Complaint Number: Customer Name: Response Due Date:
8-D is a quality management tool and is a vehicle for a cross-functional team to articulate thoughts and provides scientific determination to
details of problems and provides solutions. Organizations can benefit from the 8-D approach by applying it to all areas in the company. The 8-
D provides excellent guidelines allow ing us to get to the root of a problem and w ays to check that the solution actually w orks. Rather than
healing the symptom, the illness is cured, thus, the same problem is unlikely to recur.
Step 0 1 2 3 4 5 6 7 8
Action The Planning Stage Establishing
the Team
Problem
Definition /
Statement&
Description
Developing
Interim
Containment
Action
Identifying &
Verifying
RootCause
Identifying
Permanent
Corrective
Actions (PCA)
Implementing
& Validating
PCA
Preventing
Recurrence
Recognizing
Team Efforts
0
The Planning Stage:
The 8-D method of problem solving is appropriate in "cause
unknow n" situations and is not the right tool if concerns center
solely on decision-making or problem prevention. 8-D is
especially usefulas it results in not just a problem-solving
process, but also a standard and a reporting format. Does this
problem w arrant/require an 8D? If so comment w hy and proceed.
Is an Emergency Response Action Needed?
(If needed document actions in Action Item Table)
1
Establishing the Team:
Establish a small group of people w ith the process/ product
know ledge, allocated time, authority and skill in the required
technicaldisciplines to solve the problem and implement
corrective actions.
Team Goals:
Team Objectives:
Department Name Skills Responsibility
2A
Problem Definition
Provides the starting point for solving the problem or
Non-conformance issue. Need to have “correct” problem
description to identify causes. Need to use terms that are
understood by all.
Sketch / Photo of Problem
Part Number(s):
Customer(s):
List all of the data and documents that might help you to define
the problem more exactly?
Action Plan to collect additional information:
Prepare Process Flow Diagram for problem
use a separate sheet if needed
Page 2 of 6 www.qmsdesk.com
QMS Desk
8D :: Problem Solving Worksheet
B IS IS NOT
Who
Who is affected by the problem?
Who first observed the problem?
To w ho w asthe problemreported?
Who is not affected by the problem?
Who did not find the problem?
What
What type of problem is it?
What has the problem (part id, lot #s, etc)?
What is happening w ith the process & w ith containment?
Do w e have physicalevidence of the problem?
What does not have the problem?
What could be happening but is not?
What could be the problem but is not?
Why
Why this is a problem (degraded performance)?
Is the process stable?
Why is it not a problem?
Where
Where w as the problem observed?
Where does the problem occur?
Where could the problem be located but is not?
Where else could the problem be located but is not?
When
When the problem w as first noticed?
When has it been noticed since?
When the problem could have been noticed but w as not?
HowMuch/Many
Quantity of problem (ppm)?
How much is the problem costing in dollars, people, & time?
How many could have the problem but don’t?
How big could the problem be but is not?
HowOften
What is the trend (continuous, random, and cyclical)?
Has the problem occurred previously?
What could the trend be but is not?
2C
Problem Description
(based on the information gathered so far, provide a concise problemdescription)
Page 3 of 6 www.qmsdesk.com
QMS Desk
8D :: Problem Solving Worksheet
3
Developing Interim Containment Actions
Temporary actions to contain the problem and “fix” untilpermanent correction is in place - document actions in Action Item Table
4A
Identifying & Verifying Root Cause
Analyze for “Root Cause” of the problem. Identify and verify the Escape Point
Brainstorm the possible causes ofthe problem
4A Cause and Effect Diagram
Circle the most likely contributors (a maximum of three) fromeach side.
4B 5 Why Analysis
Ask– Why did this happen?
Ask– Why did this happen?
Ask– Why did this happen?
Ask– Why did this happen?
Ask– Why did this happen?
4C
Action Plan
Based on the team’s discussions. Begin to complete the Root Cause Action Plan to verify and validate the root causes and test the escape
point. Document this on the Action Item Table
Problem
People Materials Machine
Method Environment Measurement
People Materials Machine
Method Environment Measurement
Why did it get out?How is it made?
Page 4 of 6 www.qmsdesk.com
QMS Desk
8D :: Problem Solving Worksheet
5 Identify Permanent Corrective Actions
solutions that address and correct the root cause. Solutions determined to be the best of all the alternatives. Document and verify the
Permanent Corrective Action (PCA) in the Action Item Table
6
Implementing & Validating the PCA
Implement and validate to ensure that corrective action does “what it is supposed to do.” Detect any undesirable side effects. Document this
on the Action Item Table. Return to root cause analysis, if necessary
7
Preventing Recurrence
determines w hat improvements in systems and processeswould prevent problemfromrecurring. Ensure that corrective action remains in
place and successful
7A
Address Similar Systems
Process / Item Who Responsible When
Page 5 of 6 www.qmsdesk.com
QMS Desk
8D :: Problem Solving Worksheet
7B Review the following documents / systems
Document Who Responsible
Completion Date
Planned Actual
Management System Manual
Manufacturing WorkInstructions
Inspection WorkInstructions
Process Flow Charts
Process Control Plans
Design FMEA
Process FMEA
Gages
PPAP
Engineering Change Approval
8
Congratulate Your Team
Use all forms of employee recognition and document as necessary
Celebrate successfulconclusion of the problem solving effort
Formally disengage the team and return to normal duties
Was this problem solving exercise effective? Has it been verified with a follow-up?
Yes
No
Signature / Title / Date Findings
Page 6 of 6 www.qmsdesk.com
QMS Desk
8D :: Problem Solving Worksheet
Action Item Table
Actions Implement & Verify Actions
Action # Problem
Containment / Corrective
Action
How Verified Action Who Responsible Planned Actual Status

