Feasibility study
The project development feasibility study include:-
• Introduction
• Examination of construction techniques and the machinery
required
• How the new residential complex will compete in the existing
market and the competition
• Availability of Man power
• Planning and local issues
• Risk analysis
• Profit and loss forecasts
• Cash flow and capital requirements
• Recommendations and conclusions
About us
•RRPS builders has been into the real estate
business for the past 3 years.
• This year we are planning to venture into
Ranchi, for this we are seeking proposals
from contractors with relevant experience in
similar field.
Objective of this project are :-
• To understand the design of the complex
and to carry out a working plan.
• To complete the construction of the
complex within the stipulated time period.
Statement of Work
• The contractor should be able to
understand the design of the residential
complex and provide a feasible working
plan.
• He has to do all the construction and the
finishing work of the complex.
1
Requirements
• Residential complex has to be built which
would be comprising of 48, 2BHKs and 30,
3BHKs divided equally among two
buildings of 8 storey's and one of 10
storey’s.
• The complex would also consist of a Park,
a Gym, a Badminton court, a Community
hall, a Jogging track, Retail shop, ATM
and homes for security guards.
2
Deliverables
• The contractor would be providing us with a fully
furnished residential complex at the end of the
project.
• Bills of the expenses incurred by the contractor
must be given regularly to us so that timely
payment is made.
• Periodic progress report must be given after every
15 days by the contractor.
3
Items supplied by us
• Model of the residential complex would be given
by us to the contractor.
• Logo of our company would be provided to the
contractor which would be placed on the entrance
of the complex gate.
4
Approval required
• We would review and approve the project
before the contractor starts the construction
process.
5
• The payments will be made on a fixed price
basis which is divided into some payment in the
starting, some in between and some after the
completion of the project.
• Payment will be done after the review of
the periodic progress report.
Type of contract6
Due Date7
Time period
• The time period of the completion of the
project would be 2 years after the approval
of the project from us.
8
Proposal contents: The format of the
contractors proposal must include the following:-
 Approach:-A discussion that indicates the contractor clearly
understands the request for proposal and what is expected. Also , a
detailed discussion of the contractor’s approach to conducting the
project and a detailed description of each task and how it will be
accomplished.
 Deliverables:- A description of each deliverables the contractor will
provide.
 Schedule:- A periodic progress report of the work completed must
be shown after every 15 days.
 Experience:- The contractor must have some relevant experience in
this field.
 Costs:- The total cost of the labours and the total number of labours
involved and materials used.
9
Proposal Evaluation Criteria:-
 Experience:- Should be a registered company
and must have some experience in such type of
construction work.
 Technical feasibility:- Appropriate machines
and equipments required for this project should
be in proper working condition.
 Price:- Should have the ability to work within the
fixed price with good quality of work.
 Schedule:- Should have the ability to work
within the stipulated time period.
10
Submission of proposals by the
contractors
• The interested bidders/contractors may
submit their proposals to the office of RRPS
builders at the address mentioned below on
or before 15th September, 2011 not later
than 17:00 hours.
• Address : Plot no. 358/37, Swinhoe Street,
Ballygung, Kolkata-700019, West Bengal.
contact number:- 07501443950
11
Summary Of Activities
Activity Description IP
A Identify the interested persons _
B Feasibility Analysis (Architectural Design) _
C Fund Raising A,B
D Purchase of land & Obtaining of Permit C
E Request For Proposal D
F Biding for Contractor E
G Purchase of Raw material F
H Layout Foundation & Frame G
I Construction of community hall H
J Construction of Complex I
K Construction of Park H
L Construction of Retail Shop, Gym, S.G home J
M Jogging Track, Badminton court & ATM J
N Finishing Work J,M,L,K
Time period of activities
Activity Time (in weeks)approx.
A 12
B 12
C 4
D 4
E 2
F 2
G 4
H 8
I 12
J 18
K 4
L 4
M 4
N 6
Network Diagram of Project
10
11 12 1514
13
95 6 7 8
A
B
C D E F G H
K
I J
L
M
N
Dm1
Dm2
Dm3
3
2
1
4
Total cost of Project
Direct cost(Rs in lakh)
Land Purchase = 20
R.M for main building = 100
Equipment = 50
Contractor payment = 25
F.W of main building = 30
Registration & permit = 2
Soil testing & land holding =0.3
Architecture plan = 3
Note:- R.M = Raw material
F.W = Finishing work
Indirect cost(Rs in lakh)
RFP ad cost = 0.10
R.M for Retail shop, ATM,
community Hall etc. = 10
F.W of retail shop, etc = 2
Supervision cost = 8
S.P for 2 year operation = 1
Contingency cost = 5
Interest for finance @15% of T.C
Note:- S.P = Spare parts
T.C = Total Cost
TOTAL COST = Rs. 294.86 lakhs
Thank you…..

