SlideShare a Scribd company logo
1 of 3
Tech Training Program (Rough Draft)
What an Implementation tech does…
Phones
Switches
Routers
AP’s (Axis Points)
UPS
IAD
Ask more?…
How
Why
Tools & Training
Standards
Tech Background (Schooling needed)
Be Proactive
Be Organized
Be Thinking of better ways
Nicholas - Tech Lead
Typical Day:
When shipments arrive Nicholas will config routers and switches
Provisioning of phones
Some are for stock some are for projects
When downtime is available work on stock items (would be nice to have 5 of each)
5 1841 routers
5 1921 routers
5 24/48 port 3750 switches
AP’s ?
Truck used to have 2 of each of the routers and switches, 2 box of AP’s
How: Can we make training video’s? Youtube like?
Phones… Nicholas shared document with me…
Yealink Only for Nicholas...
John and Trent take care of the VVX Polycoms - coding issue Nicholas has not been taught
Why: To further business and have phones ready to be installed at client. Speed up the
process and have checks in place. Need to have configured so we can access and fix problems
that arise after install
Tools and Training:
Network cable and computer
Devry / My Computer Career / CSCC
ECT and 3 courses of Networking
Base knowledge of Cisco (CLI)
Knowledge of VLAN
Cable testing
Cable certifier… how long the wire is… electrical interference…
Drills
Hammers
Screw driver
Level
Termination Points: Ends (RJ 45), jacks, patch panel
Cable Runs
Ladders… crawl into ceilings
Toner -- gives off a noise thru cable to locate proper cable
Hang AP (like smoke detector)
NATing…
Punch down training
Cable making
Terminating
Install Phones
All Phones are provisioned
Router needs config and static IP
Make sure all equipment is on Truck
Set up equipment
Find place for wall mount (4U)
Level it off, mount to the wall
Need to learn how to hang in drywall vs. concrete ect.
Get the UPS (Battery Backup)
Put in switch screw it in
Put in router
Locate our circuit
Observe client rack (site survey should have been done before hand with pictures)
Mount gear...
FE 0/0 1841 Router
GE 0/0 1921 Router
Get laptop out… console into the router

More Related Content

Viewers also liked

Paul Wallace PMI Certified - Agile Resume
Paul Wallace PMI Certified - Agile Resume Paul Wallace PMI Certified - Agile Resume
Paul Wallace PMI Certified - Agile Resume Paul Wallace
 
Behavioural assessment
Behavioural assessmentBehavioural assessment
Behavioural assessmentCyndi Brannen
 
Qualitative and quantitative student assessment
Qualitative and quantitative student assessmentQualitative and quantitative student assessment
Qualitative and quantitative student assessmentGail Matthews-DeNatale
 
Architecture Before Experience - EuroIA Amsterdam 2016
Architecture Before Experience - EuroIA Amsterdam 2016 Architecture Before Experience - EuroIA Amsterdam 2016
Architecture Before Experience - EuroIA Amsterdam 2016 Bogdan Stanciu
 
Algalicious presentations
Algalicious presentationsAlgalicious presentations
Algalicious presentationsngtinsl
 
Achievement tests
Achievement testsAchievement tests
Achievement testsManu Sethi
 

Viewers also liked (8)

Evaluation approach
Evaluation approachEvaluation approach
Evaluation approach
 
Paul Wallace PMI Certified - Agile Resume
Paul Wallace PMI Certified - Agile Resume Paul Wallace PMI Certified - Agile Resume
Paul Wallace PMI Certified - Agile Resume
 
Behavioural assessment
Behavioural assessmentBehavioural assessment
Behavioural assessment
 
Resume2016
Resume2016Resume2016
Resume2016
 
Qualitative and quantitative student assessment
Qualitative and quantitative student assessmentQualitative and quantitative student assessment
Qualitative and quantitative student assessment
 
Architecture Before Experience - EuroIA Amsterdam 2016
Architecture Before Experience - EuroIA Amsterdam 2016 Architecture Before Experience - EuroIA Amsterdam 2016
Architecture Before Experience - EuroIA Amsterdam 2016
 
Algalicious presentations
Algalicious presentationsAlgalicious presentations
Algalicious presentations
 
Achievement tests
Achievement testsAchievement tests
Achievement tests
 

Similar to Tech Training Program

wayne clementi Resume 1
wayne clementi Resume 1wayne clementi Resume 1
wayne clementi Resume 1Wayne Clementi
 
