SlideShare a Scribd company logo
1 of 7
Download to read offline
PROJECT TITLE
THE PROJECT FOR BUILDING
DHULIKHEL HOSPITAL
TRAUMA AND EMERGENCY CENTER
(DHTEC)
NO DATE DESCRIPTIONS BY APP'D
REVISIONS
DWG TITLE DWG NO
DESIGNED BY
THE CONSORTIUM OF ORIENTAL CONSULTANTS GLOBAL CO., LTD.,
INTERNATIONAL TECHNO CENTER CO,. LTD. AND K.ITO ARCHITECTS & ENGINEERS INC.
NOTES SCALE
DATE
DRAWING BY
CHECKED BY
BASEMENT 3RD FLOOR PLAN
OCTOBER 2021 A-21
Y8
Y7
Y6
Y5
Y4
Y3
Y2
Y1
X1 X2 X3 X4 X5 X6 X7 X8
6,000
6,000
6,000
6,000
6,000
6,000
6,000
42,000
6,000 6,000 6,000 6,000 6,000 9,000 9,000
48,000
[
ADMIN
/
RESEACH
AND
EDUCATION
/
SERVICE
]
CHANGING
WC
GENERAL
WASTE
STORAGE
MEDICAL
WASTE
STORAGE
DISASTER
MANAGEMENT
STORAGE
CHANGING
FIRE PUMP
LINEN
(DIRTY)
LINEN
(CLEAN)
AMBULANCE
DRIVER
MORTUARY
IT OFFICE
JANITOR
PS
POLICE
ELV1
ELV2
FEMALE
CHANGING
MALE
CHANGING
DEPT
OFFICE 1
DEPT
OFFICE 2
DEPT
OFFICE 3
R&E OFFICE
LIBRARY
EPS S-WC
KITCHEN
PS
S-WC
ADMIN
OFFICE
OFFICER
TRAINING
EQUIPMENT
PS
DIRECTOR
SECRETARY
WC
CONFERENCE HALL
CONFERENCE
CAFETERIA
STAIRCASE 2
STAIRCASE 1
SERVER
CORRIDOR
N
1/200 (A3)
PROJECT TITLE
THE PROJECT FOR BUILDING
DHULIKHEL HOSPITAL
TRAUMA AND EMERGENCY CENTER
(DHTEC)
NO DATE DESCRIPTIONS BY APP'D
REVISIONS
DWG TITLE DWG NO
DESIGNED BY
THE CONSORTIUM OF ORIENTAL CONSULTANTS GLOBAL CO., LTD.,
INTERNATIONAL TECHNO CENTER CO,. LTD. AND K.ITO ARCHITECTS & ENGINEERS INC.
NOTES SCALE
DATE
DRAWING BY
CHECKED BY
BASEMENT 2ND FLOOR PLAN
OCTOBER 2021 A-22
Y8
Y7
Y6
Y5
Y4
Y3
Y2
Y1
X1 X2 X3 X4 X5 X6 X7 X8
6,000
6,000
6,000
6,000
6,000
6,000
6,000
42,000
6,000 6,000 6,000 6,000 6,000 9,000 9,000
48,000
[
PHYSIOTHERAPY
REHABILITATION
]
[
OPD
]
[ PHARMACY ]
[
LABORATORY
]
ALUMINUM LOUVER
CONSULTATION
1
CONSULTATION
2
TREATMENT/
RECOVERY
CONSULTATION 3
STAFF
STORAGE
S-WC 2
S-WC 1
PS
ELV 3
RECEPTION
WAITING
COUNTER
OFFICE
STORAGE
WC (M)
WC (F)
PWD
WC
ELV 1
ELV 2
STAIRCASE 1
STAIRCASE 2
EPS S-WC (M) S-WC (F) PS
PS
SAMPLE
COLLECTION BLOOD BANK
STORAGE
WC 2
WC 1
COUNTER
PATHOLOGIST
OFFICE PATHOLOGY
HEMATOLOGY MICROBIOLOGY BIOCHEMISTRY
STAFF
COUNTER
STORAGE
PHYSIOTHERAPY
REHABILITATION
CORRIDOR 1
CORRIDOR 2
N
1/200 (A3)
PROJECT TITLE
THE PROJECT FOR BUILDING
DHULIKHEL HOSPITAL
TRAUMA AND EMERGENCY CENTER
(DHTEC)
NO DATE DESCRIPTIONS BY APP'D
REVISIONS
DWG TITLE DWG NO
DESIGNED BY
THE CONSORTIUM OF ORIENTAL CONSULTANTS GLOBAL CO., LTD.,
INTERNATIONAL TECHNO CENTER CO,. LTD. AND K.ITO ARCHITECTS & ENGINEERS INC.
NOTES SCALE
DATE
DRAWING BY
CHECKED BY
BASEMENT 1ST FLOOR PLAN
OCTOBER 2021 A-23
Y8
Y7
Y6
Y5
Y4
Y3
Y2
Y1
X1 X2 X3 X4 X5 X6 X7 X8
6,000
6,000
6,000
6,000
6,000
6,000
6,000
42,000
6,000 6,000 6,000 6,000 6,000 9,000 9,000
48,000
6,800
7,800
897.5
7
6
9
.
3
7,500
7,800
[
ICU
/
HDU
]
[ RADIOLOGY ]
[ OPERATION THEATER ]
[
POW
]
[
CSSD
]
ALUMINUM LOUVER
STAIRCASE 2
STAIRCASE 1
CPU
ANGIOGRAPHY
S-WC 6
S-WC 5
DUTY 4
DUTY 3 STORAGE
CONTROL
ELV 1
ELV 2
ELV 3
STAFF
STAFF
HDU (6BEDS)
STAFF
STATION
ICU (10BEDS)
ISOLATION
1
ISOLATION
2
SLUICE
ANTEROOM ANTEROOM
STORAGE STORAGE
PS
PS
PS
PWD
WC
EPS
S-WC 3
