This document discusses different construction project delivery and payment models. It begins by outlining common delivery models like design-bid-build and design-build. It then explains different payment methods that can be used like fixed price, unit prices, and cost-reimbursable. The document also discusses pricing strategies and how they relate to risk transfer between parties. It provides details on collaborative models like early contractor involvement and discusses selecting the optimal contract based on a client's project risks, desired influence, and market conditions.

1 of 18
Download to read offline
What are we talking about?
Anna Kadefors
Professor of Real Estate Management at KTH Royal Institute of Technology, Stockholm
Guest Professor at Chalmers University of Technology, Göteborg
Presentation outline
• Delivery models: Design-Bid-
Build, Design Build,
• Payment methods: fixed price,
unit prices, cost-reimbursable
• Pricing strategies and risk
• Early Contractor Involvement
• Other collaborative/relational
contracting models
• Selecting the contract
Delivery models
• Design-Bid-Build: the client hires
consultants to develop a
detailed design before the
contractor is procured.
• Design-Build: the client procures
the contractor based on
performance/functional
requirements and the contractor
hires consultants to develop the
design
• Design-Bid-Build: the client hires
consultants to develop a
detailed design before the
contractor is procured.
• Design-Build: the client procures
the contractor based on
performance/functional
requirements and the contractor
hires consultants to develop the
design
3
Payment/pricing methods
4
Two principles:
• Price-based
The price is set in competition by the market
• Cost-based
Payment is based on actual costs
• In practice often combined
Payment
principles 1:
price-based
• Lump sum/fixed price: the client pays a fixed
price for the whole contract. Cost risk with
contractor.
• Schedules of rates, unit prices,
remeasurement: contractors tender fixed
prices per unit of work or activity. Cost risk is
shared.
5
Payment
principles 2:
cost-based
• Cost reimbursable (for construction): the contractor
is reimbursed for actual costs. Cost risk with client
(Also called prime cost principle)
• Guaranteed maximum price (GMP): the contractor
is reimbursed for actual costs up to an agreed
maximum price
• Incentive contracts with gainshare/painshare
formula (target cost contracts): A cost reimbursable
contract where cost overruns and underruns
relative to an agreed target cost are shared. Cost
risk is shared.
6

Recommended

Professional Practice 1
Professional Practice 1Professional Practice 1
Professional Practice 1Lee Pei Gie
 
Mesurement presentation pavaruban
Mesurement presentation pavarubanMesurement presentation pavaruban
Mesurement presentation pavarubanthevaraja pavaruban
 
Professional practice-1-presentation
Professional practice-1-presentationProfessional practice-1-presentation
Professional practice-1-presentationTimun Loh
 
20050314 tips on contract management
20050314 tips on contract management20050314 tips on contract management
20050314 tips on contract managementraymond_wan2005
 
Yam yih hwan pp1 assignment aug 14
Yam yih hwan   pp1 assignment aug 14Yam yih hwan   pp1 assignment aug 14
Yam yih hwan pp1 assignment aug 14마 이환
 

More Related Content

Similar to ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm (SE)

Considerations in Procurement Strategy - 2014 Olswang Construction Law Confer...
Considerations in Procurement Strategy - 2014 Olswang Construction Law Confer...Considerations in Procurement Strategy - 2014 Olswang Construction Law Confer...
Considerations in Procurement Strategy - 2014 Olswang Construction Law Confer...Francis Ho
 
Executing the Project (1).pdf
Executing the Project (1).pdfExecuting the Project (1).pdf
Executing the Project (1).pdfAkshithKota
 
Chapter_2-Procurement and Contract management.pptx
Chapter_2-Procurement and Contract management.pptxChapter_2-Procurement and Contract management.pptx
Chapter_2-Procurement and Contract management.pptxssuserc0bf9b
 
Marketing mix for project marketing .pptx
Marketing mix for project marketing .pptxMarketing mix for project marketing .pptx
Marketing mix for project marketing .pptxAbdiqadirOsman
 
Exploration of risks and risk management in construction project delivery
Exploration of risks and risk management in construction project deliveryExploration of risks and risk management in construction project delivery
Exploration of risks and risk management in construction project deliveryMECandPMV
 
Bid cost survey 2014 and improving efficiencies in work winning
Bid cost survey 2014 and improving efficiencies in work winningBid cost survey 2014 and improving efficiencies in work winning
Bid cost survey 2014 and improving efficiencies in work winningLeonie Thomas
 
