SlideShare a Scribd company logo
1 of 2
Download to read offline
naturalwastewatertreatment
ARM Group Ltd
Knowledge and proactive management of
assets is a key area where water companies can
cut operational and capital expenditure. The
optimisation and enhancement of remote reed
bed treatment systems can secure performance
for many years without the need for full site
refurbishment and the associated costs.
Asset
Assessment &
Support
Package
naturalwastewatertreatment
www.armgroupltd.co.uk 	t. +44 (0) 1889 583811
I
n the September 2012 issue of Water &
Wastewater Treatment it was reported by
the editor that knowledge by the majority
of water companies of the condition of their
assets is poor. According to the report from
the consultancy company E C Harris, some
90% of maintenance in the UK water industry
is reactive. Yet it is well known that proactive
maintenance will cut costs by upwards of 50%.
Although this is not the case with all water
companies we thought it would be an ideal
opportunity to offer a simple solution.
ARM Ltd have been designing, constructing,
refurbishing and retrofitting reed beds
for many of the UK’s water companies
Our Asset Assessment and Support Package works in two ways:
Reporting
•	 Verbal and written report of the
assessment complete with conclusions, 	
recommendations and indicative prices
of any required remedial work
2. Support Service
•	 Asset longevity prediction
•	 Sampling and monitoring to establish
performance
•	 Refurbish to ‘as built’
•	 Re-engineering to improve performance
•	 Maintenance
•	 System operation
•	 Retrofit with latest technologies to
enhance capability
We would be happy discuss any aspects
of this service with you and can be contacted
at info@armgroupltd.co.uk or telephone
on 01889 583811.
for decades. It is for this reason we feel
best placed to offer you our new Asset
Assessment and Support Package (AASP).
Reed beds are generally tucked away
in Sewage Treatment Works and because
they provide treatment with minimal
maintenance requirements often get
overlooked until the works are close to
breaching consent. Our Asset Assessment
and Support Package will highlight the
condition of the system and give an
indication of when refurbishment may be
required. This allows expenditure to be
planned and therefore controlled and ensures
the works performs to its full capability.
1. Asset Assessment
Visual Appraisal
•	 Condition of the reeds
•	 Extent of sludge build up on and in the
gravel matrix
•	 Condition of the flow path
•	 Site layout and accessibility
•	 Photographic evidence
Fitness for Purpose
•	 Review design basis, ‘as built’ drawings
and O & M Manual
•	 Review current and future loads and
recent performance data
Monitoring program
•	 Sampling and monitoring program to
include influent flowsloads and discharge
levels to characterise performance

More Related Content

What's hot

Andy Crookes CV (2)
Andy Crookes CV (2)Andy Crookes CV (2)
Andy Crookes CV (2)Andy Crookes
 
DARRELL_W_ROWAT_2015 Rev June 1
DARRELL_W_ROWAT_2015 Rev June 1DARRELL_W_ROWAT_2015 Rev June 1
DARRELL_W_ROWAT_2015 Rev June 1Darrell Rowat
 
MarcellusUtica Services - Geochemical Testing 2016
MarcellusUtica Services - Geochemical Testing 2016MarcellusUtica Services - Geochemical Testing 2016
MarcellusUtica Services - Geochemical Testing 2016Fred Bergstresser
 
NAES Power Contractors Hydro Services
NAES Power Contractors Hydro ServicesNAES Power Contractors Hydro Services
NAES Power Contractors Hydro ServicesNAES Corporation
 
Case Study: Modelling Refinery Processes
Case Study: Modelling Refinery ProcessesCase Study: Modelling Refinery Processes
Case Study: Modelling Refinery ProcessesFlex Process
 
OpenText Live: Modeling your business processes to new ways of working
OpenText Live: Modeling your business processes to new ways of workingOpenText Live: Modeling your business processes to new ways of working
OpenText Live: Modeling your business processes to new ways of workingOpenText Portfolio
 
Consistent Results
Consistent ResultsConsistent Results
Consistent ResultsParker Hooks
 
