Citec Oy Ab
Head office
P.O. Box 109
FI-65101 Vaasa, Finland
Tel. +358 6 3240 700 
www.citec.com
CASE IN BRIEF
Project
Management of document and
material deliverables for Altamira
power station conversion
Location
•	Power station in Mexico.
•	Project stakeholders spread over six
countries on three contintents.
Customer
Alstom Boiler France
Year
2014-2016
CITECDOT IN A NUTSHELL
CitecDot is a project lifecycle management solution that enables you to efficiently
manage your deliverables, cut down costs, risks and delays - via a single platform.
 Altamira information managed with CitecDot
Project description
n  Alstom and Isolux are converting two
units at the Altamira thermoelectric power
station in Mexico to run on petroleum
coke. The conversion project is aligned
with the Mexican energy strategy as it
will decrease 90 percent of the power
station’s sulfur dioxide emissions.
Citec scope
n  Citec’s scope included management
of document and material deliverables
of the project with focus on the main and
secondary structures of the boiler islands.
Elements were identified with 2D barcode
labels for easy tracking.
11/2016
Citec solution
n  Alstom selected Citec as supplier
largely because of project lifecycle
management solution CitecDot - to secure
traceability and quality control.
With the help of CitecDot, engineering
documents were checked and approved
by the design team in Italy and Estonia,
doc control took place in India, approval
for manufacturing was done in France,
fabrication was spread over several
factories in China, whereas the
construction site is in Mexico.
A Citec representative was employed in
China to support document management,
quality control, labelling items, progress
follow-up and expediting of steel structure
elements. The progress and status of
quality controls were animated in 3D.
CUSTOMER FEEDBACK
“In addition to the efficient way we
can manage documents with CitecDot,
we value the fact that we can follow
the status of material items visually
in a 3D model. It helps us to keep the
project on track with good control of
the engineering and manufacturing
processes.”
	- Alain Pouliguen, project manager, 	
	 Alstom Boiler France
REF Card
CITEC CUSTOMER REFERENCE
Project metrics
Documents 106 000
Structural elements 50 000 (18 000 different types)
Total weight of elements 6 000 tons (largest parts up to 32 tons)
Packages dispatched to site so far 1 439
Shipments from the factories 24

More Related Content

Viewers also liked

Citec_Attitude_1_2016_citecdot
Citec_Attitude_1_2016_citecdotCitec_Attitude_1_2016_citecdot
Citec_Attitude_1_2016_citecdotRémy Jeandemange
 
Green Circle Capabilities 04/2015
Green Circle Capabilities 04/2015Green Circle Capabilities 04/2015
Green Circle Capabilities 04/2015strumwasser
 
20160305 een goede website voor mijn vereniging
20160305 een goede website voor mijn vereniging20160305 een goede website voor mijn vereniging
20160305 een goede website voor mijn verenigingI Like Media
 
Materiaisproduzidosadaptadospelaprofessoradasaladerecursosmultifuncionais 131...
Materiaisproduzidosadaptadospelaprofessoradasaladerecursosmultifuncionais 131...Materiaisproduzidosadaptadospelaprofessoradasaladerecursosmultifuncionais 131...
Materiaisproduzidosadaptadospelaprofessoradasaladerecursosmultifuncionais 131...Lima Pedagoga
 
Analysis of Panic! At The Disco's Nine In The Afternoon
Analysis of Panic! At The Disco's Nine In The AfternoonAnalysis of Panic! At The Disco's Nine In The Afternoon
Analysis of Panic! At The Disco's Nine In The AfternoonJasmin Mahmood
 
OXYwater Strategic Marketing Plan
OXYwater Strategic Marketing PlanOXYwater Strategic Marketing Plan
OXYwater Strategic Marketing PlanSkalla Marketing
 
Analysis of The 1975's Robbers
Analysis of The 1975's RobbersAnalysis of The 1975's Robbers
Analysis of The 1975's RobbersJasmin Mahmood
 
Mitos e verdades sobre desenvolvimento de jogos
Mitos e verdades sobre desenvolvimento de jogosMitos e verdades sobre desenvolvimento de jogos
Mitos e verdades sobre desenvolvimento de jogosMauricio Alegretti
 
