3. Foreword
• Final Design in accordance with SoW
• Main Reports contains more than 400 pages
• Present the result of OD-Outcome
4. Background
• It aimed to undertake the consultancy service for
Roads, Bridges and Intersections
• Provide technical knowledge to KM staff
• To insure the highest design quality, using sound
engineering and economic evaluation in
preparation of OD