3. 2
Iraq - Baghdad - Al-Jadriya,
the site is located under the
Jadriya Bridge near Al-Nahrain
University, Baghdad University,
Al-Nahrain University Garage,
and Al-Tal, which is next to
the site and also near the
games hall and cinema
Dimensions of the site
Location
40m
35m
50m
55m
Site Analysis
The site is located northwest
of Al-Nahrain University,
which is located in the city
center near the Tigris River,
and next to the site is also
the Jadriya Bridge, which is
an active part of Baghdad.
4. 3
Site Analysis
Study the sun and wind
-The appearance of the rays
of the sun from this side
does not affect the site as
a whole, but the presence of
the hill near the site will
block the rays of the sun
from part of the site, so
it is possible to design the
baths and the mansions from
the side of the hill because
they do not need sunlight
Wind Sun Path
Project site
bridge
Secondary Street
Green spaces
People movement
Traffic
Car congestion near the
project because its location
is next to the river, and
the Jadriya Bridge, which is
an active street, and also
because of its proximity
to Nahrain University and
the University of Baghdad,
which causes a lot of car
and pedestrian traffic in
limited times
5. 4
Site Analysis
Shade and Shadow analysis
The presence of waste near the river,
which is an area where insects and rodent
animals
This waste must be cleaned because it will
affect the appearance of the project
There is no pedestrian road nor
traffic lanes
Traffic routes and paths must be
provided
The height of the hill adjacent to the
,meters 3 site from the ground is about
That the bathrooms are from the side of the
hill for the exit of winds and also because
the height of the hill
There is a risk in the design of the
project near the river due to the
occurrence of floods
Protection from floods is achieved
by building a huge mechanical
barrier across the river
PROBLEMS SOLUTION
Proplems Chacklist
6. 5
Strength:
The project
site is
distinguished
because it
overlooks the
river
S
Weakness:
There are
not enough
workers
serving the
project
W
Opportunities:
building
a huge
mechanical
barrier across
the river
O T
Threats:
There is a
risk in the
design of
the project
near the
river due to
flooding in
the winter
Site Analysis
15. 14
The building consists of
floors and a ground 3
pepper, and the ground
floor contains a swimming
pool and a cafeteria for
the swimming pool, and
the ground floor contains
the administration,
a public bathroom, a
service staff room and
a public entrance, the
first floor contains a
public cafeteria and
a playstation café,
while the third floor
contains a gym hall