CASE STUDY: GELSIA, Italy
GELSIA IMPROVES OPERATIONS AND SAFETY
MANAGEMENT WITH INTERGRAPH®
CADWORX®
&
ANALYSIS SOLUTIONS
Leading energy provider increases productivity and lowers management
costs of thermal power plant and substations in Northern Italy
IDENTIFYING GOALS
Gelsia is a leading energy supplier of gas, electricity, and thermal power located in
Seregno, Italy. Originally started as a municipal company of Seregno in 1910, and
launched as Gelsia Group in 2008, the company has grown to become one of the
major players in the Italian energy market, and currently provides services to 28
municipalities in Italy.
Gelsia wanted to improve the safety, productivity, and maintenance potential for its
existing combined heat and power station and substations in Seregno, Lombardy. The
company needed a way to map the facilities of the cogeneration plant and substations,
obtaining designs as actually constructed (“as built”).
The goals of the project were to:
• Create an intelligent and up-to-date 3D model of the plant for improved safety
management and maintenance.
• Generate an accurate overview of plant documentation, including piping layouts,
isometric sketches, and bills of material.
• Acquire component data for an accurate materials management and layout study.
• Extract critical information to improve energy efficiency of the plant.
The company wanted to improve its understanding of its own network and reduce
management costs. Gelsia decided to utilize the Intergraph®
CADWorx®
suite for the
project, including Intergraph CADWorx Plant Professional combined with CADWorx
fieldPipe™
Professional for the creation of intelligent 3D models, CADWorx P&ID for
piping and isometrics creation, and Intergraph CADWorx Design Review to enable
efficient management and tracking of the project steps.
OVERCOMING CHALLENGES
Based on its own software, Gelsia already had facility maintenance process in place.
This system needed more information to enable full and efficient management of its
FACTS AT A GLANCE
Company: Gelsia
Website: www.gelsia.it
Description: Gelsia is an Italian
industry leader in distribution of gas,
heat and environmental services.
Founded in 2008, Gelsia is a key player
in the Italian energy business and
provides services to 28 municipalities
in Northern Italy.
Employees: 600
Industry: Power Generation (Gas,
Electric, Thermal)
Country: Italy
PRODUCTS USED:
•	CADWorx®
P&ID
• CADWorx Plant Professional
•	CADWorx fieldPipe™ Professional
•	CADWorx Design Review
KEY BENEFITS:
• Improved operations and     
   maintenance efficiency
•	Increased awareness of and access     
to information
•	Safer plant management
• Reduced management costs
facility. As such, the first step was to perform a 3D laser survey
of the entities located inside the substations to create a 3D
realistic point cloud of the environment surveyed. The survey was
registered with Leica Geosystems HDS Cyclone™
software and
displayed in the Leica Truview free viewer.
From the 3D point cloud, a characterized 3D model was
implemented with CADWorx fieldPipe Professional. All
information relative to each power station and substation, such
as equipment data sheets, piping and instrument components,
etc., were included in the 3D model to:
• Allow safe management of substation operations.
• Enable easy and faster maintenance of the substations
(especially during unpredictable failures and subsequent
emergency management).
• Create a complete database of components inside substations
for materials management.
Simultaneously, Intergraph CADWorx P&ID was used to
create an intelligent database of the existing P&IDs of the plants.
Throughout the project, Intergraph CADWorx Design Review was
used by the Gelsia management team to review project progress,
and facilitate decision making regarding next steps.
REALIZING RESULTS
With the newly available information, Gelsia was able to:
• Improve safety of the facilities thanks to having a real-life 3D
design documentation of the plant.
• Streamline plant operations and management due to more
available information.
• Create a database for materials management for the
substations.
Furthermore, once the 3D model was completed, all documents
and information such as the piping layout, sections, isometric
sketches, and a complete bill of material were available to allow
PED qualification of the substations.
The choice to adopt the Intergraph CADWorx & Analysis
Solutions suite was motivated by its ease of learning and
use; complete interoperability between various aspects of the
software; and the possibility of an easy-to-implement, custom
interface with other software.
MOVING FORWARD
During the project, Gelsia standardized its work processes with
the Intergraph CADWorx solution suite. The final step of the
project will be to integrate the existing information systems
(CMMS and GIS) with the new data. The company expects to be
using Intergraph CADWorx solutions in all of its future projects.
Intergraph helps the world work smarter. The company’s software and
solutions improve the lives of millions of people through better facilities,
safer communities, and more reliable operations.
Intergraph Process, Power & Marine (PP&M) is the world’s leading provider
of enterprise engineering software enabling smarter design and operation
of plants, ships, and offshore facilities. Intergraph Security, Government &
Infrastructure (SG&I) is the leader in smart solutions for emergency
response, utilities, transportation, and other global challenges.
For more information, visit www.intergraph.com.
Intergraph is part of Hexagon (Nasdaq Stockholm: HEXA B; www.hexagon.
com), a leading global provider of information technologies that drive
productivity and quality across industrial and geospatial applications.
ABOUT INTERGRAPH
© Intergraph Corporation. All rights reserved. Intergraph is part of Hexagon. Intergraph and the Intergraph logo, and CADWorx II are registered trademarks of Intergraph Corporation or its subsidiaries in the United States and in other countries.
Other brands and product names are trademarks of their respective owners. 3/2015 PPM – NL – 0333A – ENG
Cogeneration Plant 7Mw