La hidrosfera y el balance hídrico en la
La hidrosfera y el balance hídrico en laLa hidrosfera y el balance hídrico en la
La hidrosfera y el balance hídrico en laNohemi Castillo
 
70 problemas de ha
70 problemas de ha70 problemas de ha
70 problemas de haoscar torres
 

Viewers also liked (12)

Citec_Attitude_1_2016_citecdot
Citec_Attitude_1_2016_citecdotCitec_Attitude_1_2016_citecdot
Citec_Attitude_1_2016_citecdot
 
Green Circle Capabilities 04/2015
Green Circle Capabilities 04/2015Green Circle Capabilities 04/2015
Green Circle Capabilities 04/2015
 
20160305 een goede website voor mijn vereniging
20160305 een goede website voor mijn vereniging20160305 een goede website voor mijn vereniging
20160305 een goede website voor mijn vereniging
 
Materiaisproduzidosadaptadospelaprofessoradasaladerecursosmultifuncionais 131...
Materiaisproduzidosadaptadospelaprofessoradasaladerecursosmultifuncionais 131...Materiaisproduzidosadaptadospelaprofessoradasaladerecursosmultifuncionais 131...
Materiaisproduzidosadaptadospelaprofessoradasaladerecursosmultifuncionais 131...
 
Analysis of Panic! At The Disco's Nine In The Afternoon
Analysis of Panic! At The Disco's Nine In The AfternoonAnalysis of Panic! At The Disco's Nine In The Afternoon
Analysis of Panic! At The Disco's Nine In The Afternoon
 
Storyboard
StoryboardStoryboard
Storyboard
 
Hillel brochure
Hillel brochureHillel brochure
Hillel brochure
 
OXYwater Strategic Marketing Plan
OXYwater Strategic Marketing PlanOXYwater Strategic Marketing Plan
OXYwater Strategic Marketing Plan
 
Analysis of The 1975's Robbers
Analysis of The 1975's RobbersAnalysis of The 1975's Robbers
Analysis of The 1975's Robbers
 
Mitos e verdades sobre desenvolvimento de jogos
Mitos e verdades sobre desenvolvimento de jogosMitos e verdades sobre desenvolvimento de jogos
Mitos e verdades sobre desenvolvimento de jogos
 
La hidrosfera y el balance hídrico en la
La hidrosfera y el balance hídrico en laLa hidrosfera y el balance hídrico en la
La hidrosfera y el balance hídrico en la
 
70 problemas de ha
70 problemas de ha70 problemas de ha
70 problemas de ha
 

Similar to RefCard_Altamira CitecDot_11-2016_EN

Citec Group brochure 2016_lowres
Citec Group brochure 2016_lowresCitec Group brochure 2016_lowres
Citec Group brochure 2016_lowresAustin Antony
 
CaseStudy - STI Engineering
CaseStudy - STI EngineeringCaseStudy - STI Engineering
CaseStudy - STI EngineeringMaurizio Sirica
 
CaseStudy- Gelsia_FINAL-
CaseStudy- Gelsia_FINAL-CaseStudy- Gelsia_FINAL-
CaseStudy- Gelsia_FINAL-Maurizio Sirica
 
GARE du MIDIH Open Digital Platforms the adoption of a standards-based open...
GARE du MIDIH   Open Digital Platforms the adoption of a standards-based open...GARE du MIDIH   Open Digital Platforms the adoption of a standards-based open...
GARE du MIDIH Open Digital Platforms the adoption of a standards-based open...MIDIH_EU
 
DSEC Article on ACABIO - Biofuels Nov-Dec_2013
DSEC Article on ACABIO - Biofuels Nov-Dec_2013DSEC Article on ACABIO - Biofuels Nov-Dec_2013
DSEC Article on ACABIO - Biofuels Nov-Dec_2013Pierre Jacquy
 
CD Sept 2015 (Tarmac) - Asset Tagging at Thames Tideway
CD Sept 2015 (Tarmac) - Asset Tagging at Thames TidewayCD Sept 2015 (Tarmac) - Asset Tagging at Thames Tideway
CD Sept 2015 (Tarmac) - Asset Tagging at Thames TidewayComit Projects Ltd
 