More Related Content

What's hot

Prioritize Solutions with an Impact Matrix
Prioritize Solutions with an Impact MatrixPrioritize Solutions with an Impact Matrix
Prioritize Solutions with an Impact MatrixMatt Hansen
 
The Anatomy of Problem Solving
The Anatomy of Problem SolvingThe Anatomy of Problem Solving
The Anatomy of Problem SolvingDamian T. Gordon
 
Testing metrics webinar
Testing metrics webinarTesting metrics webinar
Testing metrics webinarPractiTest
 
7 QC and New 7 QC Comparison & Applicability
7 QC and New 7 QC Comparison & Applicability7 QC and New 7 QC Comparison & Applicability
7 QC and New 7 QC Comparison & Applicabilityaksahu4u
 
The DMAIC Roadmap (Levels 1 & 2) with Matt Hansen at StatStuff
The DMAIC Roadmap (Levels 1 & 2) with Matt Hansen at StatStuffThe DMAIC Roadmap (Levels 1 & 2) with Matt Hansen at StatStuff
The DMAIC Roadmap (Levels 1 & 2) with Matt Hansen at StatStuffMatt Hansen
 
Kepner Tregoe Method PowerPoint Presentation Slides
Kepner Tregoe Method PowerPoint Presentation Slides Kepner Tregoe Method PowerPoint Presentation Slides
Kepner Tregoe Method PowerPoint Presentation Slides SlideTeam
 
Building a Problem Statement with Matt Hansen at StatStuff
Building a Problem Statement with Matt Hansen at StatStuffBuilding a Problem Statement with Matt Hansen at StatStuff
Building a Problem Statement with Matt Hansen at StatStuffMatt Hansen
 
Getting Feedback with a Plus/Delta Tool
Getting Feedback with a Plus/Delta ToolGetting Feedback with a Plus/Delta Tool
Getting Feedback with a Plus/Delta ToolMatt Hansen
 
Building a SIPOC with Matt Hansen at StatStuff
Building a SIPOC with Matt Hansen at StatStuffBuilding a SIPOC with Matt Hansen at StatStuff
Building a SIPOC with Matt Hansen at StatStuffMatt Hansen
 
Risk Assessment with a FMEA Tool
Risk Assessment with a FMEA ToolRisk Assessment with a FMEA Tool
Risk Assessment with a FMEA ToolMatt Hansen
 
