SlideShare a Scribd company logo
1 of 2
Download to read offline
RAO MUHAMMAD ABDULLAH
 engrabdullah@live.com
 +92-333-7403595
CAREER OBJECTIVE:
To utilize my technical skills for achieving the target and developing the best performance in the Organization. I would like to
implement my innovative ideas, skills and creativity for accomplishing the Organization’s goals.
WORKING EXPERIENCE:
Employer: Aga Khan University & Hospital Karachi (12th Oct, 2015 till continue)
Position: Operations Engineer (Mechanical, Electrical and Plumbing)
 Ensure Operation and Maintenance Management of all Mechanical, Air Conditioning Plumbing Equipment and
Utility Services to ensure reliable and smooth services to users through effective management of resources and
staff.
 Evaluate and Inspect operational parameters of Critical Equipment for preventive maintenance.
 Ensure to provide smooth supply of different utilities (Medical Vacuum, Medical Air and Fresh Water) to end
user round the clock.
 Ensure and inspect smooth operation of Absorption Chillers, Electrical Chillers, Steam Generator and
Instrument Air Compressors.
 Good command on BMS system for monitoring and controlling of all critical services and plant equipment.(UNC
and Structure Ware)
 Ensure and Manage smooth and effective operation of more than 200 AHU’s (including DX coil system) and
FCU’s to provide control Air Conditioning to critical areas (Operation Theaters, ICU, CICU, NICU and BSL’s Lab
etc.)
 Ensure and maintain 24 hrs. Electrical Supply by proper operation management through using Emergency
Generators with ATS system.
 Preventive Maintenance Scheduling using Maintenance Software EAM 10 for daily and Yearly Maintenance,
Planning of the Predictive and breakdown Maintenance.
Employer: Novatex Pvt Ltd. (Polymer Plant) (03rd Dec, 2013 to 11th Oct, 2015)
 Supervised Installation & Commissioning of Trane screw type vapor compression and Shuangliang absorption
chiller.
 Excellent trouble shooting skills in centrifugal and positive displacement pumps maintenance as well as
condition monitoring
 Assisted Operation and maintenance of de-mineralized plant & Soft Water Plant
 Supervision of Nitrogen generation plant based on Pressure swing absorption system
 Operations & Troubleshooting of High Pressure & Low Pressure Air compressors (Atlas Copco).
 Remarkable trouble shooting skills of Vapor compression and vapor Absorption chiller maintenance
 Guided working and treatment of forced draft and induced draft cooling towers and closed and open re-
circulating cooling systems
 Spare parts planning and Maintenance budget planning.
 Preventive Maintenance Scheduling using Maintenance Software Mogan system for daily and Yearly
Maintenance, Planning of the Predictive and breakdown Maintenance.
 Material Management System for the procurement of Spare Parts
 Piping and Estimation of BOQ.
 Assisted working in Fabrication and Erection.
 Working as a project planning engineer.
ACADEMIC QUALIFICATIONS:
B.E INDUSTRIAL ENGINEERING / MECHANICAL ENGINEERING 2013
(1st Div. 83%)Dawood College of Engineering & Technology Karachi
PRE ENGINEERING (HIGHER SECONDARY SCHOOL CERTIFICATE) 2008
(1st Div. 72%)Board of Intermediate and Secondary Education Multan
MATRIC (SECONDARY SCHOOL CERTIFICATE) 2006
(1st Div. 72%)Board of Intermediate and Secondary Education Multan
DISTINCTION:
Secured 3rd position among all student in final exam (Batch 2009)
COMPUTER SKILLS:
Primavera P6 Familiar MS Office 2007/2010 Expert
Auto CAD Familiar Windows 2000/XP/7 & 8 Expert
Pro Engineering Familiar Internet Browsing Expert
PERSONAL SKILLS:
 Able to work under pressure and meeting deadlines
 Well organized and flexible: Ability to deal with dynamic environment.
 Communication and customer handling skills.
 To understand and speaks English and Urdu languages.
 Creative, innovative, hardworking and possessing leadership abilities
 Team oriented ,competitive and excellent communication & interpersonal skills
FINAL YEAR PROJECT:
COMPANY: INDUS MOTOR COMPANY (TOYOTA)
PROJECT: LEAN MANUFACTURING & SIX SIGMA
To remove waste from manufacturing process by using lean manufacturing tools and improve quality of product by using
six sigma tools.
CERTIFICATION:
 Two days course of Advanced Project Management
PERSONAL DATA:
NAME: RAO MUHAMMAD ABDULLAH
NIC: 36302-7632082-3
D.O.B: 22nd November, 1990.
DOMICILE: Multan (Punjab)
PRESENT ADDRESS: House No A-675, Block H, North Nazimabad Karachi.
PERMANENT ADDRESS: Chak No 1/H, Basti Nagania, P/O Kot Abbas Shaheed Multan

