PJ McManus
Substation Site Manager
Tel: 07738682252
Email: pj.mcmanus@live.co.uk
Professional Profile
A highly skilled Substation Site Manager/ Supervisor and Plant Electrician specialising in the
installation and commissioning of HV substation, switchgear and transformers.
Competent, versatile and committed to achieving project milestones, continually focused on health and
safety regulations. As an effective communicator, I build excellent rapport with clients and project
partners.
Having successfully delivered on a range of projects across Ireland and the UK, I am now seeking to
secure a new opportunity. Ideally a role that will harness my existing skills and experience, allowing me to
add value to a new team, project and organisation.
Training & Certification*
Harness Inspection Start 18/12/2014 – Exp 18/12/2019 P&P Training Services
Commercial Workshop Start 28/11/2014 Powerteam
Emergency First Aid at Work Start 18/04/2014 – Exp 18/04/2019 British Red Cross
Telehandler Start 17/04/2012 – Exp 17/04/2017 Safety Lift Ireland
MEWP Boom Start 18/04/2014 – Exp 18/04/2019 Safety Lift Ireland
Abrasive Wheels Start 18/12/2012 – Exp 18/12/2017 Training Solutions NI
CSR Start 01/12/2011 – Exp 31/12/2016 CSR
Manual Handling Start 26/05/2011 - Exp 26/05/2016 Powerteam
Manual Handling Start 10/05/2011 - Exp 10/05/2016 Safety Lift Ireland
CE/NPG
W4.1 Start 19/08/2014 - Exp 19/08/2017
A2.1 Start 19/08/2014 - Exp 19/08/2017
A2.2 Start 19/08/2014 - Exp 19/08/2017
A2.3 Start 19/08/2014 - Exp 19/08/2017
A2.6 Start 19/08/2014 - Exp 19/08/2017
W4.2 Start 19/08/2014 - Exp 19/08/2017
W7.2 Start 19/08/2014 - Exp 19/08/2017
A1 Start 19/08/2014 - Exp 19/08/2017
A2.4 Start 19/08/2014 - Exp 19/08/2017
ESB
W7.1 Start 19/08/2014 - Exp 19/08/2017
POW
V Start 05/01/2015 - Exp 05/01/2020 P Code
A Start 05/01/2015 - Exp 05/01/2020 P Code
B Start 05/01/2015 - Exp 05/01/2020 P Code
U Start 05/01/2015 - Exp 05/01/2020 P Code
A1 Start 19/08/2014 - Exp 19/08/2017 P Code
SSE
A0 Start 23/05/2011 - Exp 23/05/2015
C2 Start 23/05/2011 - Exp 23/05/2015
C1 Start 23/05/2011 - Exp 23/05/2015
* Please see bottom of the CV for links to all certifications
Employment History
Powerteam NI, Northern Ireland & UK March 2008 - Date
Position: Substation Site Manager/ Site Supervisor/ Plant Electrician
• See below for project listing and roles held
Project List/ Job Title
Andover 132kv Sub Station 31/07/15 - Present
Position: Site Manager / Supervisor
Managing CDM Regulations as principle contractor for all site works
Removal of manual disconnects associated cabling and protection and concrete structures
Installation of new 132kv bay for a wind farm connection and all associated cabling and protection
Taynuilt 132-33 kv Sub Station Refurb 01/05/115 - 31/07/15
Position: Site manager /Supervisor
Managed CDM regulations as principle contractor
Removal of manual 132kv line disconnects associated cabling and structures
Installation of new motorised circuit switchers for 132kv line along with associated cabling and protection
Leeds Rawdon 66-11kv Sub Station 31/01/15 - 31/04/15
Position: Site Supervisor
Over seeing the removal of old 66-11kv tramsformers and associated cabling and protection panels and old
switch rooms and transformer bunds
Installation of two new indoor 66-11kv transformers along with associated cabling and new suite of
protection panels
North Tees 66/11kv Refurb (Transformer Site) 03/03/2014 – 31/01/2015
Position: Site Supervisor
Removal of old OS10 Reyrolle 66Kv air blast switchgear. Installation of new 66KV ABB SF6 GAS Pass