More Related Content

What's hot

Future Urban Systems: The Convergence of a Smart Integrated Infrastructure
Future Urban Systems: The Convergence of a Smart Integrated InfrastructureFuture Urban Systems: The Convergence of a Smart Integrated Infrastructure
Future Urban Systems: The Convergence of a Smart Integrated InfrastructureBlack & Veatch
 
Data-Centric Approach for Project Delivery
Data-Centric Approach for Project DeliveryData-Centric Approach for Project Delivery
Data-Centric Approach for Project DeliveryAVEVA Group plc
 
Increasing ROI Through Simulation and the 'Digital Twin'
Increasing ROI Through Simulation and the 'Digital Twin'Increasing ROI Through Simulation and the 'Digital Twin'
Increasing ROI Through Simulation and the 'Digital Twin'GSE Systems, Inc.
 
Risking all you have, for what you can’t leave behind by Adam Cooke, Yancoal ...
Risking all you have, for what you can’t leave behind by Adam Cooke, Yancoal ...Risking all you have, for what you can’t leave behind by Adam Cooke, Yancoal ...
Risking all you have, for what you can’t leave behind by Adam Cooke, Yancoal ...AVEVA Group plc
 
Optimized Energy Management and planning tools for the Iron and Steel Industr...
Optimized Energy Management and planning tools for the Iron and Steel Industr...Optimized Energy Management and planning tools for the Iron and Steel Industr...
Optimized Energy Management and planning tools for the Iron and Steel Industr...Schneider Electric
 
Motiva online monitoring and optimization energy system
Motiva online monitoring and optimization energy systemMotiva online monitoring and optimization energy system
Motiva online monitoring and optimization energy systemKBC (A Yokogawa Company)
 
prathap resume-14 professional
prathap resume-14 professionalprathap resume-14 professional
prathap resume-14 professionalPrathap Tatapudi
 
The use of R in Predictive Maintenance: A use case with TRUMPF Laser GmbH
The use of R in Predictive Maintenance: A use case with TRUMPF Laser GmbHThe use of R in Predictive Maintenance: A use case with TRUMPF Laser GmbH
The use of R in Predictive Maintenance: A use case with TRUMPF Laser GmbHeoda GmbH
 
Business Ecosystems Internet of Things at ABB
Business Ecosystems Internet of Things at ABBBusiness Ecosystems Internet of Things at ABB
Business Ecosystems Internet of Things at ABBMikko Marsio
 
