TEAM BUILDING
T&I SERVICES FOR ST-PIP’S
JACKET AND ITS APPURTENANCES
TRANSPOTATION AND INSTALLATION SERVICES FOR
ST-PIP’S JACKET AND ITS APPURTENANCES
SCOPE OF WORK:
T&I
SCOPE
JACKET weight 2378 Ton
with launching method.
4 Piles OD 1829mm
Total weight is 1567 Tons
03 conductors OD 762mm
Total weight is 270 Tons
01 Drilling deck
Weight 22ton
3
MILESTONE COMPLETION OF T&I SERVICES FOR ST-PIP’S JACKET AND ITS
APPURTENANCES
STT Description
Key Milestone
Sub Contract
Actual
Milestone
01-01 Effective Date 27 Apr 2015 27 Apr 2015
01-04a
MCD of ST-PIP’s Jacket and its
appurtenance
15 Aug 2015 15 Aug 2015
02-07 ST-PIP’s Jacket ready for Sail-away 31 Aug 2015 03 Sep 2015
02-08
Mobilization at Offshore Site of
installation Spread
05 Sep 2015 04 Sep 2015
02-09
Complete piling and Conductors
installation for ST-PIP’s Jacket
29 Sep 2015 01 Oct 2015
02-10 Handover of ST-PIP Jacket 30 Sep 2015 3 Oct 2015
TRANSPOTATION AND INSTALLATION SERVICES FOR
ST-PIP’S JACKET AND ITS APPURTENANCES
MILESTONE COMPLETION:
TRANSPOTATION AND INSTALLATION SERVICES FOR
ST-PIP’S JACKET AND ITS APPURTENANCES
EXECUTION>> PREPARATION ONSHORE
TRANSPOTATION AND INSTALLATION SERVICES FOR
ST-PIP’S JACKET AND ITS APPURTENANCES
EXECUTION>> LOADOUT
TRANSPOTATION AND INSTALLATION SERVICES FOR
ST-PIP’S JACKET AND ITS APPURTENANCES
EXECUTION>> TRANSPORTATION
TRANSPOTATION AND INSTALLATION SERVICES FOR
ST-PIP’S JACKET AND ITS APPURTENANCES
EXECUTION>> TRANSPORTATION
TRANSPOTATION AND INSTALLATION SERVICES FOR
ST-PIP’S JACKET AND ITS APPURTENANCES
EXECUTION>> LAUNCHING
TRANSPOTATION AND INSTALLATION SERVICES FOR
ST-PIP’S JACKET AND ITS APPURTENANCES
EXECUTION>> LAUNCHING
TRANSPOTATION AND INSTALLATION SERVICES FOR
ST-PIP’S JACKET AND ITS APPURTENANCES
EXECUTION>> LAUNCHING
TRANSPOTATION AND INSTALLATION SERVICES FOR
ST-PIP’S JACKET AND ITS APPURTENANCES
EXECUTION>> JACKET INSTALLATION
TRANSPOTATION AND INSTALLATION SERVICES FOR
ST-PIP’S JACKET AND ITS APPURTENANCES
EXECUTION>> INSTALLATION PILE
TRANSPOTATION AND INSTALLATION SERVICES FOR
ST-PIP’S JACKET AND ITS APPURTENANCES
EXECUTION>> INSTALLATION PILE
TRANSPOTATION AND INSTALLATION SERVICES FOR
ST-PIP’S JACKET AND ITS APPURTENANCES
EXECUTION>> INSTALLATION PILE
TRANSPOTATION AND INSTALLATION SERVICES FOR
ST-PIP’S JACKET AND ITS APPURTENANCES
EXECUTION>> INSTALLATION PILE
TRANSPOTATION AND INSTALLATION SERVICES FOR
ST-PIP’S JACKET AND ITS APPURTENANCES
EXECUTION>> LEVELING JACKET
TRANSPOTATION AND INSTALLATION SERVICES FOR
ST-PIP’S JACKET AND ITS APPURTENANCES
EXECUTION>> LEVELING JACKET
TRANSPOTATION AND INSTALLATION SERVICES FOR
ST-PIP’S JACKET AND ITS APPURTENANCES
EXECUTION>> CONDUCTOR INSTALLATION
TRANSPOTATION AND INSTALLATION SERVICES FOR
ST-PIP’S JACKET AND ITS APPURTENANCES
EXECUTION>> CONDUCTOR INSTALLATION
TRANSPOTATION AND INSTALLATION SERVICES FOR
ST-PIP’S JACKET AND ITS APPURTENANCES
EXECUTION>> CONDUCTOR INSTALLATION
TRANSPOTATION AND INSTALLATION SERVICES FOR
ST-PIP’S JACKET AND ITS APPURTENANCES
EXECUTION>> DILLING DECK INSTALLATION
TRANSPOTATION AND INSTALLATION SERVICES FOR
ST-PIP’S JACKET AND ITS APPURTENANCES
EXECUTION>> DILLING DECK INSTALLATION
TRANSPOTATION AND INSTALLATION SERVICES FOR
ST-PIP’S JACKET AND ITS APPURTENANCES
EXECUTION>> CLEANING JACKET
TRANSPOTATION AND INSTALLATION SERVICES FOR
ST-PIP’S JACKET AND ITS APPURTENANCES