More Related Content

What's hot

What's hot (19)

Shahbaz.sadiq
Shahbaz.sadiqShahbaz.sadiq
Shahbaz.sadiq
 
mY cV PDF
mY cV PDFmY cV PDF
mY cV PDF
 
CV 21-08-2016
CV 21-08-2016CV 21-08-2016
CV 21-08-2016
 
hidayath cv 2016
hidayath cv 2016hidayath cv 2016
hidayath cv 2016
 
MUHAMMAD IRFAN CV -...
MUHAMMAD IRFAN CV -...MUHAMMAD IRFAN CV -...
MUHAMMAD IRFAN CV -...
 
ASMAA ATIA-Wuzzuf-CV
ASMAA ATIA-Wuzzuf-CVASMAA ATIA-Wuzzuf-CV
ASMAA ATIA-Wuzzuf-CV
 
Tarek Hassn Ibrahim Awad Alla-2-2
Tarek Hassn Ibrahim Awad Alla-2-2Tarek Hassn Ibrahim Awad Alla-2-2
Tarek Hassn Ibrahim Awad Alla-2-2
 
Ayman Hussien cv - Copy
Ayman Hussien cv - CopyAyman Hussien cv - Copy
Ayman Hussien cv - Copy
 
Lakmal Fernando - CV.
Lakmal Fernando - CV.Lakmal Fernando - CV.
Lakmal Fernando - CV.
 
Raimon Profile 2016
Raimon Profile 2016Raimon Profile 2016
Raimon Profile 2016
 
Ali Raza Land surveyor (1)
Ali Raza Land surveyor (1)Ali Raza Land surveyor (1)
Ali Raza Land surveyor (1)
 
Cv fahad alqahtani
Cv fahad alqahtaniCv fahad alqahtani
Cv fahad alqahtani
 
CV GENDY 2016
CV GENDY 2016CV GENDY 2016
CV GENDY 2016
 
Naveed shahzad land surveyor cv
Naveed shahzad land surveyor cvNaveed shahzad land surveyor cv
Naveed shahzad land surveyor cv
 
HUM-Surveyor-CV
HUM-Surveyor-CVHUM-Surveyor-CV
HUM-Surveyor-CV
 
CV - CIVIL ENGINEER-KHODR Maen -
CV - CIVIL ENGINEER-KHODR Maen -CV - CIVIL ENGINEER-KHODR Maen -
CV - CIVIL ENGINEER-KHODR Maen -
 
QUANTITY SURVEYOR (MUHAMMAD AZEEM) UPDATED 1-22-2017
QUANTITY SURVEYOR  (MUHAMMAD AZEEM) UPDATED 1-22-2017QUANTITY SURVEYOR  (MUHAMMAD AZEEM) UPDATED 1-22-2017
QUANTITY SURVEYOR (MUHAMMAD AZEEM) UPDATED 1-22-2017
 
Updated cv (2)
Updated cv (2)Updated cv (2)
Updated cv (2)
 
Land Surveyor Updated CV
Land Surveyor Updated CVLand Surveyor Updated CV
Land Surveyor Updated CV
 

Viewers also liked

Stock audit in banks
Stock audit in banksStock audit in banks
Stock audit in banksBabasab Patil
 
Working capital management ppt
Working capital management pptWorking capital management ppt
Working capital management pptAMIT ROY
 
Preparation of a financial report to be submitted to a bank for availing cred...
Preparation of a financial report to be submitted to a bank for availing cred...Preparation of a financial report to be submitted to a bank for availing cred...
Preparation of a financial report to be submitted to a bank for availing cred...Supa Buoy
 
Preparation of project report for bank finance
Preparation of project report for bank financePreparation of project report for bank finance
Preparation of project report for bank financeRevanth Rao
 