S-WC 4
POW (5BEDS)
WASHING
S-WC 2
S-WC 1 DUTY 2 DUTY 1
DRYING
PACKING
STERILIZATION
STORAGE
OT-2
STORAGE/
PREPARATION
ANESTHESIA
S.S.
INCHARGE
MALE
CHANGING
FEMALE
CHANGING
SHOWER
SHOWER
SHOWER
SHOWER
OT-1
CORRIDOR 1
CORRIDOR 2
(COLLECTION CORRIDOR)
CORRIDOR 3 (OT HALLWAY)
CORRIDOR 4
(STAFF ROOM)
N
1/200 (A3)
PROJECT TITLE
THE PROJECT FOR BUILDING
DHULIKHEL HOSPITAL
TRAUMA AND EMERGENCY CENTER
(DHTEC)
NO DATE DESCRIPTIONS BY APP'D
REVISIONS
DWG TITLE DWG NO
DESIGNED BY
THE CONSORTIUM OF ORIENTAL CONSULTANTS GLOBAL CO., LTD.,
INTERNATIONAL TECHNO CENTER CO,. LTD. AND K.ITO ARCHITECTS & ENGINEERS INC.
NOTES SCALE
DATE
DRAWING BY
CHECKED BY
GROUND FLOOR PLAN
OCTOBER 2021 A-24
N
Y8
Y7
Y6
Y5
Y4
Y3
Y2
Y1
X1 X2 X3 X4 X5 X6 X7 X8
6,000
6,000
6,000
6,000
6,000
6,000
6,000
42,000
6,000 6,000 6,000 6,000 6,000 9,000 9,000
48,000
6,000
7,800
CL
RL
L
[ ER-OT ]
[EMERGENCY ]
[RADIOLOGY
]
ALUMINUM LOUVER
WC
WC
STAIRCASE 2
STAIRCASE 1
WAITING
RECEPTION
ELV 1
ELV 2
ELV 3
PS
PS
PS
EPS
X-RAY
CONTROL
USG
STORAGE
CT
CPU
ANTEROOM
CONTROL/REPORT
MRI
CPU
S.S.
S.S.
PWD
WC
PWD
WC
PWD
WC
OBSERVATION (11BEDS)
S.S.
ISOLATION
GREEN (10BEDS)
YELLOW (6BEDS)
STAFF STATION
PLASTER/
PROCEDURE
RED (4BEDS)
ER-OT
ANTEROOM
CHANGING
CHANGING
STOR
TRIAGE
CONTAMI
SHOWER
STORAGE/
PREPARATION/
RECOVERY
DUTY
SLUICE
STORAGE
PRE-HOSPITAL CARE/
COMMUNICATION
STAFF
DUTY
S-WC 4
S-WC 3
S-WC 1
S-WC 2
CORRIDOR 1
CORRIDOR 2
CORRIDOR 3
1/200 (A3)
PROJECT TITLE
THE PROJECT FOR BUILDING
DHULIKHEL HOSPITAL
TRAUMA AND EMERGENCY CENTER
(DHTEC)
NO DATE DESCRIPTIONS BY APP'D
REVISIONS
DWG TITLE DWG NO
DESIGNED BY
THE CONSORTIUM OF ORIENTAL CONSULTANTS GLOBAL CO., LTD.,
INTERNATIONAL TECHNO CENTER CO,. LTD. AND K.ITO ARCHITECTS & ENGINEERS INC.
NOTES SCALE
DATE
DRAWING BY
CHECKED BY
FIRST FLOOR PLAN
OCTOBER 2021 A-25
N
Y8
Y7
Y6
Y5
Y4
Y3
Y2
Y1
X1 X2 X3 X4 X5 X6 X7 X8
6,000
6,000
6,000
6,000
6,000
6,000
6,000
42,000
6,000 6,000 6,000 6,000 6,000 9,000 9,000
48,000
CANOPY
CANOPY
[
INPATIENT
WARD
(46
BEDS)
]
ALUMINUM LOUVER
STAIRCASE 2
STAIRCASE 1
6 BEDS
6 BEDS
5 BEDS
5 BEDS
4 BEDS
4 BEDS
4 BEDS
4 BEDS
4 BEDS
1 BED 1 BED 1 BED 1 BED
BTH
BTH
BTH
BTH
BTH
BTH
BTH
BTH
BTH
DUTY
DUTY
PS
PS
EPS
STORAGE
LINEN
LINEN
SLUICE
TREATMENT
STAFF
STATION
ELV 1
ELV 2
JANITOR
STAFF
DRUG
PREPARATION
COUNSELING
INCHARGE
SHOWER
S-WC
S-WC
BTH BTH BTH BTH
ROOF
CORRIDOR
1/200 (A3)
PROJECT TITLE
THE PROJECT FOR BUILDING
DHULIKHEL HOSPITAL
TRAUMA AND EMERGENCY CENTER
(DHTEC)
NO DATE DESCRIPTIONS BY APP'D
REVISIONS
DWG TITLE DWG NO
DESIGNED BY
THE CONSORTIUM OF ORIENTAL CONSULTANTS GLOBAL CO., LTD.,
INTERNATIONAL TECHNO CENTER CO,. LTD. AND K.ITO ARCHITECTS & ENGINEERS INC.
NOTES SCALE
DATE
DRAWING BY
CHECKED BY
TOP FLOOR AND ROOF FLOOR PLAN
OCTOBER 2021 A-26
Y8
Y7
Y6
Y5
Y4
Y3
Y2
Y1
X1 X2 X3 X4 X5 X6 X7 X8
6,000
6,000
6,000
6,000
6,000
6,000
6,000
42,000
6,000 6,000 6,000 6,000 6,000 9,000 9,000
48,000
STAIRCASE 1
ELECTRICAL
ROOF
N
TOP LIGHT
ROOF
X3 X4
6,000 6,000
Y6
Y5
Y4
Y3
6,000
6,000
6,000
42,000
TOP FLOOR PLAN
ROOF FLOOR PLAN
1/200 (A3)
Facility Plan_220720.pdf