Units including a full suite of protection panels and all associated wiring of an LVAC board and 110v DC
Battery Charger
Managed the CDM regulations as Principle Contractor for all works relating to the 66/11KV transformer site
including the civil works associated with the new transformer compound
Shin 132KV Refurb & Extension of Sub Station 06/12/2011
Position: Site Manager/Supervisor:
Managed the CDM regulations as Principle Contractor for all works.
Removal of old panels and manual 132kv Switchgear, replacing with motor driven switchgear. Installation of
new switch room, with a suite of protection panels and circuit breakers
Extension of the HV compound.
Luichart 132kv Hydro Station and Sub Station 05/07/2011
Position: Site Supervisor:
Managed the CDM regulations as Principle Contractor for all works
Removal of two 132kv to 11KV transformers
Removal of old circuit breakers and protection panels
Installation of two new 132kv to 11KV transformers along with a new switch room with a new suite of
protection panels and circuit breakers
Oversaw the installation of 4 no. 66/11KV ABB transformers c/w all multicoring/ glanding/ terminations
works associated with same
Slieve Kirk Wind Farm 03/05/2011
Position: Plant Maintenance Electrician
Installation of new wind farm. HV Multicores and earthing
Crockermore Wind Farm Donegal 08/02/2011
Position: Plant Maintenance Electrician
Installation of new wind farm. JV Multicores and Earthing
Edgeworthstown 38KV 04/01/2011
Position: Plant Maintenance Electrician
Replacing and refurbishment of 33kv Switchgear.
Cherrywood 110KV GIS 06/04/2010
Position: Plant Maintenance Electrician
Installation of New 110KV Siemens GISF6J Switchgear
Kilmahud 110Kv GIS Gear 03/11/2009
Position: Plant Maintenance Electrician
Installation of new 110KV Siemens GISF6J Switchgear
RTU Installation & Refurb 03/11/2009
Position: Plant Maintenance Electrician
Installation of New Scada Panel for NIE Networks
Stranorlar 38Kv Refurb 07/07/2009
Position: Plant Maintenance Electrician
33kv Switchgear refurbishment, Multicoring, Earthing and Bus Bar
Dromada W/F 06/07/2009
Position: Plant Maintenance Electrician
Installation of new wind farm, HV Multicores and Earthing
Aghada 220KV New Bay 05/05/2009
Position: Plant Maintenance Electrician
New 220 bayes New Switchgear and control room
Multicoring, Earthing and Bus Bar
Glanagow 220KV New Build 03/03/2009
Position: Plant Maintenance Electrician
New 220 bayes. New Switchgear and control room
Multicoring, Earthing and Bus Bar
Killroot Power Station - New Bay 06/01/2009
Position: Plant Maintenance Electrician
New 220 bayes. New Switchgear and control room
Multicoring, Earthing and Bus Bar
Longpoint 220KV New Bay 08/09/2008
Position: Plant Maintenance Electrician
New 220 bayes. New Switchgear and control room
Multicoring, Earthing and Bus Bar
Owenreagh W/F 04/08/2008
Position: Plant Maintenance Electrician
Installation of new Wind farm, HV multi cores and earthing
Dardistown 110KV GIS Gear 03/06/2008
Position: Plant Maintenance Electrician
Installation of new 110kv Siemens GISF6J Switchgear
Killybegs 38Kv Refurb 03/04/2008
Position: Plant Maintenance Electrician
Replacing and Refurb of 33kv Switchgear
Ballyconnell 38Kv 04/03/2008
Position: Plant Maintenance Electrician
Replacing and Refurb of 33kv Switchgear
Certification & Qualification Links
https://drive.google.com/file/d/0B4oRkatMl5-WWTI0WHhsSlNkZFU/view?usp=sharing
References available on request