Construction contracts docuements_08092008
Construction contracts docuements_08092008Construction contracts docuements_08092008
Construction contracts docuements_08092008AYM1979
 
Procurement Methods and their Application.
Procurement Methods and their Application.Procurement Methods and their Application.
Procurement Methods and their Application.Lilian Nwachukwu
 
Collaborative Contracting.pptx
Collaborative Contracting.pptxCollaborative Contracting.pptx
Collaborative Contracting.pptxBharathBabu40
 
3 developing project proposals
3 developing project proposals3 developing project proposals
3 developing project proposalsDaw Juguilon
 
Professional practice 1 (QS)
Professional practice 1 (QS)Professional practice 1 (QS)
Professional practice 1 (QS)Hasif Alias
 
Андрій Просов “Fixed Price Agile Projects: Lessons Learned” Kyiv Project Man...
Андрій Просов  “Fixed Price Agile Projects: Lessons Learned” Kyiv Project Man...Андрій Просов  “Fixed Price Agile Projects: Lessons Learned” Kyiv Project Man...
Андрій Просов “Fixed Price Agile Projects: Lessons Learned” Kyiv Project Man...Lviv Startup Club
 
The Design Assist Method of Project Delivery
The Design Assist Method of Project DeliveryThe Design Assist Method of Project Delivery
The Design Assist Method of Project DeliverySHKLaw
 
Affinity institute design assist november 25 2014
Affinity institute design assist november 25 2014Affinity institute design assist november 25 2014
Affinity institute design assist november 25 2014SHKLaw
 
Key Components of Cost Estimation in construction
Key Components of Cost Estimation in constructionKey Components of Cost Estimation in construction
Key Components of Cost Estimation in constructionWaleed Liaqat
 
Practical approaches to address government contracting problems
Practical approaches to address government contracting problemsPractical approaches to address government contracting problems
Practical approaches to address government contracting problemsJohn Gilligan
 

Similar to ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm (SE) (20)

Considerations in Procurement Strategy - 2014 Olswang Construction Law Confer...
Considerations in Procurement Strategy - 2014 Olswang Construction Law Confer...Considerations in Procurement Strategy - 2014 Olswang Construction Law Confer...
Considerations in Procurement Strategy - 2014 Olswang Construction Law Confer...
 
Executing the Project (1).pdf
Executing the Project (1).pdfExecuting the Project (1).pdf
Executing the Project (1).pdf
 
Chapter_2-Procurement and Contract management.pptx
Chapter_2-Procurement and Contract management.pptxChapter_2-Procurement and Contract management.pptx
Chapter_2-Procurement and Contract management.pptx
 
Marketing mix for project marketing .pptx
Marketing mix for project marketing .pptxMarketing mix for project marketing .pptx
Marketing mix for project marketing .pptx
 
Exploration of risks and risk management in construction project delivery
Exploration of risks and risk management in construction project deliveryExploration of risks and risk management in construction project delivery
Exploration of risks and risk management in construction project delivery
 
Bid cost survey 2014 and improving efficiencies in work winning
Bid cost survey 2014 and improving efficiencies in work winningBid cost survey 2014 and improving efficiencies in work winning
Bid cost survey 2014 and improving efficiencies in work winning
 
Pp1 final
Pp1 finalPp1 final
Pp1 final
 
Contract Negotiations
Contract NegotiationsContract Negotiations
Contract Negotiations
 
Construction contracts docuements_08092008
Construction contracts docuements_08092008Construction contracts docuements_08092008
Construction contracts docuements_08092008
 
Procurement Methods and their Application.
Procurement Methods and their Application.Procurement Methods and their Application.
Procurement Methods and their Application.
 
Collaborative Contracting.pptx
Collaborative Contracting.pptxCollaborative Contracting.pptx
Collaborative Contracting.pptx
 
3 developing project proposals
3 developing project proposals3 developing project proposals
3 developing project proposals
 
Professional practice 1 (QS)
Professional practice 1 (QS)Professional practice 1 (QS)
Professional practice 1 (QS)
 
Андрій Просов “Fixed Price Agile Projects: Lessons Learned” Kyiv Project Man...
Андрій Просов  “Fixed Price Agile Projects: Lessons Learned” Kyiv Project Man...Андрій Просов  “Fixed Price Agile Projects: Lessons Learned” Kyiv Project Man...
Андрій Просов “Fixed Price Agile Projects: Lessons Learned” Kyiv Project Man...
 