More Related Content

Similar to Facility Plan_220720.pdf

Energy Medical Corridor Update
Energy Medical Corridor UpdateEnergy Medical Corridor Update
Energy Medical Corridor Update
Edward Cook, FACHE
 
POVILAS MACKEVICIUS_Portfolio_2016
POVILAS MACKEVICIUS_Portfolio_2016POVILAS MACKEVICIUS_Portfolio_2016
POVILAS MACKEVICIUS_Portfolio_2016
Povilas Mackevičius
 
Technology-Magazine_Nov-17-Tall-Buildings-low (1).pdf
Technology-Magazine_Nov-17-Tall-Buildings-low (1).pdfTechnology-Magazine_Nov-17-Tall-Buildings-low (1).pdf
Technology-Magazine_Nov-17-Tall-Buildings-low (1).pdf
SameerSawant61
 

Similar to Facility Plan_220720.pdf (20)

cv
cvcv
cv
 
Remon Fouad
Remon FouadRemon Fouad
Remon Fouad
 
Nuprecon - Presentation I gave at Camp Dresser McKee
Nuprecon - Presentation I gave at Camp Dresser McKeeNuprecon - Presentation I gave at Camp Dresser McKee
Nuprecon - Presentation I gave at Camp Dresser McKee
 
Item # 5 - 516 Circle Notice of Intent
Item # 5 - 516 Circle Notice of IntentItem # 5 - 516 Circle Notice of Intent
Item # 5 - 516 Circle Notice of Intent
 
TechTown 1st Floor Renovation
TechTown 1st Floor RenovationTechTown 1st Floor Renovation
TechTown 1st Floor Renovation
 
1200 14
1200 141200 14
1200 14
 
1200 7
1200 71200 7
1200 7
 
IRJET- Design and Analysis of Overhead Water Tank at Phule Nagar, Ambernath
IRJET-  	  Design and Analysis of Overhead Water Tank at Phule Nagar, AmbernathIRJET-  	  Design and Analysis of Overhead Water Tank at Phule Nagar, Ambernath
IRJET- Design and Analysis of Overhead Water Tank at Phule Nagar, Ambernath
 
CURRICULUM VITAE
CURRICULUM VITAECURRICULUM VITAE
CURRICULUM VITAE
 
Research Paper on Comparative Study on Economical Material for RCC & Steel Wa...
Research Paper on Comparative Study on Economical Material for RCC & Steel Wa...Research Paper on Comparative Study on Economical Material for RCC & Steel Wa...
Research Paper on Comparative Study on Economical Material for RCC & Steel Wa...
 
4851
48514851
4851
 
Comparative Study of Seismic Analysis of RC Frame Structure with and without ...
Comparative Study of Seismic Analysis of RC Frame Structure with and without ...Comparative Study of Seismic Analysis of RC Frame Structure with and without ...
Comparative Study of Seismic Analysis of RC Frame Structure with and without ...
 
Energy Medical Corridor Update
Energy Medical Corridor UpdateEnergy Medical Corridor Update
Energy Medical Corridor Update
 
DESIGN AND ANALYSIS OF G+3 RESIDENTIAL BUILDING BY S.MAHAMMAD FROM RAJIV GAND...
DESIGN AND ANALYSIS OF G+3 RESIDENTIAL BUILDING BY S.MAHAMMAD FROM RAJIV GAND...DESIGN AND ANALYSIS OF G+3 RESIDENTIAL BUILDING BY S.MAHAMMAD FROM RAJIV GAND...
DESIGN AND ANALYSIS OF G+3 RESIDENTIAL BUILDING BY S.MAHAMMAD FROM RAJIV GAND...
 
