Stevens Shuttle 2.0
Presenters
Chinonso Oham
Rohan Waghere
Akash Dhotre
Yash Raje
Devaun Armstrong
Agenda
● Stevens Shuttle 1.0
● Problems
● Solution (Stevens Shuttle 2.0)
● Logistics
Current commute to Stevens
Students
come to
the shuttle
stop
Check a
third-
party app
for
“estimated
wait time”
Shuttle
picks
students
and drives
them to
Stevens
Problems with the current system
• Inefficiency:
• Not enough seats during peak hours
• Unreliable tracking system
• Non-value rides
Solution
● Updated GPS Modules
● Handshake and Shuttle Capacity
● Generic Model
Operation & Limitation
Shuttle Routes
Solution Limitations
• Updates
• Beneficiary Satisfaction
Index
Estimated Fuel Savings
Efficiency
Summary
Parameters Red (6) Green (2) Gray (6) Blue (12)
Potential Save
Value
Total Cost for
NVR/Semester $216.36 $68.34 $227.52 $569.16 $1,081.38
Annual Costs on
NVR $649.08 $205.02 $682.56 $1,707.48 $3,244.14
% Costs for
NVR/Annually 15.00% 5.00% 15.00% 30.00% 17.38%
Stevens Shuttle 2.0
Total
Costs/Semester $1,442.40 $1,366.80 $1,516.80 $1,897.20 $6,223.20
Annual Costs $4,327.20 $4,100.40 $4,550.40 $5,691.60 $18,669.60
Current Fuel Costs
NVR – Non-Value Rides
Proposed Schedule
● Approx 123 days
● Latest Finish: 131 days
● Total slack time: 8 days
(131-123= 8 days)
Proposed Schedule
Launch first
survey
Survey results
Begin app
development
Register app on
Google Play/App
Store
Beta test
Advertise the app
Establish
maintenance
schedule for app
Calculate BSI
Proposed Schedule
● Each stage will be monitored to
ensure that the project is on track.
● Each team member is responsible for
certain activities
● Communication and changes will
be on to the project lead.
● The updates will be distributed in the
progress reports that will be sent out
on a bi-weekly basis.
Proposed Budget
● Activity costs: $17,805
● Material costs: $150
● Allowance for extra
costs: $1,800
● Total budget: $19,755
Risks facing Stevens Shuttle 2.0
Risk Impact
Not enough students respond to
the surveys
Smaller response sample,
responses not reflective of the
whole population
App development takes longer
than projected schedule
Milestones not delivered on time,
delayed project completion
Budget doesn’t cover the entire
project
App quality may be compromised
Risks facing Stevens Shuttle 2.0
Risk Impact
Inaccuracy in shuttle arrival times
shown in the app
Passengers delayed
Hacks/cyber attacks App not working as intended,
accounts compromised
Unexpected shutdown in the app Students unable to notify drivers of
their locations / track locations of
shuttles
Assumptions
● Budget is estimated correctly
● Estimates for schedule and milestones are tangible
● Facilities/resources we need to work will be available when
required
● Risks, their severities, and mitigation plans have been properly
defined.
Assumptions
● We would have a sufficient sample in the surveys to calculate
the Beneficiary Satisfaction Index
● The solution proposed will save operational costs involved in
shuttle services
● The shuttles use an average of 17 miles per gallon
● Requirements are clearly understood by the software
development team
Stakeholders:
● Project Team
● Students
● Administration:
○ President,
○ Software developer,
○ Shuttle riders
Thank you!

More Related Content

Similar to Final Presentation Stevens Shuttle 2.0

Group 12 - Progress and Performance Measurement and Evaluation.pdf
Group 12 - Progress and Performance Measurement and Evaluation.pdfGroup 12 - Progress and Performance Measurement and Evaluation.pdf
Group 12 - Progress and Performance Measurement and Evaluation.pdf
alvieramada23
 
Next accreditation system for program coordinators meyer3
Next accreditation system for program coordinators   meyer3Next accreditation system for program coordinators   meyer3
Next accreditation system for program coordinators meyer3
jakinyi
 
