Monthly Review Panoli AUG-2022
ENERGY SCENARIO 2022-23
Month Production (MT)
Coal
Consumed
(MT)
Specific Steam
Generation (Steam
genration/kg of Coal)
(kg/kg)
Specific Steam
Consumption
(Steam
Consumption/kg
of Prod.) (kg/kg)
Specific Fuel
Consumption
(Fuel
Consumption/kg
of Prod.) (kg/kg)
Specific Nitrogen
(N2) Consumption
(N2 Consumption/kg
of Prod.) (kg/kg)
TARGET YTD 2022-23 4.88 1.74 0.37 0.104
Sep-22 1143.2 562.32 3.98 1.98 0.49 0.101
Aug-22 1282.4 629.12 4.06 1.99 0.49 0.105
Jul-22 1509.4 771.47 4.03 2.07 0.51 0.106
Jun-22 1513.6 824.44 3.6 1.98 0.54 0.113
May-22 1750.2 855.41 3.7 1.86 0.49 0.109
Apr-22 1545.3 674.29 3.8 1.77 0.44 0.114
SEQD C M
Specific Steam Consumption – KG/KG
Comments :
- Various Steam savings initiates
taken up at Curing for execution
- Minimize the application of TCP
as autoclave.
- Steam hose pipe supplier
changed and address the
quality issues.
- Avg wt. of tyre reduced from
58.8 to 52.8 kg
Month FY22-23 Apr-22 May-22 Jun-22 Jul-22 Aug-22 Sep-22 Oct-22 Nov-22 Dec-22 Jan-23 Feb-23 Mar-23
Actual 1.92 1.77 1.86 1.98 2.06 1.99 1.98
Target (22-23) 1.74 1.80 1.80 1.80 1.75 1.75 1.75 1.70 1.70 1.70 1.70 1.70 1.70
2.07
1.74
1.942
1.80 1.80 1.80 1.75 1.75 1.75 1.70 1.70 1.70 1.70 1.70 1.70
1.77
1.86
1.98
2.07 1.99 1.98
0.000
0.500
1.000
1.500
2.000
2.500
YTD
21-22
Target
-
YTD
Apr-22
May-22
Jun-22
Jul-22
Aug-22
Sep-22
Oct-22
Nov-22
Dec-22
Jan-23
Feb-23
Mar-23
YTD
22-23
YTD 22-23 SPC -FY2122 Target SPC -FY22/23
SEQD C M
Sp. Fuel Consumption (Coal to Prod ) – KG/KG
Comments :
- Skin temperature study done
on all headers and where
temperature reading out of
limit addressed.
- Increase in ratio due to
frequent failure in curing
steam traps. Corrections
taken & being monitored on
weekly basis.
- Trench #1 Trials for 4 days
- Condensate generation
increase due to rainy season.
Month FY22-23 Apr-22 May-22 Jun-22 Jul-22 Aug-22 Sep-22 Oct-22 Nov-22 Dec-22 Jan-23 Feb-23 Mar-23
Actual 0.50 0.44 0.49 0.54 0.51 0.490 0.49
Target (22-23) 0.37 0.45 0.42 0.42 0.39 0.39 0.37 0.36 0.36 0.34 0.34 0.32 0.32
0.36
0.49
0.40 0.40 0.40
0.37 0.37 0.37
0.34 0.34 0.34 0.32 0.32 0.32
0.44
0.49
0.54
0.51 0.49 0.49
0.000
0.100
0.200
0.300
0.400
0.500
0.600 Target
-
YTD
Apr-22
May-22
Jun-22
Jul-22
Aug-22
Sep-22
Oct-22
Nov-22
Dec-22
Jan-23
Feb-23
Mar-23
YTD
22-23
YTD 22-23 SPC -FY2122 Target SPC -FY22/23
SEQD C M
Specific Steam Generation (Steam to Coal ) – KG/KG
Comments :
- Coal handling plant put in
operation and avoiding using
crushed coal
- Reduce carpet and fins loss.
- Complete automation of Boiler.
- Reduce radiation loss by
covering all un-insulated
portion.
- NRV provided in 12 TPH Boiler
- Presently Boiler load is 25%
load. For better efficiency of
boiler to operate at 80-85%.
- GCV of coal to monitor for
boiler efficiency at 5500 ADB.
Month FY22-23 Apr-22 May-22 Jun-22 Jul-22 Aug-22 Sep-22 Oct-22 Nov-22 Dec-22 Jan-23 Feb-23 Mar-23
Actual 3.78 3.80 3.70 3.60 4.030 4.06 3.98
Target (22-23) 4.88 4.50 4.50 4.50 4.75 4.75 4.75 5.00 5.00 5.00 5.25 5.25 5.25
4.88
3.862
4.50 4.50 4.50
