The document presents a diagram showing the Six Sigma improvement process. It depicts the typical Define, Measure, Analyze, Improve, and Control (DMAIC) methodology used in Six Sigma projects through a series of interconnected stages. On-going audits and current state assessments help define opportunities for future improvement, which are then mapped out and implemented through rapid changes before being controlled on an ongoing basis.
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
Six Sigma process flow diagram
1. Six Sigma – Style 4
On-going Current State
Audits Assessment
DEFINE
CONTROL MEASURE
Rapid
Implementation Future State
Map
IMPROVE ANALYZE
Future State
Opportunities
www.slideteam.net Your Logo
2. Six Sigma – Style 4
On-going
Audits
Current State
Assessment
Stage 1
DEFINE
• Your Text Goes here
• Download this awesome
CONTROL
diagram
MEASURE
• Bring your presentation to
life
Rapid
Future State
• Capture your audience’s
Implementation
Map attention
• All images are 100%
IMPROVE ANALYZE
editable in powerpoint
• Your Text Goes here
• Download this awesome
Future State diagram.
Opportunities
www.slideteam.net Your Logo
3. Six Sigma – Style 4
On-going
Audits
Current State
Assessment
Stage 2
DEFINE
• Your Text Goes here
• Download this awesome
CONTROL
diagram
MEASURE
• Bring your presentation to
life
Rapid
Future State
• Capture your audience’s
Implementation
Map attention
• All images are 100%
IMPROVE ANALYZE
editable in powerpoint
• Your Text Goes here
• Download this awesome
Future State diagram.
Opportunities
www.slideteam.net Your Logo
4. Six Sigma – Style 4
On-going
Audits
Current State
Assessment
Stage 3
DEFINE
• Your Text Goes here
• Download this awesome
diagram
CONTROL MEASURE
• Bring your presentation to
life
Rapid
Future State
• Capture your audience’s
Implementation
Map attention
• All images are 100%
IMPROVE ANALYZE
editable in powerpoint
• Your Text Goes here
• Download this awesome
Future State diagram.
Opportunities
www.slideteam.net Your Logo
5. Six Sigma – Style 4
On-going
Audits
Current State
Assessment
Stage 4
DEFINE
• Your Text Goes here
• Download this awesome
CONTROL
diagram
MEASURE
• Bring your presentation to
life
Rapid
Future State
• Capture your audience’s
Implementation
Map attention
• All images are 100%
IMPROVE ANALYZE
editable in powerpoint
• Your Text Goes here
• Download this awesome
Future State diagram.
Opportunities
www.slideteam.net Your Logo
6. Six Sigma – Style 4
On-going
Audits
Current State
Assessment
Stage 5
DEFINE
• Your Text Goes here
• Download this awesome
CONTROL
diagram
MEASURE
• Bring your presentation to
life
Rapid
Future State
• Capture your audience’s
Implementation
Map attention
• All images are 100%
IMPROVE ANALYZE
editable in powerpoint
• Your Text Goes here
• Download this awesome
Future State diagram.
Opportunities
www.slideteam.net Your Logo
7. All images are 100% editable in Powerpoint
“Change color, size and orientation of any icon to your liking”
www.slideteam.net
8. Ungrouping the object
2
1
3
1. Right click the object.
2. Choose Group and then Ungroup.
3. Click beside the object and drag the arrow over it.
www.slideteam.net
9. Edit Color
2 3
1
1. Select the shape to change the color and Right click the object( click any object which you
want to change color)
2. Choose Format Shape in the dialog box.
3. Choose “Fill” in the Format Shape box then “Solid” or “Gradient” depending on the
appearance of the object. Change colour as shown in the picture.
www.slideteam.net