Company Profile Setel_Eng
Company Profile Setel_EngCompany Profile Setel_Eng
Company Profile Setel_EngGiuseppe Frullo
 
Citec - Engineering and Consultant Services In India
Citec - Engineering and Consultant Services In IndiaCitec - Engineering and Consultant Services In India
Citec - Engineering and Consultant Services In IndiaCitecIndia
 
Corporate-Profile
Corporate-ProfileCorporate-Profile
Corporate-ProfileQusay Nader
 
The Industrialist: Trends & Innovations - September 2023
The Industrialist: Trends & Innovations - September 2023The Industrialist: Trends & Innovations - September 2023
The Industrialist: Trends & Innovations - September 2023accenture
 
IEC Overview Brochure
IEC Overview BrochureIEC Overview Brochure
IEC Overview BrochureMike Nolan
 
Company profile january 2015
Company profile   january 2015Company profile   january 2015
Company profile january 2015Tinca Secuianu
 
Teamnet in Top 3 Developers of Integrated Systems in Romania Teamnet Internat...
Teamnet in Top 3 Developers of Integrated Systems in Romania Teamnet Internat...Teamnet in Top 3 Developers of Integrated Systems in Romania Teamnet Internat...
Teamnet in Top 3 Developers of Integrated Systems in Romania Teamnet Internat...Teamnet International
 
RESUME Mohsen SADOK Engineer
RESUME Mohsen SADOK EngineerRESUME Mohsen SADOK Engineer
RESUME Mohsen SADOK EngineerMohsen Sadok
 
2013-09-23_Real State Energy Management Strategy’s
2013-09-23_Real State Energy Management Strategy’s2013-09-23_Real State Energy Management Strategy’s
2013-09-23_Real State Energy Management Strategy’sAlex Ciurana Fenes, CEM, CMVP
 
Asite Platform for Cloud-Based Construction Management
Asite Platform for Cloud-Based Construction ManagementAsite Platform for Cloud-Based Construction Management
Asite Platform for Cloud-Based Construction ManagementMicrosolResourcesCorp
 

Similar to RefCard_Altamira CitecDot_11-2016_EN (20)

Citec Group brochure 2016_lowres
Citec Group brochure 2016_lowresCitec Group brochure 2016_lowres
Citec Group brochure 2016_lowres
 
CaseStudy - STI Engineering
CaseStudy - STI EngineeringCaseStudy - STI Engineering
CaseStudy - STI Engineering
 
CaseStudy- Gelsia_FINAL-
CaseStudy- Gelsia_FINAL-CaseStudy- Gelsia_FINAL-
CaseStudy- Gelsia_FINAL-
 
GARE du MIDIH Open Digital Platforms the adoption of a standards-based open...
GARE du MIDIH   Open Digital Platforms the adoption of a standards-based open...GARE du MIDIH   Open Digital Platforms the adoption of a standards-based open...
GARE du MIDIH Open Digital Platforms the adoption of a standards-based open...
 
DSEC Article on ACABIO - Biofuels Nov-Dec_2013
DSEC Article on ACABIO - Biofuels Nov-Dec_2013DSEC Article on ACABIO - Biofuels Nov-Dec_2013
DSEC Article on ACABIO - Biofuels Nov-Dec_2013
 
CD Sept 2015 (Tarmac) - Asset Tagging at Thames Tideway
CD Sept 2015 (Tarmac) - Asset Tagging at Thames TidewayCD Sept 2015 (Tarmac) - Asset Tagging at Thames Tideway
CD Sept 2015 (Tarmac) - Asset Tagging at Thames Tideway
 
Company Profile Setel_Eng
Company Profile Setel_EngCompany Profile Setel_Eng
Company Profile Setel_Eng
 
Citec - Engineering and Consultant Services In India
Citec - Engineering and Consultant Services In IndiaCitec - Engineering and Consultant Services In India
Citec - Engineering and Consultant Services In India
 