More Related Content

Viewers also liked

The offshore decommissioning market review, 2011
The offshore decommissioning market review, 2011The offshore decommissioning market review, 2011
The offshore decommissioning market review, 2011
piersfrench
 
10 Well Abandonment Presentation Jan 29
10 Well Abandonment Presentation Jan 2910 Well Abandonment Presentation Jan 29
10 Well Abandonment Presentation Jan 29
Will Butler, P.Eng
 
0200 consideraciones principales de diseño
0200   consideraciones principales de diseño0200   consideraciones principales de diseño
0200 consideraciones principales de diseño
Juan J. Elwart
 
Plug & Abandonment
Plug & AbandonmentPlug & Abandonment
Plug & Abandonment
Statoil
 
Introduction to offshore structures
Introduction to offshore structuresIntroduction to offshore structures
Introduction to offshore structures
Nitish Anand
 
Life Cycle of Oil & Gas Wells
Life Cycle of Oil & Gas WellsLife Cycle of Oil & Gas Wells
Life Cycle of Oil & Gas Wells
Mohamed Elnagar
 
Oil & Gas Production and Surface Facilities
Oil & Gas Production and Surface FacilitiesOil & Gas Production and Surface Facilities
Oil & Gas Production and Surface Facilities
Mohamed Elnagar
 

Viewers also liked (20)

Offshore oil and gas overview
Offshore oil and gas overviewOffshore oil and gas overview
Offshore oil and gas overview
 
Oil & Gas technical training courses
Oil & Gas technical training coursesOil & Gas technical training courses
Oil & Gas technical training courses
 
The offshore decommissioning market review, 2011
The offshore decommissioning market review, 2011The offshore decommissioning market review, 2011
The offshore decommissioning market review, 2011
 
Life extension of aging petroleum production facilities offshore
Life extension of aging petroleum production facilities offshoreLife extension of aging petroleum production facilities offshore
Life extension of aging petroleum production facilities offshore
 
PE976 Offshore Platform Decommissioning
PE976 Offshore Platform DecommissioningPE976 Offshore Platform Decommissioning
PE976 Offshore Platform Decommissioning
 
Offshore Petroleum Production Systems
Offshore Petroleum Production SystemsOffshore Petroleum Production Systems
Offshore Petroleum Production Systems
 
An Overview of Design, Analysis, Construction and Installation of Offshore Pe...
An Overview of Design, Analysis, Construction and Installation of Offshore Pe...An Overview of Design, Analysis, Construction and Installation of Offshore Pe...
An Overview of Design, Analysis, Construction and Installation of Offshore Pe...
 
