Soil samples and samplers
Principle of design of samplers
Collection and shiftment of sample
Boring and sampling record
CONTENT
.
Soil samples can be of two types:
(i) Disturbed samples.
(ii) Undisturbed samples
SOIL SAMPLES
A disturbed sample is a sample in which the natural structure of
soil gets partly or fully modified and destroyed .
However , by taking proper precautions , the natural water
content in soil sample can be preserved .
The composition and the mineral content of the soil is
represented by the samples
Index proprties of the soil can be determined from disturbed
samples ex. Grain size, plasticity, characteristics of specific gravity
.
DISTURB SOIL SAMPLE
An undisturbed sample is a sample which the natural
structure and properties remain preserved And the
water content are retained .
It is impossible to get the truly undisturb sample The
sample disturbance depends on the design of samplers
and the method of sampling .
These samples are used for determining engineering
properties of soil such as shear strength,
compressibility , shrinkage limit and permeability
UNDISTURB SOIL SAMPLE
DISTURB SAMPLE UNDISTURB SAMPLE
There are four types of samplers
SPLIT- SPOON SAMPLER
SCRAPER BUCKET SAMPLER
SHELBY TUBES AND THIN WALLED SAMPLERS
PISTON SAMPLER
TYPE OF SOIL SAMPLERS
It is commanly used for obtaining a disturb samples of the soil.
The split spoon sampler consist of three types
1. Tool – steel made driving shoe about 75mm in length.
2. 450mm long steel tube, split longitudally in two halves.
3. 150mm long coupling at the top of the tube.
The steel tube in the middle has inside and out side diameters of 34.9mm and 50.8mm,
respectively.
When the bore hole is advanced to a desired depth, the drilling tools are removed. The split-
spoon sampler is attached to the drilling rod and then lowered to the bottom of the bore hole
by repeated blows of hammerr and then withdrawn .
The split spoon is seperate after removing the shoe and the coupling and the sample is taken
out . sample is then placed in container , sealed and transported to the labortary .
SPLIT SPOON SAMPLER
SPLIT SPOON SAMPLER
Piston sampler consist of two parts
Sampler cylinder
Piston cylinder
The piston first tight in the sampler cylinder.
Good quality undisturbed samples of soft and sensitive clay are obtained from
piston samplers which use thin-walled sampling tubes with a piston inside.
While the tube is being lowered to the bottom of the drill hole, the piston rods and
piston are held at the bottom by different type of samplers.
The presence of the piston prevent rapid squeezing of the soft soil into the tube
and reduces the disturbance of the sample
PISTON SAMPLER
PISTON SAMPLER
When soil deposits are sand mixed with pebbles, obtaining samples by
split spoon with a spring core catcher may not be possible because the
pebbles may prevent the springs from closing.
In such cases, a scraper bucket may be used to obtain disturbed
representative sampleS
The scraper bucket has a driving point and can be attached to a drilling
rod.
The sampler is driven down into the soil and rotated, and the scraping
from the side falls into the bucket.
SCRAPER BUCKET SAMPLER
SCRAPER BUCKET SAMPLER
The stelby tubes are thin walled tube samplers having outside diameter of
the tube is 40 mm to 125 mm whose sampler having diameter 50.8 mm or
76.2 mm are commanly used. The bottom of the tube acts as a cutting
edge .
The sampler tube is attached to drilling rod and lowered to the bottom of
the drilled bore hole and tube is pushed into the soil by rapid motion
without impact or twisting .
After atleast 5 minutes the tube is turned twice through 360 degree to
shear the sample off at the bottom before The sampler is taken out.
It Is used for obtaining undisturbed sample of clay and it is also used for
exploration in cohessionless soils below water table.
SHELBYTUBE ANDTHIN WALL
SAMPLERS.
New Construction
„
1. Evaluate soils, subsoils , other elements in
the soil profile prior to construction „
2. May provide direction for design and construction. „
• Existing Fi elds
„1. Diagnose soil problems in existing fields
AIM OF COLLECTION AND SHIFTMENT
OF SAMPLE
„Impenetrable layers
o „Bedrock? „
 Depth to ground water „
o Will subsurface subsurface drain system be needed?
„Soil types presen
o Can it be reuse, modifIed , or all imported?
 „Permeability to water
INFORMATIONWE GET DUETO
COLLECTION OF SAMPLE
1. Name and address of the drilling company
2. Driller’s name
3. Job description and number
4. Number, type, and location of boring
5. Date of boring
6. Subsurface stratification, which can he obtained by visual
observation of the soil brought out by auger, split-spoon sampler, and
thin-walled Shelby tube sampler
7. Elevation of water table and date observed, use of casing and mud
losses, and so on
8. Standard penetration resistance and the depth of SPT
9. Number, type, and depth of soil sample collected
10. In case of rock coring, type of core barrel used and, for each run,
the actual length of coring, length of core recovery, and ROD
Preparation of Boring Logs
BORING LOG
THANK YOU