POVILAS MACKEVICIUS_Portfolio_2016
POVILAS MACKEVICIUS_Portfolio_2016POVILAS MACKEVICIUS_Portfolio_2016
POVILAS MACKEVICIUS_Portfolio_2016
 
SUMMER TRAINING REPORT ON BUILDING CONSTRUCTION
SUMMER TRAINING REPORT ON BUILDING CONSTRUCTIONSUMMER TRAINING REPORT ON BUILDING CONSTRUCTION
SUMMER TRAINING REPORT ON BUILDING CONSTRUCTION
 
Technology-Magazine_Nov-17-Tall-Buildings-low (1).pdf
Technology-Magazine_Nov-17-Tall-Buildings-low (1).pdfTechnology-Magazine_Nov-17-Tall-Buildings-low (1).pdf
Technology-Magazine_Nov-17-Tall-Buildings-low (1).pdf
 
Importance of site detail Report - Sprinteriors Designer
Importance of site detail Report - Sprinteriors DesignerImportance of site detail Report - Sprinteriors Designer
Importance of site detail Report - Sprinteriors Designer
 
Numerically and CFD studies on shell and tube heat exchangers
Numerically and CFD studies on shell and tube heat exchangersNumerically and CFD studies on shell and tube heat exchangers
Numerically and CFD studies on shell and tube heat exchangers
 
Water supply
Water supply Water supply
Water supply
 

More from NeerajOjha17

पाठ्यवस्तु समायोजन ढांचा (कक्षा ९-१०).pdf
पाठ्यवस्तु समायोजन ढांचा (कक्षा ९-१०).pdfपाठ्यवस्तु समायोजन ढांचा (कक्षा ९-१०).pdf
पाठ्यवस्तु समायोजन ढांचा (कक्षा ९-१०).pdf
NeerajOjha17
 
Affidavit of Surya B Gurung.docx
Affidavit of Surya B Gurung.docxAffidavit of Surya B Gurung.docx
Affidavit of Surya B Gurung.docx
NeerajOjha17
 
AFFIDAVIT ON EXTRAORDINARY BY A PETITIONER-1.docx
AFFIDAVIT ON EXTRAORDINARY BY A PETITIONER-1.docxAFFIDAVIT ON EXTRAORDINARY BY A PETITIONER-1.docx
AFFIDAVIT ON EXTRAORDINARY BY A PETITIONER-1.docx
NeerajOjha17
 
Affidavit Ghosh.docx
Affidavit Ghosh.docxAffidavit Ghosh.docx
Affidavit Ghosh.docx
NeerajOjha17
 
affidvit.Cjitrakar,Nalina_1.doc
affidvit.Cjitrakar,Nalina_1.docaffidvit.Cjitrakar,Nalina_1.doc
affidvit.Cjitrakar,Nalina_1.doc
NeerajOjha17
 
Affidavit.COV.docx
Affidavit.COV.docxAffidavit.COV.docx
Affidavit.COV.docx
NeerajOjha17
 
Affidavit of Plaintiff.docx
Affidavit of Plaintiff.docxAffidavit of Plaintiff.docx
Affidavit of Plaintiff.docx
NeerajOjha17
 
Affidavit of Regularity_1.docx
Affidavit of Regularity_1.docxAffidavit of Regularity_1.docx
Affidavit of Regularity_1.docx
NeerajOjha17
 
Supporting Letter.EB-1,Ghosh, Mampi (BhattaLawFirm's conflicted copy 2011-11-...
Supporting Letter.EB-1,Ghosh, Mampi (BhattaLawFirm's conflicted copy 2011-11-...Supporting Letter.EB-1,Ghosh, Mampi (BhattaLawFirm's conflicted copy 2011-11-...
Supporting Letter.EB-1,Ghosh, Mampi (BhattaLawFirm's conflicted copy 2011-11-...
NeerajOjha17
 

More from NeerajOjha17 (20)

पाठ्यवस्तु समायोजन ढांचा (कक्षा ९-१०).pdf
पाठ्यवस्तु समायोजन ढांचा (कक्षा ९-१०).pdfपाठ्यवस्तु समायोजन ढांचा (कक्षा ९-१०).pdf
पाठ्यवस्तु समायोजन ढांचा (कक्षा ९-१०).pdf
 
Staff commitment.doc
Staff commitment.docStaff commitment.doc
Staff commitment.doc
 
Affidavit of Surya B Gurung.docx
Affidavit of Surya B Gurung.docxAffidavit of Surya B Gurung.docx
Affidavit of Surya B Gurung.docx
 
AFFIDAVIT ON EXTRAORDINARY BY A PETITIONER-1.docx
AFFIDAVIT ON EXTRAORDINARY BY A PETITIONER-1.docxAFFIDAVIT ON EXTRAORDINARY BY A PETITIONER-1.docx
AFFIDAVIT ON EXTRAORDINARY BY A PETITIONER-1.docx
 
Affidavit Ghosh.docx
Affidavit Ghosh.docxAffidavit Ghosh.docx
Affidavit Ghosh.docx
 
affidvit.Cjitrakar,Nalina.doc
affidvit.Cjitrakar,Nalina.docaffidvit.Cjitrakar,Nalina.doc
affidvit.Cjitrakar,Nalina.doc
 
affidvit.Cjitrakar,Nalina_1.doc
affidvit.Cjitrakar,Nalina_1.docaffidvit.Cjitrakar,Nalina_1.doc
affidvit.Cjitrakar,Nalina_1.doc
 
Affidavit.COV.docx
Affidavit.COV.docxAffidavit.COV.docx
Affidavit.COV.docx
 
Affidavit of Plaintiff.docx
Affidavit of Plaintiff.docxAffidavit of Plaintiff.docx
Affidavit of Plaintiff.docx
 
Affidavit of Regularity_1.docx
Affidavit of Regularity_1.docxAffidavit of Regularity_1.docx
Affidavit of Regularity_1.docx
 
Supporting Letter.EB-1,Ghosh, Mampi (BhattaLawFirm's conflicted copy 2011-11-...
Supporting Letter.EB-1,Ghosh, Mampi (BhattaLawFirm's conflicted copy 2011-11-...Supporting Letter.EB-1,Ghosh, Mampi (BhattaLawFirm's conflicted copy 2011-11-...
Supporting Letter.EB-1,Ghosh, Mampi (BhattaLawFirm's conflicted copy 2011-11-...
 
