Asite Platform for Cloud-Based Construction Management
RefCard_Altamira CitecDot_11-2016_EN
1. Citec Oy Ab
Head office
P.O. Box 109
FI-65101 Vaasa, Finland
Tel. +358 6 3240 700
www.citec.com
CASE IN BRIEF
Project
Management of document and
material deliverables for Altamira
power station conversion
Location
• Power station in Mexico.
• Project stakeholders spread over six
countries on three contintents.
Customer
Alstom Boiler France
Year
2014-2016
CITECDOT IN A NUTSHELL
CitecDot is a project lifecycle management solution that enables you to efficiently
manage your deliverables, cut down costs, risks and delays - via a single platform.
Altamira information managed with CitecDot
Project description
n Alstom and Isolux are converting two
units at the Altamira thermoelectric power
station in Mexico to run on petroleum
coke. The conversion project is aligned
with the Mexican energy strategy as it
will decrease 90 percent of the power
station’s sulfur dioxide emissions.
Citec scope
n Citec’s scope included management
of document and material deliverables
of the project with focus on the main and
secondary structures of the boiler islands.
Elements were identified with 2D barcode
labels for easy tracking.
11/2016
Citec solution
n Alstom selected Citec as supplier
largely because of project lifecycle
management solution CitecDot - to secure
traceability and quality control.
With the help of CitecDot, engineering
documents were checked and approved
by the design team in Italy and Estonia,
doc control took place in India, approval
for manufacturing was done in France,
fabrication was spread over several
factories in China, whereas the
construction site is in Mexico.
A Citec representative was employed in
China to support document management,
quality control, labelling items, progress
follow-up and expediting of steel structure
elements. The progress and status of
quality controls were animated in 3D.
CUSTOMER FEEDBACK
“In addition to the efficient way we
can manage documents with CitecDot,
we value the fact that we can follow
the status of material items visually
in a 3D model. It helps us to keep the
project on track with good control of
the engineering and manufacturing
processes.”
- Alain Pouliguen, project manager,
Alstom Boiler France
REF Card
CITEC CUSTOMER REFERENCE
Project metrics
Documents 106 000
Structural elements 50 000 (18 000 different types)
Total weight of elements 6 000 tons (largest parts up to 32 tons)
Packages dispatched to site so far 1 439
Shipments from the factories 24