More Related Content

What's hot (20)

Shear strength of soil
Shear strength of soilShear strength of soil
Shear strength of soil
 
Soil exploration part i
Soil exploration part  iSoil exploration part  i
Soil exploration part i
 
Field control of compaction and compaction Equipment
Field control of compaction and compaction EquipmentField control of compaction and compaction Equipment
Field control of compaction and compaction Equipment
 
Grouting
GroutingGrouting
Grouting
 
Quick sand condation
Quick sand condationQuick sand condation
Quick sand condation
 
Soil stabilisation (1)
Soil stabilisation (1)Soil stabilisation (1)
Soil stabilisation (1)
 
Ground Improvement Techniques
Ground Improvement TechniquesGround Improvement Techniques
Ground Improvement Techniques
 
Subsurface exploration
Subsurface exploration  Subsurface exploration
Subsurface exploration
 
Wash boring
Wash boringWash boring
Wash boring
 
Soil slope stability
Soil slope stabilitySoil slope stability
Soil slope stability
 
Darcy's law
Darcy's lawDarcy's law
Darcy's law
 
Soil investigation
Soil investigationSoil investigation
Soil investigation
 
Burmister 2 layer
Burmister 2 layerBurmister 2 layer
Burmister 2 layer
 
Slope stability analysis methods
Slope stability analysis methodsSlope stability analysis methods
Slope stability analysis methods
 
4 permeability and seepage
4  permeability and seepage4  permeability and seepage
4 permeability and seepage
 
Subsurface Investigation
Subsurface InvestigationSubsurface Investigation
Subsurface Investigation
 
IS Classification of Soils
IS Classification of SoilsIS Classification of Soils
IS Classification of Soils
 
Earth pressure( soil mechanics)
Earth pressure( soil mechanics)Earth pressure( soil mechanics)
Earth pressure( soil mechanics)
 
Atterberg limits
Atterberg limitsAtterberg limits
Atterberg limits
 
Well foundation
Well foundationWell foundation
Well foundation
 

Similar to TYPES OF SOIL SAMPLE AND SAMPLERS .

site investigation by snjv sir
site investigation by snjv sirsite investigation by snjv sir
site investigation by snjv sirSANJEEV Wazir
 
ppt foundation.pptx
ppt foundation.pptxppt foundation.pptx
ppt foundation.pptxAnshuBarmase
 
sampler,open drive sampler, piston sampler, rotary sampler
sampler,open drive sampler, piston sampler, rotary samplersampler,open drive sampler, piston sampler, rotary sampler
sampler,open drive sampler, piston sampler, rotary samplerSANJEEV Wazir
 
1. Site Investgation.pptxDebre Markos University Technology College Departmen...
1. Site Investgation.pptxDebre Markos University Technology College Departmen...1. Site Investgation.pptxDebre Markos University Technology College Departmen...
1. Site Investgation.pptxDebre Markos University Technology College Departmen...teseraaddis1
 
M soil exploration
M soil explorationM soil exploration
M soil explorationsatishjain17
 
sm-1_chap._6_geotechnical_investigation.pptx
sm-1_chap._6_geotechnical_investigation.pptxsm-1_chap._6_geotechnical_investigation.pptx
sm-1_chap._6_geotechnical_investigation.pptxpavuluri2014
 
Foundation engineering
Foundation engineeringFoundation engineering
Foundation engineeringShaker Krupa
 
Lecture about foundation engineering.pptx
Lecture about foundation engineering.pptxLecture about foundation engineering.pptx
Lecture about foundation engineering.pptxambipathi1986
 
Chapter-1-Soil Exploration.ppt
Chapter-1-Soil Exploration.pptChapter-1-Soil Exploration.ppt
Chapter-1-Soil Exploration.pptestifanosdemeke1
 
Chapter 1.0 soil exploration
Chapter 1.0   soil explorationChapter 1.0   soil exploration
Chapter 1.0 soil explorationDYPCET
 
soilsampling-191108151522.pdf
soilsampling-191108151522.pdfsoilsampling-191108151522.pdf
soilsampling-191108151522.pdfLyricCorner
 