Now Is the Time for Energy Management
Now Is the Time for Energy ManagementNow Is the Time for Energy Management
Now Is the Time for Energy ManagementBlack & Veatch
 
Digital Solutions Development and Measurement at ABB Process Industries
Digital Solutions Development and Measurement at ABB Process IndustriesDigital Solutions Development and Measurement at ABB Process Industries
Digital Solutions Development and Measurement at ABB Process IndustriesMikko Marsio
 
How Process Industry takes advantage of our solutions
How Process Industrytakes advantage of our solutionsHow Process Industrytakes advantage of our solutions
How Process Industry takes advantage of our solutionsSchneider Electric
 
Leios 2
Leios 2 Leios 2
Leios 2 EGS
 

What's hot (20)

Future Urban Systems: The Convergence of a Smart Integrated Infrastructure
Future Urban Systems: The Convergence of a Smart Integrated InfrastructureFuture Urban Systems: The Convergence of a Smart Integrated Infrastructure
Future Urban Systems: The Convergence of a Smart Integrated Infrastructure
 
Data-Centric Approach for Project Delivery
Data-Centric Approach for Project DeliveryData-Centric Approach for Project Delivery
Data-Centric Approach for Project Delivery
 
Increasing ROI Through Simulation and the 'Digital Twin'
Increasing ROI Through Simulation and the 'Digital Twin'Increasing ROI Through Simulation and the 'Digital Twin'
Increasing ROI Through Simulation and the 'Digital Twin'
 
DC4Cities: an innovative approach for efficient and environmentally sustainab...
DC4Cities: an innovative approach for efficient and environmentally sustainab...DC4Cities: an innovative approach for efficient and environmentally sustainab...
DC4Cities: an innovative approach for efficient and environmentally sustainab...
 
Risking all you have, for what you can’t leave behind by Adam Cooke, Yancoal ...
Risking all you have, for what you can’t leave behind by Adam Cooke, Yancoal ...Risking all you have, for what you can’t leave behind by Adam Cooke, Yancoal ...
Risking all you have, for what you can’t leave behind by Adam Cooke, Yancoal ...
 
Optimized Energy Management and planning tools for the Iron and Steel Industr...
Optimized Energy Management and planning tools for the Iron and Steel Industr...Optimized Energy Management and planning tools for the Iron and Steel Industr...
Optimized Energy Management and planning tools for the Iron and Steel Industr...
 
Motiva online monitoring and optimization energy system
Motiva online monitoring and optimization energy systemMotiva online monitoring and optimization energy system
Motiva online monitoring and optimization energy system
 
Geospatial Product Watch 2015
Geospatial Product Watch 2015Geospatial Product Watch 2015
Geospatial Product Watch 2015
 
SmartPlant Construction
SmartPlant ConstructionSmartPlant Construction
SmartPlant Construction
 
prathap resume-14 professional
prathap resume-14 professionalprathap resume-14 professional
prathap resume-14 professional
 
KBC Proven Application of Digital Twin
KBC Proven Application of Digital TwinKBC Proven Application of Digital Twin
KBC Proven Application of Digital Twin
 
The use of R in Predictive Maintenance: A use case with TRUMPF Laser GmbH
The use of R in Predictive Maintenance: A use case with TRUMPF Laser GmbHThe use of R in Predictive Maintenance: A use case with TRUMPF Laser GmbH
The use of R in Predictive Maintenance: A use case with TRUMPF Laser GmbH
 
Business Ecosystems Internet of Things at ABB
Business Ecosystems Internet of Things at ABBBusiness Ecosystems Internet of Things at ABB
Business Ecosystems Internet of Things at ABB
 
Now Is the Time for Energy Management
Now Is the Time for Energy ManagementNow Is the Time for Energy Management
Now Is the Time for Energy Management
 