Jornada convocatoria experimentos H2020 FORTISSIMO2
Jornada convocatoria experimentos H2020 FORTISSIMO2Jornada convocatoria experimentos H2020 FORTISSIMO2
Jornada convocatoria experimentos H2020 FORTISSIMO2
 
Corporate-Profile
Corporate-ProfileCorporate-Profile
Corporate-Profile
 
Vostok presentation
Vostok presentationVostok presentation
Vostok presentation
 
The Industrialist: Trends & Innovations - September 2023
The Industrialist: Trends & Innovations - September 2023The Industrialist: Trends & Innovations - September 2023
The Industrialist: Trends & Innovations - September 2023
 
IEC Overview Brochure
IEC Overview BrochureIEC Overview Brochure
IEC Overview Brochure
 
Vostok
VostokVostok
Vostok
 
Company profile january 2015
Company profile   january 2015Company profile   january 2015
Company profile january 2015
 
Citec Dot Wiz card 09_2015
Citec Dot Wiz card 09_2015Citec Dot Wiz card 09_2015
Citec Dot Wiz card 09_2015
 
Teamnet in Top 3 Developers of Integrated Systems in Romania Teamnet Internat...
Teamnet in Top 3 Developers of Integrated Systems in Romania Teamnet Internat...Teamnet in Top 3 Developers of Integrated Systems in Romania Teamnet Internat...
Teamnet in Top 3 Developers of Integrated Systems in Romania Teamnet Internat...
 
RESUME Mohsen SADOK Engineer
RESUME Mohsen SADOK EngineerRESUME Mohsen SADOK Engineer
RESUME Mohsen SADOK Engineer
 
2013-09-23_Real State Energy Management Strategy’s
2013-09-23_Real State Energy Management Strategy’s2013-09-23_Real State Energy Management Strategy’s
2013-09-23_Real State Energy Management Strategy’s
 
Asite Platform for Cloud-Based Construction Management
Asite Platform for Cloud-Based Construction ManagementAsite Platform for Cloud-Based Construction Management
Asite Platform for Cloud-Based Construction Management
 

RefCard_Altamira CitecDot_11-2016_EN

  • 1. Citec Oy Ab Head office P.O. Box 109 FI-65101 Vaasa, Finland Tel. +358 6 3240 700  www.citec.com CASE IN BRIEF Project Management of document and material deliverables for Altamira power station conversion Location • Power station in Mexico. • Project stakeholders spread over six countries on three contintents. Customer Alstom Boiler France Year 2014-2016 CITECDOT IN A NUTSHELL CitecDot is a project lifecycle management solution that enables you to efficiently manage your deliverables, cut down costs, risks and delays - via a single platform.  Altamira information managed with CitecDot Project description n  Alstom and Isolux are converting two units at the Altamira thermoelectric power station in Mexico to run on petroleum coke. The conversion project is aligned with the Mexican energy strategy as it will decrease 90 percent of the power station’s sulfur dioxide emissions. Citec scope n  Citec’s scope included management of document and material deliverables of the project with focus on the main and secondary structures of the boiler islands. Elements were identified with 2D barcode labels for easy tracking. 11/2016 Citec solution n  Alstom selected Citec as supplier largely because of project lifecycle management solution CitecDot - to secure traceability and quality control. With the help of CitecDot, engineering documents were checked and approved by the design team in Italy and Estonia, doc control took place in India, approval for manufacturing was done in France, fabrication was spread over several factories in China, whereas the construction site is in Mexico. A Citec representative was employed in China to support document management, quality control, labelling items, progress follow-up and expediting of steel structure elements. The progress and status of quality controls were animated in 3D. CUSTOMER FEEDBACK “In addition to the efficient way we can manage documents with CitecDot, we value the fact that we can follow the status of material items visually in a 3D model. It helps us to keep the project on track with good control of the engineering and manufacturing processes.” - Alain Pouliguen, project manager, Alstom Boiler France REF Card CITEC CUSTOMER REFERENCE Project metrics Documents 106 000 Structural elements 50 000 (18 000 different types) Total weight of elements 6 000 tons (largest parts up to 32 tons) Packages dispatched to site so far 1 439 Shipments from the factories 24