Tortilla Line Improvement Project at H-E-B’s Snacks Factory 1
Tortilla Line Improvement Project
H-E-B Snacks Factory
Roman Yakhin
UHV-Victoria
MGMT-6355-Operations Management Creating Competitive Advantage
Aug-03-2016
The Instructor: Dr. Jie Yang
Tortilla Line Improvement Project at H-E-B’s Snacks Factory 2
Table of Contents:
1. Abstract-------------------------------------------------------------------------3
2. Background Information----------------------------------------------------4
3. Problem Description----------------------------------------------------------6
4. OM/Concepts Tools------------------------------------------------------------6
5. Application of OM/Concepts Tools ----------------------------------------7
6. Analysis of Expected Results ------------------------------------------------8
7. Appendix-Excel sigma calculations-----------------------------------------9
8. Reference-------------------------------------------------------------------------10
Tortilla Line Improvement Project at H-E-B’s Snacks Factory 3
Abstract
The goal of this project is to improve operations of the Tortilla Lane at H-E-B’s snacks
factory in San Antonio, Texas. This project is based off my experience there as a quality
assurance technician. The project has multiple objectives:
1. Reduce the labor needed to operate the line
2. Maximize the output
3. Reduce the number of defects due to breakage
4. Reduce variations in the amount of salt coverage
The project addresses all of these issues by modifying the line in a way that can improve
productivity and at the same time improve the quality of the product.
Tortilla Line Improvement Project at H-E-B’s Snacks Factory 4
Background Information
The Current Line set up
The current fryer setup enables the snack factory to make 2,400 pounds of tortilla chips
an hour, which is then seasoned via 2 of a possible 3 active tumblers.
The product travels upstairs to the Tumblers, which are large metal drums that spin at a
very fast rate while dispensing salt. The amount of salt applied at Tumbler #1 is different from
Tumbler #1
(1 operator)
Amount of salt =A
Packing Line #1
(1 operator)
Tumbler #2
(1 operator)
Amount of salt =B
Tumbler #3
DOWN
Fryer (1 operator)
Is set at 2/3 of its capacity
at 2400 LB/HR
Packing Line #3
DOWN
Packing Line #2
(1 operator)
Tortilla Line Improvement Project at H-E-B’s Snacks Factory 5
the amount of salt applied at Tumbler #2. Tumbler #3 stays down and is used only as a backup.
The production team has tried, and failed to run all 3 Tumblers at the same time. The issue is
they could not synchronize the flow of the product with the speeds of all 3 tumblers in order to
apply salt correctly.
Tumbler:
After passing through the Tumblers the product goes downstairs to the packing lines. Two
packaging lines are used with 1 worker operating each of them.
Tortilla Line Improvement Project at H-E-B’s Snacks Factory 6
Problem Description
The Tortilla line at H-E-B’s snacks factory produces product with 2 major defects. The
chips have a lot of breakage. A lot chips get broken while being spun inside the tumbler at high
speed. The chips have a lot of variation in the amount of salt they have. Some chips have too
much salt, and some have very little. This leads to dissatisfied customers and loss of the
company’s reputation. The fryer is not operating at its full capacity, because the salt distribution
is very difficult to control, at the current set up. An individual operator must be assigned to each
tumbler, because the speed of the tumbler must be constantly adjusted to the flow of the product
to achieve a steady salt coverage. The line needs five workers to be operational.
OM/Concepts Tools
I used a cost and effect method known as a fishbone or Ishikawa diagram to identify the
cause of the quality and productivity issues. They were as follows: Measurements - Titrator, lab
equipment used to measure salt content, Machine-Tumbler, Methods-Applying salt upstairs via
tumblers, Material-Salt, Mother Nature-Humidity, Man Power-Operators.
Machine
Tumbler
Methods
Applying salt upstairs
Materials
Salt
Man Power
Operators
Mother Nature
Humidity
Measurements
Titrator
Not consistent
Salt Distribution,
Broken Chips,
Low Output
Tortilla Line Improvement Project at H-E-B’s Snacks Factory 7
I have also used Sigma calculation for salt distribution based on the present and proposed
production setup. I used Standard Deviation(Sigma) to numerically represent amount of
deviation.
Application of OM/Concepts Tools
I have eliminated Measurements, Materials, Mother Nature, and man Power as possible
causes of problems. I have identified 2 causes for the issue, the Method and the Machine. I have
calculated Sigma for the salt distribution before and after (Apendix).
The proposed solution is to replace the use of tumblers for salted chips with an integrated
salter system downstairs, right after they exit the fryer. Tumblers will still have to be used for
Nachos and Jalapeno chips, but they will not be used for regular salty chips.
Integrated salter system(currently only on the potato line)
Tortilla Line Improvement Project at H-E-B’s Snacks Factory 8
The Proposed Line set up
Analysis of Expected Results
The Old System The New System Benefits & Explanation
Labor 5 workers 4 workers 1 worker is freed, because no
need to constantly monitor
tumblers.
The Output 2,400 LB/HR 3,600 LB/HR The fryer can be maxed out
because it will not have to be
in sync with tumblers rotation
anymore. The output will be
increase by 33.33%.
Breakage A lot of breakage Not too much
breakage
The amount of breakage will
be reduced, because the chips
will not have to be spun in
tumblers anymore.
The Variations in
Salt Distribution
(Estimates are in
Excel)
Each line produces
chips with deferent
salt amount.
All line produces
chips with the
same amount of
salt.
The variations will reduce
because chips on all 3 lines
will have the same amount of
salt.
Packing Line #1
(1 operator)
Fryer (1 operator)
Set to full capacity at
3,600 LB/HR
Packing Line #3
(1 operator)
Packing Line #2
(1 operator)
Integrated
Salter
System
Tortilla Line Improvement Project at H-E-B’s Snacks Factory 9
Installing the integrated salter on the tortilla line will provide multiple process
improvement benefits.
Appendix-Excel sigma calculations
Tortilla Line Improvement Project at H-E-B’s Snacks Factory 10
References
 Tague, N. (2005). The Quality Toolbox, Second Edition, ASQ Quality Press, 2005, pages
247–249. Retrieved August 01, 2016, from http://asq.org/learn-about-quality/cause-
analysis-tools/overview/fishbone.html.
 Byrne, A., & Womack, J. P. (2013). The lean turnaround: How business leaders use lean
principles to create value and transform their company. New York: McGraw-Hill.
 Sanghera, P. (2009). 90 days to success as a project manager. Boston, MA: Course
Technology.
 Brussee, W. (2010). Six Sigma on a budget: Achieving more with less using the
principles of Six Sigma. New York: McGraw-Hill.
 Standard Deviation Formulas. Retrieved august 04,2016, from
https://www.mathsisfun.com/data/standard-deviation-formulas.html