4.75 4.75 4.75
5.00 5.00 5.00
5.25 5.25 5.25
3.80 3.70 3.600
4.030 4.060 3.980
2.000
2.500
3.000
3.500
4.000
4.500
5.000
5.500
6.000
Target
-
YTD
Apr-22
May-22
Jun-22
Jul-22
Aug-22
Sep-22
Oct-22
Nov-22
Dec-22
Jan-23
Feb-23
Mar-23
YTD
22-23
YTD 22-23 Steam/coal SPC -FY2122 Target Steam/Coal SPC -FY22/23
SEQD C M
Nitrogen (N2) Consumption– KG/KG
Comments :
-Leakage checking in
every shift
-Focus on tanker
unloading time ( each
tanker 200 kg loss)
-Improved Internal hose
pipe quality.
Month FY22-23 Apr-22 May-22 Jun-22 Jul-22 Aug-22 Sep-22 Oct-22 Nov-22 Dec-22 Jan-23 Feb-23 Mar-23
Actual 0.111 0.114 0.109 0.113 0.106 0.105 0.101
Target (22-23) 0.104 0.108 0.108 0.108 0.108 0.103 0.103 0.103 0.103 0.100 0.100 0.100 0.100
0.110
0.104 0.108
0.108 0.108 0.108 0.108
0.103 0.103 0.103 0.103 0.103 0.100 0.100 0.100
0.114
0.109 0.113
0.106 0.105 0.101
0.000
0.020
0.040
0.060
0.080
0.100
0.120
0.140
YTD
21-22
Target
-
YTD
Apr-22
May-22
Jun-22
Jul-22
Aug-22
Sep-22
Oct-22
Nov-22
Dec-22
Jan-23
Feb-23
Mar-23
YTD
22-23
YTD 22-23 SPC -FY2122 Target SPC -FY22/23
SEQD C M
Water Consumption– Ltr./Kg
Comments :
-Leakage checking in
every shift
--GIDC main supply line
leakage month of April-
2022 ( water loss 3000kl
app)
-GIDC water line leakage
month of AUG-2022
(water loss 450KL)
Month FY22-23 Apr-22 May-22 Jun-22 Jul-22 Aug-22 Sep-22 Oct-22 Nov-22 Dec-22 Jan-23 Feb-23 Mar-23
Actual 4.25 6.53 4.42 3.94 2.63 3.72 2.50
Target (22-23) 3.63 4.00 4.00 4.00 3.75 3.75 3.75 3.50 3.50 3.50 3.25 3.25 3.25
3.63
3.960
4.00 4.00 4.00
3.75 3.75 3.75
3.50 3.50 3.50
3.25 3.25 3.25
6.53
4.42
3.94
2.63
3.73
2.50
0.000
1.000
2.000
3.000
4.000
5.000
6.000
7.000 Target
-
YTD
Apr-22
May-22
Jun-22
Jul-22
Aug-22
Sep-22
Oct-22
Nov-22
Dec-22
Jan-23
Feb-23
Mar-23
YTD
22-23
YTD 22-23 SPC -FY2122 Target SPC -FY22/23
1
Maintain the Coal Consumption Pattern
Month
Production
(MT)
Steam
Generation [M3
]
Coal [MT]
Steam -
Production Ratio
[KG/Kg]
Fuel - Production
Ratio [Kg/Kg]
Apr. 2022 1545.18 2729.04 674.29 1.77 0.44
May. 2022 1749.84 3260.38 855.41 1.86 0.49
June. 2022 1512.37 2991.54 824.44 1.98 0.55
July. 2022 1509.52 3107.82 771.97 2.06 0.51
Aug. 2022 1282.40 2555.30 629.12 1.99 0.49
Sep-22 1143.24 2267.57 562.32 1.98 0.49
TARGET :- 700MT COAL @1500MT PRODUCTION
1
ACTIVITY INITIATED FOR STEAM SAVING
Insulation Skin Temperature Report Main Steam Header
(Boiler to 4-Roll Calendar)
07.8.2022 10.9.2022
Sr.
No.
Location Temp.( 0
C ) Temp.( 0
C )
1 Main Line Boiler to Steam Distribution Header 34.3 33.0
2 Main Steam Distribution Header point -1 (In-let from Boiler to Header) 31.2 35.4
3 Main Steam Distribution Header point -2 (Out-let Header to PRS) 31.3 33.1
4 10" main header to PRS - before 1 st Expansion loop 30.5 38.5
5 10" main header to PRS - on 1 st Expansion loop 29.9 32.0
6 10" main header to PRS - before 2 nd Expansion loop 34.1 34.4
7 10" main header to PRS - on 2 nd Expansion loop 33.0 33.6
8 10" main header to PRS - before 3 rd Expansion loop 35.4 35.4
9 10" main header to PRS - on 3 rd Expansion loop 32.9 32.9