Procurement Methods
Procurement MethodsProcurement Methods
Procurement Methods
 
Purpose
PurposePurpose
Purpose
 
The Design Assist Method of Project Delivery
The Design Assist Method of Project DeliveryThe Design Assist Method of Project Delivery
The Design Assist Method of Project Delivery
 
Affinity institute design assist november 25 2014
Affinity institute design assist november 25 2014Affinity institute design assist november 25 2014
Affinity institute design assist november 25 2014
 
Key Components of Cost Estimation in construction
Key Components of Cost Estimation in constructionKey Components of Cost Estimation in construction
Key Components of Cost Estimation in construction
 
Practical approaches to address government contracting problems
Practical approaches to address government contracting problemsPractical approaches to address government contracting problems
Practical approaches to address government contracting problems
 

More from OECD Governance

Public Integrity Indicators Slides
Public Integrity Indicators SlidesPublic Integrity Indicators Slides
Public Integrity Indicators SlidesOECD Governance
 
Summary of the OECD expert meeting: Construction Risk Management in Infrastru...
Summary of the OECD expert meeting: Construction Risk Management in Infrastru...Summary of the OECD expert meeting: Construction Risk Management in Infrastru...
Summary of the OECD expert meeting: Construction Risk Management in Infrastru...OECD Governance
 
Using AI led assurance to deliver projects on time and on budget - D. Amratia...
Using AI led assurance to deliver projects on time and on budget - D. Amratia...Using AI led assurance to deliver projects on time and on budget - D. Amratia...
Using AI led assurance to deliver projects on time and on budget - D. Amratia...OECD Governance
 
Building Client Capability to Deliver Megaprojects - J. Denicol, professor at...
Building Client Capability to Deliver Megaprojects - J. Denicol, professor at...Building Client Capability to Deliver Megaprojects - J. Denicol, professor at...
Building Client Capability to Deliver Megaprojects - J. Denicol, professor at...OECD Governance
 
Procurement strategy in major infrastructure: The AS-IS and STEPS - D. Makovš...
Procurement strategy in major infrastructure: The AS-IS and STEPS - D. Makovš...Procurement strategy in major infrastructure: The AS-IS and STEPS - D. Makovš...
Procurement strategy in major infrastructure: The AS-IS and STEPS - D. Makovš...OECD Governance
 
Procurement of major infrastructure projects 2017-22 - B. Hasselgren, Senior ...
Procurement of major infrastructure projects 2017-22 - B. Hasselgren, Senior ...Procurement of major infrastructure projects 2017-22 - B. Hasselgren, Senior ...
Procurement of major infrastructure projects 2017-22 - B. Hasselgren, Senior ...OECD Governance
 
ECI Dutch Experience - A. Chao, Partner, Bird&Bird & J. de Koning, Head of Co...
ECI Dutch Experience - A. Chao, Partner, Bird&Bird & J. de Koning, Head of Co...ECI Dutch Experience - A. Chao, Partner, Bird&Bird & J. de Koning, Head of Co...
ECI Dutch Experience - A. Chao, Partner, Bird&Bird & J. de Koning, Head of Co...OECD Governance
 
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, StockholmECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, StockholmOECD Governance
 
EPEC's perception of market developments - E. Farquharson, Principal Adviser,...
EPEC's perception of market developments - E. Farquharson, Principal Adviser,...EPEC's perception of market developments - E. Farquharson, Principal Adviser,...
EPEC's perception of market developments - E. Farquharson, Principal Adviser,...OECD Governance
 
Geographical scope of the lines in Design and Build - B.Dupuis, Executive Dir...
Geographical scope of the lines in Design and Build - B.Dupuis, Executive Dir...Geographical scope of the lines in Design and Build - B.Dupuis, Executive Dir...
Geographical scope of the lines in Design and Build - B.Dupuis, Executive Dir...OECD Governance
 
New Jersey Wind Port - J. Kennedy, New Jersey Economic Development Authority ...
New Jersey Wind Port - J. Kennedy, New Jersey Economic Development Authority ...New Jersey Wind Port - J. Kennedy, New Jersey Economic Development Authority ...
New Jersey Wind Port - J. Kennedy, New Jersey Economic Development Authority ...OECD Governance
 
Executive Agency of the Dutch Ministry of Infrastructure and Water Management...
Executive Agency of the Dutch Ministry of Infrastructure and Water Management...Executive Agency of the Dutch Ministry of Infrastructure and Water Management...
Executive Agency of the Dutch Ministry of Infrastructure and Water Management...OECD Governance
 
