HDT
High Design Technology
World ’s Fastest Circuit Analysis Company
Company Environment
Turin
home of
• Fiat (Alfa Romeo, Lancia, Ferrari ….)
• CSELT (Telecom Italia - 4th ww operator)
• Politecnico School of Engineering
The Industry Trends
1990 1992 1994 1996 1998 2000
• The Demands
• Smaller
• Faster
• Cheaper
• Sooner
• The Constraints
• Gate delays
• Cross talks
• Switching noises
• Parasitic radiation
MHz
80386
80486
Pentium pro
Pentium II
Pentium
50
100
150
200
250
300
80286
The Legal Requirements
Starting January 1996
the European guideline on Electro Magnetic
Compatibility is explicit:
If the product does not conform…
….it cannot go to the market !
The Engineering Crisis
Routing
• Electrical Constraints
- Gate delays
- Cross talks
- Switching noises
- Parasitic radiation
• Geometry Rules
- Clearances
- Wire & Via Sizes
- Routing Layers
TheLawofOhm
• Smaller
- Higher density
• Faster
- Timing controls
• Cheaper
- Lower Power
• Sooner
- Time to Market
Schematics
Pre-layout
Post-layout
Controls & Test
The Switching Problem
If your signal doesn’t behave
you don’t get to the market
Before optimization
After optimization
Our Mission
Providing the Tools to Tame the Signals
Directing the pre-layout
Verifying the post-layout
Converting Electrical Constraints into Geometric Rules
Controlling the Routing Process
The Engineering Crisis solved
Concurrent
routing
• Electrical Constraints
- Gate delays
- Cross talks
- Switching noises
- Parasitic radiation
• Geometry Rules
- Clearances
- Wire & Via Sizes
- Routing Layers
TheLawofOhm
• Smaller
- Higher density
• Faster
- Timing controls
• Cheaper
- Lower Power
• Sooner
- Time to Market
Schematics
Pre-layout
Post-layout
Controls & Test
Our Objective
Becoming the
World ’s Leading
Circuit Analysis Company
(along with ZR
if just possible)

HDT mission

  • 1.
    HDT High Design Technology World’s Fastest Circuit Analysis Company
  • 2.
    Company Environment Turin home of •Fiat (Alfa Romeo, Lancia, Ferrari ….) • CSELT (Telecom Italia - 4th ww operator) • Politecnico School of Engineering
  • 3.
    The Industry Trends 19901992 1994 1996 1998 2000 • The Demands • Smaller • Faster • Cheaper • Sooner • The Constraints • Gate delays • Cross talks • Switching noises • Parasitic radiation MHz 80386 80486 Pentium pro Pentium II Pentium 50 100 150 200 250 300 80286
  • 4.
    The Legal Requirements StartingJanuary 1996 the European guideline on Electro Magnetic Compatibility is explicit: If the product does not conform… ….it cannot go to the market !
  • 5.
    The Engineering Crisis Routing •Electrical Constraints - Gate delays - Cross talks - Switching noises - Parasitic radiation • Geometry Rules - Clearances - Wire & Via Sizes - Routing Layers TheLawofOhm • Smaller - Higher density • Faster - Timing controls • Cheaper - Lower Power • Sooner - Time to Market Schematics Pre-layout Post-layout Controls & Test
  • 6.
    The Switching Problem Ifyour signal doesn’t behave you don’t get to the market Before optimization After optimization
  • 7.
    Our Mission Providing theTools to Tame the Signals Directing the pre-layout Verifying the post-layout Converting Electrical Constraints into Geometric Rules Controlling the Routing Process
  • 8.
    The Engineering Crisissolved Concurrent routing • Electrical Constraints - Gate delays - Cross talks - Switching noises - Parasitic radiation • Geometry Rules - Clearances - Wire & Via Sizes - Routing Layers TheLawofOhm • Smaller - Higher density • Faster - Timing controls • Cheaper - Lower Power • Sooner - Time to Market Schematics Pre-layout Post-layout Controls & Test
  • 9.
    Our Objective Becoming the World’s Leading Circuit Analysis Company (along with ZR if just possible)