Affidavit Ghosh.docx
Affidavit Ghosh.docxAffidavit Ghosh.docx
Affidavit Ghosh.docx
 
Proof of Service (2).docx
Proof of Service (2).docxProof of Service (2).docx
Proof of Service (2).docx
 
MY FORMAT ULTRA PRO MAX (1).docx
MY FORMAT  ULTRA PRO MAX (1).docxMY FORMAT  ULTRA PRO MAX (1).docx
MY FORMAT ULTRA PRO MAX (1).docx
 
mamata.doc
mamata.docmamata.doc
mamata.doc
 
Sailesh CV_Cist.docx
Sailesh CV_Cist.docxSailesh CV_Cist.docx
Sailesh CV_Cist.docx
 
Sristi.docx
Sristi.docxSristi.docx
Sristi.docx
 
1-A-Define the health system and describe the functions and elements of healt...
1-A-Define the health system and describe the functions and elements of healt...1-A-Define the health system and describe the functions and elements of healt...
1-A-Define the health system and describe the functions and elements of healt...
 
1-B-Models of Health System.ppt
1-B-Models of Health System.ppt1-B-Models of Health System.ppt
1-B-Models of Health System.ppt
 
2-A-Brief Hisory of HSD in Nepal.pptx
2-A-Brief Hisory of HSD in Nepal.pptx2-A-Brief Hisory of HSD in Nepal.pptx
2-A-Brief Hisory of HSD in Nepal.pptx
 

Recently uploaded

Famous No -1 amil baba in Hyderabad ! Best No _ Astrologer in Pakistan, UK, A...
Famous No -1 amil baba in Hyderabad ! Best No _ Astrologer in Pakistan, UK, A...Famous No -1 amil baba in Hyderabad ! Best No _ Astrologer in Pakistan, UK, A...
Famous No -1 amil baba in Hyderabad ! Best No _ Astrologer in Pakistan, UK, A...
No -1 Astrologer ,Amil Baba In Australia | Uk | Usa | Canada | Pakistan
 
Top Kala Jadu, Black magic expert in Faisalabad and Kala ilam specialist in S...
Top Kala Jadu, Black magic expert in Faisalabad and Kala ilam specialist in S...Top Kala Jadu, Black magic expert in Faisalabad and Kala ilam specialist in S...
Top Kala Jadu, Black magic expert in Faisalabad and Kala ilam specialist in S...
baharayali
 
Top 10 Amil baba list Famous Amil baba In Pakistan Amil baba Kala jadu in Raw...
Top 10 Amil baba list Famous Amil baba In Pakistan Amil baba Kala jadu in Raw...Top 10 Amil baba list Famous Amil baba In Pakistan Amil baba Kala jadu in Raw...
Top 10 Amil baba list Famous Amil baba In Pakistan Amil baba Kala jadu in Raw...
Amil Baba Naveed Bangali
 
Real Kala Jadu, Black magic specialist in Lahore and Kala ilam expert in kara...
Real Kala Jadu, Black magic specialist in Lahore and Kala ilam expert in kara...Real Kala Jadu, Black magic specialist in Lahore and Kala ilam expert in kara...
Real Kala Jadu, Black magic specialist in Lahore and Kala ilam expert in kara...
baharayali
 
Famous Kala Jadu, Black magic specialist in Lahore and Kala ilam expert in ka...
Famous Kala Jadu, Black magic specialist in Lahore and Kala ilam expert in ka...Famous Kala Jadu, Black magic specialist in Lahore and Kala ilam expert in ka...
Famous Kala Jadu, Black magic specialist in Lahore and Kala ilam expert in ka...
baharayali
 
VADODARA CALL GIRL AVAILABLE 7568201473 call me
VADODARA CALL GIRL AVAILABLE 7568201473 call meVADODARA CALL GIRL AVAILABLE 7568201473 call me
VADODARA CALL GIRL AVAILABLE 7568201473 call me
shivanisharma5244
 

Recently uploaded (20)

Famous No -1 amil baba in Hyderabad ! Best No _ Astrologer in Pakistan, UK, A...
Famous No -1 amil baba in Hyderabad ! Best No _ Astrologer in Pakistan, UK, A...Famous No -1 amil baba in Hyderabad ! Best No _ Astrologer in Pakistan, UK, A...
Famous No -1 amil baba in Hyderabad ! Best No _ Astrologer in Pakistan, UK, A...
 