Presentation of OECD Government at a Glance 2023
Presentation of OECD Government at a Glance 2023Presentation of OECD Government at a Glance 2023
Presentation of OECD Government at a Glance 2023OECD Governance
 
The Protection and Promotion of Civic Space: Strengthening Alignment with Int...
The Protection and Promotion of Civic Space: Strengthening Alignment with Int...The Protection and Promotion of Civic Space: Strengthening Alignment with Int...
The Protection and Promotion of Civic Space: Strengthening Alignment with Int...OECD Governance
 
Digital Government Review Türkiye - Assessment and Recommendations
Digital Government Review Türkiye - Assessment and RecommendationsDigital Government Review Türkiye - Assessment and Recommendations
Digital Government Review Türkiye - Assessment and RecommendationsOECD Governance
 
Buliding-Financial-Resilience-to climate-Impacts.pdf
Buliding-Financial-Resilience-to climate-Impacts.pdfBuliding-Financial-Resilience-to climate-Impacts.pdf
Buliding-Financial-Resilience-to climate-Impacts.pdfOECD Governance
 
Session-7-OECD-Strengthening-climate.pptx
Session-7-OECD-Strengthening-climate.pptxSession-7-OECD-Strengthening-climate.pptx
Session-7-OECD-Strengthening-climate.pptxOECD Governance
 
Session-6-Building-Financial-Resilience.pptx
Session-6-Building-Financial-Resilience.pptxSession-6-Building-Financial-Resilience.pptx
Session-6-Building-Financial-Resilience.pptxOECD Governance
 
Session-5-Assurance-on-sustainability-Peter-Welch.pptx
Session-5-Assurance-on-sustainability-Peter-Welch.pptxSession-5-Assurance-on-sustainability-Peter-Welch.pptx
Session-5-Assurance-on-sustainability-Peter-Welch.pptxOECD Governance
 
Session-4-Sovereign-green-bonds-Fatos-Koc.pptx
Session-4-Sovereign-green-bonds-Fatos-Koc.pptxSession-4-Sovereign-green-bonds-Fatos-Koc.pptx
Session-4-Sovereign-green-bonds-Fatos-Koc.pptxOECD Governance
 

More from OECD Governance (20)

Public Integrity Indicators Slides
Public Integrity Indicators SlidesPublic Integrity Indicators Slides
Public Integrity Indicators Slides
 
Summary of the OECD expert meeting: Construction Risk Management in Infrastru...
Summary of the OECD expert meeting: Construction Risk Management in Infrastru...Summary of the OECD expert meeting: Construction Risk Management in Infrastru...
Summary of the OECD expert meeting: Construction Risk Management in Infrastru...
 
Using AI led assurance to deliver projects on time and on budget - D. Amratia...
Using AI led assurance to deliver projects on time and on budget - D. Amratia...Using AI led assurance to deliver projects on time and on budget - D. Amratia...
Using AI led assurance to deliver projects on time and on budget - D. Amratia...
 
Building Client Capability to Deliver Megaprojects - J. Denicol, professor at...
Building Client Capability to Deliver Megaprojects - J. Denicol, professor at...Building Client Capability to Deliver Megaprojects - J. Denicol, professor at...
Building Client Capability to Deliver Megaprojects - J. Denicol, professor at...
 
Procurement strategy in major infrastructure: The AS-IS and STEPS - D. Makovš...
Procurement strategy in major infrastructure: The AS-IS and STEPS - D. Makovš...Procurement strategy in major infrastructure: The AS-IS and STEPS - D. Makovš...
Procurement strategy in major infrastructure: The AS-IS and STEPS - D. Makovš...
 
Procurement of major infrastructure projects 2017-22 - B. Hasselgren, Senior ...
Procurement of major infrastructure projects 2017-22 - B. Hasselgren, Senior ...Procurement of major infrastructure projects 2017-22 - B. Hasselgren, Senior ...
Procurement of major infrastructure projects 2017-22 - B. Hasselgren, Senior ...
 
ECI Dutch Experience - A. Chao, Partner, Bird&Bird & J. de Koning, Head of Co...
ECI Dutch Experience - A. Chao, Partner, Bird&Bird & J. de Koning, Head of Co...ECI Dutch Experience - A. Chao, Partner, Bird&Bird & J. de Koning, Head of Co...
ECI Dutch Experience - A. Chao, Partner, Bird&Bird & J. de Koning, Head of Co...
 
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, StockholmECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm
 
EPEC's perception of market developments - E. Farquharson, Principal Adviser,...
EPEC's perception of market developments - E. Farquharson, Principal Adviser,...EPEC's perception of market developments - E. Farquharson, Principal Adviser,...
EPEC's perception of market developments - E. Farquharson, Principal Adviser,...
 