IGNITE 2015 EU - DuPont's Project Cornerstone: A Journey to Global Logistics ...
IGNITE 2015 EU - DuPont's Project Cornerstone: A Journey to Global Logistics ...IGNITE 2015 EU - DuPont's Project Cornerstone: A Journey to Global Logistics ...
IGNITE 2015 EU - DuPont's Project Cornerstone: A Journey to Global Logistics ...
Elemica
 
ECO 605 Module Four Case Study Guidelines and RubricOverv.docx
ECO 605 Module Four Case Study Guidelines and RubricOverv.docxECO 605 Module Four Case Study Guidelines and RubricOverv.docx
ECO 605 Module Four Case Study Guidelines and RubricOverv.docx
SALU18
 
(Slides) A Personal Navigation System with a Schedule Planning Facility Based...
(Slides) A Personal Navigation System with a Schedule Planning Facility Based...(Slides) A Personal Navigation System with a Schedule Planning Facility Based...
(Slides) A Personal Navigation System with a Schedule Planning Facility Based...
Naoki Shibata
 
Catch! Workshop concept 2 - Improving travel plan monitoring with better, mor...
Catch! Workshop concept 2 - Improving travel plan monitoring with better, mor...Catch! Workshop concept 2 - Improving travel plan monitoring with better, mor...
Catch! Workshop concept 2 - Improving travel plan monitoring with better, mor...
Peter Lindgren
 
A comprehensive approach to digital transformation at the University of South...
A comprehensive approach to digital transformation at the University of South...A comprehensive approach to digital transformation at the University of South...
A comprehensive approach to digital transformation at the University of South...
MuleSoft
 
07 projectcostmanagement
07 projectcostmanagement07 projectcostmanagement
07 projectcostmanagement
Dhamo daran
 
Topic 10 - Project Performance Management.pdf
Topic 10 - Project Performance Management.pdfTopic 10 - Project Performance Management.pdf
Topic 10 - Project Performance Management.pdf
HuyNguyen657394
 
AEES - ELC Poster
AEES - ELC PosterAEES - ELC Poster
AEES - ELC Poster
Ashleigh Hough
 
2018 GIS Colorado: Your Geospatial Connection: Permanent Water Quality Contro...
2018 GIS Colorado: Your Geospatial Connection: Permanent Water Quality Contro...2018 GIS Colorado: Your Geospatial Connection: Permanent Water Quality Contro...
2018 GIS Colorado: Your Geospatial Connection: Permanent Water Quality Contro...
GIS in the Rockies
 
Teachers assitent
Teachers assitentTeachers assitent
Teachers assitent
ROHITCHAVAN88
 
Development of Universal Credit with Agile
Development of Universal Credit with AgileDevelopment of Universal Credit with Agile
Development of Universal Credit with Agile
David Nicoll
 
Project3Paper (2)
Project3Paper (2)Project3Paper (2)
Project3Paper (2)
Joseph Y. Dadzie
 
State of Hawaii Digital Leveling Project
State of Hawaii Digital Leveling ProjectState of Hawaii Digital Leveling Project
State of Hawaii Digital Leveling Project
Hawaii Geographic Information Coordinating Council
 
new ASE GROUPWORK.docx
new ASE GROUPWORK.docxnew ASE GROUPWORK.docx
new ASE GROUPWORK.docx
ShangaviS2
 
SUCCESS STORY: Reducing Activity Planning Lead Time by 81%
SUCCESS STORY: Reducing Activity Planning Lead Time by 81%SUCCESS STORY: Reducing Activity Planning Lead Time by 81%
SUCCESS STORY: Reducing Activity Planning Lead Time by 81%
GoLeanSixSigma.com
 
Project Management Project Assignment - Project Schedule & Resource Allocatio...
Project Management Project Assignment - Project Schedule & Resource Allocatio...Project Management Project Assignment - Project Schedule & Resource Allocatio...
Project Management Project Assignment - Project Schedule & Resource Allocatio...
Shuchi Joshi
 
demandlocker_TRB_v3
demandlocker_TRB_v3demandlocker_TRB_v3
demandlocker_TRB_v3
Luís Moreira-Matias
 
Webinar 2013 delivery operations
Webinar 2013   delivery operationsWebinar 2013   delivery operations
Webinar 2013 delivery operations
decision/analysis partners
 

Similar to Final Presentation Stevens Shuttle 2.0 (20)

