 The full project implementation ofa self-designed and built Xeras models forthe Exxaro
Leeuwpan, Grootegeluk, NBC, Thabametsi, Belfast, UG Matla Coal mines . These
completed models replace the previous cumbersome typical mine Excel models. The
modelsform partofourcurrent mineral resources managementfocus and gives a seamless
integration of mine plan evaluation with Xpac.
The Xeras models are used extensively in the planning process to understand the impact
of projects and scenario changes on the financial costs. The models typically an take into
account Xpac scheduling info, plant algorithms, stockpiles, marketing info, the detail
primary and secondary mining fleet cost (with LCC costing) etc. and is used to evaluate
different scenarios with detail Financial cash flow statements.
 Responsible for detail mine to plant throughput simulation models for Belfast mine,
Matla Mine and the new Grootegeluk Medupi mine expansion including backfilling and
discard strategies. All models are used to make decisions for pre and feasibility studies for
expansion projects and assist in design parameters and contract negotiations with the
power utility.
 Involved with Hatch Associates Ltd of Canada in the simulation, with animation, of the
Saldanha Steel mini-mill processes, raw materials handling and warehousing operations.
The modelswereused to reflect the latest plant layout and the interaction of the proposed
Saldanha Steel Plant. Recommendations were made to ensure the expected production
levels and to establish and understand the dynamic interaction of major process units.
 Responsible fora simulation model that willbe used to assist in the design of equipment
in the crushing and screening circuits for the Rosh Pinah mine.
1.
 Responsible forasimulation model that was used to determine the Throughput capacity
(train off-loading and ship loading) of Saldanha Port facilities.
 Responsible for a comprehensive financial model in Excel, representing the Saldanha
Steel business from economic, production, marketing parameters to a full set of financial
statements. This model is still currently utilised for forecasting, budgeting purposes and
is used to make executive management decisions regarding the economic viability of the
project for the respective shareholders.
 Responsible as project manager for the optimisation project of the Iscor Mining
Ferrosillicon plant. The recommendations were based on the theory of constraints and
recommendations were made regarding the improvement of production processes and
increasing throughput.
 Responsible for the economic evaluation of the RSA Iscor Coking coal business to
determine a long-term strategy of this business for Iscor.
 Responsible for the economic evaluation of the Rosh Pinah mine, expansion project, as
used for the Bankable document.
 Responsible for providing modelling expertise in the Iscor Value Network project. The
project objective is to investigate, map and model the total Value Network in order to
support the evaluation of company business decisions.
MAIN PROJECTS

More Related Content

Similar to Exxaro Main Projects

Case Studies of Simultaneous M&M Operations in the Platinum Industry - SAIMM ...
Case Studies of Simultaneous M&M Operations in the Platinum Industry - SAIMM ...Case Studies of Simultaneous M&M Operations in the Platinum Industry - SAIMM ...
Case Studies of Simultaneous M&M Operations in the Platinum Industry - SAIMM ...Steve Burks
 
Higher education apr 2013
Higher education apr 2013Higher education apr 2013
Higher education apr 2013mdonoghue1
 
Sr Cost Estimator-Resume (July 2016)-Pankaj Kisnadwala
Sr Cost Estimator-Resume (July 2016)-Pankaj KisnadwalaSr Cost Estimator-Resume (July 2016)-Pankaj Kisnadwala
Sr Cost Estimator-Resume (July 2016)-Pankaj KisnadwalaPankaj Kisnadwala
 
Asif M Idris 2015 CV
Asif M Idris 2015 CVAsif M Idris 2015 CV
Asif M Idris 2015 CVAsif M Idris
 
Asif M Idris 2015 CV
Asif M Idris 2015 CVAsif M Idris 2015 CV
Asif M Idris 2015 CVAsif M Idris
 
Eduardo Neira - Project Experience
Eduardo Neira - Project ExperienceEduardo Neira - Project Experience
Eduardo Neira - Project ExperienceEduardo Neira
 
Project Resume - HCL-Axon
Project Resume - HCL-AxonProject Resume - HCL-Axon
Project Resume - HCL-AxonLisa Loveland
 
Gaurav Sharma - Petroleum Engineer LATEST 2017
Gaurav Sharma - Petroleum Engineer LATEST 2017Gaurav Sharma - Petroleum Engineer LATEST 2017
Gaurav Sharma - Petroleum Engineer LATEST 2017GAURAV SHARMA
 
S11 ORA 4 2015 - Technology 03
S11 ORA 4 2015 - Technology 03S11 ORA 4 2015 - Technology 03
S11 ORA 4 2015 - Technology 03Ali Ramady
 
Darrell Ketchum Project Controls
Darrell Ketchum Project ControlsDarrell Ketchum Project Controls
Darrell Ketchum Project ControlsDarrell Ketchum
 
P.Koshalendra-2009H106472P-Projects
P.Koshalendra-2009H106472P-ProjectsP.Koshalendra-2009H106472P-Projects
P.Koshalendra-2009H106472P-ProjectsKoshalendra Pandey
 
Revised corrected cv s mahapatra
Revised corrected cv s mahapatra Revised corrected cv s mahapatra
Revised corrected cv s mahapatra Subhankar Mahapatra
 
Maintenance Planning & Scheduling
Maintenance Planning & SchedulingMaintenance Planning & Scheduling
Maintenance Planning & SchedulingPowerEDGE
 

Similar to Exxaro Main Projects (20)

Case Studies of Simultaneous M&M Operations in the Platinum Industry - SAIMM ...
Case Studies of Simultaneous M&M Operations in the Platinum Industry - SAIMM ...Case Studies of Simultaneous M&M Operations in the Platinum Industry - SAIMM ...
Case Studies of Simultaneous M&M Operations in the Platinum Industry - SAIMM ...
 
