Omar Ali Moussa
Sr.Project Engineer
Jeddah, Saudi Arabia
Egyptian
February 1980
Married & Have 2 Children
Mobile: +966 54 960 8105
Email Address: omarelhassemi@yahoo.com
PROFILE
 Over Eleven years experience in Project Management, Commercial and Contract
Administrative.
 Sound commercial awareness, contract knowledge, procurement processes and
procedures from preparation to issue of Bidders Lists, Contracting Plans and bid
invitation package preparation through to award, administration and close out of
Contracts.
 Reviewing Sub-contractors program submittals and commenting upon technical and
practical competence and fitness for purpose.
 Controlling and monitoring of project resources to achieve the project goals and
optimizing the allocation of inputs necessary to meet project objectives
 Familiar PRIMAVERA and AUTO-CAD.
 Bachelor of Science of Civil Engineering (Civil),2003, Ain Shams University
WORK EXPERIENCE
NOVEMBER 2013 – TO DATE
SBG SAUDI BIN LADIN GROUP (ABC DEPARTMENT), JEDDAH - SAUDI ARABIA
PROJECT ENGINEER
Projects: Abraj Kudai Project
Project value of US Dollar 4.6 Billion
Project Location: Holly Makkah, KSA
Owner: Saudi Ministry of Finance
Form of Contract: Lump sum Base
Responsibilities:
 Reviews the contractors’ correspondences to determine compliance with the relevant
contract Terms and Conditions.
 Reviews and approves in coordination with the project staff the contractor’s payment
certificates.
 Monitors, evaluates and prepares fully supported estimates and claims for alternations /
variations to the Contract Scope and substantiates
 Manages the contractual commitments and performance of the work according to the
Client’s instructions, Specifications and Drawings, and the Terms and Conditions of the
Contract, including construction Change Orders.
 Reviews the Subcontractors’ correspondences to determine compliance with the
relevant Subcontract Terms and Conditions.
 Evaluates and prepares response to and defense versus Subcontractors’ claims.
Page 1 of 4
Omar Ali Moussa
WORK EXPERIENCE continued …
JULY 2007 – NOVEMBER 2013
ARABIAN CONSTRUCTION COMPANY (ACC EGYPT)
SITE TECHNICAL OFFICE MANAGER
Projects
1. 5 & 7 Stars Hotels Renovation (Old & New Cataract Aswan – Nile Ritz Charlton)
Project value of EGP 670 Millions
Project Location: Aswan / Cairo, ARE
Owner: EGOTH
Form of Contract: Lump sum Base
2. EMAAR Luxury Residential Project (Uptown Cairo – Mivida –Marasi)
Project value of EGP 940 Millions
Project Location: New Cairo – North Coast, ARE
Owner: EMAAR
Form of Contract: Lump sum Base
Role: Cost Engineer - Cost Estimate &Tender Department - Contract & Procurement Department - Site
Technical Office Manager.
Planning Experienced in:
 Experience in both pre-construction (design / tender stage) & construction stages.
 On-site background and good experience in pre-construction stages.
 Assists in preparing work program, cash flow and manpower histogram for tenders
Cost Experienced in:
 Compiling cost estimates & target Budget
 Cost Engineering and pre-contract cost planning
 Create revenue budget according to the contract.
 Monitoring of the cost plan and adjusting and updating accordingly.
 Reviewing and assessing Sub-Contractors quotations to ensure cost is within target budget.
 Carry out analysis of programs/schedules/design/Variations etc. on Project sites to protect
interests.
 Coordinate and work with the PCM to resolve project issues to ensure the
delivery/completion of the project work.
 Review and audit of Detailed Project Target Budget in accordance with established WBS and
Standard Cost Codes.
 Perform project costing related reporting for the team and management’s review to ensure
that expenditures are kept within the project budget.
 Evaluation of variation submitted by contractors and negotiation with contractors quantity
surveyor on any discrepancy in quantities, items, rates and checking price escalation
submitted by contractors.
Page 2 of 4
Omar Ali Moussa
WORK EXPERIENCE continued …
Estimating Experienced in:
 Pre-Tendering and Post-Tendering works.
 Bill of Quantities and Quantity Surveying.
 Preparing Cost estimates and Tender documents.
 Lead a team of quantity surveyors on one or more complex projects
 Prepare price worksheet for the Labor, Materials, Equipment, and
Consumables.
 Preparation of full cost estimates on conceptual, design, or general tender work.
 Review scope of work for Prepare discipline estimates by calculating complete take-off of
scope of work & split civil packages.
 Prepare & Coordinate the project as per proposal specifications, Drawings and required
contents of estimate.
 Send technical clarification with regards to the project prior to material take-off
preparation and Construction Cost
 Request for quotation for Materials or Equipment required for the project as per the
proposal Specification and Standard.
Technical Office (Commercial) Experienced in:
 Client contract monitoring
 Issuing & monitoring subcontractors contracts
 Budget Control
 Material Control
 Time & Cost claims
 Reviewing monthly invoices
 Issuing POs
 Variation Orders pricing & reflecting on base time schedule
 Preparing TOC documents
 Deputy Project manager (Weekly meeting attendance)
APRIL 2004 – JULY 2007
NATURAL GAS VEHICLES CO. (NGV)
SITE MANAGER
Project: CNG Fueling Station / Administration Buildings
Project value of EGP 20 Millions
Project Location: Around ARE
Owner: Egyptian Ministry of Petroleum
Form of Contract: Re-Measured Base
Responsibilities:
 Preparing Project Initiation documentation.
 Tracking activities against the detailed project plans.
 Responsible for costing, estimating and planning projects.
 Monitoring actual expenditure figures against project budgets.
 Organizing and facilitating Project Steering / Operating Committees meetings.
 Responsible for ensuring best value is obtained for the project including supplier base,
use of internal and external resources.
 Check and verify drawings before release for execution
 Quantity Takeoff preparation
 Material Control
 Partial Procurement plan
 Owner Representative
Page 3 of 4
Omar Ali Moussa
WORK EXPERIENCE continued …
GRADUATION – APRIL 2004
BRILLIANT OFFICE & FINISHING INTERIOR (BOFI)
SITE ENGINEER
Project: Nile City Tower (+30 Floors)
Project value of EGP 7 Millions
Project Location: Cairo, ARE
Owner: Orascom
Responsibilities:
 Supervising Finishes Activities
TECHNICAL COURSES AND TRAINING
 Natural Gas Engineering Diploma 2005-2007- Cairo University
 Project Management Course (preparation for PMP certification)
 HSE – Risk Assessment –British Gas.
ALL REFERENCES INCLUDING CERTIFICATES ARE AVAILABLE UPON REQUEST.
Page 4 of 4