10 10" main header to PRS - before 4 th Expansion loop 38.5 32.4
11 10" main header to PRS - on 4 th Expansion loop 32.0 34.1
12 10" main header to PRS - in between 4 th Expansion loop & PRS 32.7 34.7
13 Inlet to PRS 27.3 35.2
14 H.P. steam line from PRS to Curing 27.3 32.7
15 M.P. steam line from PRS to Curing 26.8 31.9
16 HP Down-comer line (Trench-3) 32.8 32.6
17 HP line before Expansion loop (Trench -3) 31.2 32.2
18 HP line after Expansion loop (Trench -3) 31.2 35.3
19 HP line at Dummy end (Trench -3) 31.5 34.8
20 MP Down-comer line (Trench-3) 30.8 30.8
21 MP line Dummy end (Trench -3) 30.4 30.4
22 HP Down-comer line (Trench-2) 32.9 32.9
23 HP line before Expansion loop (Trench -2) 39.8 39.8
24 HP line after Expansion loop (Trench -2) 37.8 37.8
25 HP line at Dummy end (Trench -2) 36.8 36.2
26 MP Down-comer line (Trench-2) 33.9 33.5
27 MP line before Expansion loop (Trench -2) 36.4 35.2
28 MP line after Expansion loop (Trench -2) 38.5 36.5
29 MP line Dummy end (Trench -2) 45.5 37.5
30 MP Line at Dummy point (On Howrah Bridge) 31.1 32.4
31 HP Line at Isolation valve for 4-Roll Calendar(On Howrah Bridge) 32.5 34.1
32 Steam Line at Loop-1 (MFG) 32.4 34.7
33 Steam Line at Loop-2 (MFG) 33.4 35.2
34 Steam Line at Loop-3 (MFG) 34.4 32.7
35 Steam Line at Loop-4 (MFG) 33.7 31.9
36 Steam Line at Loop-5 (Mixing) 31.8 32.6
37 Steam Line at Loop-6 (RMS) 31.3 32.2
38 Steam line at Mixing PRS 31.8 35.3
39 Steam line at Calendar PRS 36.0 34.8
INSULATION SKIN TEMP.
TRAP CHECK SHEET
1
BOILER EFFICIENCY MONITORING
Date Coal Consumed [MT]
Steam Generation
[MT]
GCV of Coal (ARB)
[ K.Cal/Kg]
Boiler Efficiency
[%]
Average Load on
Boiler [%]
09-09-22 28.12 104.96 4200 51.13 21.87
10-09-22 29.64 108.63 4200 50.21 22.63
11-09-22 26.60 109.63 4200 56.46 22.84
12-09-22 28.12 110.62 4200 53.89 23.05
13-09-22 27.77 111.53 4200 55.02 23.24
14-09-22 26.56 110.03 4200 56.75 22.92
15-09-22 26.56 116.34 4200 60.01 24.24
16-09-22 23.24 112.21 4200 66.15 23.38
17-09-22 24.07 105.00 4200 59.76 21.88
18-09-22 27.39 102.72 4200 51.38 21.40
19-09-22 23.24 104.15 4200 61.39 21.70
20-09-22 25.73 105.39 4200 56.11 21.96
21-09-22 27.36 107.57 4200 53.86 22.41
22-09-22 28.88 112.00 4200 53.13 23.33
23-09-22 28.12 114.25 4200 55.66 23.80
COAL ANALIYSIS REPORT (UTILTIY LAB)
MONTH - SEPT-2022
MAHANSARIA TYRES PVT. LTD. PANOLI
MTPL UTILITY LAB
Date Vehical No.
GCV (ARB) GCV (ADB) Ash
Total
Moisture
(ARB)
Inherent
Moisture
Volitile
Matter
Fixed
Carbon
4800 ± 100
K.Cal/Kg
5700 ± 100
K.Cal/Kg
5 - 7 % 29 ± 2 % 11% 40 - 42%
3/9/2022 GJ 21 Y 8823 4693 5969 6.04 34.32 16.46 41.35 36.15
3/9/2022 GJ 16 AW 2255 4662 6061 5.93 34.96 15.44 41.72 36.91
3/9/2022 GJ 16 AU 9558 4665 5869 6.11 31.89 14.32 39.61 39.96
05/09/22 GJ 16 AV 1560 4555 5721 8.18 33.33 16.27 38.67 36.88
05/09/22 GJ 16 AV 1888 4838 5896 7.06 32.66 17.94 41.39 33.61
05/09/22 GJ 16 AV 4049 4812 5964 6.39 33.00 16.96 40.02 36.63
06/09/22 GJ 21 W 7405 4643 5909 8.22 34.18 16.23 36.82 38.73
06/09/22 GJ 21 W 7662 4727 5985 7.25 33.72 16.08 37.28 39.39
07/09/22 GJ 21 V 0433 4690 5964 7.64 34.57 16.80 36.76 38.80
