of Chassis Frame for 40ft Dual-Axle Flatbed Trailer D...
 
Caterpillar Cat D6N TRACK-TYPE TRACTOR (Prefix GB6) Service Repair Manual Ins...
Caterpillar Cat D6N TRACK-TYPE TRACTOR (Prefix GB6) Service Repair Manual Ins...Caterpillar Cat D6N TRACK-TYPE TRACTOR (Prefix GB6) Service Repair Manual Ins...
Caterpillar Cat D6N TRACK-TYPE TRACTOR (Prefix GB6) Service Repair Manual Ins...
 
Caterpillar Cat D6N TRACK-TYPE TRACTOR (Prefix GB6) Service Repair Manual Ins...
Caterpillar Cat D6N TRACK-TYPE TRACTOR (Prefix GB6) Service Repair Manual Ins...Caterpillar Cat D6N TRACK-TYPE TRACTOR (Prefix GB6) Service Repair Manual Ins...
Caterpillar Cat D6N TRACK-TYPE TRACTOR (Prefix GB6) Service Repair Manual Ins...
 

SARNATH-PROFILE-at LNT

  • 2. CLIENTS WORKED WITH AT L&T  M/s. ADANI LTD.,  M/s. NTPC  M/s. SAIL INDIA  M/s. M N DASTUR  M/s. BMT WBM AUSTRALIA  M/s. NINE DOT SOUTH AFRICA
  • 3. MACHINE DESIGN AND ENGINEERING CAPABILITIES:  STACKER AND RECLAIMER  Bucket Wheel Stacker cum Reclaimer  Bucket Wheel Reclaimer  Slewing and Non-Slewing Stacker  Twin Boom Stacker  Tripper, Elevator and Tail house.
  • 4.
  • 5. Design Process for Stacker, Reclaimer and Ship Unloader  Design Basis (ISO, FEM, AS)  Input Design Document (Design Specification)  Preliminary Calculations  FEA
  • 7. Input Document  BASIC DATAS  ENVIRONMENT, DUTY & DESIGN PARAMETERS  STANDARDS, RULES & LOADS  LOAD CASES / COMBINATIONS  MATERIAL  MECHANICAL PROPERTIES  ALLOWABLE STRESSES  MATERIAL LOADS  LIVE LOADS ON BOOM CONVEYOR  INCRUSTATION (DIRT ACCUMULATION) ON BOOM  BELT TENSIONS  RESISTANCES DUE TO FRICTION AND TRAVEL  WIND LOAD  DEAD LOADS  LIVE LOADS  LATERAL COLLISION  SEISMIC LOAD
  • 8. Standards  ISO 5049 & ISO 5048  FEM Section II  IS 800  BS 2573 part 1 & 2  AS 4324,AS4100, AS 1170  DIN ISO 281
  • 9. CALCULATIONS  Slew Bearing Calculation  Wheel and Rail Calculation  Bucket Wheel / Screw Calculation  Drive Calculation (conveyor, Travel, Bucket Wheel, Slew)  Conveyor Calculation  Pin, Shaft, Bearing Calculation  Wheel Load Calculation  Stability Calculation  Cylinder Calculation  Guy and Boom Calculation  Splice Joint Calculation  Weld Calculation
  • 10. FEA Calculation  Structural Analysis  Buckling Analysis  Modal analysis
  • 11. POST FEA CALCULATION  Fatigue Calculations  Buckling Calculation –Plate and Column  Pin Calculation  Joint calculation  Bearing Calculation  Buffer Calculation
  • 12. A B C
  • 13. Fixed and Floating Bearings
  • 15.
  • 19. LOAD CASES & LOAD COMBINATIONS Load combinatio n Ref No ISO 5049 Load combinatio n Case DESCRIPTION OF LOAD COMBINATION & LOADS Case type Stress Factor FEA Req'd Luff Angle Boom Slew Posn FEA Load Case 1 I DEAD LOADS ONLY (A+I) STRENG TH 1.5 YES Fully Raised 2 1 2 I NORMAL DIGGING (A+B1+C1+C3+D+E+I+Fu+ Fs+G+N1) STRENG TH 1.5 YES Fully Lowere d 2 2 2.1 I NORMAL DIGGING (A+B1+C1+C3+D+E+I+Fu+ Fs+G+N1) STRENG TH 1.5 YES Horizo ntal 2 2.1 3 I NORMAL STACKING (A+B2+X+D+E+I+G) STRENG TH 1.5 YES Fully Lowere d 2 3 4 I FATIGUE ANALYSIS (Load Comb'n rf.No.1 - Load Comb'n rf.No.2) OR (Load Comb'n rf.No.1 - Load Comb'n rf.No.3) FATIGUE NA NA NA NA NA 5 II ABNORMAL DIGGING + TAIL WIND (A+B1+C1+C3+D+E+I+G+H 4+Ju+Js+K+L+N2) STRENG TH 1.333 YES Fully Lowere d 2 4 5.1 II ABNORMAL DIGGING + SIDE WIND (A+B1+C1+C3+D+E+I+G+H 1+Ju+Js+K+L+N2) STRENG TH 1.333 YES Horizo ntal 2 4.1