Digital Solutions Development and Measurement at ABB Process Industries
Digital Solutions Development and Measurement at ABB Process IndustriesDigital Solutions Development and Measurement at ABB Process Industries
Digital Solutions Development and Measurement at ABB Process Industries
 
How Process Industry takes advantage of our solutions
How Process Industrytakes advantage of our solutionsHow Process Industrytakes advantage of our solutions
How Process Industry takes advantage of our solutions
 
Leios 2
Leios 2 Leios 2
Leios 2
 
Drivetrain Modeling
Drivetrain ModelingDrivetrain Modeling
Drivetrain Modeling
 
Industrial IoT bootcamp
Industrial IoT bootcampIndustrial IoT bootcamp
Industrial IoT bootcamp
 
axisCONSERVE4.0
axisCONSERVE4.0axisCONSERVE4.0
axisCONSERVE4.0
 

Similar to CaseStudy- Gelsia_FINAL-

CaseStudy - STI Engineering
CaseStudy - STI EngineeringCaseStudy - STI Engineering
CaseStudy - STI EngineeringMaurizio Sirica
 
Smartplant application and effectiveness
Smartplant application and effectivenessSmartplant application and effectiveness
Smartplant application and effectivenessraghunathan janarthanan
 
Intergraph CADWorx & Analysis Flyer
Intergraph CADWorx & Analysis FlyerIntergraph CADWorx & Analysis Flyer
Intergraph CADWorx & Analysis FlyerNicole Brlek
 
Intergraph cad worx_analysis_flyer_2012
Intergraph cad worx_analysis_flyer_2012Intergraph cad worx_analysis_flyer_2012
Intergraph cad worx_analysis_flyer_2012Nicole Brlek
 
Citec Group brochure 2016_lowres
Citec Group brochure 2016_lowresCitec Group brochure 2016_lowres
Citec Group brochure 2016_lowresAustin Antony
 
Portfolio
PortfolioPortfolio
PortfolioCraigW
 
Intergraph ICAS tools through Ingenious
Intergraph ICAS tools through IngeniousIntergraph ICAS tools through Ingenious
Intergraph ICAS tools through IngeniousGautam Vadnere
 
Demolition project-management-solution
Demolition project-management-solutionDemolition project-management-solution
Demolition project-management-solutionVishakhaBhagia1
 
Demolition project-management-solution
Demolition project-management-solutionDemolition project-management-solution
Demolition project-management-solutionMaitrikpaida
 
MoreauMulumeCV_Profile07012015
MoreauMulumeCV_Profile07012015MoreauMulumeCV_Profile07012015
MoreauMulumeCV_Profile07012015Moreau Mulume
 
Elecworks - electrical and automation CAD software - ECAD
Elecworks - electrical and automation CAD software - ECADElecworks - electrical and automation CAD software - ECAD
Elecworks - electrical and automation CAD software - ECADGuillem Fiter
 
Power, Process & Marine
Power, Process & MarinePower, Process & Marine
Power, Process & MarineTauladan
 
CADISON world Issue-1-2013
CADISON world Issue-1-2013CADISON world Issue-1-2013
CADISON world Issue-1-2013CADISON
 
CaseStudy - MARSON 3D-ISAGRO
CaseStudy - MARSON 3D-ISAGROCaseStudy - MARSON 3D-ISAGRO
CaseStudy - MARSON 3D-ISAGROMaurizio Sirica
 

Similar to CaseStudy- Gelsia_FINAL- (20)

CaseStudy - STI Engineering
CaseStudy - STI EngineeringCaseStudy - STI Engineering
CaseStudy - STI Engineering
 
Smartplant application and effectiveness
Smartplant application and effectivenessSmartplant application and effectiveness
Smartplant application and effectiveness
 
CaseStudy-Nortech
CaseStudy-NortechCaseStudy-Nortech
CaseStudy-Nortech
 
Intergraph CADWorx & Analysis Flyer
Intergraph CADWorx & Analysis FlyerIntergraph CADWorx & Analysis Flyer
Intergraph CADWorx & Analysis Flyer
 