More Related Content

What's hot

ELECHTRICAL TECHNICIAN RESUME (((((2016)))))
ELECHTRICAL  TECHNICIAN RESUME  (((((2016)))))ELECHTRICAL  TECHNICIAN RESUME  (((((2016)))))
ELECHTRICAL TECHNICIAN RESUME (((((2016)))))MOHAMMAD KHALID MUSTAFA
 
PaulBriggs20032016
PaulBriggs20032016PaulBriggs20032016
PaulBriggs20032016Paul Briggs
 
Abbas fadhil resume
Abbas fadhil resumeAbbas fadhil resume
Abbas fadhil resumeAbbas Fadhil
 
Craig Sparks. Resume April 2016 Electrician - Supervisor - Manager
Craig Sparks. Resume April 2016 Electrician - Supervisor - ManagerCraig Sparks. Resume April 2016 Electrician - Supervisor - Manager
Craig Sparks. Resume April 2016 Electrician - Supervisor - ManagerCraig Sparks
 
Vipul updated elec resume..
Vipul updated elec resume..Vipul updated elec resume..
Vipul updated elec resume..Vipul Patel
 
amit cv electrical engineer
amit cv electrical engineeramit cv electrical engineer
amit cv electrical engineeramitsjob1981
 
Patrick_C._McDuffie CV and EXP 2016
Patrick_C._McDuffie CV and EXP 2016Patrick_C._McDuffie CV and EXP 2016
Patrick_C._McDuffie CV and EXP 2016Patrick McDuffie
 
Cost Components in a MW Scale Solar Power Project
Cost Components in a MW Scale Solar Power ProjectCost Components in a MW Scale Solar Power Project
Cost Components in a MW Scale Solar Power ProjectSrini Chopakatla, PE, PMP
 
Ian Rae CV docx
Ian Rae CV docxIan Rae CV docx
Ian Rae CV docxIan Rae
 
Project involvement and construction.
Project involvement and construction.Project involvement and construction.
Project involvement and construction.Arno Kanter
 
Ashok Resume-2015
Ashok Resume-2015Ashok Resume-2015
Ashok Resume-2015ashok kumar
 
Engr. Ayaz Khan CV11 (1)
Engr.  Ayaz Khan CV11 (1)Engr.  Ayaz Khan CV11 (1)
Engr. Ayaz Khan CV11 (1)Engr.ayaz khan
 
Craig Sparks. Resume April 2016 Electrician - Supervisor - Manager
Craig Sparks. Resume April 2016 Electrician - Supervisor - ManagerCraig Sparks. Resume April 2016 Electrician - Supervisor - Manager
Craig Sparks. Resume April 2016 Electrician - Supervisor - ManagerCraig Sparks
 

What's hot (20)

ELECHTRICAL TECHNICIAN RESUME (((((2016)))))
ELECHTRICAL  TECHNICIAN RESUME  (((((2016)))))ELECHTRICAL  TECHNICIAN RESUME  (((((2016)))))
ELECHTRICAL TECHNICIAN RESUME (((((2016)))))
 
PaulBriggs20032016
PaulBriggs20032016PaulBriggs20032016
PaulBriggs20032016
 
Abbas fadhil resume
Abbas fadhil resumeAbbas fadhil resume
Abbas fadhil resume
 
Craig Sparks. Resume April 2016 Electrician - Supervisor - Manager
Craig Sparks. Resume April 2016 Electrician - Supervisor - ManagerCraig Sparks. Resume April 2016 Electrician - Supervisor - Manager
Craig Sparks. Resume April 2016 Electrician - Supervisor - Manager
 
Vipul updated elec resume..
Vipul updated elec resume..Vipul updated elec resume..
Vipul updated elec resume..
 
amit cv electrical engineer
amit cv electrical engineeramit cv electrical engineer
amit cv electrical engineer
 
Patrick_C._McDuffie CV and EXP 2016
Patrick_C._McDuffie CV and EXP 2016Patrick_C._McDuffie CV and EXP 2016
Patrick_C._McDuffie CV and EXP 2016
 
Micks CV_10_07_16
Micks CV_10_07_16Micks CV_10_07_16
Micks CV_10_07_16
 
CV
CVCV
CV
 
Cost Components in a MW Scale Solar Power Project
Cost Components in a MW Scale Solar Power ProjectCost Components in a MW Scale Solar Power Project
Cost Components in a MW Scale Solar Power Project
 
Ian Rae CV docx
Ian Rae CV docxIan Rae CV docx
Ian Rae CV docx
 
Project involvement and construction.
Project involvement and construction.Project involvement and construction.
Project involvement and construction.
 