07/09/22 GJ 21 W 6708 4884 6178 6.59 31.52 13.37 41.81 38.23
1
ACTIVITY INITIATED FOR FLY ASH % MONITORING
BOILER FLY ASH ANALYSIS REPORT MONTH- SEPT-2022
BOILER FLY ASH ANALYSIS REPORT MONTH- AUG-2022
Date UNBURN %
9/7/2022 10.86%
9/11/2022 7.2%
9/18/2022 8.34%
9/20/2022 7.67%
9/21/2022 8.9%
9/22/2022 8.21%
9/23/2022 7.82%
9/24/2022 7.02%
Date UNBURN %
8/5/2022 10.22%
8/9/2022 10.37%
9/10/2022 9.35%
8/17/2022 8.97%
8/21/2022 9.89%
8/25/2022 8.05%
8/27/2022 9.61%
8/30/2022 10.02%
1
ACTIVITY INITIATED FOR DEAERATOR TEMP.
DEAERATOR TEMPERATUR REPORT MONTH- AUG-2022
DATE 7AM 9AM 11AM 1PM 3PM 5PM 7PM 9PM 11PM 1AM 3AM 5AM
8/4/2022 90 90 88 91 96 85 92 90 90 92 90 92
8/5/2022 92 96 94 99 96 93 94 93 93 91 90 91
8/6/2022 90 90 92 90 92 90 93 95 90 96 91 92
8/7/2022 95 88 88 82 87 90 92 93 91 94 96 92
8/8/2022 92 92 90 92 95 95 95 94 90 92 95 91
8/9/2022 90 95 92 90 89 87 91 90 95 93 94 91
8/10/2022 91 88 90 87 90 93 95 93 90 91 94 96
8/16/2022 95 90 95 95 96 93 91 91 95 92 93 95
8/17/2022 93 90 91 90 90 95 95 95 96 92 93 91
8/18/2022 98 99 97 98 97 97 100 99 98 91 96 95
8/19/2022 90 97 93 91 92 91 93 97 92 90 91 90
8/20/2022 95 95 93 90 96 94 94 97 98 97 96 96
8/21/2022 94 96 92 96 93 97 89 90 92 93 96 93
8/22/2022 94 98 94 95 93 94 90 90 92 90 91 97
8/23/2022 94 96 90 90 97 90 98 95 91 94 98 90
8/24/2022 92 87 98 95 97 93 96 93 90 91 94 91
8/25/2022 97 98 92 95 90 93 96 95 94 98 92 97
8/26/2022 92 96 98 95 95 92 94 93 90 94 96 94
8/27/2022 96 91 90 90 90 92 92 92 96 91 90 95
8/28/2022 95 89 89 91 89 92 89 92 94 97 90 94
8/29/2022 95 98 92 94 91 93 94 93 91 96 96 94
8/30/2022 91 92 90 92 94 93 90 92 95 96 99 91
8/31/2022 94 101 98 95 99 97 96 95 94 93 96 97
AVG. DEAERATOR TEMP. 94 *C /DAILY
WAY FORWARD – STEAM & FUEL
CFT – Steam & Fuel :-1. Mr. M.M. Kidwai, 2. Mr. Sudip Banerjee 3. Mr. Santosh 4. Mr. Amit Rathore
Energy Conservation Plan & Status
S.No. Job Description Action Responsibility TCD
1 BU-1 MIXER /4-ROLL area steam line pressure reduced from 16
bar to 7 bar
Tapping change over from HP to
LP steam line
Kidwai Ji DONE 17.07.2022
2
MAIN HEADER TO STEAM PRS condensate Darin line cover with
ROP ,Replace with LRB /Alum. Cladding ,total 9 no's pipeline
app 60-meter 1/2" pipeline
Insulatio provide with clading Santosh Done 23.09.2022
3
CURING TO MIXER PROCESS OIL tank condensate drain line
open condition, cover with LRB /Alum. cladding ,total 15 no's
pipeline app 120-meter 1/2" pipeline
Insulatio provide with clading Santosh Work going on
4
Continously steam used in process oil & day tank ,Steam valve
on/off base on temp .
On/Off valve to be provided
based on temp.
Amit Rathore Ji 10/10/2022
5 All curing presses flot type steam trap to be tunned ,TD trap
servicing to be done
Trap valve to be tunned Sudeep Banerjee DONE 03.08.2022
6 curing area over head mixer area 2" steam line to be insulated
app. 18 mtr
Insulatio provide with clading Santosh DONE 16.08.2022
7
RO-1 Reject water recovery project through Softner plant
Tank arranged & pipeline work
going on
Santosh 5/10/2022
Thank You