Site investigation 5.pdf
Site investigation 5.pdfSite investigation 5.pdf
Site investigation 5.pdfRGamesSaudi
 
methods of sub-surface exploration, methods of boring, number, location and d...
methods of sub-surface exploration, methods of boring, number, location and d...methods of sub-surface exploration, methods of boring, number, location and d...
methods of sub-surface exploration, methods of boring, number, location and d...Prajakta Lade
 
Exploratory Drilling
Exploratory Drilling Exploratory Drilling
Exploratory Drilling BIT Sindri
 
Subsoil exploiration
Subsoil exploirationSubsoil exploiration
Subsoil exploirationdhara dattani
 

Similar to TYPES OF SOIL SAMPLE AND SAMPLERS . (20)

site investigation by snjv sir
site investigation by snjv sirsite investigation by snjv sir
site investigation by snjv sir
 
ppt foundation.pptx
ppt foundation.pptxppt foundation.pptx
ppt foundation.pptx
 
sampler,open drive sampler, piston sampler, rotary sampler
sampler,open drive sampler, piston sampler, rotary samplersampler,open drive sampler, piston sampler, rotary sampler
sampler,open drive sampler, piston sampler, rotary sampler
 
1. Site Investgation.pptxDebre Markos University Technology College Departmen...
1. Site Investgation.pptxDebre Markos University Technology College Departmen...1. Site Investgation.pptxDebre Markos University Technology College Departmen...
1. Site Investgation.pptxDebre Markos University Technology College Departmen...
 
M soil exploration
M soil explorationM soil exploration
M soil exploration
 
sm-1_chap._6_geotechnical_investigation.pptx
sm-1_chap._6_geotechnical_investigation.pptxsm-1_chap._6_geotechnical_investigation.pptx
sm-1_chap._6_geotechnical_investigation.pptx
 
Foundation
FoundationFoundation
Foundation
 
Foundation engineering
Foundation engineeringFoundation engineering
Foundation engineering
 
Lecture about foundation engineering.pptx
Lecture about foundation engineering.pptxLecture about foundation engineering.pptx
Lecture about foundation engineering.pptx
 
Chapter 09
Chapter 09Chapter 09
Chapter 09
 
1442 site investigation 325
1442 site investigation 3251442 site investigation 325
1442 site investigation 325
 
Soil Exploration.pdf
Soil Exploration.pdfSoil Exploration.pdf
Soil Exploration.pdf
 
Chapter-1-Soil Exploration.ppt
Chapter-1-Soil Exploration.pptChapter-1-Soil Exploration.ppt
Chapter-1-Soil Exploration.ppt
 
Chapter 1.0 soil exploration
Chapter 1.0   soil explorationChapter 1.0   soil exploration
Chapter 1.0 soil exploration
 
soilsampling-191108151522.pdf
soilsampling-191108151522.pdfsoilsampling-191108151522.pdf
soilsampling-191108151522.pdf
 
Soil sampling
Soil samplingSoil sampling
Soil sampling
 
Site investigation 5.pdf
Site investigation 5.pdfSite investigation 5.pdf
Site investigation 5.pdf
 
methods of sub-surface exploration, methods of boring, number, location and d...
methods of sub-surface exploration, methods of boring, number, location and d...methods of sub-surface exploration, methods of boring, number, location and d...
methods of sub-surface exploration, methods of boring, number, location and d...
 
Exploratory Drilling
Exploratory Drilling Exploratory Drilling
Exploratory Drilling
 
Subsoil exploiration
Subsoil exploirationSubsoil exploiration
Subsoil exploiration
 

Recently uploaded

CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...121011101441
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfROCENODodongVILLACER
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 

Recently uploaded (20)

CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdf
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 

TYPES OF SOIL SAMPLE AND SAMPLERS .