More Related Content

Similar to Engineering new line

Naomi Tanner Resume
Naomi Tanner ResumeNaomi Tanner Resume
Naomi Tanner Resume
Naomi Tanner
 

Similar to Engineering new line (20)

Magne gas
Magne gasMagne gas
Magne gas
 
Alliage Casting
Alliage CastingAlliage Casting
Alliage Casting
 
Corner Post Project
Corner Post ProjectCorner Post Project
Corner Post Project
 
Reactor & Impeller Design in Hydrogenation
Reactor & Impeller Design in Hydrogenation Reactor & Impeller Design in Hydrogenation
Reactor & Impeller Design in Hydrogenation
 
Plant Sustainability and Relaibility.pptx
Plant Sustainability and Relaibility.pptxPlant Sustainability and Relaibility.pptx
Plant Sustainability and Relaibility.pptx
 
Gupta ayank project_report
Gupta ayank project_reportGupta ayank project_report
Gupta ayank project_report
 
Design And Manufacture Prototype of Jaggery Plant
Design And Manufacture Prototype of Jaggery PlantDesign And Manufacture Prototype of Jaggery Plant
Design And Manufacture Prototype of Jaggery Plant
 
Equipment reliability l2
Equipment reliability l2Equipment reliability l2
Equipment reliability l2
 
GreenBelt
GreenBeltGreenBelt
GreenBelt
 
FINAL PROJECT
FINAL PROJECTFINAL PROJECT
FINAL PROJECT
 
METHANOL PLANT ARC RETROFIT Case Study
METHANOL PLANT ARC RETROFIT Case StudyMETHANOL PLANT ARC RETROFIT Case Study
METHANOL PLANT ARC RETROFIT Case Study
 
The delta composite knitting ind. ltd.
The delta composite knitting ind. ltd.The delta composite knitting ind. ltd.
The delta composite knitting ind. ltd.
 