Team D Final Presentation Busn 460
Team D Final Presentation   Busn 460Team D Final Presentation   Busn 460
Team D Final Presentation Busn 460Mike Stroud
 
project on construction of house report.
project on construction of house report.project on construction of house report.
project on construction of house report.Hagi Sahib
 
HDFC BANK PROJECT REPORT
HDFC BANK PROJECT REPORTHDFC BANK PROJECT REPORT
HDFC BANK PROJECT REPORTAbhishek Keshri
 

Viewers also liked (9)

Stock audit in banks
Stock audit in banksStock audit in banks
Stock audit in banks
 
Working capital management ppt
Working capital management pptWorking capital management ppt
Working capital management ppt
 
Preparation of a financial report to be submitted to a bank for availing cred...
Preparation of a financial report to be submitted to a bank for availing cred...Preparation of a financial report to be submitted to a bank for availing cred...
Preparation of a financial report to be submitted to a bank for availing cred...
 
Model Project Profiles
Model Project ProfilesModel Project Profiles
Model Project Profiles
 
Preparation of project report for bank finance
Preparation of project report for bank financePreparation of project report for bank finance
Preparation of project report for bank finance
 
Rural development ppt
Rural development pptRural development ppt
Rural development ppt
 
Team D Final Presentation Busn 460
Team D Final Presentation   Busn 460Team D Final Presentation   Busn 460
Team D Final Presentation Busn 460
 
project on construction of house report.
project on construction of house report.project on construction of house report.
project on construction of house report.
 
HDFC BANK PROJECT REPORT
HDFC BANK PROJECT REPORTHDFC BANK PROJECT REPORT
HDFC BANK PROJECT REPORT
 

Similar to Prjm project management

Jha Ajachi_NIT Jamshedpur_CV
Jha Ajachi_NIT Jamshedpur_CVJha Ajachi_NIT Jamshedpur_CV
Jha Ajachi_NIT Jamshedpur_CVAjachi Jha
 
Eng. Sherif kadry C.V.updating April 2016
Eng. Sherif kadry C.V.updating April 2016Eng. Sherif kadry C.V.updating April 2016
Eng. Sherif kadry C.V.updating April 2016sherif kadry
 
Solai_Resume _As on 29th Aug 15
Solai_Resume _As on 29th Aug 15Solai_Resume _As on 29th Aug 15
Solai_Resume _As on 29th Aug 15SOLAI RAMAIAH
 
Sanjeewa_CV updated on 23.02.2016
Sanjeewa_CV  updated on 23.02.2016Sanjeewa_CV  updated on 23.02.2016
Sanjeewa_CV updated on 23.02.2016Sanjeewa Mahawedage
 
C.V of Project Manager Haider Ahmed Al Dure.PDF
C.V of Project Manager Haider Ahmed Al Dure.PDFC.V of Project Manager Haider Ahmed Al Dure.PDF
C.V of Project Manager Haider Ahmed Al Dure.PDFHaider Salman
 
Mohit Sharma C.V -
Mohit Sharma C.V - Mohit Sharma C.V -
Mohit Sharma C.V - Mohit Sharma
 
Lecture slides4; Construction Project Planning
Lecture slides4; Construction Project PlanningLecture slides4; Construction Project Planning
Lecture slides4; Construction Project PlanningJB Nartey
 
Estimating seminar
Estimating seminarEstimating seminar
Estimating seminarwendyteosy
 
Kadam_Nitin_-_civil_engg_resume_.19_Nov__15
Kadam_Nitin_-_civil_engg_resume_.19_Nov__15Kadam_Nitin_-_civil_engg_resume_.19_Nov__15
Kadam_Nitin_-_civil_engg_resume_.19_Nov__15Nitin Kadam
 
CURRICULUM_VITAE (1)1
CURRICULUM_VITAE (1)1CURRICULUM_VITAE (1)1
CURRICULUM_VITAE (1)1rajesh thomas
 
Project Manager (Contract) for Harborside
Project Manager (Contract) for HarborsideProject Manager (Contract) for Harborside
Project Manager (Contract) for HarborsideMenita Villanueva, PHR
 
PPT4 RIBA Plan of Work 2013 Power point slide
PPT4 RIBA Plan of Work 2013 Power point slidePPT4 RIBA Plan of Work 2013 Power point slide
PPT4 RIBA Plan of Work 2013 Power point slideSithick Mohamed .
 