More Related Content

What's hot (20)

Mechanical Maintenance Engineer
Mechanical Maintenance Engineer Mechanical Maintenance Engineer
Mechanical Maintenance Engineer
 
Subrata 1313
Subrata 1313Subrata 1313
Subrata 1313
 
Subrat Ranajn
Subrat RanajnSubrat Ranajn
Subrat Ranajn
 
sanjeev
sanjeevsanjeev
sanjeev
 
Ahmed Mohamed Abdelkhalik Final Update CV
Ahmed Mohamed Abdelkhalik Final Update CVAhmed Mohamed Abdelkhalik Final Update CV
Ahmed Mohamed Abdelkhalik Final Update CV
 
Resume to I EC
Resume to I ECResume to I EC
Resume to I EC
 
mohy CV UPDATED
mohy CV UPDATEDmohy CV UPDATED
mohy CV UPDATED
 
RESUME FORMAT 2016 signed
RESUME FORMAT 2016 signedRESUME FORMAT 2016 signed
RESUME FORMAT 2016 signed
 
OMAR AHMED C V.doc
OMAR AHMED C V.docOMAR AHMED C V.doc
OMAR AHMED C V.doc
 
Updated Resume
Updated ResumeUpdated Resume
Updated Resume
 
Manoj resume (1)
Manoj resume (1)Manoj resume (1)
Manoj resume (1)
 
Cv ajay parikh
Cv ajay parikhCv ajay parikh
Cv ajay parikh
 
Bradley R (1) (1)
Bradley R (1) (1)Bradley R (1) (1)
Bradley R (1) (1)
 
E. Mohammad
E. MohammadE. Mohammad
E. Mohammad
 
RAVI KUMAR DOMATERA_original
RAVI KUMAR DOMATERA_originalRAVI KUMAR DOMATERA_original
RAVI KUMAR DOMATERA_original
 
Mechanical engineer
Mechanical engineerMechanical engineer
Mechanical engineer
 
Iwd4000120462@focus career.com
Iwd4000120462@focus career.comIwd4000120462@focus career.com
Iwd4000120462@focus career.com
 
Naushad Bhatti (CV) (1)
Naushad Bhatti (CV) (1)Naushad Bhatti (CV) (1)
Naushad Bhatti (CV) (1)
 
darwis rme
darwis rmedarwis rme
darwis rme
 
ZIA-CV
ZIA-CV ZIA-CV
ZIA-CV
 

Viewers also liked (20)

Zia Ur Rehman Cv
Zia Ur Rehman CvZia Ur Rehman Cv
Zia Ur Rehman Cv
 
Profile - Innovative Casting Technologies
Profile - Innovative Casting TechnologiesProfile - Innovative Casting Technologies
Profile - Innovative Casting Technologies
 
Cv Fazal Ur Rehman 2016 (wo)
Cv Fazal Ur Rehman 2016 (wo)Cv Fazal Ur Rehman 2016 (wo)
Cv Fazal Ur Rehman 2016 (wo)
 
junaid CV 2016
junaid CV 2016junaid CV 2016
junaid CV 2016
 
mahimavarma_cv_2016
mahimavarma_cv_2016mahimavarma_cv_2016
mahimavarma_cv_2016
 
Rao_Tahir Resume_
Rao_Tahir Resume_Rao_Tahir Resume_
Rao_Tahir Resume_
 
Abid ur Rehman cv for Job
Abid ur Rehman cv for JobAbid ur Rehman cv for Job
Abid ur Rehman cv for Job
 
Profile. Hanif Ur Rehman
Profile. Hanif Ur RehmanProfile. Hanif Ur Rehman
Profile. Hanif Ur Rehman
 
rizwan ur rehman 12
rizwan ur rehman 12rizwan ur rehman 12
rizwan ur rehman 12
 
RESUME - Col Ata- eni Pakistan Ltd.
RESUME - Col Ata- eni Pakistan Ltd.RESUME - Col Ata- eni Pakistan Ltd.
RESUME - Col Ata- eni Pakistan Ltd.
 