Dfuson Resume log
Dfuson Resume logDfuson Resume log
Dfuson Resume logDavid Fuson
 
PARESH KUMAR DASH-RESUME-BOILER (1)
PARESH KUMAR   DASH-RESUME-BOILER (1)PARESH KUMAR   DASH-RESUME-BOILER (1)
PARESH KUMAR DASH-RESUME-BOILER (1)PARESH DASH
 
Paul brayman chronological
Paul brayman chronologicalPaul brayman chronological
Paul brayman chronologicalPaul Brayman
 
DigitalClone® Wind Turbine Validations
DigitalClone® Wind Turbine ValidationsDigitalClone® Wind Turbine Validations
DigitalClone® Wind Turbine ValidationsSentient Science
 
Luz McGrath Resume2 April 2012
Luz McGrath Resume2 April 2012Luz McGrath Resume2 April 2012
Luz McGrath Resume2 April 2012Luz Hoyos-McGrath
 
Improving The Reliability Of Differential Pressure Level Instrumentation
Improving The Reliability Of Differential Pressure Level InstrumentationImproving The Reliability Of Differential Pressure Level Instrumentation
Improving The Reliability Of Differential Pressure Level InstrumentationOsemhen Akhibi
 
Decommissioning your offshore assets
Decommissioning your offshore assetsDecommissioning your offshore assets
Decommissioning your offshore assetsAdvisian
 
Kevin Sansome Engineering achievements
Kevin Sansome Engineering achievementsKevin Sansome Engineering achievements
Kevin Sansome Engineering achievementsKevin Sansome
 

What's hot (19)

Kevin Sutherland
Kevin SutherlandKevin Sutherland
Kevin Sutherland
 
Andy Crookes CV (2)
Andy Crookes CV (2)Andy Crookes CV (2)
Andy Crookes CV (2)
 
Chris resume
Chris resumeChris resume
Chris resume
 
DARRELL_W_ROWAT_2015 Rev June 1
DARRELL_W_ROWAT_2015 Rev June 1DARRELL_W_ROWAT_2015 Rev June 1
DARRELL_W_ROWAT_2015 Rev June 1
 
James Hibbits
James HibbitsJames Hibbits
James Hibbits
 
MarcellusUtica Services - Geochemical Testing 2016
MarcellusUtica Services - Geochemical Testing 2016MarcellusUtica Services - Geochemical Testing 2016
MarcellusUtica Services - Geochemical Testing 2016
 
NAES Power Contractors Hydro Services
NAES Power Contractors Hydro ServicesNAES Power Contractors Hydro Services
NAES Power Contractors Hydro Services
 
Case Study: Modelling Refinery Processes
Case Study: Modelling Refinery ProcessesCase Study: Modelling Refinery Processes
Case Study: Modelling Refinery Processes
 
OpenText Live: Modeling your business processes to new ways of working
OpenText Live: Modeling your business processes to new ways of workingOpenText Live: Modeling your business processes to new ways of working
OpenText Live: Modeling your business processes to new ways of working
 
Resume
ResumeResume
Resume
 
Consistent Results
Consistent ResultsConsistent Results
Consistent Results
 
Dfuson Resume log
Dfuson Resume logDfuson Resume log
Dfuson Resume log
 
PARESH KUMAR DASH-RESUME-BOILER (1)
PARESH KUMAR   DASH-RESUME-BOILER (1)PARESH KUMAR   DASH-RESUME-BOILER (1)
PARESH KUMAR DASH-RESUME-BOILER (1)
 
Paul brayman chronological
Paul brayman chronologicalPaul brayman chronological
Paul brayman chronological
 
DigitalClone® Wind Turbine Validations
DigitalClone® Wind Turbine ValidationsDigitalClone® Wind Turbine Validations
DigitalClone® Wind Turbine Validations
 
Luz McGrath Resume2 April 2012
Luz McGrath Resume2 April 2012Luz McGrath Resume2 April 2012
Luz McGrath Resume2 April 2012
 