Quantity Surveyor 5+ Yrs Exp
Quantity Surveyor 5+ Yrs ExpQuantity Surveyor 5+ Yrs Exp
Quantity Surveyor 5+ Yrs ExpMubarak Ali
 

Similar to Prjm project management (20)

Jha Ajachi_NIT Jamshedpur_CV
Jha Ajachi_NIT Jamshedpur_CVJha Ajachi_NIT Jamshedpur_CV
Jha Ajachi_NIT Jamshedpur_CV
 
Eng. Ahmed Yhia
Eng.  Ahmed YhiaEng.  Ahmed Yhia
Eng. Ahmed Yhia
 
Eng. Sherif kadry C.V.updating April 2016
Eng. Sherif kadry C.V.updating April 2016Eng. Sherif kadry C.V.updating April 2016
Eng. Sherif kadry C.V.updating April 2016
 
Solai_Resume _As on 29th Aug 15
Solai_Resume _As on 29th Aug 15Solai_Resume _As on 29th Aug 15
Solai_Resume _As on 29th Aug 15
 
CV
CVCV
CV
 
Sanjeewa_CV updated on 23.02.2016
Sanjeewa_CV  updated on 23.02.2016Sanjeewa_CV  updated on 23.02.2016
Sanjeewa_CV updated on 23.02.2016
 
C.V of Project Manager Haider Ahmed Al Dure.PDF
C.V of Project Manager Haider Ahmed Al Dure.PDFC.V of Project Manager Haider Ahmed Al Dure.PDF
C.V of Project Manager Haider Ahmed Al Dure.PDF
 
Jesfar C.V
Jesfar C.VJesfar C.V
Jesfar C.V
 
Mohit Sharma C.V -
Mohit Sharma C.V - Mohit Sharma C.V -
Mohit Sharma C.V -
 
Lecture slides4; Construction Project Planning
Lecture slides4; Construction Project PlanningLecture slides4; Construction Project Planning
Lecture slides4; Construction Project Planning
 
Abhishek Resume
Abhishek ResumeAbhishek Resume
Abhishek Resume
 
Estimating seminar
Estimating seminarEstimating seminar
Estimating seminar
 
Kadam_Nitin_-_civil_engg_resume_.19_Nov__15
Kadam_Nitin_-_civil_engg_resume_.19_Nov__15Kadam_Nitin_-_civil_engg_resume_.19_Nov__15
Kadam_Nitin_-_civil_engg_resume_.19_Nov__15
 
CURRICULUM_VITAE (1)1
CURRICULUM_VITAE (1)1CURRICULUM_VITAE (1)1
CURRICULUM_VITAE (1)1
 
Resume of Hariom
Resume of HariomResume of Hariom
Resume of Hariom
 
Subhash CV Dec 2016
Subhash CV Dec 2016Subhash CV Dec 2016
Subhash CV Dec 2016
 
Senior Architect
Senior ArchitectSenior Architect
Senior Architect
 
Project Manager (Contract) for Harborside
Project Manager (Contract) for HarborsideProject Manager (Contract) for Harborside
Project Manager (Contract) for Harborside
 
PPT4 RIBA Plan of Work 2013 Power point slide
PPT4 RIBA Plan of Work 2013 Power point slidePPT4 RIBA Plan of Work 2013 Power point slide
PPT4 RIBA Plan of Work 2013 Power point slide
 
Quantity Surveyor 5+ Yrs Exp
Quantity Surveyor 5+ Yrs ExpQuantity Surveyor 5+ Yrs Exp
Quantity Surveyor 5+ Yrs Exp
 