Azeem CV
Azeem CVAzeem CV
Azeem CV
 
rehman c.v (2)
rehman c.v (2)rehman c.v (2)
rehman c.v (2)
 
faizan cv
faizan cvfaizan cv
faizan cv
 
Aziz ur Rehman Resume-Update
Aziz ur Rehman Resume-UpdateAziz ur Rehman Resume-Update
Aziz ur Rehman Resume-Update
 
Muzammil CV
Muzammil CVMuzammil CV
Muzammil CV
 
New cv of me
New cv of meNew cv of me
New cv of me
 
Muhammad Ghufran CV
Muhammad Ghufran CVMuhammad Ghufran CV
Muhammad Ghufran CV
 
Saadat ur Rehman_CV_2014
Saadat ur Rehman_CV_2014Saadat ur Rehman_CV_2014
Saadat ur Rehman_CV_2014
 
Internship Report - Rao Saim Zafar
Internship Report - Rao Saim ZafarInternship Report - Rao Saim Zafar
Internship Report - Rao Saim Zafar
 
meher khan c.v
meher khan c.vmeher khan c.v
meher khan c.v
 

Similar to Resume (RMA) (20)

CV Dewaharbabu
CV DewaharbabuCV Dewaharbabu
CV Dewaharbabu
 
Yusuff- CV
Yusuff- CVYusuff- CV
Yusuff- CV
 
Resume E&I
Resume E&IResume E&I
Resume E&I
 
AVINASH . Basrur
AVINASH . BasrurAVINASH . Basrur
AVINASH . Basrur
 
social profile _sachin soni_220715
social profile _sachin soni_220715social profile _sachin soni_220715
social profile _sachin soni_220715
 
M.Yesrub Iqbal
M.Yesrub IqbalM.Yesrub Iqbal
M.Yesrub Iqbal
 
Maintenance and Projects 16+ Yrs in Automotive Industry
Maintenance and Projects 16+ Yrs in Automotive IndustryMaintenance and Projects 16+ Yrs in Automotive Industry
Maintenance and Projects 16+ Yrs in Automotive Industry
 
Islam's CV.pdf
Islam's CV.pdfIslam's CV.pdf
Islam's CV.pdf
 
Dino_with_photodoc1
Dino_with_photodoc1Dino_with_photodoc1
Dino_with_photodoc1
 
Assistant manager in maintenance
Assistant manager in maintenanceAssistant manager in maintenance
Assistant manager in maintenance
 
Resume Ravindra K Maheshwari - CC
Resume Ravindra K Maheshwari -  CCResume Ravindra K Maheshwari -  CC
Resume Ravindra K Maheshwari - CC
 
ROHIT JOSHI JI
ROHIT JOSHI JIROHIT JOSHI JI
ROHIT JOSHI JI
 
CV
CVCV
CV
 
RAJENDRA SHARMA CV
RAJENDRA SHARMA CVRAJENDRA SHARMA CV
RAJENDRA SHARMA CV
 
Khubaib Khan_CV Instrument
Khubaib Khan_CV InstrumentKhubaib Khan_CV Instrument
Khubaib Khan_CV Instrument
 
upated c.v sa S.E.C (1)
upated c.v sa S.E.C (1)upated c.v sa S.E.C (1)
upated c.v sa S.E.C (1)
 
viklesh essar
viklesh essarviklesh essar
viklesh essar
 
Curriculum vitae original
Curriculum vitae originalCurriculum vitae original
Curriculum vitae original
 
dinesh techom - with outpic revised
dinesh techom - with outpic reviseddinesh techom - with outpic revised
dinesh techom - with outpic revised
 
resume 23
resume 23resume 23
resume 23
 

Resume (RMA)