More Related Content

Featured

How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024Albert Qian
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsKurio // The Social Media Age(ncy)
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Search Engine Journal
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summarySpeakerHub
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next Tessa Mero
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentLily Ray
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best PracticesVit Horky
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project managementMindGenius
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...RachelPearson36
 
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Applitools
 
12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at WorkGetSmarter
 
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...DevGAMM Conference
 
Barbie - Brand Strategy Presentation
Barbie - Brand Strategy PresentationBarbie - Brand Strategy Presentation
Barbie - Brand Strategy PresentationErica Santiago
 
Good Stuff Happens in 1:1 Meetings: Why you need them and how to do them well
Good Stuff Happens in 1:1 Meetings: Why you need them and how to do them wellGood Stuff Happens in 1:1 Meetings: Why you need them and how to do them well
Good Stuff Happens in 1:1 Meetings: Why you need them and how to do them wellSaba Software
 
Introduction to C Programming Language
Introduction to C Programming LanguageIntroduction to C Programming Language
Introduction to C Programming LanguageSimplilearn
 

Featured (20)

How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
 
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
 
12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work
 
ChatGPT webinar slides
ChatGPT webinar slidesChatGPT webinar slides
ChatGPT webinar slides
 
More than Just Lines on a Map: Best Practices for U.S Bike Routes
More than Just Lines on a Map: Best Practices for U.S Bike RoutesMore than Just Lines on a Map: Best Practices for U.S Bike Routes
More than Just Lines on a Map: Best Practices for U.S Bike Routes
 
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
 
Barbie - Brand Strategy Presentation
Barbie - Brand Strategy PresentationBarbie - Brand Strategy Presentation
Barbie - Brand Strategy Presentation
 
Good Stuff Happens in 1:1 Meetings: Why you need them and how to do them well
Good Stuff Happens in 1:1 Meetings: Why you need them and how to do them wellGood Stuff Happens in 1:1 Meetings: Why you need them and how to do them well
Good Stuff Happens in 1:1 Meetings: Why you need them and how to do them well
 
Introduction to C Programming Language
Introduction to C Programming LanguageIntroduction to C Programming Language
Introduction to C Programming Language
 