Prjm project management

  • 1. Request for Proposal of R.R.P .S builders. Presented by:- Pritam Kar -PGPM/10-12/ 32 Rakesh Kumar -PGPIB/10-12/19 Ranjeeta Roy -PGPIB/10-12/20 Sandip Sahoo -PGPM/10-12/38 Dated:- 7th August 2011
  • 2. Feasibility study The project development feasibility study include:- • Introduction • Examination of construction techniques and the machinery required • How the new residential complex will compete in the existing market and the competition • Availability of Man power • Planning and local issues • Risk analysis • Profit and loss forecasts • Cash flow and capital requirements • Recommendations and conclusions
  • 3. About us •RRPS builders has been into the real estate business for the past 3 years. • This year we are planning to venture into Ranchi, for this we are seeking proposals from contractors with relevant experience in similar field.
  • 4. Objective of this project are :- • To understand the design of the complex and to carry out a working plan. • To complete the construction of the complex within the stipulated time period.
  • 5. Statement of Work • The contractor should be able to understand the design of the residential complex and provide a feasible working plan. • He has to do all the construction and the finishing work of the complex. 1
  • 6. Requirements • Residential complex has to be built which would be comprising of 48, 2BHKs and 30, 3BHKs divided equally among two buildings of 8 storey's and one of 10 storey’s. • The complex would also consist of a Park, a Gym, a Badminton court, a Community hall, a Jogging track, Retail shop, ATM and homes for security guards. 2
  • 7. Deliverables • The contractor would be providing us with a fully furnished residential complex at the end of the project. • Bills of the expenses incurred by the contractor must be given regularly to us so that timely payment is made. • Periodic progress report must be given after every 15 days by the contractor. 3
  • 8. Items supplied by us • Model of the residential complex would be given by us to the contractor. • Logo of our company would be provided to the contractor which would be placed on the entrance of the complex gate. 4
  • 9. Approval required • We would review and approve the project before the contractor starts the construction process. 5
  • 10. • The payments will be made on a fixed price basis which is divided into some payment in the starting, some in between and some after the completion of the project. • Payment will be done after the review of the periodic progress report. Type of contract6 Due Date7
  • 11. Time period • The time period of the completion of the project would be 2 years after the approval of the project from us. 8
  • 12. Proposal contents: The format of the contractors proposal must include the following:-  Approach:-A discussion that indicates the contractor clearly understands the request for proposal and what is expected. Also , a detailed discussion of the contractor’s approach to conducting the project and a detailed description of each task and how it will be accomplished.  Deliverables:- A description of each deliverables the contractor will provide.  Schedule:- A periodic progress report of the work completed must be shown after every 15 days.  Experience:- The contractor must have some relevant experience in this field.  Costs:- The total cost of the labours and the total number of labours involved and materials used. 9
  • 13. Proposal Evaluation Criteria:-  Experience:- Should be a registered company and must have some experience in such type of construction work.  Technical feasibility:- Appropriate machines and equipments required for this project should be in proper working condition.  Price:- Should have the ability to work within the fixed price with good quality of work.  Schedule:- Should have the ability to work within the stipulated time period. 10
  • 14. Submission of proposals by the contractors • The interested bidders/contractors may submit their proposals to the office of RRPS builders at the address mentioned below on or before 15th September, 2011 not later than 17:00 hours. • Address : Plot no. 358/37, Swinhoe Street, Ballygung, Kolkata-700019, West Bengal. contact number:- 07501443950 11
  • 15. Summary Of Activities Activity Description IP A Identify the interested persons _ B Feasibility Analysis (Architectural Design) _ C Fund Raising A,B D Purchase of land & Obtaining of Permit C E Request For Proposal D F Biding for Contractor E G Purchase of Raw material F H Layout Foundation & Frame G I Construction of community hall H J Construction of Complex I K Construction of Park H L Construction of Retail Shop, Gym, S.G home J M Jogging Track, Badminton court & ATM J N Finishing Work J,M,L,K
  • 16. Time period of activities Activity Time (in weeks)approx. A 12 B 12 C 4 D 4 E 2 F 2 G 4 H 8 I 12 J 18 K 4 L 4 M 4 N 6
  • 17. Network Diagram of Project 10 11 12 1514 13 95 6 7 8 A B C D E F G H K I J L M N Dm1 Dm2 Dm3 3 2 1 4
  • 18. Total cost of Project Direct cost(Rs in lakh) Land Purchase = 20 R.M for main building = 100 Equipment = 50 Contractor payment = 25 F.W of main building = 30 Registration & permit = 2 Soil testing & land holding =0.3 Architecture plan = 3 Note:- R.M = Raw material F.W = Finishing work Indirect cost(Rs in lakh) RFP ad cost = 0.10 R.M for Retail shop, ATM, community Hall etc. = 10 F.W of retail shop, etc = 2 Supervision cost = 8 S.P for 2 year operation = 1 Contingency cost = 5 Interest for finance @15% of T.C Note:- S.P = Spare parts T.C = Total Cost TOTAL COST = Rs. 294.86 lakhs