Pang YS Resumes Jan_ 2016
Pang YS Resumes Jan_ 2016Pang YS Resumes Jan_ 2016
Pang YS Resumes Jan_ 2016Pang You sin
 
Practical IEC 61850 for Substation Automation for Engineers and Technicians
Practical IEC 61850 for Substation Automation for Engineers and TechniciansPractical IEC 61850 for Substation Automation for Engineers and Technicians
Practical IEC 61850 for Substation Automation for Engineers and TechniciansLiving Online
 
It essentials pc hardware and software overview
It essentials pc hardware and software overviewIt essentials pc hardware and software overview
It essentials pc hardware and software overviewAhmed Sultan
 
Railway Data Communication in Harsh Environments
Railway Data Communication in Harsh EnvironmentsRailway Data Communication in Harsh Environments
Railway Data Communication in Harsh EnvironmentsIbrahim Al-Hudhaif
 
STS _ TLF 2014 IDT
STS _ TLF 2014 IDTSTS _ TLF 2014 IDT
STS _ TLF 2014 IDTHank Lydick
 
MARCOS SAMPLE2011
MARCOS SAMPLE2011MARCOS SAMPLE2011
MARCOS SAMPLE2011Marc Sample
 
CCNA training 101
CCNA training 101CCNA training 101
CCNA training 101Rohan Reddy
 
Cisco Certified Network Associate (CCNA) - R&S - Semester 1 Notes
Cisco Certified Network Associate (CCNA) - R&S - Semester 1 NotesCisco Certified Network Associate (CCNA) - R&S - Semester 1 Notes
Cisco Certified Network Associate (CCNA) - R&S - Semester 1 NotesAhmed Gad
 
AETA_2004_VOIP.ppt
AETA_2004_VOIP.pptAETA_2004_VOIP.ppt
AETA_2004_VOIP.pptVideoguy
 
Automotive Days 2015 by InterLatin &
Automotive Days 2015 by InterLatin & Automotive Days 2015 by InterLatin &
Automotive Days 2015 by InterLatin & Interlatin
 
Meiling Chung_Resume
Meiling Chung_ResumeMeiling Chung_Resume
Meiling Chung_ResumeMeiLing Chung
 
Meiling Chung_Resume
Meiling Chung_ResumeMeiling Chung_Resume
Meiling Chung_ResumeMeiLing Chung
 
2019 FRSecure CISSP Mentor Program: Class Seven
2019 FRSecure CISSP Mentor Program: Class Seven2019 FRSecure CISSP Mentor Program: Class Seven
2019 FRSecure CISSP Mentor Program: Class SevenFRSecure
 
Comp tia network_n10-005
Comp tia network_n10-005Comp tia network_n10-005
Comp tia network_n10-005Shandayle Shaw
 
Eng.Walidmanaa CV
Eng.Walidmanaa  CVEng.Walidmanaa  CV
Eng.Walidmanaa CVwalidmanaa1
 
Industrial Ethernet, Part 2: Case Studies
Industrial Ethernet,Part 2: Case StudiesIndustrial Ethernet,Part 2: Case Studies
Industrial Ethernet, Part 2: Case StudiesControlEng
 
CompTIA Network+ Objectives
CompTIA Network+ ObjectivesCompTIA Network+ Objectives
CompTIA Network+ Objectivessombat nirund
 
Jose Vera Resume
Jose Vera ResumeJose Vera Resume
Jose Vera ResumeJose Vera
 

Similar to Tech Training Program (20)

wayne clementi Resume 1
wayne clementi Resume 1wayne clementi Resume 1
wayne clementi Resume 1
 
Pang YS Resumes Jan_ 2016
Pang YS Resumes Jan_ 2016Pang YS Resumes Jan_ 2016
Pang YS Resumes Jan_ 2016
 
Practical IEC 61850 for Substation Automation for Engineers and Technicians
Practical IEC 61850 for Substation Automation for Engineers and TechniciansPractical IEC 61850 for Substation Automation for Engineers and Technicians
Practical IEC 61850 for Substation Automation for Engineers and Technicians
 
It essentials pc hardware and software overview
It essentials pc hardware and software overviewIt essentials pc hardware and software overview
It essentials pc hardware and software overview
 
Railway Data Communication in Harsh Environments
Railway Data Communication in Harsh EnvironmentsRailway Data Communication in Harsh Environments
Railway Data Communication in Harsh Environments
 