  • 1. RAO MUHAMMAD ABDULLAH  engrabdullah@live.com  +92-333-7403595 CAREER OBJECTIVE: To utilize my technical skills for achieving the target and developing the best performance in the Organization. I would like to implement my innovative ideas, skills and creativity for accomplishing the Organization’s goals. WORKING EXPERIENCE: Employer: Aga Khan University & Hospital Karachi (12th Oct, 2015 till continue) Position: Operations Engineer (Mechanical, Electrical and Plumbing)  Ensure Operation and Maintenance Management of all Mechanical, Air Conditioning Plumbing Equipment and Utility Services to ensure reliable and smooth services to users through effective management of resources and staff.  Evaluate and Inspect operational parameters of Critical Equipment for preventive maintenance.  Ensure to provide smooth supply of different utilities (Medical Vacuum, Medical Air and Fresh Water) to end user round the clock.  Ensure and inspect smooth operation of Absorption Chillers, Electrical Chillers, Steam Generator and Instrument Air Compressors.  Good command on BMS system for monitoring and controlling of all critical services and plant equipment.(UNC and Structure Ware)  Ensure and Manage smooth and effective operation of more than 200 AHU’s (including DX coil system) and FCU’s to provide control Air Conditioning to critical areas (Operation Theaters, ICU, CICU, NICU and BSL’s Lab etc.)  Ensure and maintain 24 hrs. Electrical Supply by proper operation management through using Emergency Generators with ATS system.  Preventive Maintenance Scheduling using Maintenance Software EAM 10 for daily and Yearly Maintenance, Planning of the Predictive and breakdown Maintenance. Employer: Novatex Pvt Ltd. (Polymer Plant) (03rd Dec, 2013 to 11th Oct, 2015)  Supervised Installation & Commissioning of Trane screw type vapor compression and Shuangliang absorption chiller.  Excellent trouble shooting skills in centrifugal and positive displacement pumps maintenance as well as condition monitoring  Assisted Operation and maintenance of de-mineralized plant & Soft Water Plant  Supervision of Nitrogen generation plant based on Pressure swing absorption system  Operations & Troubleshooting of High Pressure & Low Pressure Air compressors (Atlas Copco).  Remarkable trouble shooting skills of Vapor compression and vapor Absorption chiller maintenance  Guided working and treatment of forced draft and induced draft cooling towers and closed and open re- circulating cooling systems  Spare parts planning and Maintenance budget planning.  Preventive Maintenance Scheduling using Maintenance Software Mogan system for daily and Yearly Maintenance, Planning of the Predictive and breakdown Maintenance.  Material Management System for the procurement of Spare Parts  Piping and Estimation of BOQ.  Assisted working in Fabrication and Erection.  Working as a project planning engineer.
  • 2. ACADEMIC QUALIFICATIONS: B.E INDUSTRIAL ENGINEERING / MECHANICAL ENGINEERING 2013 (1st Div. 83%)Dawood College of Engineering & Technology Karachi PRE ENGINEERING (HIGHER SECONDARY SCHOOL CERTIFICATE) 2008 (1st Div. 72%)Board of Intermediate and Secondary Education Multan MATRIC (SECONDARY SCHOOL CERTIFICATE) 2006 (1st Div. 72%)Board of Intermediate and Secondary Education Multan DISTINCTION: Secured 3rd position among all student in final exam (Batch 2009) COMPUTER SKILLS: Primavera P6 Familiar MS Office 2007/2010 Expert Auto CAD Familiar Windows 2000/XP/7 & 8 Expert Pro Engineering Familiar Internet Browsing Expert PERSONAL SKILLS:  Able to work under pressure and meeting deadlines  Well organized and flexible: Ability to deal with dynamic environment.  Communication and customer handling skills.  To understand and speaks English and Urdu languages.  Creative, innovative, hardworking and possessing leadership abilities  Team oriented ,competitive and excellent communication & interpersonal skills FINAL YEAR PROJECT: COMPANY: INDUS MOTOR COMPANY (TOYOTA) PROJECT: LEAN MANUFACTURING & SIX SIGMA To remove waste from manufacturing process by using lean manufacturing tools and improve quality of product by using six sigma tools. CERTIFICATION:  Two days course of Advanced Project Management PERSONAL DATA: NAME: RAO MUHAMMAD ABDULLAH NIC: 36302-7632082-3 D.O.B: 22nd November, 1990. DOMICILE: Multan (Punjab) PRESENT ADDRESS: House No A-675, Block H, North Nazimabad Karachi. PERMANENT ADDRESS: Chak No 1/H, Basti Nagania, P/O Kot Abbas Shaheed Multan