  • 1. (GEOTECHNICAL ENGINEERING 2 ) TYPES OF SOIL SAMPLE AND SAMPLERS, PRINCIPLE OF DESIGN OF SAMPLERS , COLLECTION AND SHIPMENT OF SAMPLES , BORING AND SAMPLING RECORD. PRESENTED BY PRAJAKTA LADE
  • 2. Soil samples and samplers Principle of design of samplers Collection and shiftment of sample Boring and sampling record CONTENT
  • 3. . Soil samples can be of two types: (i) Disturbed samples. (ii) Undisturbed samples SOIL SAMPLES
  • 4. A disturbed sample is a sample in which the natural structure of soil gets partly or fully modified and destroyed . However , by taking proper precautions , the natural water content in soil sample can be preserved . The composition and the mineral content of the soil is represented by the samples Index proprties of the soil can be determined from disturbed samples ex. Grain size, plasticity, characteristics of specific gravity . DISTURB SOIL SAMPLE
  • 5. An undisturbed sample is a sample which the natural structure and properties remain preserved And the water content are retained . It is impossible to get the truly undisturb sample The sample disturbance depends on the design of samplers and the method of sampling . These samples are used for determining engineering properties of soil such as shear strength, compressibility , shrinkage limit and permeability UNDISTURB SOIL SAMPLE
  • 7.
  • 8. There are four types of samplers SPLIT- SPOON SAMPLER SCRAPER BUCKET SAMPLER SHELBY TUBES AND THIN WALLED SAMPLERS PISTON SAMPLER TYPE OF SOIL SAMPLERS
  • 9. It is commanly used for obtaining a disturb samples of the soil. The split spoon sampler consist of three types 1. Tool – steel made driving shoe about 75mm in length. 2. 450mm long steel tube, split longitudally in two halves. 3. 150mm long coupling at the top of the tube. The steel tube in the middle has inside and out side diameters of 34.9mm and 50.8mm, respectively. When the bore hole is advanced to a desired depth, the drilling tools are removed. The split- spoon sampler is attached to the drilling rod and then lowered to the bottom of the bore hole by repeated blows of hammerr and then withdrawn . The split spoon is seperate after removing the shoe and the coupling and the sample is taken out . sample is then placed in container , sealed and transported to the labortary . SPLIT SPOON SAMPLER
  • 11. Piston sampler consist of two parts Sampler cylinder Piston cylinder The piston first tight in the sampler cylinder. Good quality undisturbed samples of soft and sensitive clay are obtained from piston samplers which use thin-walled sampling tubes with a piston inside. While the tube is being lowered to the bottom of the drill hole, the piston rods and piston are held at the bottom by different type of samplers. The presence of the piston prevent rapid squeezing of the soft soil into the tube and reduces the disturbance of the sample PISTON SAMPLER
  • 13. When soil deposits are sand mixed with pebbles, obtaining samples by split spoon with a spring core catcher may not be possible because the pebbles may prevent the springs from closing. In such cases, a scraper bucket may be used to obtain disturbed representative sampleS The scraper bucket has a driving point and can be attached to a drilling rod. The sampler is driven down into the soil and rotated, and the scraping from the side falls into the bucket. SCRAPER BUCKET SAMPLER
  • 15. The stelby tubes are thin walled tube samplers having outside diameter of the tube is 40 mm to 125 mm whose sampler having diameter 50.8 mm or 76.2 mm are commanly used. The bottom of the tube acts as a cutting edge . The sampler tube is attached to drilling rod and lowered to the bottom of the drilled bore hole and tube is pushed into the soil by rapid motion without impact or twisting . After atleast 5 minutes the tube is turned twice through 360 degree to shear the sample off at the bottom before The sampler is taken out. It Is used for obtaining undisturbed sample of clay and it is also used for exploration in cohessionless soils below water table. SHELBYTUBE ANDTHIN WALL SAMPLERS.
  • 16.
  • 17. New Construction „ 1. Evaluate soils, subsoils , other elements in the soil profile prior to construction „ 2. May provide direction for design and construction. „ • Existing Fi elds „1. Diagnose soil problems in existing fields AIM OF COLLECTION AND SHIFTMENT OF SAMPLE
  • 18. „Impenetrable layers o „Bedrock? „  Depth to ground water „ o Will subsurface subsurface drain system be needed? „Soil types presen o Can it be reuse, modifIed , or all imported?  „Permeability to water INFORMATIONWE GET DUETO COLLECTION OF SAMPLE
  • 19. 1. Name and address of the drilling company 2. Driller’s name 3. Job description and number 4. Number, type, and location of boring 5. Date of boring 6. Subsurface stratification, which can he obtained by visual observation of the soil brought out by auger, split-spoon sampler, and thin-walled Shelby tube sampler 7. Elevation of water table and date observed, use of casing and mud losses, and so on 8. Standard penetration resistance and the depth of SPT 9. Number, type, and depth of soil sample collected 10. In case of rock coring, type of core barrel used and, for each run, the actual length of coring, length of core recovery, and ROD Preparation of Boring Logs