St. John's Church Parish Magazine - May 2024
St. John's Church Parish Magazine - May 2024St. John's Church Parish Magazine - May 2024
St. John's Church Parish Magazine - May 2024
 
Genesis 1:2 - Meditate the Scripture Daily bit by bit
Genesis 1:2 - Meditate the Scripture Daily bit by bitGenesis 1:2 - Meditate the Scripture Daily bit by bit
Genesis 1:2 - Meditate the Scripture Daily bit by bit
 
St. Louise de Marillac and Care of the Sick Poor
St. Louise de Marillac and Care of the Sick PoorSt. Louise de Marillac and Care of the Sick Poor
St. Louise de Marillac and Care of the Sick Poor
 
Amil baba in Lahore /Amil baba in Karachi /Amil baba in Pakistan
Amil baba in Lahore /Amil baba in Karachi /Amil baba in PakistanAmil baba in Lahore /Amil baba in Karachi /Amil baba in Pakistan
Amil baba in Lahore /Amil baba in Karachi /Amil baba in Pakistan
 
Top Kala Jadu, Black magic expert in Faisalabad and Kala ilam specialist in S...
Top Kala Jadu, Black magic expert in Faisalabad and Kala ilam specialist in S...Top Kala Jadu, Black magic expert in Faisalabad and Kala ilam specialist in S...
Top Kala Jadu, Black magic expert in Faisalabad and Kala ilam specialist in S...
 
St. Louise de Marillac and Abandoned Children
St. Louise de Marillac and Abandoned ChildrenSt. Louise de Marillac and Abandoned Children
St. Louise de Marillac and Abandoned Children
 
Top 10 Amil baba list Famous Amil baba In Pakistan Amil baba Kala jadu in Raw...
Top 10 Amil baba list Famous Amil baba In Pakistan Amil baba Kala jadu in Raw...Top 10 Amil baba list Famous Amil baba In Pakistan Amil baba Kala jadu in Raw...
Top 10 Amil baba list Famous Amil baba In Pakistan Amil baba Kala jadu in Raw...
 
The Revelation Chapter 4 Working Copy.docx
The Revelation Chapter 4 Working Copy.docxThe Revelation Chapter 4 Working Copy.docx
The Revelation Chapter 4 Working Copy.docx
 
Jude: The Acts of the Apostates (Jude vv.1-4).pptx
Jude: The Acts of the Apostates (Jude vv.1-4).pptxJude: The Acts of the Apostates (Jude vv.1-4).pptx
Jude: The Acts of the Apostates (Jude vv.1-4).pptx
 
Real Kala Jadu, Black magic specialist in Lahore and Kala ilam expert in kara...
Real Kala Jadu, Black magic specialist in Lahore and Kala ilam expert in kara...Real Kala Jadu, Black magic specialist in Lahore and Kala ilam expert in kara...
Real Kala Jadu, Black magic specialist in Lahore and Kala ilam expert in kara...
 
Zulu - The Epistle of Ignatius to Polycarp.pdf
Zulu - The Epistle of Ignatius to Polycarp.pdfZulu - The Epistle of Ignatius to Polycarp.pdf
Zulu - The Epistle of Ignatius to Polycarp.pdf
 
Hire Best Next Js Developer For Your Project
Hire Best Next Js Developer For Your ProjectHire Best Next Js Developer For Your Project
Hire Best Next Js Developer For Your Project
 
Legends of the Light v2.pdf xxxxxxxxxxxxx
Legends of the Light v2.pdf xxxxxxxxxxxxxLegends of the Light v2.pdf xxxxxxxxxxxxx
Legends of the Light v2.pdf xxxxxxxxxxxxx
 
Study of the Psalms Chapter 1 verse 3 - wanderean
Study of the Psalms Chapter 1 verse 3 - wandereanStudy of the Psalms Chapter 1 verse 3 - wanderean
Study of the Psalms Chapter 1 verse 3 - wanderean
 
Famous Kala Jadu, Black magic specialist in Lahore and Kala ilam expert in ka...
Famous Kala Jadu, Black magic specialist in Lahore and Kala ilam expert in ka...Famous Kala Jadu, Black magic specialist in Lahore and Kala ilam expert in ka...
Famous Kala Jadu, Black magic specialist in Lahore and Kala ilam expert in ka...
 
English - The Forgotten Books of Eden.pdf
English - The Forgotten Books of Eden.pdfEnglish - The Forgotten Books of Eden.pdf
English - The Forgotten Books of Eden.pdf
 
VADODARA CALL GIRL AVAILABLE 7568201473 call me
VADODARA CALL GIRL AVAILABLE 7568201473 call meVADODARA CALL GIRL AVAILABLE 7568201473 call me
VADODARA CALL GIRL AVAILABLE 7568201473 call me
 
Genesis 1:10 || Meditate the Scripture daily verse by verse
Genesis 1:10  ||  Meditate the Scripture daily verse by verseGenesis 1:10  ||  Meditate the Scripture daily verse by verse
Genesis 1:10 || Meditate the Scripture daily verse by verse
 
The_Chronological_Life_of_Christ_Part_99_Words_and_Works
The_Chronological_Life_of_Christ_Part_99_Words_and_WorksThe_Chronological_Life_of_Christ_Part_99_Words_and_Works
The_Chronological_Life_of_Christ_Part_99_Words_and_Works
 

