1. Personal Data
Name:
ColinValdés Neri
Career:
Industrial Engineering
Date of Birth:
26/May/1979
Age: 36 years
Email:
neri.colinvaldes@gm.com
Cell Phone:
+5217223543904
Currently working at GM Toluca Aluminum Foundry Plant
Career path:
Maintenance Aluminum Foundry Plant (2012-2015)
Support Launching Project Aluminum Foundry Plant, developing Spare parts
process for new equipment, lessons learned visiting Aluminum Bedford Plant and
Defiance Plant, support CME team to acquire spare parts and developing suppliers
for spare parts in the time of installation process. Define Process of spare parts for
crib in aluminum plant developing the macro to organize the spare parts into the
crib. Acquisition spare parts thru OEM and Manufacturing for Aluminum Foundry
Plant (Grob, Barnnes, Busch, Allen Bradley, Siemens, Valiant, Can-Eng, Telesis,
Rexroth, Loramendi, MT System, Fata, Fanuc and local suppliers.)
Current Job
General Motors Aluminum Foundry Plant
Type of Industry: Automotive
Position: Maintenance Aluminum Foundry Spare Parts Coordinator
Date of entry: May – 2012
Skill acquisition spare parts for the Launch team of Aluminum Foundry Plant for
heads side, supporting weekends and shut down plans coordinating services, spare
parts and activities thru the needs of maintenance Plans in Maximo.
GM Toluca Iron Foundry
Type of Industry: Automotive
Position: Maintenance
Date of entry: March 1998
Release date: Jan – 2001
Production
2. Finish, (Launch paint final process Camera Detecta)
Maintenance
Finish, (Maximo Programmer System) 2001-2002, generate Work Orders and
management of the MTBF and MTTR into Maximo, definition of critical equipment.
Supporting Manager Finishing and Core Room 2002-2003, Management of the
vacations, over time and human resources items related with hourly employees
Supporting Cores Department, (Acquisition Spare Parts for Maintenance Core
Room) 2003-2006, ensure the spare parts for the equipment of core room according
with the maintenance plan.
Launch Project Loramendi I 2007-2008, Support the launch team in the installation
process, with the acquiring process for spare parts, developing new suppliers and
local services to reduce cost in the project, define the spare parts list for the cribs
thru the development of matrix to define critical spare parts (physics spare partsin
cribs and logic spare parts). Support in the developmentof the Maintenance Plant
in order to uploadingin Maximo.
Acquisition Spare Parts Management for Maintenance Loramendi and Maximo
System2008-2010. Define acquiringprocessfor refurbishof loramendimachinesand
ensure the spare parts in site on time.
Technology ultrasound Specialist (Routes Predictive Maintenance) 2008-2009.
Define the needsfor predictivemaintenance for the equipmentinironfoundryplant.
Support in the execution for the predictive maintenance and generating reports for
corrective maintenance.
TechnologyFaro Armdimensions2008-2011, Implementpredictive technologiesinto
the aliment for the core machines, drag and cope machines in molding line in iron
foundry plant.
Supporting Manager of Manufacturing 2008-2011, Management for the services
with business partners for iron foundry plant, supporting administration for hourly
employees.
Acquisition Spare Parts for Outsourcing’s (Aligur, Sensa) 2008-2011, supportingon
the management for acquisition process for spare parts and developing plans for
preventing maintenance.
Launch project Loramendi II 2011-2012, Develop a local supplier for the
implementations of improvements in loramendi line in order to reduce costs and
generate savings in the project
College - (2012 – 2015)
IULATAM
Industrial Engineering 2015,
Currently studying English Language
Languages:
3. Spanish- (Native Language)
Technical English -(Able to establish a conversation, reading and listening)
Knowledge:
- Auto Cad,
- Procurement Tracker
- Olympic, Attachmate Extra software
- Predictive Technologies (Thermography, Vibration Analyze and
Ultrasound Certificates.
- AMEF analysis , 5Ws problem solving process, RCM2 maintenance
analysis certificates
- Global Manufacturing System deployment process
- Microsoft Office 2013 WORD, EXCEL, PPT, PROJECT, OUTLOOK,
ACCESS
- Pc Dmis, Software
- Maximo System
- Hydraulic and Pneumatic Systems knowledge
- Read drawings Pneumatics System
- Global Manufacturing System (BPD 5, Problem Solving,
Continuous Improvement)
- Studying English Language Semi Intensive level 3 of the 9