STS _ TLF 2014 IDT
STS _ TLF 2014 IDTSTS _ TLF 2014 IDT
STS _ TLF 2014 IDT
 
MARCOS SAMPLE2011
MARCOS SAMPLE2011MARCOS SAMPLE2011
MARCOS SAMPLE2011
 
CCNA training 101
CCNA training 101CCNA training 101
CCNA training 101
 
Cisco Certified Network Associate (CCNA) - R&S - Semester 1 Notes
Cisco Certified Network Associate (CCNA) - R&S - Semester 1 NotesCisco Certified Network Associate (CCNA) - R&S - Semester 1 Notes
Cisco Certified Network Associate (CCNA) - R&S - Semester 1 Notes
 
AETA_2004_VOIP.ppt
AETA_2004_VOIP.pptAETA_2004_VOIP.ppt
AETA_2004_VOIP.ppt
 
Automotive Days 2015 by InterLatin &
Automotive Days 2015 by InterLatin & Automotive Days 2015 by InterLatin &
Automotive Days 2015 by InterLatin &
 
Meiling Chung_Resume
Meiling Chung_ResumeMeiling Chung_Resume
Meiling Chung_Resume
 
Meiling Chung_Resume
Meiling Chung_ResumeMeiling Chung_Resume
Meiling Chung_Resume
 
2019 FRSecure CISSP Mentor Program: Class Seven
2019 FRSecure CISSP Mentor Program: Class Seven2019 FRSecure CISSP Mentor Program: Class Seven
2019 FRSecure CISSP Mentor Program: Class Seven
 
Ccna labs-udemy
Ccna labs-udemyCcna labs-udemy
Ccna labs-udemy
 
Comp tia network_n10-005
Comp tia network_n10-005Comp tia network_n10-005
Comp tia network_n10-005
 
Eng.Walidmanaa CV
Eng.Walidmanaa  CVEng.Walidmanaa  CV
Eng.Walidmanaa CV
 
Industrial Ethernet, Part 2: Case Studies
Industrial Ethernet,Part 2: Case StudiesIndustrial Ethernet,Part 2: Case Studies
Industrial Ethernet, Part 2: Case Studies
 
CompTIA Network+ Objectives
CompTIA Network+ ObjectivesCompTIA Network+ Objectives
CompTIA Network+ Objectives
 
Jose Vera Resume
Jose Vera ResumeJose Vera Resume
Jose Vera Resume
 

Tech Training Program

  • 1. Tech Training Program (Rough Draft) What an Implementation tech does… Phones Switches Routers AP’s (Axis Points) UPS IAD Ask more?… How Why Tools & Training Standards Tech Background (Schooling needed) Be Proactive Be Organized Be Thinking of better ways Nicholas - Tech Lead
  • 2. Typical Day: When shipments arrive Nicholas will config routers and switches Provisioning of phones Some are for stock some are for projects When downtime is available work on stock items (would be nice to have 5 of each) 5 1841 routers 5 1921 routers 5 24/48 port 3750 switches AP’s ? Truck used to have 2 of each of the routers and switches, 2 box of AP’s How: Can we make training video’s? Youtube like? Phones… Nicholas shared document with me… Yealink Only for Nicholas... John and Trent take care of the VVX Polycoms - coding issue Nicholas has not been taught Why: To further business and have phones ready to be installed at client. Speed up the process and have checks in place. Need to have configured so we can access and fix problems that arise after install Tools and Training: Network cable and computer Devry / My Computer Career / CSCC ECT and 3 courses of Networking Base knowledge of Cisco (CLI) Knowledge of VLAN Cable testing Cable certifier… how long the wire is… electrical interference… Drills Hammers Screw driver Level Termination Points: Ends (RJ 45), jacks, patch panel Cable Runs
  • 3. Ladders… crawl into ceilings Toner -- gives off a noise thru cable to locate proper cable Hang AP (like smoke detector) NATing… Punch down training Cable making Terminating Install Phones All Phones are provisioned Router needs config and static IP Make sure all equipment is on Truck Set up equipment Find place for wall mount (4U) Level it off, mount to the wall Need to learn how to hang in drywall vs. concrete ect. Get the UPS (Battery Backup) Put in switch screw it in Put in router Locate our circuit Observe client rack (site survey should have been done before hand with pictures) Mount gear... FE 0/0 1841 Router GE 0/0 1921 Router Get laptop out… console into the router