Ashok Resume-2015
Ashok Resume-2015Ashok Resume-2015
Ashok Resume-2015
 
gamal ghazy svc
gamal ghazy svcgamal ghazy svc
gamal ghazy svc
 
Resume mohan
Resume mohanResume mohan
Resume mohan
 
Engr. Ayaz Khan CV11 (1)
Engr.  Ayaz Khan CV11 (1)Engr.  Ayaz Khan CV11 (1)
Engr. Ayaz Khan CV11 (1)
 
UPDATED CV-1
UPDATED CV-1UPDATED CV-1
UPDATED CV-1
 
SASIdharan p CV
SASIdharan p CVSASIdharan p CV
SASIdharan p CV
 
Craig Sparks. Resume April 2016 Electrician - Supervisor - Manager
Craig Sparks. Resume April 2016 Electrician - Supervisor - ManagerCraig Sparks. Resume April 2016 Electrician - Supervisor - Manager
Craig Sparks. Resume April 2016 Electrician - Supervisor - Manager
 
Mohamed Abou mesalem updated CV
Mohamed Abou mesalem  updated CVMohamed Abou mesalem  updated CV
Mohamed Abou mesalem updated CV
 

Similar to PJMcManus

Similar to PJMcManus (20)

2019 robert bertranb
2019 robert bertranb 2019 robert bertranb
2019 robert bertranb
 
Resume_for_Kendall_Holland1
Resume_for_Kendall_Holland1Resume_for_Kendall_Holland1
Resume_for_Kendall_Holland1
 
MY CV
MY CVMY CV
MY CV
 
Daniel Snyman Resume
Daniel Snyman ResumeDaniel Snyman Resume
Daniel Snyman Resume
 
Ramadan cv new.dotx (2)
Ramadan cv   new.dotx (2)Ramadan cv   new.dotx (2)
Ramadan cv new.dotx (2)
 
JD RYNDERS CV REV 2015 orig
JD RYNDERS CV REV 2015 origJD RYNDERS CV REV 2015 orig
JD RYNDERS CV REV 2015 orig
 
updated Mahmoud Niem CV
updated Mahmoud Niem CVupdated Mahmoud Niem CV
updated Mahmoud Niem CV
 
Mohammad Yeamin Hoque Resume
Mohammad Yeamin Hoque ResumeMohammad Yeamin Hoque Resume
Mohammad Yeamin Hoque Resume
 
Paulpandy CV.
Paulpandy  CV.Paulpandy  CV.
Paulpandy CV.
 
David Golding1
David Golding1David Golding1
David Golding1
 
F Bryce CV
F Bryce CVF Bryce CV
F Bryce CV
 
Se management presentation november 2010
Se management presentation november 2010Se management presentation november 2010
Se management presentation november 2010
 
Robert Burns CV 2015
Robert Burns CV 2015Robert Burns CV 2015
Robert Burns CV 2015
 
resume
resumeresume
resume
 
Glen Mayes resume 2016
Glen Mayes resume 2016Glen Mayes resume 2016
Glen Mayes resume 2016
 
Allan Borja CV
Allan Borja CVAllan Borja CV
Allan Borja CV
 
CV - RAMADAN 2016
CV - RAMADAN 2016CV - RAMADAN 2016
CV - RAMADAN 2016
 
SENTHIL.k RESUME
SENTHIL.k RESUMESENTHIL.k RESUME
SENTHIL.k RESUME
 
CV OULTON BROAD 09 08 16 A
CV OULTON BROAD 09 08 16 ACV OULTON BROAD 09 08 16 A
CV OULTON BROAD 09 08 16 A
 
Mr johann van der westhuizen full cv.docx
Mr johann van der westhuizen full cv.docxMr johann van der westhuizen full cv.docx
Mr johann van der westhuizen full cv.docx
 