  • 20. 6 III/1 BLOCKED CHUTE + TAIL WIND (A+B1+M1+C1+D+E+I+Fu+ Fs+G+H4+N3) STRENG TH 1.2 YES Fully Lowere d 2 5 7 III/2 BW RESTING + HEAD/TAIL WIND (A+B2+X+D+E+I+G+H4+BR ) STRENG TH 1.2 YES Fully Lowere d 2 6 8 III/5 BW LATERAL COLLISION WITH STOCKPILE (A+B1+C1+D+E+I+Fu+Fs+ G+H1+N1+R+R2) STRENG TH 1.2 YES Horizo ntal 2 7 9 III/6 TRAVEL TO STORM TIE STRENG 1.2 YES Fully 1 8
  • 21. Machine Configurations Boom Fully Raised - Slew Position 2 – 35 degrees to Main Track Boom Fully Lowered - Slew Position 2 – 35 degrees to Main Track Boom Horizontal - Slew Position 2 – 35 degrees to Main Track Boom Fully Raised - Slew Position 1 – Zero degrees to Main Track
  • 25. Boom Girder with Rear Luff cylinder
  • 28. C Frame Type S/R Nodes: 91842 Elements: 96432
  • 32. LARSEN & TOUBRO LTD MACHINE DESIGN AND ENGINEERING
  • 33. PROJECT ROLE TEAM SIZE MAN DAYS ADANI VIZAG DESIGN REVIEW 2 200 ADANI MUNDRA PHASE II PROJECT LEAD 8 800 ADANI PARSAKENTE DESIGN REVIEW 2 100 10,000TPH BWSR DEVELOPMENT DESIGN REVIEW 2 100 ADANI DHAMRA 45m DESIGN LEAD 8 100 ADANI DHAMRA 51m DESIGN LEAD 8 125 KHARGONE 41m BWR DESIGN LEAD 7 600 KHARGONE 41m BWSR & ELEVATOR, TRIPPER AND TAILHOUSE DESIGN LEAD 8 900 RECLAIMER DEVELOPEMNT DESIGN LEAD 3 200
  • 35. Tech Spec Material Handled : Coal Stacking Capacity : 6800 TPH Reclaiming Capacity: 3500 TPH Boom Length : 41m Stock pile : 44m x 15m No of Wheels : 48+8
  • 36.
  • 37.
  • 38.
  • 40. Tech Spec Material Handled : Coal Stacking Capacity : 3600 TPH Reclaiming Capacity: 3350 TPH Boom Length : 51m Stock pile : 44m x 15m No of Wheels : 36+10
  • 41. Achievement  India’s first C-Frame machine  The C-Frame Design of Stacker Reclaimer is realized in Adani Vizag and in Dhamra
  • 42.
  • 43.
  • 44.
  • 46.  MAST CONSTRUCTION : C-FRAME WITH DETACHABLE TOWED STRUCTURE  BOOM LENGTH : 60 M LATTICE GIRDER  CAPACITY : 10000 TPH STACKING 10000 TPH RECLAIMING  BOOM BELT WIDTH : 2500 MM  BOOM BELT SPEED : 4.7 M/S  BUCKET WHEEL : 11 M CUTTING DIAMETER, 10 NOS. OF BUCKETS EACH OF 3850 LITRE VOLUME  DESIGN STANDARD : AS-4324.1, AS-3990,AS-4100
  • 47. Scope  Maintain Single point contact with AB  To Review Design of AB as per AS standards  Codes used : AS4324, AS4100, AS1403, AS1418, AS1170, BS 2573 1&2, FEM Sec-II  Check the Loads, Load Cases and all calculations
  • 48.
  • 49.
  • 50.
  • 51.
  • 53. Tech Spec  MAST CONSTRUCTION : LINK TYPE  BOOM LENGTH : 41 M  STACKING CAP : 1760 TPH  RECLAIMING CAP : 2000 TPH (PEAK)  BELT SPEED : 3.2 m/s  MATERIAL HANDLED : COAL  Designed as per ISO 5049/1  Reviewed by: NTPC
  • 54. Achievement  Reduced the weight of the Reclaimer Machine by 30T, i.e., reduced weight of structure by 15%.  Reduced Elevator, Tripper and Tail house weight by 10T.
  • 55.
  • 56.
  • 57. Tripper , Elevator and Tail House