Shortcut Methods of Distillation Design
Shortcut Methods of Distillation DesignShortcut Methods of Distillation Design
Shortcut Methods of Distillation Design
 
Pickling Plant for SS Coils
Pickling Plant for SS Coils Pickling Plant for SS Coils
Pickling Plant for SS Coils
 
Scale up of industrial microbial processes
Scale up of industrial microbial processes Scale up of industrial microbial processes
Scale up of industrial microbial processes
 
Line balancing example
Line balancing exampleLine balancing example
Line balancing example
 
Personal Resume of Darrell CordeiroV3
Personal Resume of Darrell CordeiroV3Personal Resume of Darrell CordeiroV3
Personal Resume of Darrell CordeiroV3
 
Feed weighing systems
Feed weighing systemsFeed weighing systems
Feed weighing systems
 
Project
ProjectProject
Project
 
Naomi Tanner Resume
Naomi Tanner ResumeNaomi Tanner Resume
Naomi Tanner Resume
 

Recently uploaded

The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
daisycvs
 
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
vineshkumarsajnani12
 

Recently uploaded (20)

Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
Cannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 UpdatedCannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 Updated
 
New 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck TemplateNew 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck Template
 
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
 
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTSJAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
 
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
 
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All TimeCall 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
 
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTSDurg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
 
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAIGetting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
 
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book nowGUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
PARK STREET 💋 Call Girl 9827461493 Call Girls in Escort service book now
PARK STREET 💋 Call Girl 9827461493 Call Girls in  Escort service book nowPARK STREET 💋 Call Girl 9827461493 Call Girls in  Escort service book now
PARK STREET 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur DubaiUAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
 
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service AvailableBerhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
 
WheelTug Short Pitch Deck 2024 | Byond Insights
WheelTug Short Pitch Deck 2024 | Byond InsightsWheelTug Short Pitch Deck 2024 | Byond Insights
WheelTug Short Pitch Deck 2024 | Byond Insights
 
Kalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book nowKalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book now
 