Improving The Reliability Of Differential Pressure Level Instrumentation
Improving The Reliability Of Differential Pressure Level InstrumentationImproving The Reliability Of Differential Pressure Level Instrumentation
Improving The Reliability Of Differential Pressure Level Instrumentation
 
Decommissioning your offshore assets
Decommissioning your offshore assetsDecommissioning your offshore assets
Decommissioning your offshore assets
 
Kevin Sansome Engineering achievements
Kevin Sansome Engineering achievementsKevin Sansome Engineering achievements
Kevin Sansome Engineering achievements
 

Similar to Natural water treatment asset assessment package

AMEC Paragon Receives AVEVA award for Engineering Excellence-Final 010308
AMEC Paragon Receives AVEVA award for Engineering Excellence-Final 010308AMEC Paragon Receives AVEVA award for Engineering Excellence-Final 010308
AMEC Paragon Receives AVEVA award for Engineering Excellence-Final 010308Marc-Henri Cerar
 
Vessel Efficiency competition company elevator pitches - London
Vessel Efficiency competition company elevator pitches - LondonVessel Efficiency competition company elevator pitches - London
Vessel Efficiency competition company elevator pitches - LondonKTN
 
How to Instill a Culture of Reliability - "The Big Bang"
How to Instill a Culture of Reliability - "The Big Bang"How to Instill a Culture of Reliability - "The Big Bang"
How to Instill a Culture of Reliability - "The Big Bang"ARMS Reliability
 
Advanced solutions for water networks
Advanced solutions for water networksAdvanced solutions for water networks
Advanced solutions for water networksRick Nabett
 
ADVANCED SOLUTIONS FOR WATER NETWORKS
ADVANCED SOLUTIONS FOR WATER NETWORKSADVANCED SOLUTIONS FOR WATER NETWORKS
ADVANCED SOLUTIONS FOR WATER NETWORKSRick Nabett
 
Suez advanced solutions for water networks
Suez advanced solutions for water networksSuez advanced solutions for water networks
Suez advanced solutions for water networksRick Nabett
 
Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...
Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...
Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...Charlie Reith
 
Industrial business Proposition for operation synergy
Industrial business Proposition for operation synergyIndustrial business Proposition for operation synergy
Industrial business Proposition for operation synergySyamsul Nizam
 
VFDFVFDV
VFDFVFDVVFDFVFDV
VFDFVFDVdfdfdf7
 
PAM Case Study 3 - Flooding Risk V1
 PAM Case Study 3 - Flooding Risk V1 PAM Case Study 3 - Flooding Risk V1
PAM Case Study 3 - Flooding Risk V1Ralph Overbeck
 
Ship powering performance – learning from the challenges faced by owners
Ship powering performance – learning from the challenges faced by ownersShip powering performance – learning from the challenges faced by owners
Ship powering performance – learning from the challenges faced by ownersJohn Wills
 
Sparrows Corporate Presentation
Sparrows Corporate PresentationSparrows Corporate Presentation
Sparrows Corporate PresentationBenji George
 
The MWH way - Embedding APM’s Qualification framework into career progression
The MWH way - Embedding APM’s Qualification framework into career progressionThe MWH way - Embedding APM’s Qualification framework into career progression
The MWH way - Embedding APM’s Qualification framework into career progressionAssociation for Project Management
 

Similar to Natural water treatment asset assessment package (20)

Aquatis brochure A4-lowres
Aquatis brochure A4-lowresAquatis brochure A4-lowres
Aquatis brochure A4-lowres
 
AMEC Paragon Receives AVEVA award for Engineering Excellence-Final 010308
AMEC Paragon Receives AVEVA award for Engineering Excellence-Final 010308AMEC Paragon Receives AVEVA award for Engineering Excellence-Final 010308
AMEC Paragon Receives AVEVA award for Engineering Excellence-Final 010308
 
Vessel Efficiency competition company elevator pitches - London
Vessel Efficiency competition company elevator pitches - LondonVessel Efficiency competition company elevator pitches - London
Vessel Efficiency competition company elevator pitches - London
 