PJMcManus

  • 1. PJ McManus Substation Site Manager Tel: 07738682252 Email: pj.mcmanus@live.co.uk Professional Profile A highly skilled Substation Site Manager/ Supervisor and Plant Electrician specialising in the installation and commissioning of HV substation, switchgear and transformers. Competent, versatile and committed to achieving project milestones, continually focused on health and safety regulations. As an effective communicator, I build excellent rapport with clients and project partners. Having successfully delivered on a range of projects across Ireland and the UK, I am now seeking to secure a new opportunity. Ideally a role that will harness my existing skills and experience, allowing me to add value to a new team, project and organisation. Training & Certification* Harness Inspection Start 18/12/2014 – Exp 18/12/2019 P&P Training Services Commercial Workshop Start 28/11/2014 Powerteam Emergency First Aid at Work Start 18/04/2014 – Exp 18/04/2019 British Red Cross Telehandler Start 17/04/2012 – Exp 17/04/2017 Safety Lift Ireland MEWP Boom Start 18/04/2014 – Exp 18/04/2019 Safety Lift Ireland Abrasive Wheels Start 18/12/2012 – Exp 18/12/2017 Training Solutions NI CSR Start 01/12/2011 – Exp 31/12/2016 CSR Manual Handling Start 26/05/2011 - Exp 26/05/2016 Powerteam Manual Handling Start 10/05/2011 - Exp 10/05/2016 Safety Lift Ireland CE/NPG W4.1 Start 19/08/2014 - Exp 19/08/2017 A2.1 Start 19/08/2014 - Exp 19/08/2017 A2.2 Start 19/08/2014 - Exp 19/08/2017 A2.3 Start 19/08/2014 - Exp 19/08/2017 A2.6 Start 19/08/2014 - Exp 19/08/2017 W4.2 Start 19/08/2014 - Exp 19/08/2017 W7.2 Start 19/08/2014 - Exp 19/08/2017 A1 Start 19/08/2014 - Exp 19/08/2017 A2.4 Start 19/08/2014 - Exp 19/08/2017 ESB W7.1 Start 19/08/2014 - Exp 19/08/2017 POW V Start 05/01/2015 - Exp 05/01/2020 P Code A Start 05/01/2015 - Exp 05/01/2020 P Code B Start 05/01/2015 - Exp 05/01/2020 P Code U Start 05/01/2015 - Exp 05/01/2020 P Code A1 Start 19/08/2014 - Exp 19/08/2017 P Code SSE A0 Start 23/05/2011 - Exp 23/05/2015 C2 Start 23/05/2011 - Exp 23/05/2015 C1 Start 23/05/2011 - Exp 23/05/2015 * Please see bottom of the CV for links to all certifications Employment History Powerteam NI, Northern Ireland & UK March 2008 - Date Position: Substation Site Manager/ Site Supervisor/ Plant Electrician • See below for project listing and roles held
  • 2. Project List/ Job Title Andover 132kv Sub Station 31/07/15 - Present Position: Site Manager / Supervisor Managing CDM Regulations as principle contractor for all site works Removal of manual disconnects associated cabling and protection and concrete structures Installation of new 132kv bay for a wind farm connection and all associated cabling and protection Taynuilt 132-33 kv Sub Station Refurb 01/05/115 - 31/07/15 Position: Site manager /Supervisor Managed CDM regulations as principle contractor Removal of manual 132kv line disconnects associated cabling and structures Installation of new motorised circuit switchers for 132kv line along with associated cabling and protection Leeds Rawdon 66-11kv Sub Station 31/01/15 - 31/04/15 Position: Site Supervisor Over seeing the removal of old 66-11kv tramsformers and associated cabling and protection panels and old switch rooms and transformer bunds Installation of two new indoor 66-11kv transformers along with associated cabling and new suite of protection panels North Tees 66/11kv Refurb (Transformer Site) 03/03/2014 – 31/01/2015 Position: Site Supervisor Removal of old OS10 Reyrolle 66Kv air blast