Engineering new line

  • 1. Tortilla Line Improvement Project at H-E-B’s Snacks Factory 1 Tortilla Line Improvement Project H-E-B Snacks Factory Roman Yakhin UHV-Victoria MGMT-6355-Operations Management Creating Competitive Advantage Aug-03-2016 The Instructor: Dr. Jie Yang
  • 2. Tortilla Line Improvement Project at H-E-B’s Snacks Factory 2 Table of Contents: 1. Abstract-------------------------------------------------------------------------3 2. Background Information----------------------------------------------------4 3. Problem Description----------------------------------------------------------6 4. OM/Concepts Tools------------------------------------------------------------6 5. Application of OM/Concepts Tools ----------------------------------------7 6. Analysis of Expected Results ------------------------------------------------8 7. Appendix-Excel sigma calculations-----------------------------------------9 8. Reference-------------------------------------------------------------------------10
  • 3. Tortilla Line Improvement Project at H-E-B’s Snacks Factory 3 Abstract The goal of this project is to improve operations of the Tortilla Lane at H-E-B’s snacks factory in San Antonio, Texas. This project is based off my experience there as a quality assurance technician. The project has multiple objectives: 1. Reduce the labor needed to operate the line 2. Maximize the output 3. Reduce the number of defects due to breakage 4. Reduce variations in the amount of salt coverage The project addresses all of these issues by modifying the line in a way that can improve productivity and at the same time improve the quality of the product.
  • 4. Tortilla Line Improvement Project at H-E-B’s Snacks Factory 4 Background Information The Current Line set up The current fryer setup enables the snack factory to make 2,400 pounds of tortilla chips an hour, which is then seasoned via 2 of a possible 3 active tumblers. The product travels upstairs to the Tumblers, which are large metal drums that spin at a very fast rate while dispensing salt. The amount of salt applied at Tumbler #1 is different from Tumbler #1 (1 operator) Amount of salt =A Packing Line #1 (1 operator) Tumbler #2 (1 operator) Amount of salt =B Tumbler #3 DOWN Fryer (1 operator) Is set at 2/3 of its capacity at 2400 LB/HR Packing Line #3 DOWN Packing Line #2 (1 operator)
  • 5. Tortilla Line Improvement Project at H-E-B’s Snacks Factory 5 the amount of salt applied at Tumbler #2. Tumbler #3 stays down and is used only as a backup. The production team has tried, and failed to run all 3 Tumblers at the same time. The issue is they could not synchronize the flow of the product with the speeds of all 3 tumblers in order to apply salt correctly. Tumbler: After passing through the Tumblers the product goes downstairs to the packing lines. Two packaging lines are used with 1 worker operating each of them.
  • 6. Tortilla Line Improvement Project at H-E-B’s Snacks Factory 6 Problem Description The Tortilla line at H-E-B’s snacks factory produces product with 2 major defects. The chips have a lot of breakage. A lot chips get broken while being spun inside the tumbler at high speed. The chips have a lot of variation in the amount of salt they have. Some chips have too much salt, and some have very little. This leads to dissatisfied customers and loss of the company’s reputation. The fryer is not operating at its full capacity, because the salt distribution is very difficult to control, at the current set up. An individual operator must be assigned to each tumbler, because the speed of the tumbler must be constantly adjusted to the flow of the product to achieve a steady salt coverage. The line needs five workers to be operational. OM/Concepts Tools I used a cost and effect method known as a fishbone or Ishikawa diagram to identify the cause of the quality and productivity issues. They were as follows: Measurements - Titrator, lab equipment used to measure salt content, Machine-Tumbler, Methods-Applying salt upstairs via tumblers, Material-Salt, Mother Nature-Humidity, Man Power-Operators. Machine Tumbler Methods Applying salt upstairs Materials Salt Man Power Operators Mother Nature Humidity Measurements Titrator Not consistent Salt Distribution, Broken Chips, Low Output
  • 7. Tortilla Line Improvement Project at H-E-B’s Snacks Factory 7 I have also used Sigma calculation for salt distribution based on the present and proposed production setup. I used Standard Deviation(Sigma) to numerically represent amount of deviation. Application of OM/Concepts Tools I have eliminated Measurements, Materials, Mother Nature, and man Power as possible causes of problems. I have identified 2 causes for the issue, the Method and the Machine. I have calculated Sigma for the salt distribution before and after (Apendix). The proposed solution is to replace the use of tumblers for salted chips with an integrated salter system downstairs, right after they exit the fryer. Tumblers will still have to be used for Nachos and Jalapeno chips, but they will not be used for regular salty chips. Integrated salter system(currently only on the potato line)
  • 8. Tortilla Line Improvement Project at H-E-B’s Snacks Factory 8 The Proposed Line set up Analysis of Expected Results The Old System The New System Benefits & Explanation Labor 5 workers 4 workers 1 worker is freed, because no need to constantly monitor tumblers. The Output 2,400 LB/HR 3,600 LB/HR The fryer can be maxed out because it will not have to be in sync with tumblers rotation anymore. The output will be increase by 33.33%. Breakage A lot of breakage Not too much breakage The amount of breakage will be reduced, because the chips will not have to be spun in tumblers anymore. The Variations in Salt Distribution (Estimates are in Excel) Each line produces chips with deferent salt amount. All line produces chips with the same amount of salt. The variations will reduce because chips on all 3 lines will have the same amount of salt. Packing Line #1 (1 operator) Fryer (1 operator) Set to full capacity at 3,600 LB/HR Packing Line #3 (1 operator) Packing Line #2 (1 operator) Integrated Salter System
  • 9. Tortilla Line Improvement Project at H-E-B’s Snacks Factory 9 Installing the integrated salter on the tortilla line will provide multiple process improvement benefits. Appendix-Excel sigma calculations
  • 10. Tortilla Line Improvement Project at H-E-B’s Snacks Factory 10 References  Tague, N. (2005). The Quality Toolbox, Second Edition, ASQ Quality Press, 2005, pages 247–249. Retrieved August 01, 2016, from http://asq.org/learn-about-quality/cause- analysis-tools/overview/fishbone.html.  Byrne, A., & Womack, J. P. (2013). The lean turnaround: How business leaders use lean principles to create value and transform their company. New York: McGraw-Hill.  Sanghera, P. (2009). 90 days to success as a project manager. Boston, MA: Course Technology.  Brussee, W. (2010). Six Sigma on a budget: Achieving more with less using the principles of Six Sigma. New York: McGraw-Hill.  Standard Deviation Formulas. Retrieved august 04,2016, from https://www.mathsisfun.com/data/standard-deviation-formulas.html