How to Instill a Culture of Reliability - "The Big Bang"
How to Instill a Culture of Reliability - "The Big Bang"How to Instill a Culture of Reliability - "The Big Bang"
How to Instill a Culture of Reliability - "The Big Bang"
 
servotech-brochure
servotech-brochureservotech-brochure
servotech-brochure
 
Maverick consulting
Maverick consulting Maverick consulting
Maverick consulting
 
Advanced solutions for water networks
Advanced solutions for water networksAdvanced solutions for water networks
Advanced solutions for water networks
 
ADVANCED SOLUTIONS FOR WATER NETWORKS
ADVANCED SOLUTIONS FOR WATER NETWORKSADVANCED SOLUTIONS FOR WATER NETWORKS
ADVANCED SOLUTIONS FOR WATER NETWORKS
 
Suez advanced solutions for water networks
Suez advanced solutions for water networksSuez advanced solutions for water networks
Suez advanced solutions for water networks
 
Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...
Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...
Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...
 
Industrial business Proposition for operation synergy
Industrial business Proposition for operation synergyIndustrial business Proposition for operation synergy
Industrial business Proposition for operation synergy
 
VFDFVFDV
VFDFVFDVVFDFVFDV
VFDFVFDV
 
PAM Case Study 3 - Flooding Risk V1
 PAM Case Study 3 - Flooding Risk V1 PAM Case Study 3 - Flooding Risk V1
PAM Case Study 3 - Flooding Risk V1
 
Ship powering performance – learning from the challenges faced by owners
Ship powering performance – learning from the challenges faced by ownersShip powering performance – learning from the challenges faced by owners
Ship powering performance – learning from the challenges faced by owners
 
Brochure esp
Brochure espBrochure esp
Brochure esp
 
GdES and Ronergy Services
GdES and Ronergy ServicesGdES and Ronergy Services
GdES and Ronergy Services
 
GPS 2023
GPS 2023GPS 2023
GPS 2023
 
Sparrows Corporate Presentation
Sparrows Corporate PresentationSparrows Corporate Presentation
Sparrows Corporate Presentation
 
The MWH way - Embedding APM’s Qualification framework into career progression
The MWH way - Embedding APM’s Qualification framework into career progressionThe MWH way - Embedding APM’s Qualification framework into career progression
The MWH way - Embedding APM’s Qualification framework into career progression
 
Vestas modified 1
Vestas modified 1Vestas modified 1
Vestas modified 1
 

More from Neil McCarthy

Wetland Treatment Systems and Cold Weather
Wetland Treatment Systems and Cold WeatherWetland Treatment Systems and Cold Weather
Wetland Treatment Systems and Cold WeatherNeil McCarthy
 
Buffalo Airport De-Icing
Buffalo Airport De-IcingBuffalo Airport De-Icing
Buffalo Airport De-IcingNeil McCarthy
 
British Airportss Authority BAA Mayfield Aerated Subsurface Horizontal Airpor...
British Airportss Authority BAA Mayfield Aerated Subsurface Horizontal Airpor...British Airportss Authority BAA Mayfield Aerated Subsurface Horizontal Airpor...
British Airportss Authority BAA Mayfield Aerated Subsurface Horizontal Airpor...Neil McCarthy
 
ARM Armthwaite case study-HQP
ARM Armthwaite case study-HQPARM Armthwaite case study-HQP
ARM Armthwaite case study-HQPNeil McCarthy
 
ARM Wolseley case study-LR
ARM Wolseley case study-LRARM Wolseley case study-LR
ARM Wolseley case study-LRNeil McCarthy
 
ARM Torver case study-LR
ARM Torver case study-LRARM Torver case study-LR
ARM Torver case study-LRNeil McCarthy
 
ARM Casper case study-LR
ARM Casper case study-LRARM Casper case study-LR
ARM Casper case study-LRNeil McCarthy
 
ARM Heathrow case study-LR
ARM Heathrow case study-LRARM Heathrow case study-LR
ARM Heathrow case study-LRNeil McCarthy
 