Group 12 - Progress and Performance Measurement and Evaluation.pdf
Group 12 - Progress and Performance Measurement and Evaluation.pdfGroup 12 - Progress and Performance Measurement and Evaluation.pdf
Group 12 - Progress and Performance Measurement and Evaluation.pdf
 
Next accreditation system for program coordinators meyer3
Next accreditation system for program coordinators   meyer3Next accreditation system for program coordinators   meyer3
Next accreditation system for program coordinators meyer3
 
IGNITE 2015 EU - DuPont's Project Cornerstone: A Journey to Global Logistics ...
IGNITE 2015 EU - DuPont's Project Cornerstone: A Journey to Global Logistics ...IGNITE 2015 EU - DuPont's Project Cornerstone: A Journey to Global Logistics ...
IGNITE 2015 EU - DuPont's Project Cornerstone: A Journey to Global Logistics ...
 
ECO 605 Module Four Case Study Guidelines and RubricOverv.docx
ECO 605 Module Four Case Study Guidelines and RubricOverv.docxECO 605 Module Four Case Study Guidelines and RubricOverv.docx
ECO 605 Module Four Case Study Guidelines and RubricOverv.docx
 
(Slides) A Personal Navigation System with a Schedule Planning Facility Based...
(Slides) A Personal Navigation System with a Schedule Planning Facility Based...(Slides) A Personal Navigation System with a Schedule Planning Facility Based...
(Slides) A Personal Navigation System with a Schedule Planning Facility Based...
 
Catch! Workshop concept 2 - Improving travel plan monitoring with better, mor...
Catch! Workshop concept 2 - Improving travel plan monitoring with better, mor...Catch! Workshop concept 2 - Improving travel plan monitoring with better, mor...
Catch! Workshop concept 2 - Improving travel plan monitoring with better, mor...
 
A comprehensive approach to digital transformation at the University of South...
A comprehensive approach to digital transformation at the University of South...A comprehensive approach to digital transformation at the University of South...
A comprehensive approach to digital transformation at the University of South...
 
07 projectcostmanagement
07 projectcostmanagement07 projectcostmanagement
07 projectcostmanagement
 
Topic 10 - Project Performance Management.pdf
Topic 10 - Project Performance Management.pdfTopic 10 - Project Performance Management.pdf
Topic 10 - Project Performance Management.pdf
 
AEES - ELC Poster
AEES - ELC PosterAEES - ELC Poster
AEES - ELC Poster
 
2018 GIS Colorado: Your Geospatial Connection: Permanent Water Quality Contro...
2018 GIS Colorado: Your Geospatial Connection: Permanent Water Quality Contro...2018 GIS Colorado: Your Geospatial Connection: Permanent Water Quality Contro...
2018 GIS Colorado: Your Geospatial Connection: Permanent Water Quality Contro...
 
Teachers assitent
Teachers assitentTeachers assitent
Teachers assitent
 
Development of Universal Credit with Agile
Development of Universal Credit with AgileDevelopment of Universal Credit with Agile
Development of Universal Credit with Agile
 
Project3Paper (2)
Project3Paper (2)Project3Paper (2)
Project3Paper (2)
 
State of Hawaii Digital Leveling Project
State of Hawaii Digital Leveling ProjectState of Hawaii Digital Leveling Project
State of Hawaii Digital Leveling Project
 
new ASE GROUPWORK.docx
new ASE GROUPWORK.docxnew ASE GROUPWORK.docx
new ASE GROUPWORK.docx
 
SUCCESS STORY: Reducing Activity Planning Lead Time by 81%
SUCCESS STORY: Reducing Activity Planning Lead Time by 81%SUCCESS STORY: Reducing Activity Planning Lead Time by 81%
SUCCESS STORY: Reducing Activity Planning Lead Time by 81%
 
Project Management Project Assignment - Project Schedule & Resource Allocatio...
Project Management Project Assignment - Project Schedule & Resource Allocatio...Project Management Project Assignment - Project Schedule & Resource Allocatio...
Project Management Project Assignment - Project Schedule & Resource Allocatio...
 