Building a Process Map with Matt Hansen at StatStuff
Building a Process Map with Matt Hansen at StatStuffBuilding a Process Map with Matt Hansen at StatStuff
Building a Process Map with Matt Hansen at StatStuffMatt Hansen
 
The SOLUTION Model
The SOLUTION ModelThe SOLUTION Model
The SOLUTION ModelMark Adams
 
Closing a Project
Closing a ProjectClosing a Project
Closing a ProjectMatt Hansen
 
Fishbone analysis (edited)
Fishbone analysis (edited)Fishbone analysis (edited)
Fishbone analysis (edited)Izzah Ros
 
Introduction to Lean with Matt Hansen at StatStuff
Introduction to Lean with Matt Hansen at StatStuffIntroduction to Lean with Matt Hansen at StatStuff
Introduction to Lean with Matt Hansen at StatStuffMatt Hansen
 
Setting Project Milestones with Matt Hansen at StatStuff
Setting Project Milestones with Matt Hansen at StatStuffSetting Project Milestones with Matt Hansen at StatStuff
Setting Project Milestones with Matt Hansen at StatStuffMatt Hansen
 

What's hot (20)

Prioritize Solutions with an Impact Matrix
Prioritize Solutions with an Impact MatrixPrioritize Solutions with an Impact Matrix
Prioritize Solutions with an Impact Matrix
 
The Anatomy of Problem Solving
The Anatomy of Problem SolvingThe Anatomy of Problem Solving
The Anatomy of Problem Solving
 
Testing metrics webinar
Testing metrics webinarTesting metrics webinar
Testing metrics webinar
 
7 QC and New 7 QC Comparison & Applicability
7 QC and New 7 QC Comparison & Applicability7 QC and New 7 QC Comparison & Applicability
7 QC and New 7 QC Comparison & Applicability
 
4 Of The 7 Problem Solving Tools
4 Of The 7 Problem Solving Tools4 Of The 7 Problem Solving Tools
4 Of The 7 Problem Solving Tools
 
The DMAIC Roadmap (Levels 1 & 2) with Matt Hansen at StatStuff
The DMAIC Roadmap (Levels 1 & 2) with Matt Hansen at StatStuffThe DMAIC Roadmap (Levels 1 & 2) with Matt Hansen at StatStuff
The DMAIC Roadmap (Levels 1 & 2) with Matt Hansen at StatStuff
 
Kepner Tregoe Method PowerPoint Presentation Slides
Kepner Tregoe Method PowerPoint Presentation Slides Kepner Tregoe Method PowerPoint Presentation Slides
Kepner Tregoe Method PowerPoint Presentation Slides
 
Building a Problem Statement with Matt Hansen at StatStuff
Building a Problem Statement with Matt Hansen at StatStuffBuilding a Problem Statement with Matt Hansen at StatStuff
Building a Problem Statement with Matt Hansen at StatStuff
 
Getting Feedback with a Plus/Delta Tool
Getting Feedback with a Plus/Delta ToolGetting Feedback with a Plus/Delta Tool
Getting Feedback with a Plus/Delta Tool
 
Building a SIPOC with Matt Hansen at StatStuff
Building a SIPOC with Matt Hansen at StatStuffBuilding a SIPOC with Matt Hansen at StatStuff
Building a SIPOC with Matt Hansen at StatStuff
 
Quality tools
Quality toolsQuality tools
Quality tools
 
Risk Assessment with a FMEA Tool
Risk Assessment with a FMEA ToolRisk Assessment with a FMEA Tool
Risk Assessment with a FMEA Tool
 
Building a Process Map with Matt Hansen at StatStuff
Building a Process Map with Matt Hansen at StatStuffBuilding a Process Map with Matt Hansen at StatStuff
Building a Process Map with Matt Hansen at StatStuff
 
The SOLUTION Model
The SOLUTION ModelThe SOLUTION Model
The SOLUTION Model
 
Closing a Project
Closing a ProjectClosing a Project
Closing a Project
 
Fishbone analysis (edited)
Fishbone analysis (edited)Fishbone analysis (edited)
Fishbone analysis (edited)
 