Geographical scope of the lines in Design and Build - B.Dupuis, Executive Dir...
Geographical scope of the lines in Design and Build - B.Dupuis, Executive Dir...Geographical scope of the lines in Design and Build - B.Dupuis, Executive Dir...
Geographical scope of the lines in Design and Build - B.Dupuis, Executive Dir...
 
New Jersey Wind Port - J. Kennedy, New Jersey Economic Development Authority ...
New Jersey Wind Port - J. Kennedy, New Jersey Economic Development Authority ...New Jersey Wind Port - J. Kennedy, New Jersey Economic Development Authority ...
New Jersey Wind Port - J. Kennedy, New Jersey Economic Development Authority ...
 
Executive Agency of the Dutch Ministry of Infrastructure and Water Management...
Executive Agency of the Dutch Ministry of Infrastructure and Water Management...Executive Agency of the Dutch Ministry of Infrastructure and Water Management...
Executive Agency of the Dutch Ministry of Infrastructure and Water Management...
 
Presentation of OECD Government at a Glance 2023
Presentation of OECD Government at a Glance 2023Presentation of OECD Government at a Glance 2023
Presentation of OECD Government at a Glance 2023
 
The Protection and Promotion of Civic Space: Strengthening Alignment with Int...
The Protection and Promotion of Civic Space: Strengthening Alignment with Int...The Protection and Promotion of Civic Space: Strengthening Alignment with Int...
The Protection and Promotion of Civic Space: Strengthening Alignment with Int...
 
Digital Government Review Türkiye - Assessment and Recommendations
Digital Government Review Türkiye - Assessment and RecommendationsDigital Government Review Türkiye - Assessment and Recommendations
Digital Government Review Türkiye - Assessment and Recommendations
 
Buliding-Financial-Resilience-to climate-Impacts.pdf
Buliding-Financial-Resilience-to climate-Impacts.pdfBuliding-Financial-Resilience-to climate-Impacts.pdf
Buliding-Financial-Resilience-to climate-Impacts.pdf
 
Session-7-OECD-Strengthening-climate.pptx
Session-7-OECD-Strengthening-climate.pptxSession-7-OECD-Strengthening-climate.pptx
Session-7-OECD-Strengthening-climate.pptx
 
Session-6-Building-Financial-Resilience.pptx
Session-6-Building-Financial-Resilience.pptxSession-6-Building-Financial-Resilience.pptx
Session-6-Building-Financial-Resilience.pptx
 
Session-5-Assurance-on-sustainability-Peter-Welch.pptx
Session-5-Assurance-on-sustainability-Peter-Welch.pptxSession-5-Assurance-on-sustainability-Peter-Welch.pptx
Session-5-Assurance-on-sustainability-Peter-Welch.pptx
 
Session-4-Sovereign-green-bonds-Fatos-Koc.pptx
Session-4-Sovereign-green-bonds-Fatos-Koc.pptxSession-4-Sovereign-green-bonds-Fatos-Koc.pptx
Session-4-Sovereign-green-bonds-Fatos-Koc.pptx
 

Recently uploaded

2023 Winter Springs Water and Wastewater Rate Study Presentation
2023 Winter Springs Water and Wastewater Rate Study Presentation2023 Winter Springs Water and Wastewater Rate Study Presentation
2023 Winter Springs Water and Wastewater Rate Study PresentationVictoriaColangelo
 
Understanding the Transition from Planning to Implementation (P2I)
Understanding the Transition from Planning to Implementation (P2I)Understanding the Transition from Planning to Implementation (P2I)
Understanding the Transition from Planning to Implementation (P2I)NAP Global Network
 
Item # 10 - 1st Qtr Financial & Inv. Report.pdf
Item # 10 - 1st Qtr Financial & Inv. Report.pdfItem # 10 - 1st Qtr Financial & Inv. Report.pdf
Item # 10 - 1st Qtr Financial & Inv. Report.pdfahcitycouncil
 
Presentation of the European Youth Foundation
Presentation of the European Youth FoundationPresentation of the European Youth Foundation
Presentation of the European Youth FoundationEuropeanYouthFoundation
 
PPT Item # 8 - Cancellation May General Election
PPT Item # 8 - Cancellation May General ElectionPPT Item # 8 - Cancellation May General Election
PPT Item # 8 - Cancellation May General Electionahcitycouncil
 