Higher education apr 2013
Higher education apr 2013Higher education apr 2013
Higher education apr 2013
 
Sr Cost Estimator-Resume (July 2016)-Pankaj Kisnadwala
Sr Cost Estimator-Resume (July 2016)-Pankaj KisnadwalaSr Cost Estimator-Resume (July 2016)-Pankaj Kisnadwala
Sr Cost Estimator-Resume (July 2016)-Pankaj Kisnadwala
 
Asif M Idris 2015 CV
Asif M Idris 2015 CVAsif M Idris 2015 CV
Asif M Idris 2015 CV
 
Asif M Idris 2015 CV
Asif M Idris 2015 CVAsif M Idris 2015 CV
Asif M Idris 2015 CV
 
Eduardo Neira - Project Experience
Eduardo Neira - Project ExperienceEduardo Neira - Project Experience
Eduardo Neira - Project Experience
 
resumenew_Atul Bhalla
resumenew_Atul Bhallaresumenew_Atul Bhalla
resumenew_Atul Bhalla
 
Project Resume - HCL-Axon
Project Resume - HCL-AxonProject Resume - HCL-Axon
Project Resume - HCL-Axon
 
Resume Leyla Clothier
Resume Leyla ClothierResume Leyla Clothier
Resume Leyla Clothier
 
Gaurav Sharma - Petroleum Engineer LATEST 2017
Gaurav Sharma - Petroleum Engineer LATEST 2017Gaurav Sharma - Petroleum Engineer LATEST 2017
Gaurav Sharma - Petroleum Engineer LATEST 2017
 
S11 ORA 4 2015 - Technology 03
S11 ORA 4 2015 - Technology 03S11 ORA 4 2015 - Technology 03
S11 ORA 4 2015 - Technology 03
 
Geraldine_Goh-CV
Geraldine_Goh-CVGeraldine_Goh-CV
Geraldine_Goh-CV
 
Khan Danial
Khan DanialKhan Danial
Khan Danial
 
My_CV
My_CVMy_CV
My_CV
 
Darrell Ketchum Project Controls
Darrell Ketchum Project ControlsDarrell Ketchum Project Controls
Darrell Ketchum Project Controls
 
Surendran_CVupdated
Surendran_CVupdatedSurendran_CVupdated
Surendran_CVupdated
 
P.Koshalendra-2009H106472P-Projects
P.Koshalendra-2009H106472P-ProjectsP.Koshalendra-2009H106472P-Projects
P.Koshalendra-2009H106472P-Projects
 
Revised corrected cv s mahapatra
Revised corrected cv s mahapatra Revised corrected cv s mahapatra
Revised corrected cv s mahapatra
 
Samrat Khanorkar_Resume
Samrat Khanorkar_ResumeSamrat Khanorkar_Resume
Samrat Khanorkar_Resume
 
Maintenance Planning & Scheduling
Maintenance Planning & SchedulingMaintenance Planning & Scheduling
Maintenance Planning & Scheduling
 

Exxaro Main Projects

  • 1.  The full project implementation ofa self-designed and built Xeras models forthe Exxaro Leeuwpan, Grootegeluk, NBC, Thabametsi, Belfast, UG Matla Coal mines . These completed models replace the previous cumbersome typical mine Excel models. The modelsform partofourcurrent mineral resources managementfocus and gives a seamless integration of mine plan evaluation with Xpac. The Xeras models are used extensively in the planning process to understand the impact of projects and scenario changes on the financial costs. The models typically an take into account Xpac scheduling info, plant algorithms, stockpiles, marketing info, the detail primary and secondary mining fleet cost (with LCC costing) etc. and is used to evaluate different scenarios with detail Financial cash flow statements.  Responsible for detail mine to plant throughput simulation models for Belfast mine, Matla Mine and the new Grootegeluk Medupi mine expansion including backfilling and discard strategies. All models are used to make decisions for pre and feasibility studies for expansion projects and assist in design parameters and contract negotiations with the power utility.  Involved with Hatch Associates Ltd of Canada in the simulation, with animation, of the Saldanha Steel mini-mill processes, raw materials handling and warehousing operations. The modelswereused to reflect the latest plant layout and the interaction of the proposed Saldanha Steel Plant. Recommendations were made to ensure the expected production levels and to establish and understand the dynamic interaction of major process units.  Responsible fora simulation model that willbe used to assist in the design of equipment in the crushing and screening circuits for the Rosh Pinah mine. 1.  Responsible forasimulation model that was used to determine the Throughput capacity (train off-loading and ship loading) of Saldanha Port facilities.  Responsible for a comprehensive financial model in Excel, representing the Saldanha Steel business from economic, production, marketing parameters to a full set of financial statements. This model is still currently utilised for forecasting, budgeting purposes and is used to make executive management decisions regarding the economic viability of the project for the respective shareholders.  Responsible as project manager for the optimisation project of the Iscor Mining Ferrosillicon plant. The recommendations were based on the theory of constraints and recommendations were made regarding the improvement of production processes and increasing throughput.  Responsible for the economic evaluation of the RSA Iscor Coking coal business to determine a long-term strategy of this business for Iscor.  Responsible for the economic evaluation of the Rosh Pinah mine, expansion project, as used for the Bankable document.  Responsible for providing modelling expertise in the Iscor Value Network project. The project objective is to investigate, map and model the total Value Network in order to support the evaluation of company business decisions. MAIN PROJECTS