Introduction to Lean with Matt Hansen at StatStuff
Introduction to Lean with Matt Hansen at StatStuffIntroduction to Lean with Matt Hansen at StatStuff
Introduction to Lean with Matt Hansen at StatStuff
 
The two largest project killers
The two largest project killersThe two largest project killers
The two largest project killers
 
Change management toolkit for Leaders
Change management toolkit for LeadersChange management toolkit for Leaders
Change management toolkit for Leaders
 
Setting Project Milestones with Matt Hansen at StatStuff
Setting Project Milestones with Matt Hansen at StatStuffSetting Project Milestones with Matt Hansen at StatStuff
Setting Project Milestones with Matt Hansen at StatStuff
 

Similar to 8 d template_advanced

8D Problem Solving WorksheetGroup NumberGroup Member Nam.docx
8D Problem Solving WorksheetGroup NumberGroup Member Nam.docx8D Problem Solving WorksheetGroup NumberGroup Member Nam.docx
8D Problem Solving WorksheetGroup NumberGroup Member Nam.docxransayo
 
Problem solving use a fishbone diagram
Problem solving use a fishbone diagramProblem solving use a fishbone diagram
Problem solving use a fishbone diagramJohnRicoPanjaitan
 
New 7QC tools for the quality person during RCa
New 7QC tools for the quality person during RCaNew 7QC tools for the quality person during RCa
New 7QC tools for the quality person during RCaAravindhNagaraj1
 
A3 Management - From Structured Problem-Solving to Workplace Development (Par...
A3 Management - From Structured Problem-Solving to Workplace Development (Par...A3 Management - From Structured Problem-Solving to Workplace Development (Par...
A3 Management - From Structured Problem-Solving to Workplace Development (Par...TKMG, Inc.
 
Problem Solving1.pptx
Problem Solving1.pptxProblem Solving1.pptx
Problem Solving1.pptxsuresh667793
 
Speed And Quality Of Development
Speed And Quality Of DevelopmentSpeed And Quality Of Development
Speed And Quality Of Developmentjohnstonda
 
8 Disciplines (8D) Problem Solving Approach
8 Disciplines (8D) Problem Solving Approach8 Disciplines (8D) Problem Solving Approach
8 Disciplines (8D) Problem Solving ApproachJ. García - Verdugo
 
5_Why_Root_Cause_Corrective_Actions.pdf
5_Why_Root_Cause_Corrective_Actions.pdf5_Why_Root_Cause_Corrective_Actions.pdf
5_Why_Root_Cause_Corrective_Actions.pdfJenniferElizarraras1
 
QM-021-PDCA
QM-021-PDCAQM-021-PDCA
QM-021-PDCAhandbook
 
Corrective & Preventive Action
Corrective & Preventive Action Corrective & Preventive Action
Corrective & Preventive Action Praneet Surti
 
Effective CAPA Implementation in a Management System - Praneet Surti
Effective CAPA Implementation in a Management System - Praneet SurtiEffective CAPA Implementation in a Management System - Praneet Surti
Effective CAPA Implementation in a Management System - Praneet SurtiPraneet Surti
 
7 QC Tools training presentation
7 QC Tools training presentation7 QC Tools training presentation
7 QC Tools training presentationPRASHANT KSHIRSAGAR
 
Using the DMAIC Process for SEO Projects
Using the DMAIC Process for SEO ProjectsUsing the DMAIC Process for SEO Projects
Using the DMAIC Process for SEO Projectsunevendock6891
 

Similar to 8 d template_advanced (20)

8D Problem Solving WorksheetGroup NumberGroup Member Nam.docx
8D Problem Solving WorksheetGroup NumberGroup Member Nam.docx8D Problem Solving WorksheetGroup NumberGroup Member Nam.docx
8D Problem Solving WorksheetGroup NumberGroup Member Nam.docx
 
Problem solving use a fishbone diagram
Problem solving use a fishbone diagramProblem solving use a fishbone diagram
Problem solving use a fishbone diagram
 
New 7QC tools for the quality person during RCa
New 7QC tools for the quality person during RCaNew 7QC tools for the quality person during RCa
New 7QC tools for the quality person during RCa
 
#8 Root Cause Analysis
#8 Root Cause Analysis#8 Root Cause Analysis
#8 Root Cause Analysis
 
Fishbone analysis
Fishbone analysisFishbone analysis
Fishbone analysis
 
A3 Management - From Structured Problem-Solving to Workplace Development (Par...
A3 Management - From Structured Problem-Solving to Workplace Development (Par...A3 Management - From Structured Problem-Solving to Workplace Development (Par...
A3 Management - From Structured Problem-Solving to Workplace Development (Par...
 