Intergraph cad worx_analysis_flyer_2012
Intergraph cad worx_analysis_flyer_2012Intergraph cad worx_analysis_flyer_2012
Intergraph cad worx_analysis_flyer_2012
 
Smart 3D
Smart 3DSmart 3D
Smart 3D
 
CaseStudy-SAFE
CaseStudy-SAFECaseStudy-SAFE
CaseStudy-SAFE
 
CaseStudy-ECOFOXl
CaseStudy-ECOFOXlCaseStudy-ECOFOXl
CaseStudy-ECOFOXl
 
CaseStudy_Mahler_CADWorx_CAESARII
CaseStudy_Mahler_CADWorx_CAESARIICaseStudy_Mahler_CADWorx_CAESARII
CaseStudy_Mahler_CADWorx_CAESARII
 
Citec Group brochure 2016_lowres
Citec Group brochure 2016_lowresCitec Group brochure 2016_lowres
Citec Group brochure 2016_lowres
 
Portfolio
PortfolioPortfolio
Portfolio
 
Intergraph ICAS tools through Ingenious
Intergraph ICAS tools through IngeniousIntergraph ICAS tools through Ingenious
Intergraph ICAS tools through Ingenious
 
CaseStudy_OnLine_Design
CaseStudy_OnLine_DesignCaseStudy_OnLine_Design
CaseStudy_OnLine_Design
 
Demolition project-management-solution
Demolition project-management-solutionDemolition project-management-solution
Demolition project-management-solution
 
Demolition project-management-solution
Demolition project-management-solutionDemolition project-management-solution
Demolition project-management-solution
 
MoreauMulumeCV_Profile07012015
MoreauMulumeCV_Profile07012015MoreauMulumeCV_Profile07012015
MoreauMulumeCV_Profile07012015
 
Elecworks - electrical and automation CAD software - ECAD
Elecworks - electrical and automation CAD software - ECADElecworks - electrical and automation CAD software - ECAD
Elecworks - electrical and automation CAD software - ECAD
 
Power, Process & Marine
Power, Process & MarinePower, Process & Marine
Power, Process & Marine
 
CADISON world Issue-1-2013
CADISON world Issue-1-2013CADISON world Issue-1-2013
CADISON world Issue-1-2013
 
CaseStudy - MARSON 3D-ISAGRO
CaseStudy - MARSON 3D-ISAGROCaseStudy - MARSON 3D-ISAGRO
CaseStudy - MARSON 3D-ISAGRO
 