Omar Ali Moussa - CV - Rev.01

  • 1. Omar Ali Moussa Sr.Project Engineer Jeddah, Saudi Arabia Egyptian February 1980 Married & Have 2 Children Mobile: +966 54 960 8105 Email Address: omarelhassemi@yahoo.com PROFILE  Over Eleven years experience in Project Management, Commercial and Contract Administrative.  Sound commercial awareness, contract knowledge, procurement processes and procedures from preparation to issue of Bidders Lists, Contracting Plans and bid invitation package preparation through to award, administration and close out of Contracts.  Reviewing Sub-contractors program submittals and commenting upon technical and practical competence and fitness for purpose.  Controlling and monitoring of project resources to achieve the project goals and optimizing the allocation of inputs necessary to meet project objectives  Familiar PRIMAVERA and AUTO-CAD.  Bachelor of Science of Civil Engineering (Civil),2003, Ain Shams University WORK EXPERIENCE NOVEMBER 2013 – TO DATE SBG SAUDI BIN LADIN GROUP (ABC DEPARTMENT), JEDDAH - SAUDI ARABIA PROJECT ENGINEER Projects: Abraj Kudai Project Project value of US Dollar 4.6 Billion Project Location: Holly Makkah, KSA Owner: Saudi Ministry of Finance Form of Contract: Lump sum Base Responsibilities:  Reviews the contractors’ correspondences to determine compliance with the relevant contract Terms and Conditions.  Reviews and approves in coordination with the project staff the contractor’s payment certificates.  Monitors, evaluates and prepares fully supported estimates and claims for alternations / variations to the Contract Scope and substantiates  Manages the contractual commitments and performance of the work according to the Client’s instructions, Specifications and Drawings, and the Terms and Conditions of the Contract, including construction Change Orders.  Reviews the Subcontractors’ correspondences to determine compliance with the relevant Subcontract Terms and Conditions.  Evaluates and prepares response to and defense versus Subcontractors’ claims. Page 1 of 4
  • 2. Omar Ali Moussa WORK EXPERIENCE continued … JULY 2007 – NOVEMBER 2013 ARABIAN CONSTRUCTION COMPANY (ACC EGYPT) SITE TECHNICAL OFFICE MANAGER Projects 1. 5 & 7 Stars Hotels Renovation (Old & New Cataract Aswan – Nile Ritz Charlton) Project value of EGP 670 Millions Project Location: Aswan / Cairo, ARE Owner: EGOTH Form of Contract: Lump sum Base 2. EMAAR Luxury Residential Project (Uptown Cairo – Mivida –Marasi) Project value of EGP 940 Millions Project Location: New Cairo – North Coast, ARE Owner: EMAAR Form of Contract: Lump sum Base Role: Cost Engineer - Cost Estimate &Tender Department - Contract & Procurement Department - Site Technical Office Manager. Planning Experienced in:  Experience in both pre-construction (design / tender stage) & construction stages.  On-site background and good experience in pre-construction stages.  Assists in preparing work program, cash flow and manpower histogram for tenders Cost Experienced in:  Compiling cost estimates & target Budget  Cost Engineering and pre-contract cost planning  Create revenue budget according to the contract.  Monitoring of the cost plan and adjusting and updating accordingly.  Reviewing and assessing Sub-Contractors quotations to ensure cost is within target budget.  Carry out analysis of programs/schedules/design/Variations etc. on Project sites to protect interests.  Coordinate and work with the PCM to resolve project issues to ensure the delivery/completion of the project work.  Review and audit of Detailed Project Target Budget in accordance with established WBS and Standard Cost Codes.  Perform project costing related reporting for the team and management’s review to ensure that expenditures are kept within the project budget.  Evaluation of variation submitted by contractors and negotiation with contractors quantity surveyor on any discrepancy in quantities, items, rates and checking price escalation submitted by contractors. Page 2 of 4
  • 3. Omar Ali Moussa WORK EXPERIENCE continued … Estimating Experienced in:  Pre-Tendering and Post-Tendering works.  Bill of Quantities and Quantity Surveying.  Preparing Cost estimates and Tender documents.  Lead a team of quantity surveyors on one or more complex projects  Prepare price worksheet for the Labor, Materials, Equipment, and Consumables.  Preparation of full cost estimates on conceptual, design, or general tender work.  Review scope of work for Prepare discipline estimates by calculating complete take-off of scope of work & split civil packages.  Prepare & Coordinate the project as per proposal specifications, Drawings and required contents of estimate.  Send technical clarification with regards to the project prior to material take-off preparation and Construction Cost  Request for quotation for Materials or Equipment required for the project as per the proposal Specification and Standard. Technical Office (Commercial) Experienced in:  Client contract monitoring  Issuing & monitoring subcontractors contracts  Budget Control  Material Control  Time & Cost claims  Reviewing monthly invoices  Issuing POs  Variation Orders pricing & reflecting on base time schedule  Preparing TOC documents  Deputy Project manager (Weekly meeting attendance) APRIL 2004 – JULY 2007 NATURAL GAS VEHICLES CO. (NGV) SITE MANAGER Project: CNG Fueling Station / Administration Buildings Project value of EGP 20 Millions Project Location: Around ARE Owner: Egyptian Ministry of Petroleum Form of Contract: Re-Measured Base Responsibilities:  Preparing Project Initiation documentation.  Tracking activities against the detailed project plans.  Responsible for costing, estimating and planning projects.  Monitoring actual expenditure figures against project budgets.  Organizing and facilitating Project Steering / Operating Committees meetings.  Responsible for ensuring best value is obtained for the project including supplier base, use of internal and external resources.  Check and verify drawings before release for execution  Quantity Takeoff preparation  Material Control  Partial Procurement plan  Owner Representative Page 3 of 4
  • 4. Omar Ali Moussa WORK EXPERIENCE continued … GRADUATION – APRIL 2004 BRILLIANT OFFICE & FINISHING INTERIOR (BOFI) SITE ENGINEER Project: Nile City Tower (+30 Floors) Project value of EGP 7 Millions Project Location: Cairo, ARE Owner: Orascom Responsibilities:  Supervising Finishes Activities TECHNICAL COURSES AND TRAINING  Natural Gas Engineering Diploma 2005-2007- Cairo University  Project Management Course (preparation for PMP certification)  HSE – Risk Assessment –British Gas. ALL REFERENCES INCLUDING CERTIFICATES ARE AVAILABLE UPON REQUEST. Page 4 of 4