10 Well Abandonment Presentation Jan 29
10 Well Abandonment Presentation Jan 2910 Well Abandonment Presentation Jan 29
10 Well Abandonment Presentation Jan 29
 
Basic cpp presentation(1)
Basic cpp presentation(1)Basic cpp presentation(1)
Basic cpp presentation(1)
 
0200 consideraciones principales de diseño
0200   consideraciones principales de diseño0200   consideraciones principales de diseño
0200 consideraciones principales de diseño
 
Structural Design and Analysis of Offshore Wind Turbines from a System Point ...
Structural Design and Analysis of Offshore Wind Turbines from a System Point ...Structural Design and Analysis of Offshore Wind Turbines from a System Point ...
Structural Design and Analysis of Offshore Wind Turbines from a System Point ...
 
Plug & Abandonment
Plug & AbandonmentPlug & Abandonment
Plug & Abandonment
 
Basic whp presentation(1)
Basic whp presentation(1)Basic whp presentation(1)
Basic whp presentation(1)
 
Introduction to offshore structures
Introduction to offshore structuresIntroduction to offshore structures
Introduction to offshore structures
 
How to build a platform
How to build a platformHow to build a platform
How to build a platform
 
Offshore Platforms
Offshore Platforms Offshore Platforms
Offshore Platforms
 
Introduction to offshore structure
Introduction to offshore structure Introduction to offshore structure
Introduction to offshore structure
 
Life Cycle of Oil & Gas Wells
Life Cycle of Oil & Gas WellsLife Cycle of Oil & Gas Wells
Life Cycle of Oil & Gas Wells
 
Oil & Gas Production and Surface Facilities
Oil & Gas Production and Surface FacilitiesOil & Gas Production and Surface Facilities
Oil & Gas Production and Surface Facilities
 
Introduction into Oil and Gas Industry. OIL: Part 1
Introduction into Oil and Gas Industry. OIL: Part 1Introduction into Oil and Gas Industry. OIL: Part 1
Introduction into Oil and Gas Industry. OIL: Part 1
 

Similar to Teambuilding present T&I STT 2016

OFFSHORE CV DYLAN OLIVIER UPDATE Oct 2014
OFFSHORE CV DYLAN OLIVIER UPDATE Oct 2014OFFSHORE CV DYLAN OLIVIER UPDATE Oct 2014
OFFSHORE CV DYLAN OLIVIER UPDATE Oct 2014
Dylan Olivier
 
CV Siam Update 31-10-2016
CV  Siam Update 31-10-2016CV  Siam Update 31-10-2016
CV Siam Update 31-10-2016
siam sayed
 
Proposed Methodology Shore Approach
Proposed Methodology  Shore ApproachProposed Methodology  Shore Approach
Proposed Methodology Shore Approach
Mohd Zaini Baharum
 
C.H.Scott Goodwin (2)
C.H.Scott Goodwin (2)C.H.Scott Goodwin (2)
C.H.Scott Goodwin (2)
Scott Goodwin
 
8.CV ARIF NIZAR
8.CV ARIF NIZAR8.CV ARIF NIZAR
8.CV ARIF NIZAR
Arif Nizar
 
QP_Safety_executive_procedure_final
QP_Safety_executive_procedure_finalQP_Safety_executive_procedure_final
QP_Safety_executive_procedure_final
Ian Kelly
 
TEMPERATURE EXPANSION OF FLANGE JOINTS
TEMPERATURE EXPANSION OF FLANGE JOINTSTEMPERATURE EXPANSION OF FLANGE JOINTS
TEMPERATURE EXPANSION OF FLANGE JOINTS
Andrey Zhilin
 

Similar to Teambuilding present T&I STT 2016 (20)