The Global 8D Problem Solving Process
The Global 8D Problem Solving ProcessThe Global 8D Problem Solving Process
The Global 8D Problem Solving Process
 
Iaq paper
Iaq paperIaq paper
Iaq paper
 
Problem Solving1.pptx
Problem Solving1.pptxProblem Solving1.pptx
Problem Solving1.pptx
 
Speed And Quality Of Development
Speed And Quality Of DevelopmentSpeed And Quality Of Development
Speed And Quality Of Development
 
Root cause analysis by: ICG Team
Root cause analysis by: ICG TeamRoot cause analysis by: ICG Team
Root cause analysis by: ICG Team
 
8 Disciplines (8D) Problem Solving Approach
8 Disciplines (8D) Problem Solving Approach8 Disciplines (8D) Problem Solving Approach
8 Disciplines (8D) Problem Solving Approach
 
5_Why_Root_Cause_Corrective_Actions.pdf
5_Why_Root_Cause_Corrective_Actions.pdf5_Why_Root_Cause_Corrective_Actions.pdf
5_Why_Root_Cause_Corrective_Actions.pdf
 
Problem solving preview
Problem solving previewProblem solving preview
Problem solving preview
 
QM-021-PDCA
QM-021-PDCAQM-021-PDCA
QM-021-PDCA
 
PDCA
PDCAPDCA
PDCA
 
Corrective & Preventive Action
Corrective & Preventive Action Corrective & Preventive Action
Corrective & Preventive Action
 
Effective CAPA Implementation in a Management System - Praneet Surti
Effective CAPA Implementation in a Management System - Praneet SurtiEffective CAPA Implementation in a Management System - Praneet Surti
Effective CAPA Implementation in a Management System - Praneet Surti
 
7 QC Tools training presentation
7 QC Tools training presentation7 QC Tools training presentation
7 QC Tools training presentation
 
Using the DMAIC Process for SEO Projects
Using the DMAIC Process for SEO ProjectsUsing the DMAIC Process for SEO Projects
Using the DMAIC Process for SEO Projects
 

Recently uploaded

An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
DATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage exampleDATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage examplePragyanshuParadkar1
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHC Sai Kiran
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 

Recently uploaded (20)

An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
DATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage exampleDATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage example
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECH
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 