demandlocker_TRB_v3
demandlocker_TRB_v3demandlocker_TRB_v3
demandlocker_TRB_v3
 
Webinar 2013 delivery operations
Webinar 2013   delivery operationsWebinar 2013   delivery operations
Webinar 2013 delivery operations
 

Recently uploaded

Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
National Information Standards Organization (NISO)
 
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
IreneSebastianRueco1
 
Your Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective UpskillingYour Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective Upskilling
Excellence Foundation for South Sudan
 
How to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 InventoryHow to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 Inventory
Celine George
 
The History of Stoke Newington Street Names
The History of Stoke Newington Street NamesThe History of Stoke Newington Street Names
The History of Stoke Newington Street Names
History of Stoke Newington
 
Liberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdfLiberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdf
WaniBasim
 
Pengantar Penggunaan Flutter - Dart programming language1.pptx
Pengantar Penggunaan Flutter - Dart programming language1.pptxPengantar Penggunaan Flutter - Dart programming language1.pptx
Pengantar Penggunaan Flutter - Dart programming language1.pptx
Fajar Baskoro
 
Walmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdfWalmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdf
TechSoup
 
Life upper-Intermediate B2 Workbook for student
Life upper-Intermediate B2 Workbook for studentLife upper-Intermediate B2 Workbook for student
Life upper-Intermediate B2 Workbook for student
NgcHiNguyn25
 
How to Fix the Import Error in the Odoo 17
How to Fix the Import Error in the Odoo 17How to Fix the Import Error in the Odoo 17
How to Fix the Import Error in the Odoo 17
Celine George
 
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
GeorgeMilliken2
 
Executive Directors Chat Leveraging AI for Diversity, Equity, and Inclusion
Executive Directors Chat  Leveraging AI for Diversity, Equity, and InclusionExecutive Directors Chat  Leveraging AI for Diversity, Equity, and Inclusion
Executive Directors Chat Leveraging AI for Diversity, Equity, and Inclusion
TechSoup
 
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptxC1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
mulvey2
 
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UPLAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
RAHUL
 
writing about opinions about Australia the movie
writing about opinions about Australia the moviewriting about opinions about Australia the movie
writing about opinions about Australia the movie
Nicholas Montgomery
 
Hindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdfHindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdf
Dr. Mulla Adam Ali
 
World environment day ppt For 5 June 2024
World environment day ppt For 5 June 2024World environment day ppt For 5 June 2024
World environment day ppt For 5 June 2024
ak6969907
 
Film vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movieFilm vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movie
Nicholas Montgomery
 
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
PECB
 
The simplified electron and muon model, Oscillating Spacetime: The Foundation...
The simplified electron and muon model, Oscillating Spacetime: The Foundation...The simplified electron and muon model, Oscillating Spacetime: The Foundation...
The simplified electron and muon model, Oscillating Spacetime: The Foundation...
RitikBhardwaj56
 

Recently uploaded (20)

Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
 
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
 
Your Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective UpskillingYour Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective Upskilling
 
How to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 InventoryHow to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 Inventory
 
The History of Stoke Newington Street Names
The History of Stoke Newington Street NamesThe History of Stoke Newington Street Names
The History of Stoke Newington Street Names
 
Liberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdfLiberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdf
 
Pengantar Penggunaan Flutter - Dart programming language1.pptx
Pengantar Penggunaan Flutter - Dart programming language1.pptxPengantar Penggunaan Flutter - Dart programming language1.pptx
Pengantar Penggunaan Flutter - Dart programming language1.pptx
 
Walmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdfWalmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdf
 
Life upper-Intermediate B2 Workbook for student
Life upper-Intermediate B2 Workbook for studentLife upper-Intermediate B2 Workbook for student
Life upper-Intermediate B2 Workbook for student
 
How to Fix the Import Error in the Odoo 17
How to Fix the Import Error in the Odoo 17How to Fix the Import Error in the Odoo 17
How to Fix the Import Error in the Odoo 17
 
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
 
Executive Directors Chat Leveraging AI for Diversity, Equity, and Inclusion
Executive Directors Chat  Leveraging AI for Diversity, Equity, and InclusionExecutive Directors Chat  Leveraging AI for Diversity, Equity, and Inclusion
Executive Directors Chat Leveraging AI for Diversity, Equity, and Inclusion
 
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptxC1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
 