CaseStudy- Gelsia_FINAL-

  • 1. CASE STUDY: GELSIA, Italy GELSIA IMPROVES OPERATIONS AND SAFETY MANAGEMENT WITH INTERGRAPH® CADWORX® & ANALYSIS SOLUTIONS Leading energy provider increases productivity and lowers management costs of thermal power plant and substations in Northern Italy IDENTIFYING GOALS Gelsia is a leading energy supplier of gas, electricity, and thermal power located in Seregno, Italy. Originally started as a municipal company of Seregno in 1910, and launched as Gelsia Group in 2008, the company has grown to become one of the major players in the Italian energy market, and currently provides services to 28 municipalities in Italy. Gelsia wanted to improve the safety, productivity, and maintenance potential for its existing combined heat and power station and substations in Seregno, Lombardy. The company needed a way to map the facilities of the cogeneration plant and substations, obtaining designs as actually constructed (“as built”). The goals of the project were to: • Create an intelligent and up-to-date 3D model of the plant for improved safety management and maintenance. • Generate an accurate overview of plant documentation, including piping layouts, isometric sketches, and bills of material. • Acquire component data for an accurate materials management and layout study. • Extract critical information to improve energy efficiency of the plant. The company wanted to improve its understanding of its own network and reduce management costs. Gelsia decided to utilize the Intergraph® CADWorx® suite for the project, including Intergraph CADWorx Plant Professional combined with CADWorx fieldPipe™ Professional for the creation of intelligent 3D models, CADWorx P&ID for piping and isometrics creation, and Intergraph CADWorx Design Review to enable efficient management and tracking of the project steps. OVERCOMING CHALLENGES Based on its own software, Gelsia already had facility maintenance process in place. This system needed more information to enable full and efficient management of its FACTS AT A GLANCE Company: Gelsia Website: www.gelsia.it Description: Gelsia is an Italian industry leader in distribution of gas, heat and environmental services. Founded in 2008, Gelsia is a key player in the Italian energy business and provides services to 28 municipalities in Northern Italy. Employees: 600 Industry: Power Generation (Gas, Electric, Thermal) Country: Italy PRODUCTS USED: • CADWorx® P&ID • CADWorx Plant Professional • CADWorx fieldPipe™ Professional • CADWorx Design Review KEY BENEFITS: • Improved operations and maintenance efficiency • Increased awareness of and access to information • Safer plant management • Reduced management costs
  • 2. facility. As such, the first step was to perform a 3D laser survey of the entities located inside the substations to create a 3D realistic point cloud of the environment surveyed. The survey was registered with Leica Geosystems HDS Cyclone™ software and displayed in the Leica Truview free viewer. From the 3D point cloud, a characterized 3D model was implemented with CADWorx fieldPipe Professional. All information relative to each power station and substation, such as equipment data sheets, piping and instrument components, etc., were included in the 3D model to: • Allow safe management of substation operations. • Enable easy and faster maintenance of the substations (especially during unpredictable failures and subsequent emergency management). • Create a complete database of components inside substations for materials management. Simultaneously, Intergraph CADWorx P&ID was used to create an intelligent database of the existing P&IDs of the plants. Throughout the project, Intergraph CADWorx Design Review was used by the Gelsia management team to review project progress, and facilitate decision making regarding next steps. REALIZING RESULTS With the newly available information, Gelsia was able to: • Improve safety of the facilities thanks to having a real-life 3D design documentation of the plant. • Streamline plant operations and management due to more available information. • Create a database for materials management for the substations. Furthermore, once the 3D model was completed, all documents and information such as the piping layout, sections, isometric sketches, and a complete bill of material were available to allow PED qualification of the substations. The choice to adopt the Intergraph CADWorx & Analysis Solutions suite was motivated by its ease of learning and use; complete interoperability between various aspects of the software; and the possibility of an easy-to-implement, custom interface with other software. MOVING FORWARD During the project, Gelsia standardized its work processes with the Intergraph CADWorx solution suite. The final step of the project will be to integrate the existing information systems (CMMS and GIS) with the new data. The company expects to be using Intergraph CADWorx solutions in all of its future projects. Intergraph helps the world work smarter. The company’s software and solutions improve the lives of millions of people through better facilities, safer communities, and more reliable operations. Intergraph Process, Power & Marine (PP&M) is the world’s leading provider of enterprise engineering software enabling smarter design and operation of plants, ships, and offshore facilities. Intergraph Security, Government & Infrastructure (SG&I) is the leader in smart solutions for emergency response, utilities, transportation, and other global challenges. For more information, visit www.intergraph.com. Intergraph is part of Hexagon (Nasdaq Stockholm: HEXA B; www.hexagon. com), a leading global provider of information technologies that drive productivity and quality across industrial and geospatial applications. ABOUT INTERGRAPH © Intergraph Corporation. All rights reserved. Intergraph is part of Hexagon. Intergraph and the Intergraph logo, and CADWorx II are registered trademarks of Intergraph Corporation or its subsidiaries in the United States and in other countries. Other brands and product names are trademarks of their respective owners. 3/2015 PPM – NL – 0333A – ENG Cogeneration Plant 7Mw