SoNo Infrastructure Design - Community Meeting - 9/19/23
1. Improvements around the South
Norwalk Train Station
Infrastructure
September 19, 2023 | Public Kick-off Meeting
2. Project Introduction
๏ง Builds off the South Norwalk Station Area
Study (completed in 2022)
๏ง Department of Economic and Community
Development (DECD): Connecticut
Communities Challenge Grant
๏ง Focus on equity
๏ง Streetscape and Connectivity Enhancements
๏ง Connect residents to employment centers,
business development opportunities,
neighborhood uses, and affordable housing.
๏ง Sustainability
4. Design Goals
๏ง Equitable Complete Streets
๏ง Accessible sidewalks that include street trees,
street furniture, and enhanced lighting
๏ง Enhanced intersections
๏ง Optimized access and operational improvements
๏ง Effective curbside management at South
Norwalk Station
๏ง Reduced impervious surfaces
๏ง Green infrastructure
5.
6. Dr. Martin Luther King, Jr. Drive
Lowe Street to Washington Street
๏ง Enhance streetscape inclusive of road diet
๏ง Reduce number of travel lanes
๏ง Reduce travel lane widths
๏ง Increase sidewalk widths
๏ง Accommodate bicycles
๏ง Expand/enhance center medians
๏ง Maintain tree canopy
๏ง Modify and/or replace signal equipment
๏ง Reduce impervious area
7. Chestnut Street Corridor
Monroe Street to Concord Street
๏ง Focus on safety and mobility
๏ง Extend streetscape design palette
๏ง Maximize on-street parking
๏ง Review contraflow traffic operations
๏ง Assess and retain existing street trees
๏ง Enhance pedestrian crossings
๏ง Incorporate undergrounding of utilities
๏ง Coordinate with developers
8. Henry Street Corridor
Henry Street, Mulvoy Street, Franklin Street,
and Bates Court
๏ง Focus on safety and mobility
๏ง Extend streetscape design palette
๏ง Maintain on-street parking
๏ง Assess and retain existing street trees
๏ง Enhance pedestrian crossings
๏ง Frame on-street parking with bump-outs
๏ง Improve railroad underpass (Whistleville)
๏ง Incorporate undergrounding of utilities
๏ง Coordinate with developers
9. Station Place
๏ง Improve access for all modes
๏ง Manage Station curb side activities
๏ง Enhance landscape, hardscape, streetscape,
and open space features
๏ง Maintain balance of parking
๏ง Incorporate undergrounding of utilities
๏ง Coordinate and integrate with
adjacent developers
10. Landscape and Hardscape
๏ง Consistent streetscape palette
โ Pavers
โ Lighting
โ Tree Wells
โ Site furnishings
โ Streetscape planting design
๏ง Sidewalk replacements
๏ง Sustainable design
strategies/green infrastructure
๏ง Preserving Existing Tree
Canopy
โ Coordinate with City Tree
Warden
โ Contract arborist specifications
Existing Tree Canopy - Henry Street
11. Whistleville โ Placemaking
๏ง Create a "Sense of Placeโ
๏ง Focus on safety and mobility
๏ง Welcome users with a Transit
Gateway
๏ง Enhanced/decorative pedestrian
crossings
๏ง Incorporate creative bump outs
๏ง Improve lighting
๏ง Community involvement
12. Process and Schedule
๏ง Project Kick-off
with NRDA
๏ง Concept Plan
๏ง Illustrations and
Graphics
๏ง Concept
Development Public
Meeting
๏ง Project Control
and Datum
๏ง Right-of-Way
Survey
๏ง Topographic
Survey
๏ง Existing Utility
Survey
๏ง Field Reconnaissance
๏ง Drainage Analysis
๏ง Preliminary Design Plans
๏ง Utility Coordination
๏ง Cost Estimate
๏ง Preliminary Design Report
๏ง Preliminary Design Public Meeting
๏ง Semi-Final
Design Plans
๏ง Specifications/
Special
Provisions
๏ง Semi-Final
Design Report
๏ง Drainage Report
๏ง Utility Test Pits
๏ง Cost Estimate
๏ง Final Plans for
Review
๏ง Specifications/
Special Provisions
๏ง 90% Design
Report
๏ง Established
Underground
Utility Corridors
๏ง Cost Estimate
๏ง Bid Documents
๏ง Final Design Report
๏ง Final Cost Estimate
๏ง Community Engagement
๏ง Coordination with Developers
Concept Development Survey
Semi-Final
Design (70%)
Final Plans for
Review (90%)
Final Design
(100%)
Preliminary Design (35%)
Ongoing
Public Meeting Public Meeting
13. Improvements around the South
Norwalk Train Station
Infrastructure
September 19, 2023 | Public Kick-off Meeting
Editor's Notes
Note that TMP is investigating the conversion of Chestnut to one-way
Considering adding image of โpublic open spaceโ that the developer will be proving for integration purposes
Working with the NRDA and TMP to develop a concept for Station Place. Coordination with Transit District required.