switchgear. Installation of new 66KV ABB SF6 GAS Pass Units including a full suite of protection panels and all associated wiring of an LVAC board and 110v DC Battery Charger Managed the CDM regulations as Principle Contractor for all works relating to the 66/11KV transformer site including the civil works associated with the new transformer compound Shin 132KV Refurb & Extension of Sub Station 06/12/2011 Position: Site Manager/Supervisor: Managed the CDM regulations as Principle Contractor for all works. Removal of old panels and manual 132kv Switchgear, replacing with motor driven switchgear. Installation of new switch room, with a suite of protection panels and circuit breakers Extension of the HV compound. Luichart 132kv Hydro Station and Sub Station 05/07/2011 Position: Site Supervisor: Managed the CDM regulations as Principle Contractor for all works Removal of two 132kv to 11KV transformers Removal of old circuit breakers and protection panels Installation of two new 132kv to 11KV transformers along with a new switch room with a new suite of protection panels and circuit breakers Oversaw the installation of 4 no. 66/11KV ABB transformers c/w all multicoring/ glanding/ terminations works associated with same Slieve Kirk Wind Farm 03/05/2011 Position: Plant Maintenance Electrician Installation of new wind farm. HV Multicores and earthing Crockermore Wind Farm Donegal 08/02/2011 Position: Plant Maintenance Electrician Installation of new wind farm. JV Multicores and Earthing Edgeworthstown 38KV 04/01/2011 Position: Plant Maintenance Electrician Replacing and refurbishment of 33kv Switchgear. Cherrywood 110KV GIS 06/04/2010 Position: Plant Maintenance Electrician Installation of New 110KV Siemens GISF6J Switchgear
  • 3. Kilmahud 110Kv GIS Gear 03/11/2009 Position: Plant Maintenance Electrician Installation of new 110KV Siemens GISF6J Switchgear RTU Installation & Refurb 03/11/2009 Position: Plant Maintenance Electrician Installation of New Scada Panel for NIE Networks Stranorlar 38Kv Refurb 07/07/2009 Position: Plant Maintenance Electrician 33kv Switchgear refurbishment, Multicoring, Earthing and Bus Bar Dromada W/F 06/07/2009 Position: Plant Maintenance Electrician Installation of new wind farm, HV Multicores and Earthing Aghada 220KV New Bay 05/05/2009 Position: Plant Maintenance Electrician New 220 bayes New Switchgear and control room Multicoring, Earthing and Bus Bar Glanagow 220KV New Build 03/03/2009 Position: Plant Maintenance Electrician New 220 bayes. New Switchgear and control room Multicoring, Earthing and Bus Bar Killroot Power Station - New Bay 06/01/2009 Position: Plant Maintenance Electrician New 220 bayes. New Switchgear and control room Multicoring, Earthing and Bus Bar Longpoint 220KV New Bay 08/09/2008 Position: Plant Maintenance Electrician New 220 bayes. New Switchgear and control room Multicoring, Earthing and Bus Bar Owenreagh W/F 04/08/2008 Position: Plant Maintenance Electrician Installation of new Wind farm, HV multi cores and earthing Dardistown 110KV GIS Gear 03/06/2008 Position: Plant Maintenance Electrician Installation of new 110kv Siemens GISF6J Switchgear Killybegs 38Kv Refurb 03/04/2008 Position: Plant Maintenance Electrician Replacing and Refurb of 33kv Switchgear Ballyconnell 38Kv 04/03/2008 Position: Plant Maintenance Electrician Replacing and Refurb of 33kv Switchgear Certification & Qualification Links https://drive.google.com/file/d/0B4oRkatMl5-WWTI0WHhsSlNkZFU/view?usp=sharing References available on request