More Related Content

Similar to UTILITY ENERGY REVIEW PPT 25-09-22 - Copy.pptx

Presentation1
Presentation1Presentation1
Presentation1Akma Ija
 
Dalmia Cement Ariyalur_240314_114438.pdf
Dalmia Cement Ariyalur_240314_114438.pdfDalmia Cement Ariyalur_240314_114438.pdf
Dalmia Cement Ariyalur_240314_114438.pdfBlentBulut5
 
97fd01fe-d033-40ce-964b-f2b030a90d30-150210013729-conversion-gate01
97fd01fe-d033-40ce-964b-f2b030a90d30-150210013729-conversion-gate0197fd01fe-d033-40ce-964b-f2b030a90d30-150210013729-conversion-gate01
97fd01fe-d033-40ce-964b-f2b030a90d30-150210013729-conversion-gate01Vinoth Kanna
 
Portofolio jacket platform dynamic analysis
Portofolio jacket platform dynamic analysisPortofolio jacket platform dynamic analysis
Portofolio jacket platform dynamic analysisKristoforusAnggara
 
Effect of Exhaust Gas Recirculation on Combustion and Emission Performance of...
Effect of Exhaust Gas Recirculation on Combustion and Emission Performance of...Effect of Exhaust Gas Recirculation on Combustion and Emission Performance of...
Effect of Exhaust Gas Recirculation on Combustion and Emission Performance of...Md Khairul Islam Rifat
 
Review W 26 & Plan Week 27 2022_MUM.pptx
Review W 26 & Plan Week 27 2022_MUM.pptxReview W 26 & Plan Week 27 2022_MUM.pptx
Review W 26 & Plan Week 27 2022_MUM.pptxssuserb71d4d
 
Airah Natural Refrigerants Special Interest Group Sydney 30 October 2008
Airah Natural Refrigerants Special Interest Group Sydney 30 October 2008Airah Natural Refrigerants Special Interest Group Sydney 30 October 2008
Airah Natural Refrigerants Special Interest Group Sydney 30 October 2008rhysemo
 
Airah Natural Refrigerants Special Interest Group Sydney 30 October 2008
Airah Natural Refrigerants Special Interest Group Sydney 30 October 2008Airah Natural Refrigerants Special Interest Group Sydney 30 October 2008
Airah Natural Refrigerants Special Interest Group Sydney 30 October 2008rhysemo
 
GE Small Scale Lng solutions
GE Small Scale  Lng solutionsGE Small Scale  Lng solutions
GE Small Scale Lng solutionsAndy Varoshiotis
 
Training presentation
Training presentation Training presentation
Training presentation Keyur Patel
 
Six Sigma - Enhancement availability of UBH Furnace
Six Sigma -  Enhancement availability of UBH FurnaceSix Sigma -  Enhancement availability of UBH Furnace
Six Sigma - Enhancement availability of UBH Furnaceashishmishra47940
 
CE Confr Presentation 08 Oct 2022.pptx
CE Confr Presentation 08 Oct 2022.pptxCE Confr Presentation 08 Oct 2022.pptx
CE Confr Presentation 08 Oct 2022.pptxSaketChandra4
 
COOP training-Bokhari
COOP training-BokhariCOOP training-Bokhari
COOP training-BokhariAssad Bokhari
 
HydroKhan Catalog150224
HydroKhan Catalog150224HydroKhan Catalog150224
HydroKhan Catalog150224Roy Koo
 
Complete catalogue
Complete catalogueComplete catalogue
Complete catalogueCathy Hsu
 
412 Final Report
412 Final Report412 Final Report
412 Final ReportKevin Qi
 

Similar to UTILITY ENERGY REVIEW PPT 25-09-22 - Copy.pptx (20)

Presentation1
Presentation1Presentation1
Presentation1
 
Dalmia Cement Ariyalur_240314_114438.pdf
Dalmia Cement Ariyalur_240314_114438.pdfDalmia Cement Ariyalur_240314_114438.pdf
Dalmia Cement Ariyalur_240314_114438.pdf
 
97fd01fe-d033-40ce-964b-f2b030a90d30-150210013729-conversion-gate01
97fd01fe-d033-40ce-964b-f2b030a90d30-150210013729-conversion-gate0197fd01fe-d033-40ce-964b-f2b030a90d30-150210013729-conversion-gate01
97fd01fe-d033-40ce-964b-f2b030a90d30-150210013729-conversion-gate01
 
Post-combustion CO2 capture from natural gas combined cycles by solvent suppo...
Post-combustion CO2 capture from natural gas combined cycles by solvent suppo...Post-combustion CO2 capture from natural gas combined cycles by solvent suppo...
Post-combustion CO2 capture from natural gas combined cycles by solvent suppo...
 
Portofolio jacket platform dynamic analysis
Portofolio jacket platform dynamic analysisPortofolio jacket platform dynamic analysis
Portofolio jacket platform dynamic analysis
 
Review Week 1 Oktober 2022.pptx
Review Week 1 Oktober 2022.pptxReview Week 1 Oktober 2022.pptx
Review Week 1 Oktober 2022.pptx
 
Effect of Exhaust Gas Recirculation on Combustion and Emission Performance of...
Effect of Exhaust Gas Recirculation on Combustion and Emission Performance of...Effect of Exhaust Gas Recirculation on Combustion and Emission Performance of...
Effect of Exhaust Gas Recirculation on Combustion and Emission Performance of...
 