Facility Plan_220720.pdf

  • 1. PROJECT TITLE THE PROJECT FOR BUILDING DHULIKHEL HOSPITAL TRAUMA AND EMERGENCY CENTER (DHTEC) NO DATE DESCRIPTIONS BY APP'D REVISIONS DWG TITLE DWG NO DESIGNED BY THE CONSORTIUM OF ORIENTAL CONSULTANTS GLOBAL CO., LTD., INTERNATIONAL TECHNO CENTER CO,. LTD. AND K.ITO ARCHITECTS & ENGINEERS INC. NOTES SCALE DATE DRAWING BY CHECKED BY BASEMENT 3RD FLOOR PLAN OCTOBER 2021 A-21 Y8 Y7 Y6 Y5 Y4 Y3 Y2 Y1 X1 X2 X3 X4 X5 X6 X7 X8 6,000 6,000 6,000 6,000 6,000 6,000 6,000 42,000 6,000 6,000 6,000 6,000 6,000 9,000 9,000 48,000 [ ADMIN / RESEACH AND EDUCATION / SERVICE ] CHANGING WC GENERAL WASTE STORAGE MEDICAL WASTE STORAGE DISASTER MANAGEMENT STORAGE CHANGING FIRE PUMP LINEN (DIRTY) LINEN (CLEAN) AMBULANCE DRIVER MORTUARY IT OFFICE JANITOR PS POLICE ELV1 ELV2 FEMALE CHANGING MALE CHANGING DEPT OFFICE 1 DEPT OFFICE 2 DEPT OFFICE 3 R&E OFFICE LIBRARY EPS S-WC KITCHEN PS S-WC ADMIN OFFICE OFFICER TRAINING EQUIPMENT PS DIRECTOR SECRETARY WC CONFERENCE HALL CONFERENCE CAFETERIA STAIRCASE 2 STAIRCASE 1 SERVER CORRIDOR N 1/200 (A3)
  • 2. PROJECT TITLE THE PROJECT FOR BUILDING DHULIKHEL HOSPITAL TRAUMA AND EMERGENCY CENTER (DHTEC) NO DATE DESCRIPTIONS BY APP'D REVISIONS DWG TITLE DWG NO DESIGNED BY THE CONSORTIUM OF ORIENTAL CONSULTANTS GLOBAL CO., LTD., INTERNATIONAL TECHNO CENTER CO,. LTD. AND K.ITO ARCHITECTS & ENGINEERS INC. NOTES SCALE DATE DRAWING BY CHECKED BY BASEMENT 2ND FLOOR PLAN OCTOBER 2021 A-22 Y8 Y7 Y6 Y5 Y4 Y3 Y2 Y1 X1 X2 X3 X4 X5 X6 X7 X8 6,000 6,000 6,000 6,000 6,000 6,000 6,000 42,000 6,000 6,000 6,000 6,000 6,000 9,000 9,000 48,000 [ PHYSIOTHERAPY REHABILITATION ] [ OPD ] [ PHARMACY ] [ LABORATORY ] ALUMINUM LOUVER CONSULTATION 1 CONSULTATION 2 TREATMENT/ RECOVERY CONSULTATION 3 STAFF STORAGE S-WC 2 S-WC 1 PS ELV 3 RECEPTION WAITING COUNTER OFFICE STORAGE WC (M) WC (F) PWD WC ELV 1 ELV 2 STAIRCASE 1 STAIRCASE 2 EPS S-WC (M) S-WC (F) PS PS SAMPLE COLLECTION BLOOD BANK STORAGE WC 2 WC 1 COUNTER PATHOLOGIST OFFICE PATHOLOGY HEMATOLOGY MICROBIOLOGY BIOCHEMISTRY STAFF COUNTER STORAGE PHYSIOTHERAPY REHABILITATION CORRIDOR 1 CORRIDOR 2 N 1/200 (A3)
  • 3. PROJECT TITLE THE PROJECT FOR BUILDING DHULIKHEL HOSPITAL TRAUMA AND EMERGENCY CENTER (DHTEC) NO DATE DESCRIPTIONS BY APP'D REVISIONS DWG TITLE DWG NO DESIGNED BY THE CONSORTIUM OF ORIENTAL CONSULTANTS GLOBAL CO., LTD., INTERNATIONAL TECHNO CENTER CO,. LTD. AND K.ITO ARCHITECTS & ENGINEERS INC. NOTES SCALE DATE DRAWING BY CHECKED BY BASEMENT 1ST FLOOR PLAN OCTOBER 2021 A-23 Y8 Y7 Y6 Y5 Y4 Y3 Y2 Y1 X1 X2 X3 X4 X5 X6 X7 X8 6,000 6,000 6,000 6,000 6,000 6,000 6,000 42,000 6,000 6,000 6,000 6,000 6,000 9,000 9,000 48,000 6,800 7,800 897.5 7 6 9 . 3 7,500 7,800 [ ICU / HDU ] [ RADIOLOGY ] [ OPERATION THEATER ] [ POW ] [ CSSD ] ALUMINUM LOUVER STAIRCASE 2 STAIRCASE 1 CPU ANGIOGRAPHY S-WC 6 S-WC 5 DUTY 4 DUTY 3 STORAGE CONTROL ELV 1 ELV 2 ELV 3 STAFF STAFF HDU (6BEDS) STAFF STATION ICU (10BEDS) ISOLATION 1 ISOLATION 2 SLUICE ANTEROOM ANTEROOM STORAGE STORAGE PS PS PS PWD WC EPS S-WC 3 S-WC 4 POW (5BEDS) WASHING S-WC 2 S-WC 1 DUTY 2 DUTY 1 DRYING PACKING STERILIZATION STORAGE OT-2 STORAGE/ PREPARATION ANESTHESIA S.S. INCHARGE MALE CHANGING FEMALE CHANGING SHOWER SHOWER SHOWER SHOWER OT-1 CORRIDOR 1 CORRIDOR 2 (COLLECTION CORRIDOR) CORRIDOR 3 (OT HALLWAY) CORRIDOR 4 (STAFF ROOM) N 1/200 (A3)
