1. Ronald Bollinger
Elko, NV
ronaldtitusbollinger@gmail.com - (775) 385 - 2123 (618) 964 - 6372
Authorized to work in the US for any employer
WORK EXPERIENCE
Household Renovating / Construction
Self Employed - Elko, NV - May 2015 to Present
All phases including carpentry, plumbing, electrical, masonry & flooring.
Underground Mine Foreman
Pennsy Supply - Harrisburg, PA - August 2014 to May 2015
Responsible for direction & safety of work force.
Development and production of two 3500' declines for limestone mine.
Development / Production Miner
Barrick Gold - Carlin, NV - February 2011 to October 2013
Production Miner
Roofbolting - Nye, MT - July 2010 to December 2010
Roof bolting, drilling, blasting, mucking & utilities installation for platinum & palladium mine.
Underground Mine Foreman
Merendon Mining Inc - Forks of Salmon, CA - May 2006 to May 2010
Development for direction, safety & scheduling of workforce.
Development and production headings, timber raises and I-drifts for gold mine.
Underground Miner / Shaft Miner
Dynatec Mining - Salt Lake City, UT - January 1999 to March 2006
Production and development mining.
Excavation of shaft, construction of head frame & bottom loading pocket.
Installation of skips, hoist ropes & cable guides.
Rehab and refurbish shafts, slopes and In-seam drifts.
Performed for: Newmont, Barrick Gold, Queenstake, (NV). Morton Salt, Cargill Salt (LA).
Projects Manager / Q.C. Engineer
Patrick Harrison Constructors - Tooele, UT - July 1992 to October 1998
Responsible for overseeing multiple underground projects simultaneously.
Projects included; declines, production & development mining, In-seam and shaft re-hab.
Performed for: ARCO (CO), Army Corps of Eng. (NM), Kennecott (UT), Axso & Cargill Salt (LA).
Underground Miner / Shaft Miner
Centennial Development - Salt Lake City, UT - May 1991 to June 1992
Rehab and refurbish a four compartment shaft.
Excavate and install bearing sets, water rings and curtain grout.
2. Roof bolting project & install ground movement sensors.
Superintendent / Lead Miner / Shaft Miner
R.G. Johnson Company - Washington, PA - March 1984 to April 1991
Excavation and development of five concrete finished shafts@20' to 26' diameter.
Numerous shotcrete, grouting and concrete pumping projects from surface to underground.
Performed for: CONSOL, Peabody Coal, and U.S. Steel in (PA, WV, OH, MD, IL).
Lead Miner / Shaft Miner
Gunther-Nash Mining Construction - St. Louis, MO - May 1981 to January 1984
Excavation and development of four concrete finished shafts@18' to 24' diameter.
Performed for: CONSOL and Blue Diamond Coal in (WV, VA, KY).
EDUCATION
General
Immaculate Conception High School - Washington, PA
1977 to 1981