OFFSHORE CV DYLAN OLIVIER UPDATE Oct 2014
OFFSHORE CV DYLAN OLIVIER UPDATE Oct 2014OFFSHORE CV DYLAN OLIVIER UPDATE Oct 2014
OFFSHORE CV DYLAN OLIVIER UPDATE Oct 2014
 
NCGB PROFILE
NCGB PROFILENCGB PROFILE
NCGB PROFILE
 
Glenn Ross-CV
Glenn Ross-CVGlenn Ross-CV
Glenn Ross-CV
 
CV Siam Update 31-10-2016
CV  Siam Update 31-10-2016CV  Siam Update 31-10-2016
CV Siam Update 31-10-2016
 
INSTRUMENT SUPERVISOR
INSTRUMENT SUPERVISORINSTRUMENT SUPERVISOR
INSTRUMENT SUPERVISOR
 
INSTRUMENT SUPERVISOR
INSTRUMENT SUPERVISORINSTRUMENT SUPERVISOR
INSTRUMENT SUPERVISOR
 
Continuous Weighing-Only for Knowledge sharing.ppt
Continuous Weighing-Only for Knowledge sharing.pptContinuous Weighing-Only for Knowledge sharing.ppt
Continuous Weighing-Only for Knowledge sharing.ppt
 
Cable Pulling & Laying Equipment for Street Lighting
Cable Pulling & Laying Equipment for Street LightingCable Pulling & Laying Equipment for Street Lighting
Cable Pulling & Laying Equipment for Street Lighting
 
SEB - Cable Pulling & Cable Laying Equipment For Low & High Voltage Cables In...
SEB - Cable Pulling & Cable Laying Equipment For Low & High Voltage Cables In...SEB - Cable Pulling & Cable Laying Equipment For Low & High Voltage Cables In...
SEB - Cable Pulling & Cable Laying Equipment For Low & High Voltage Cables In...
 
Cable Laying Pulling Equipment Low High Voltage Cables - Catalogue
Cable Laying Pulling Equipment Low High Voltage Cables - CatalogueCable Laying Pulling Equipment Low High Voltage Cables - Catalogue
Cable Laying Pulling Equipment Low High Voltage Cables - Catalogue
 
SEB Cable Pulling & Laying Equipment Catalogue
SEB Cable Pulling & Laying Equipment CatalogueSEB Cable Pulling & Laying Equipment Catalogue
SEB Cable Pulling & Laying Equipment Catalogue
 
Proposed Methodology Shore Approach
Proposed Methodology  Shore ApproachProposed Methodology  Shore Approach
Proposed Methodology Shore Approach
 
C.H.Scott Goodwin (2)
C.H.Scott Goodwin (2)C.H.Scott Goodwin (2)
C.H.Scott Goodwin (2)
 
Pigging Solutions Skid & Assembly Examples
Pigging Solutions Skid & Assembly ExamplesPigging Solutions Skid & Assembly Examples
Pigging Solutions Skid & Assembly Examples
 
23. CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
23.  CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)23.  CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
23. CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
 
8.CV ARIF NIZAR
8.CV ARIF NIZAR8.CV ARIF NIZAR
8.CV ARIF NIZAR
 
Engineered Spring Supports V.2
Engineered Spring Supports V.2Engineered Spring Supports V.2
Engineered Spring Supports V.2
 
QP_Safety_executive_procedure_final
QP_Safety_executive_procedure_finalQP_Safety_executive_procedure_final
QP_Safety_executive_procedure_final
 
EDGAR P AGUILAR
EDGAR  P AGUILAREDGAR  P AGUILAR
EDGAR P AGUILAR
 
TEMPERATURE EXPANSION OF FLANGE JOINTS
TEMPERATURE EXPANSION OF FLANGE JOINTSTEMPERATURE EXPANSION OF FLANGE JOINTS
TEMPERATURE EXPANSION OF FLANGE JOINTS
 

Teambuilding present T&I STT 2016