  • 4. PROJECT TITLE THE PROJECT FOR BUILDING DHULIKHEL HOSPITAL TRAUMA AND EMERGENCY CENTER (DHTEC) NO DATE DESCRIPTIONS BY APP'D REVISIONS DWG TITLE DWG NO DESIGNED BY THE CONSORTIUM OF ORIENTAL CONSULTANTS GLOBAL CO., LTD., INTERNATIONAL TECHNO CENTER CO,. LTD. AND K.ITO ARCHITECTS & ENGINEERS INC. NOTES SCALE DATE DRAWING BY CHECKED BY GROUND FLOOR PLAN OCTOBER 2021 A-24 N Y8 Y7 Y6 Y5 Y4 Y3 Y2 Y1 X1 X2 X3 X4 X5 X6 X7 X8 6,000 6,000 6,000 6,000 6,000 6,000 6,000 42,000 6,000 6,000 6,000 6,000 6,000 9,000 9,000 48,000 6,000 7,800 CL RL L [ ER-OT ] [EMERGENCY ] [RADIOLOGY ] ALUMINUM LOUVER WC WC STAIRCASE 2 STAIRCASE 1 WAITING RECEPTION ELV 1 ELV 2 ELV 3 PS PS PS EPS X-RAY CONTROL USG STORAGE CT CPU ANTEROOM CONTROL/REPORT MRI CPU S.S. S.S. PWD WC PWD WC PWD WC OBSERVATION (11BEDS) S.S. ISOLATION GREEN (10BEDS) YELLOW (6BEDS) STAFF STATION PLASTER/ PROCEDURE RED (4BEDS) ER-OT ANTEROOM CHANGING CHANGING STOR TRIAGE CONTAMI SHOWER STORAGE/ PREPARATION/ RECOVERY DUTY SLUICE STORAGE PRE-HOSPITAL CARE/ COMMUNICATION STAFF DUTY S-WC 4 S-WC 3 S-WC 1 S-WC 2 CORRIDOR 1 CORRIDOR 2 CORRIDOR 3 1/200 (A3)
  • 5. PROJECT TITLE THE PROJECT FOR BUILDING DHULIKHEL HOSPITAL TRAUMA AND EMERGENCY CENTER (DHTEC) NO DATE DESCRIPTIONS BY APP'D REVISIONS DWG TITLE DWG NO DESIGNED BY THE CONSORTIUM OF ORIENTAL CONSULTANTS GLOBAL CO., LTD., INTERNATIONAL TECHNO CENTER CO,. LTD. AND K.ITO ARCHITECTS & ENGINEERS INC. NOTES SCALE DATE DRAWING BY CHECKED BY FIRST FLOOR PLAN OCTOBER 2021 A-25 N Y8 Y7 Y6 Y5 Y4 Y3 Y2 Y1 X1 X2 X3 X4 X5 X6 X7 X8 6,000 6,000 6,000 6,000 6,000 6,000 6,000 42,000 6,000 6,000 6,000 6,000 6,000 9,000 9,000 48,000 CANOPY CANOPY [ INPATIENT WARD (46 BEDS) ] ALUMINUM LOUVER STAIRCASE 2 STAIRCASE 1 6 BEDS 6 BEDS 5 BEDS 5 BEDS 4 BEDS 4 BEDS 4 BEDS 4 BEDS 4 BEDS 1 BED 1 BED 1 BED 1 BED BTH BTH BTH BTH BTH BTH BTH BTH BTH DUTY DUTY PS PS EPS STORAGE LINEN LINEN SLUICE TREATMENT STAFF STATION ELV 1 ELV 2 JANITOR STAFF DRUG PREPARATION COUNSELING INCHARGE SHOWER S-WC S-WC BTH BTH BTH BTH ROOF CORRIDOR 1/200 (A3)
  • 6. PROJECT TITLE THE PROJECT FOR BUILDING DHULIKHEL HOSPITAL TRAUMA AND EMERGENCY CENTER (DHTEC) NO DATE DESCRIPTIONS BY APP'D REVISIONS DWG TITLE DWG NO DESIGNED BY THE CONSORTIUM OF ORIENTAL CONSULTANTS GLOBAL CO., LTD., INTERNATIONAL TECHNO CENTER CO,. LTD. AND K.ITO ARCHITECTS & ENGINEERS INC. NOTES SCALE DATE DRAWING BY CHECKED BY TOP FLOOR AND ROOF FLOOR PLAN OCTOBER 2021 A-26 Y8 Y7 Y6 Y5 Y4 Y3 Y2 Y1 X1 X2 X3 X4 X5 X6 X7 X8 6,000 6,000 6,000 6,000 6,000 6,000 6,000 42,000 6,000 6,000 6,000 6,000 6,000 9,000 9,000 48,000 STAIRCASE 1 ELECTRICAL ROOF N TOP LIGHT ROOF X3 X4 6,000 6,000 Y6 Y5 Y4 Y3 6,000 6,000 6,000 42,000 TOP FLOOR PLAN ROOF FLOOR PLAN 1/200 (A3)