8 d template_advanced

  • 1. Page 1 of 6 www.qmsdesk.com QMS Desk 8D :: Problem Solving Worksheet Complaint Number: Customer Name: Response Due Date: 8-D is a quality management tool and is a vehicle for a cross-functional team to articulate thoughts and provides scientific determination to details of problems and provides solutions. Organizations can benefit from the 8-D approach by applying it to all areas in the company. The 8- D provides excellent guidelines allow ing us to get to the root of a problem and w ays to check that the solution actually w orks. Rather than healing the symptom, the illness is cured, thus, the same problem is unlikely to recur. Step 0 1 2 3 4 5 6 7 8 Action The Planning Stage Establishing the Team Problem Definition / Statement& Description Developing Interim Containment Action Identifying & Verifying RootCause Identifying Permanent Corrective Actions (PCA) Implementing & Validating PCA Preventing Recurrence Recognizing Team Efforts 0 The Planning Stage: The 8-D method of problem solving is appropriate in "cause unknow n" situations and is not the right tool if concerns center solely on decision-making or problem prevention. 8-D is especially usefulas it results in not just a problem-solving process, but also a standard and a reporting format. Does this problem w arrant/require an 8D? If so comment w hy and proceed. Is an Emergency Response Action Needed? (If needed document actions in Action Item Table) 1 Establishing the Team: Establish a small group of people w ith the process/ product know ledge, allocated time, authority and skill in the required technicaldisciplines to solve the problem and implement corrective actions. Team Goals: Team Objectives: Department Name Skills Responsibility 2A Problem Definition Provides the starting point for solving the problem or Non-conformance issue. Need to have “correct” problem description to identify causes. Need to use terms that are understood by all. Sketch / Photo of Problem Part Number(s): Customer(s): List all of the data and documents that might help you to define the problem more exactly? Action Plan to collect additional information: Prepare Process Flow Diagram for problem use a separate sheet if needed
  • 2. Page 2 of 6 www.qmsdesk.com QMS Desk 8D :: Problem Solving Worksheet B IS IS NOT Who Who is affected by the problem? Who first observed the problem? To w ho w asthe problemreported? Who is not affected by the problem? Who did not find the problem? What What type of problem is it? What has the problem (part id, lot #s, etc)? What is happening w ith the process & w ith containment? Do w e have physicalevidence of the problem? What does not have the problem? What could be happening but is not? What could be the problem but is not? Why Why this is a problem (degraded performance)? Is the process stable? Why is it not a problem? Where Where w as the problem observed? Where does the problem occur? Where could the problem be located but is not? Where else could the problem be located but is not? When When the problem w as first noticed? When has it been noticed since? When the problem could have been noticed but w as not? HowMuch/Many Quantity of problem (ppm)? How much is the problem costing in dollars, people, & time? How many could have the problem but don’t? How big could the problem be but is not? HowOften What is the trend (continuous, random, and cyclical)? Has the problem occurred previously? What could the trend be but is not? 2C Problem Description (based on the information gathered so far, provide a concise problemdescription)
  • 3. Page 3 of 6 www.qmsdesk.com QMS Desk 8D :: Problem Solving Worksheet 3 Developing Interim Containment Actions Temporary actions to contain the problem and “fix” untilpermanent correction is in place - document actions in Action Item Table 4A Identifying & Verifying Root Cause Analyze for “Root Cause” of the problem. Identify and verify the Escape Point Brainstorm the possible causes ofthe problem 4A Cause and Effect Diagram Circle the most likely contributors (a maximum of three) fromeach side. 4B 5 Why Analysis Ask– Why did this happen? Ask– Why did this happen? Ask– Why did this happen? Ask– Why did this happen? Ask– Why did this happen? 4C Action Plan Based on the team’s discussions. Begin to complete the Root Cause Action Plan to verify and validate the root causes and test the escape point. Document this on the Action Item Table Problem People Materials Machine Method Environment Measurement People Materials Machine Method Environment Measurement Why did it get out?How is it made?
  • 4. Page 4 of 6 www.qmsdesk.com QMS Desk 8D :: Problem Solving Worksheet 5 Identify Permanent Corrective Actions solutions that address and correct the root cause. Solutions determined to be the best of all the alternatives. Document and verify the Permanent Corrective Action (PCA) in the Action Item Table 6 Implementing & Validating the PCA Implement and validate to ensure that corrective action does “what it is supposed to do.” Detect any undesirable side effects. Document this on the Action Item Table. Return to root cause analysis, if necessary 7 Preventing Recurrence determines w hat improvements in systems and processeswould prevent problemfromrecurring. Ensure that corrective action remains in place and successful 7A Address Similar Systems Process / Item Who Responsible When
  • 5. Page 5 of 6 www.qmsdesk.com QMS Desk 8D :: Problem Solving Worksheet 7B Review the following documents / systems Document Who Responsible Completion Date Planned Actual Management System Manual Manufacturing WorkInstructions Inspection WorkInstructions Process Flow Charts Process Control Plans Design FMEA Process FMEA Gages PPAP Engineering Change Approval 8 Congratulate Your Team Use all forms of employee recognition and document as necessary Celebrate successfulconclusion of the problem solving effort Formally disengage the team and return to normal duties Was this problem solving exercise effective? Has it been verified with a follow-up? Yes No Signature / Title / Date Findings