FBA Technology specific-LR
FBA Technology specific-LRFBA Technology specific-LR
FBA Technology specific-LRNeil McCarthy
 

More from Neil McCarthy (10)

Wetland Treatment Systems and Cold Weather
Wetland Treatment Systems and Cold WeatherWetland Treatment Systems and Cold Weather
Wetland Treatment Systems and Cold Weather
 
Buffalo Airport De-Icing
Buffalo Airport De-IcingBuffalo Airport De-Icing
Buffalo Airport De-Icing
 
British Airportss Authority BAA Mayfield Aerated Subsurface Horizontal Airpor...
British Airportss Authority BAA Mayfield Aerated Subsurface Horizontal Airpor...British Airportss Authority BAA Mayfield Aerated Subsurface Horizontal Airpor...
British Airportss Authority BAA Mayfield Aerated Subsurface Horizontal Airpor...
 
ARM Armthwaite case study-HQP
ARM Armthwaite case study-HQPARM Armthwaite case study-HQP
ARM Armthwaite case study-HQP
 
ARM Wolseley case study-LR
ARM Wolseley case study-LRARM Wolseley case study-LR
ARM Wolseley case study-LR
 
ARM Torver case study-LR
ARM Torver case study-LRARM Torver case study-LR
ARM Torver case study-LR
 
ARM Casper case study-LR
ARM Casper case study-LRARM Casper case study-LR
ARM Casper case study-LR
 
ARM Heathrow case study-LR
ARM Heathrow case study-LRARM Heathrow case study-LR
ARM Heathrow case study-LR
 
FBA Technology specific-LR
FBA Technology specific-LRFBA Technology specific-LR
FBA Technology specific-LR
 
ARM about NEW LR
ARM about NEW LRARM about NEW LR
ARM about NEW LR
 

Natural water treatment asset assessment package

  • 1. naturalwastewatertreatment ARM Group Ltd Knowledge and proactive management of assets is a key area where water companies can cut operational and capital expenditure. The optimisation and enhancement of remote reed bed treatment systems can secure performance for many years without the need for full site refurbishment and the associated costs. Asset Assessment & Support Package
  • 2. naturalwastewatertreatment www.armgroupltd.co.uk t. +44 (0) 1889 583811 I n the September 2012 issue of Water & Wastewater Treatment it was reported by the editor that knowledge by the majority of water companies of the condition of their assets is poor. According to the report from the consultancy company E C Harris, some 90% of maintenance in the UK water industry is reactive. Yet it is well known that proactive maintenance will cut costs by upwards of 50%. Although this is not the case with all water companies we thought it would be an ideal opportunity to offer a simple solution. ARM Ltd have been designing, constructing, refurbishing and retrofitting reed beds for many of the UK’s water companies Our Asset Assessment and Support Package works in two ways: Reporting • Verbal and written report of the assessment complete with conclusions, recommendations and indicative prices of any required remedial work 2. Support Service • Asset longevity prediction • Sampling and monitoring to establish performance • Refurbish to ‘as built’ • Re-engineering to improve performance • Maintenance • System operation • Retrofit with latest technologies to enhance capability We would be happy discuss any aspects of this service with you and can be contacted at info@armgroupltd.co.uk or telephone on 01889 583811. for decades. It is for this reason we feel best placed to offer you our new Asset Assessment and Support Package (AASP). Reed beds are generally tucked away in Sewage Treatment Works and because they provide treatment with minimal maintenance requirements often get overlooked until the works are close to breaching consent. Our Asset Assessment and Support Package will highlight the condition of the system and give an indication of when refurbishment may be required. This allows expenditure to be planned and therefore controlled and ensures the works performs to its full capability. 1. Asset Assessment Visual Appraisal • Condition of the reeds • Extent of sludge build up on and in the gravel matrix • Condition of the flow path • Site layout and accessibility • Photographic evidence Fitness for Purpose • Review design basis, ‘as built’ drawings and O & M Manual • Review current and future loads and recent performance data Monitoring program • Sampling and monitoring program to include influent flowsloads and discharge levels to characterise performance