IIED's environmental sustainability impact report 2022/23
IIED's environmental sustainability impact report 2022/23IIED's environmental sustainability impact report 2022/23
IIED's environmental sustainability impact report 2022/23IIED
 
IEF Energy Outlooks Comparison Report-2024
IEF Energy Outlooks Comparison Report-2024IEF Energy Outlooks Comparison Report-2024
IEF Energy Outlooks Comparison Report-2024Energy for One World
 
Item # 8 - Cancellation May General Election
Item # 8 - Cancellation May General ElectionItem # 8 - Cancellation May General Election
Item # 8 - Cancellation May General Electionahcitycouncil
 
2024 Message on the State of the Nation (1).pdf
2024 Message on the State of the Nation (1).pdf2024 Message on the State of the Nation (1).pdf
2024 Message on the State of the Nation (1).pdfKweku Zurek
 
Horsley U3A February 2024 Monthly Presentation
Horsley U3A February 2024 Monthly PresentationHorsley U3A February 2024 Monthly Presentation
Horsley U3A February 2024 Monthly Presentationngc5xjz5dp
 
Sparks Fire Dept. investigative report into Timothy Egan dropping a senior ci...
Sparks Fire Dept. investigative report into Timothy Egan dropping a senior ci...Sparks Fire Dept. investigative report into Timothy Egan dropping a senior ci...
Sparks Fire Dept. investigative report into Timothy Egan dropping a senior ci...This Is Reno
 
PPT ITem # 10 - 1st Qtr Financial & Inv. Report
PPT ITem # 10 - 1st Qtr Financial & Inv. ReportPPT ITem # 10 - 1st Qtr Financial & Inv. Report
PPT ITem # 10 - 1st Qtr Financial & Inv. Reportahcitycouncil
 
Item # 6 - Municipal Court Appointments.
Item # 6 - Municipal Court Appointments.Item # 6 - Municipal Court Appointments.
Item # 6 - Municipal Court Appointments.ahcitycouncil
 
PPT Item # 5 - 2024 SMP Agmt Freese & Nichols
PPT Item # 5 - 2024 SMP Agmt Freese & NicholsPPT Item # 5 - 2024 SMP Agmt Freese & Nichols
PPT Item # 5 - 2024 SMP Agmt Freese & Nicholsahcitycouncil
 
Item # 9 - 2023 Racial Profiling Annual Report
Item # 9 - 2023 Racial Profiling Annual ReportItem # 9 - 2023 Racial Profiling Annual Report
Item # 9 - 2023 Racial Profiling Annual Reportahcitycouncil
 
Item # 1a - February 12, 2024 CC Minutes
Item # 1a - February 12, 2024 CC MinutesItem # 1a - February 12, 2024 CC Minutes
Item # 1a - February 12, 2024 CC Minutesahcitycouncil
 
PPT Item # 2 -- Announcements Powerpoint
PPT Item # 2 -- Announcements PowerpointPPT Item # 2 -- Announcements Powerpoint
PPT Item # 2 -- Announcements Powerpointahcitycouncil
 
Beyond COP28 (Extract from Agenda2024 Publication)
Beyond COP28 (Extract from Agenda2024 Publication)Beyond COP28 (Extract from Agenda2024 Publication)
Beyond COP28 (Extract from Agenda2024 Publication)Energy for One World
 
Self-assessment: Planning to implementation in the NAP process + integrating ...
Self-assessment: Planning to implementation in the NAP process + integrating ...Self-assessment: Planning to implementation in the NAP process + integrating ...
Self-assessment: Planning to implementation in the NAP process + integrating ...NAP Global Network
 

Recently uploaded (20)

2023 Winter Springs Water and Wastewater Rate Study Presentation
2023 Winter Springs Water and Wastewater Rate Study Presentation2023 Winter Springs Water and Wastewater Rate Study Presentation
2023 Winter Springs Water and Wastewater Rate Study Presentation
 
Understanding the Transition from Planning to Implementation (P2I)
Understanding the Transition from Planning to Implementation (P2I)Understanding the Transition from Planning to Implementation (P2I)
Understanding the Transition from Planning to Implementation (P2I)
 
Item # 10 - 1st Qtr Financial & Inv. Report.pdf
Item # 10 - 1st Qtr Financial & Inv. Report.pdfItem # 10 - 1st Qtr Financial & Inv. Report.pdf
Item # 10 - 1st Qtr Financial & Inv. Report.pdf
 