Review W 26 & Plan Week 27 2022_MUM.pptx
Review W 26 & Plan Week 27 2022_MUM.pptxReview W 26 & Plan Week 27 2022_MUM.pptx
Review W 26 & Plan Week 27 2022_MUM.pptx
 
Airah Natural Refrigerants Special Interest Group Sydney 30 October 2008
Airah Natural Refrigerants Special Interest Group Sydney 30 October 2008Airah Natural Refrigerants Special Interest Group Sydney 30 October 2008
Airah Natural Refrigerants Special Interest Group Sydney 30 October 2008
 
Airah Natural Refrigerants Special Interest Group Sydney 30 October 2008
Airah Natural Refrigerants Special Interest Group Sydney 30 October 2008Airah Natural Refrigerants Special Interest Group Sydney 30 October 2008
Airah Natural Refrigerants Special Interest Group Sydney 30 October 2008
 
GE Small Scale Lng solutions
GE Small Scale  Lng solutionsGE Small Scale  Lng solutions
GE Small Scale Lng solutions
 
Training presentation
Training presentation Training presentation
Training presentation
 
Six Sigma - Enhancement availability of UBH Furnace
Six Sigma -  Enhancement availability of UBH FurnaceSix Sigma -  Enhancement availability of UBH Furnace
Six Sigma - Enhancement availability of UBH Furnace
 
Final-report
Final-reportFinal-report
Final-report
 
CE Confr Presentation 08 Oct 2022.pptx
CE Confr Presentation 08 Oct 2022.pptxCE Confr Presentation 08 Oct 2022.pptx
CE Confr Presentation 08 Oct 2022.pptx
 
COOP training-Bokhari
COOP training-BokhariCOOP training-Bokhari
COOP training-Bokhari
 
HydroKhan Catalog150224
HydroKhan Catalog150224HydroKhan Catalog150224
HydroKhan Catalog150224
 
Complete catalogue
Complete catalogueComplete catalogue
Complete catalogue
 
412 Final Report
412 Final Report412 Final Report
412 Final Report
 
Depositiondata
DepositiondataDepositiondata
Depositiondata
 

Recently uploaded

Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2RajaP95
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEroselinkalist12
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 

Recently uploaded (20)

Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 

UTILITY ENERGY REVIEW PPT 25-09-22 - Copy.pptx

  • 2. ENERGY SCENARIO 2022-23 Month Production (MT) Coal Consumed (MT) Specific Steam Generation (Steam genration/kg of Coal) (kg/kg) Specific Steam Consumption (Steam Consumption/kg of Prod.) (kg/kg) Specific Fuel Consumption (Fuel Consumption/kg of Prod.) (kg/kg) Specific Nitrogen (N2) Consumption (N2 Consumption/kg of Prod.) (kg/kg) TARGET YTD 2022-23 4.88 1.74 0.37 0.104 Sep-22 1143.2 562.32 3.98 1.98 0.49 0.101 Aug-22 1282.4 629.12 4.06 1.99 0.49 0.105 Jul-22 1509.4 771.47 4.03 2.07 0.51 0.106 Jun-22 1513.6 824.44 3.6 1.98 0.54 0.113 May-22 1750.2 855.41 3.7 1.86 0.49 0.109 Apr-22 1545.3 674.29 3.8 1.77 0.44 0.114
  • 3. SEQD C M Specific Steam Consumption – KG/KG Comments : - Various Steam savings initiates taken up at Curing for execution - Minimize the application of TCP as autoclave. - Steam hose pipe supplier changed and address the quality issues. - Avg wt. of tyre reduced from 58.8 to 52.8 kg Month FY22-23 Apr-22 May-22 Jun-22 Jul-22 Aug-22 Sep-22 Oct-22 Nov-22 Dec-22 Jan-23 Feb-23 Mar-23 Actual 1.92 1.77 1.86 1.98 2.06 1.99 1.98 Target (22-23) 1.74 1.80 1.80 1.80 1.75 1.75 1.75 1.70 1.70 1.70 1.70 1.70 1.70 2.07 1.74 1.942 1.80 1.80 1.80 1.75 1.75 1.75 1.70 1.70 1.70 1.70 1.70 1.70 1.77 1.86 1.98 2.07 1.99 1.98 0.000 0.500 1.000 1.500 2.000 2.500 YTD 21-22 Target - YTD Apr-22 May-22 Jun-22 Jul-22 Aug-22 Sep-22 Oct-22 Nov-22 Dec-22 Jan-23 Feb-23 Mar-23 YTD 22-23 YTD 22-23 SPC -FY2122 Target SPC -FY22/23
  • 4. SEQD C M Sp. Fuel Consumption (Coal to Prod ) – KG/KG Comments : - Skin temperature study done on all headers and where temperature reading out of limit addressed. - Increase in ratio due to frequent failure in curing steam traps. Corrections taken & being monitored on weekly basis. - Trench #1 Trials for 4 days - Condensate generation increase due to rainy season. Month FY22-23 Apr-22 May-22 Jun-22 Jul-22 Aug-22 Sep-22 Oct-22 Nov-22 Dec-22 Jan-23 Feb-23 Mar-23 Actual 0.50 0.44 0.49 0.54 0.51 0.490 0.49 Target (22-23) 0.37 0.45 0.42 0.42 0.39 0.39 0.37 0.36 0.36 0.34 0.34 0.32 0.32 0.36 0.49 0.40 0.40 0.40 0.37 0.37 0.37 0.34 0.34 0.34 0.32 0.32 0.32 0.44 0.49 0.54 0.51 0.49 0.49 0.000 0.100 0.200 0.300 0.400 0.500 0.600 Target - YTD Apr-22 May-22 Jun-22 Jul-22 Aug-22 Sep-22 Oct-22 Nov-22 Dec-22 Jan-23 Feb-23 Mar-23 YTD 22-23 YTD 22-23 SPC -FY2122 Target SPC -FY22/23
  • 5. SEQD C M Specific Steam Generation (Steam to Coal ) – KG/KG Comments : - Coal handling plant put in operation and avoiding using crushed coal - Reduce carpet and fins loss. - Complete automation of Boiler. - Reduce radiation loss by covering all un-insulated portion. - NRV provided in 12 TPH Boiler - Presently Boiler load is 25% load. For better efficiency of boiler to operate at 80-85%. - GCV of coal to monitor for boiler efficiency at 5500 ADB. Month FY22-23 Apr-22 May-22 Jun-22 Jul-22 Aug-22 Sep-22 Oct-22 Nov-22 Dec-22 Jan-23 Feb-23 Mar-23 Actual 3.78 3.80 3.70 3.60 4.030 4.06 3.98 Target (22-23) 4.88 4.50 4.50 4.50 4.75 4.75 4.75 5.00 5.00 5.00 5.25 5.25 5.25 4.88 3.862 4.50 4.50 4.50 4.75 4.75 4.75 5.00 5.00 5.00 5.25 5.25 5.25 3.80 3.70 3.600 4.030 4.060 3.980 2.000 2.500 3.000 3.500 4.000 4.500 5.000 5.500 6.000 Target - YTD Apr-22 May-22 Jun-22 Jul-22 Aug-22 Sep-22 Oct-22 Nov-22 Dec-22 Jan-23 Feb-23 Mar-23 YTD 22-23 YTD 22-23 Steam/coal SPC -FY2122 Target Steam/Coal SPC -FY22/23
  • 6. SEQD C M Nitrogen (N2) Consumption– KG/KG Comments : -Leakage checking in every shift -Focus on tanker unloading time ( each tanker 200 kg loss) -Improved Internal hose pipe quality. Month FY22-23 Apr-22 May-22 Jun-22 Jul-22 Aug-22 Sep-22 Oct-22 Nov-22 Dec-22 Jan-23 Feb-23 Mar-23 Actual 0.111 0.114 0.109 0.113 0.106 0.105 0.101 Target (22-23) 0.104 0.108 0.108 0.108 0.108 0.103 0.103 0.103 0.103 0.100 0.100 0.100 0.100 0.110 0.104 0.108 0.108 0.108 0.108 0.108 0.103 0.103 0.103 0.103 0.103 0.100 0.100 0.100 0.114 0.109 0.113 0.106 0.105 0.101 0.000 0.020 0.040 0.060 0.080 0.100 0.120 0.140 YTD 21-22 Target - YTD Apr-22 May-22 Jun-22 Jul-22 Aug-22 Sep-22 Oct-22 Nov-22 Dec-22 Jan-23 Feb-23 Mar-23 YTD 22-23 YTD 22-23 SPC -FY2122 Target SPC -FY22/23