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UPLAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
 
writing about opinions about Australia the movie
writing about opinions about Australia the moviewriting about opinions about Australia the movie
writing about opinions about Australia the movie
 
Hindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdfHindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdf
 
World environment day ppt For 5 June 2024
World environment day ppt For 5 June 2024World environment day ppt For 5 June 2024
World environment day ppt For 5 June 2024
 
Film vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movieFilm vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movie
 
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
 
The simplified electron and muon model, Oscillating Spacetime: The Foundation...
The simplified electron and muon model, Oscillating Spacetime: The Foundation...The simplified electron and muon model, Oscillating Spacetime: The Foundation...
The simplified electron and muon model, Oscillating Spacetime: The Foundation...
 

Final Presentation Stevens Shuttle 2.0

  • 1. Stevens Shuttle 2.0 Presenters Chinonso Oham Rohan Waghere Akash Dhotre Yash Raje Devaun Armstrong
  • 2. Agenda ● Stevens Shuttle 1.0 ● Problems ● Solution (Stevens Shuttle 2.0) ● Logistics
  • 3. Current commute to Stevens Students come to the shuttle stop Check a third- party app for “estimated wait time” Shuttle picks students and drives them to Stevens
  • 4. Problems with the current system • Inefficiency: • Not enough seats during peak hours • Unreliable tracking system • Non-value rides
  • 5. Solution ● Updated GPS Modules ● Handshake and Shuttle Capacity ● Generic Model
  • 6. Operation & Limitation Shuttle Routes Solution Limitations • Updates • Beneficiary Satisfaction Index
  • 7. Estimated Fuel Savings Efficiency Summary Parameters Red (6) Green (2) Gray (6) Blue (12) Potential Save Value Total Cost for NVR/Semester $216.36 $68.34 $227.52 $569.16 $1,081.38 Annual Costs on NVR $649.08 $205.02 $682.56 $1,707.48 $3,244.14 % Costs for NVR/Annually 15.00% 5.00% 15.00% 30.00% 17.38% Stevens Shuttle 2.0 Total Costs/Semester $1,442.40 $1,366.80 $1,516.80 $1,897.20 $6,223.20 Annual Costs $4,327.20 $4,100.40 $4,550.40 $5,691.60 $18,669.60 Current Fuel Costs NVR – Non-Value Rides
  • 8. Proposed Schedule ● Approx 123 days ● Latest Finish: 131 days ● Total slack time: 8 days (131-123= 8 days)
  • 9. Proposed Schedule Launch first survey Survey results Begin app development Register app on Google Play/App Store Beta test Advertise the app Establish maintenance schedule for app Calculate BSI
  • 10. Proposed Schedule ● Each stage will be monitored to ensure that the project is on track. ● Each team member is responsible for certain activities ● Communication and changes will be on to the project lead. ● The updates will be distributed in the progress reports that will be sent out on a bi-weekly basis.
  • 11. Proposed Budget ● Activity costs: $17,805 ● Material costs: $150 ● Allowance for extra costs: $1,800 ● Total budget: $19,755
  • 12. Risks facing Stevens Shuttle 2.0 Risk Impact Not enough students respond to the surveys Smaller response sample, responses not reflective of the whole population App development takes longer than projected schedule Milestones not delivered on time, delayed project completion Budget doesn’t cover the entire project App quality may be compromised
  • 13. Risks facing Stevens Shuttle 2.0 Risk Impact Inaccuracy in shuttle arrival times shown in the app Passengers delayed Hacks/cyber attacks App not working as intended, accounts compromised Unexpected shutdown in the app Students unable to notify drivers of their locations / track locations of shuttles
  • 14. Assumptions ● Budget is estimated correctly ● Estimates for schedule and milestones are tangible ● Facilities/resources we need to work will be available when required ● Risks, their severities, and mitigation plans have been properly defined.
  • 15. Assumptions ● We would have a sufficient sample in the surveys to calculate the Beneficiary Satisfaction Index ● The solution proposed will save operational costs involved in shuttle services ● The shuttles use an average of 17 miles per gallon ● Requirements are clearly understood by the software development team
  • 16. Stakeholders: ● Project Team ● Students ● Administration: ○ President, ○ Software developer, ○ Shuttle riders