Presentation of the European Youth Foundation
Presentation of the European Youth FoundationPresentation of the European Youth Foundation
Presentation of the European Youth Foundation
 
PPT Item # 8 - Cancellation May General Election
PPT Item # 8 - Cancellation May General ElectionPPT Item # 8 - Cancellation May General Election
PPT Item # 8 - Cancellation May General Election
 
IIED's environmental sustainability impact report 2022/23
IIED's environmental sustainability impact report 2022/23IIED's environmental sustainability impact report 2022/23
IIED's environmental sustainability impact report 2022/23
 
IEF Energy Outlooks Comparison Report-2024
IEF Energy Outlooks Comparison Report-2024IEF Energy Outlooks Comparison Report-2024
IEF Energy Outlooks Comparison Report-2024
 
Item # 8 - Cancellation May General Election
Item # 8 - Cancellation May General ElectionItem # 8 - Cancellation May General Election
Item # 8 - Cancellation May General Election
 
2024 Message on the State of the Nation (1).pdf
2024 Message on the State of the Nation (1).pdf2024 Message on the State of the Nation (1).pdf
2024 Message on the State of the Nation (1).pdf
 
Horsley U3A February 2024 Monthly Presentation
Horsley U3A February 2024 Monthly PresentationHorsley U3A February 2024 Monthly Presentation
Horsley U3A February 2024 Monthly Presentation
 
Sparks Fire Dept. investigative report into Timothy Egan dropping a senior ci...
Sparks Fire Dept. investigative report into Timothy Egan dropping a senior ci...Sparks Fire Dept. investigative report into Timothy Egan dropping a senior ci...
Sparks Fire Dept. investigative report into Timothy Egan dropping a senior ci...
 
PPT ITem # 10 - 1st Qtr Financial & Inv. Report
PPT ITem # 10 - 1st Qtr Financial & Inv. ReportPPT ITem # 10 - 1st Qtr Financial & Inv. Report
PPT ITem # 10 - 1st Qtr Financial & Inv. Report
 
Item # 6 - Municipal Court Appointments.
Item # 6 - Municipal Court Appointments.Item # 6 - Municipal Court Appointments.
Item # 6 - Municipal Court Appointments.
 
PPT Item # 5 - 2024 SMP Agmt Freese & Nichols
PPT Item # 5 - 2024 SMP Agmt Freese & NicholsPPT Item # 5 - 2024 SMP Agmt Freese & Nichols
PPT Item # 5 - 2024 SMP Agmt Freese & Nichols
 
Item # 9 - 2023 Racial Profiling Annual Report
Item # 9 - 2023 Racial Profiling Annual ReportItem # 9 - 2023 Racial Profiling Annual Report
Item # 9 - 2023 Racial Profiling Annual Report
 
Item # 1a - February 12, 2024 CC Minutes
Item # 1a - February 12, 2024 CC MinutesItem # 1a - February 12, 2024 CC Minutes
Item # 1a - February 12, 2024 CC Minutes
 
PPT Item # 2 -- Announcements Powerpoint
PPT Item # 2 -- Announcements PowerpointPPT Item # 2 -- Announcements Powerpoint
PPT Item # 2 -- Announcements Powerpoint
 
Beyond COP28 (Extract from Agenda2024 Publication)
Beyond COP28 (Extract from Agenda2024 Publication)Beyond COP28 (Extract from Agenda2024 Publication)
Beyond COP28 (Extract from Agenda2024 Publication)
 
2024 Economic Forecast Forum Presentation
2024 Economic Forecast Forum Presentation2024 Economic Forecast Forum Presentation
2024 Economic Forecast Forum Presentation
 
Self-assessment: Planning to implementation in the NAP process + integrating ...
Self-assessment: Planning to implementation in the NAP process + integrating ...Self-assessment: Planning to implementation in the NAP process + integrating ...
Self-assessment: Planning to implementation in the NAP process + integrating ...
 

ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm (SE)

  • 1. What are we talking about? Anna Kadefors Professor of Real Estate Management at KTH Royal Institute of Technology, Stockholm Guest Professor at Chalmers University of Technology, Göteborg
  • 2. Presentation outline • Delivery models: Design-Bid- Build, Design Build, • Payment methods: fixed price, unit prices, cost-reimbursable • Pricing strategies and risk • Early Contractor Involvement • Other collaborative/relational contracting models • Selecting the contract
  • 3. Delivery models • Design-Bid-Build: the client hires consultants to develop a detailed design before the contractor is procured. • Design-Build: the client procures the contractor based on performance/functional requirements and the contractor hires consultants to develop the design • Design-Bid-Build: the client hires consultants to develop a detailed design before the contractor is procured. • Design-Build: the client procures the contractor based on performance/functional requirements and the contractor hires consultants to develop the design 3
  • 4. Payment/pricing methods 4 Two principles: • Price-based The price is set in competition by the market • Cost-based Payment is based on actual costs • In practice often combined
  • 5. Payment principles 1: price-based • Lump sum/fixed price: the client pays a fixed price for the whole contract. Cost risk with contractor. • Schedules of rates, unit prices, remeasurement: contractors tender fixed prices per unit of work or activity. Cost risk is shared. 5
  • 6. Payment principles 2: cost-based • Cost reimbursable (for construction): the contractor is reimbursed for actual costs. Cost risk with client (Also called prime cost principle) • Guaranteed maximum price (GMP): the contractor is reimbursed for actual costs up to an agreed maximum price • Incentive contracts with gainshare/painshare formula (target cost contracts): A cost reimbursable contract where cost overruns and underruns relative to an agreed target cost are shared. Cost risk is shared. 6
  • 7. Gain shared to be shared 7 Payment model: target cost contracts
  • 8. 8
  • 9. Pricing strategies and risk • Lump sum contracts: competitive tendering for basic contract – risk for winner's curse • Changes/variations priced in monopoly (claims) ➢Contractor strategy: bid low – claim high ➢Client strategy: monitoring, suspicion ➢Costs and conflicts increase when uncertainty is high (many changes = many conflicts) • Contractors will price risk – can be expensive • So if there is uncertainty all contracts will be either high risk or very costly for clients
  • 10. ▪ Relationship-building activities – workshops etc ▪ Partnering charter with joint goals ▪ Communication to support creative interaction ▪ Joint risk management ▪ Systems for following up goals and collaboration ▪ A conflict management system ▪ Often: Monetary incentives (”carrots” for collaboration and innovation), open books Collaboration models - activities and systems 10
  • 11. ECI – Early Contractor Involvement • Most common interpretation (?): bilateral two-stage open book contracts with collaborative measures and contractor selection on soft parameters • But also refers to alliances with multiparty contracts and collaborative measures (f ex PPC2000 in UK) • Or just to involving contractors early without collaborative measures 11
  • 12. Early Contractor Involvement (bilateral) Two-stage process Phase 1: - Often cost plus payment - Develop budget/target cost - Go/NoGo Phase 2: - Target cost contract with gainshare/painshare - Or cost reimbursable with fixed part - Or fixed price 12
  • 13. International trend: inspiration, imitation and translation between contexts
  • 14. Other collaborative models and labels • Partnering – US, UK, DK, SW… • Can refer to any collaborative relation • Or to collaboration within traditional contracts • Or to two-stage open book tendering plus collaborative measures • And more… • Alliances – Australia, UK, Finland • Multiparty contracts • Can also siginify any collaborative relation (cf strategic alliances) • Integrated Project Delivery (IPD) – US and other countries • Originally multiparty contract, but now wider term • Related to lean and VDC • Framework contracts involving multiple projects (UK: FAC1) • Various local models: Bouwteam, etc. • (Relational contracting, collaborative contracting, supply chain management) • Labels change meaning between context and over time in the same context
  • 15. Reasons for using early contractor involvement • There is uncertainty in the project (geology, existing structures, external actors, user demands, complexity in requirements, re-use of material…) • The client wants to influence detailed design beyond traditional contracts (architecture, labs, etc.) • Benefits of including construction competence in design (constructability, optimizing for carbon reduction, etc.) • To get tenders – contractors prefer low-risk contracts • Industry attractiveness and recruitment (less stressful, more learning) • Lean client functions • Everybody does it, test something new
  • 16. Trust and control • Calculus-based trust • Contracts • Reputation effects in small markets • Relational trust • Based on actual interaction • Selecting contractors with high collaborative competence • Collaborative measures to build trust at project level – social control • Institutional trust • Informal shared understandings at industry level • Certifications of companies, standard contracts, certified training
  • 17. Some takeaways • You can’t have your cake and eat it • Don’t assume that others use label/terminology in the same way as you • It’s not only about selecting a contract for a project, it’s an industry learning process
  • 18. Client’s choice of procurement strategy • Which risks are there and which party can control them? • How much influence does the client wish to have over detailed design? • Client competence and resources for procurement and contract management • Time pressure • Market aspects (competition): how many contractors have the necessary competence and how many will be interested in submitting a tender? 18