  • 7. SEQD C M Water Consumption– Ltr./Kg Comments : -Leakage checking in every shift --GIDC main supply line leakage month of April- 2022 ( water loss 3000kl app) -GIDC water line leakage month of AUG-2022 (water loss 450KL) Month FY22-23 Apr-22 May-22 Jun-22 Jul-22 Aug-22 Sep-22 Oct-22 Nov-22 Dec-22 Jan-23 Feb-23 Mar-23 Actual 4.25 6.53 4.42 3.94 2.63 3.72 2.50 Target (22-23) 3.63 4.00 4.00 4.00 3.75 3.75 3.75 3.50 3.50 3.50 3.25 3.25 3.25 3.63 3.960 4.00 4.00 4.00 3.75 3.75 3.75 3.50 3.50 3.50 3.25 3.25 3.25 6.53 4.42 3.94 2.63 3.73 2.50 0.000 1.000 2.000 3.000 4.000 5.000 6.000 7.000 Target - YTD Apr-22 May-22 Jun-22 Jul-22 Aug-22 Sep-22 Oct-22 Nov-22 Dec-22 Jan-23 Feb-23 Mar-23 YTD 22-23 YTD 22-23 SPC -FY2122 Target SPC -FY22/23
  • 8. 1 Maintain the Coal Consumption Pattern Month Production (MT) Steam Generation [M3 ] Coal [MT] Steam - Production Ratio [KG/Kg] Fuel - Production Ratio [Kg/Kg] Apr. 2022 1545.18 2729.04 674.29 1.77 0.44 May. 2022 1749.84 3260.38 855.41 1.86 0.49 June. 2022 1512.37 2991.54 824.44 1.98 0.55 July. 2022 1509.52 3107.82 771.97 2.06 0.51 Aug. 2022 1282.40 2555.30 629.12 1.99 0.49 Sep-22 1143.24 2267.57 562.32 1.98 0.49 TARGET :- 700MT COAL @1500MT PRODUCTION
  • 9. 1 ACTIVITY INITIATED FOR STEAM SAVING Insulation Skin Temperature Report Main Steam Header (Boiler to 4-Roll Calendar) 07.8.2022 10.9.2022 Sr. No. Location Temp.( 0 C ) Temp.( 0 C ) 1 Main Line Boiler to Steam Distribution Header 34.3 33.0 2 Main Steam Distribution Header point -1 (In-let from Boiler to Header) 31.2 35.4 3 Main Steam Distribution Header point -2 (Out-let Header to PRS) 31.3 33.1 4 10" main header to PRS - before 1 st Expansion loop 30.5 38.5 5 10" main header to PRS - on 1 st Expansion loop 29.9 32.0 6 10" main header to PRS - before 2 nd Expansion loop 34.1 34.4 7 10" main header to PRS - on 2 nd Expansion loop 33.0 33.6 8 10" main header to PRS - before 3 rd Expansion loop 35.4 35.4 9 10" main header to PRS - on 3 rd Expansion loop 32.9 32.9 10 10" main header to PRS - before 4 th Expansion loop 38.5 32.4 11 10" main header to PRS - on 4 th Expansion loop 32.0 34.1 12 10" main header to PRS - in between 4 th Expansion loop & PRS 32.7 34.7 13 Inlet to PRS 27.3 35.2 14 H.P. steam line from PRS to Curing 27.3 32.7 15 M.P. steam line from PRS to Curing 26.8 31.9 16 HP Down-comer line (Trench-3) 32.8 32.6 17 HP line before Expansion loop (Trench -3) 31.2 32.2 18 HP line after Expansion loop (Trench -3) 31.2 35.3 19 HP line at Dummy end (Trench -3) 31.5 34.8 20 MP Down-comer line (Trench-3) 30.8 30.8 21 MP line Dummy end (Trench -3) 30.4 30.4 22 HP Down-comer line (Trench-2) 32.9 32.9 23 HP line before Expansion loop (Trench -2) 39.8 39.8 24 HP line after Expansion loop (Trench -2) 37.8 37.8 25 HP line at Dummy end (Trench -2) 36.8 36.2 26 MP Down-comer line (Trench-2) 33.9 33.5 27 MP line before Expansion loop (Trench -2) 36.4 35.2 28 MP line after Expansion loop (Trench -2) 38.5 36.5 29 MP line Dummy end (Trench -2) 45.5 37.5 30 MP Line at Dummy point (On Howrah Bridge) 31.1 32.4 31 HP Line at Isolation valve for 4-Roll Calendar(On Howrah Bridge) 32.5 34.1 32 Steam Line at Loop-1 (MFG) 32.4 34.7 33 Steam Line at Loop-2 (MFG) 33.4 35.2 34 Steam Line at Loop-3 (MFG) 34.4 32.7 35 Steam Line at Loop-4 (MFG) 33.7 31.9 36 Steam Line at Loop-5 (Mixing) 31.8 32.6 37 Steam Line at Loop-6 (RMS) 31.3 32.2 38 Steam line at Mixing PRS 31.8 35.3 39 Steam line at Calendar PRS 36.0 34.8 INSULATION SKIN TEMP. TRAP CHECK SHEET
  • 10. 1 BOILER EFFICIENCY MONITORING Date Coal Consumed [MT] Steam Generation [MT] GCV of Coal (ARB) [ K.Cal/Kg] Boiler Efficiency [%] Average Load on Boiler [%] 09-09-22 28.12 104.96 4200 51.13 21.87 10-09-22 29.64 108.63 4200 50.21 22.63 11-09-22 26.60 109.63 4200 56.46 22.84 12-09-22 28.12 110.62 4200 53.89 23.05 13-09-22 27.77 111.53 4200 55.02 23.24 14-09-22 26.56 110.03 4200 56.75 22.92 15-09-22 26.56 116.34 4200 60.01 24.24 16-09-22 23.24 112.21 4200 66.15 23.38 17-09-22 24.07 105.00 4200 59.76 21.88 18-09-22 27.39 102.72 4200 51.38 21.40 19-09-22 23.24 104.15 4200 61.39 21.70 20-09-22 25.73 105.39 4200 56.11 21.96 21-09-22 27.36 107.57 4200 53.86 22.41 22-09-22 28.88 112.00 4200 53.13 23.33 23-09-22 28.12 114.25 4200 55.66 23.80
  • 11. COAL ANALIYSIS REPORT (UTILTIY LAB) MONTH - SEPT-2022 MAHANSARIA TYRES PVT. LTD. PANOLI MTPL UTILITY LAB Date Vehical No. GCV (ARB) GCV (ADB) Ash Total Moisture (ARB) Inherent Moisture Volitile Matter Fixed Carbon 4800 ± 100 K.Cal/Kg 5700 ± 100 K.Cal/Kg 5 - 7 % 29 ± 2 % 11% 40 - 42% 3/9/2022 GJ 21 Y 8823 4693 5969 6.04 34.32 16.46 41.35 36.15 3/9/2022 GJ 16 AW 2255 4662 6061 5.93 34.96 15.44 41.72 36.91 3/9/2022 GJ 16 AU 9558 4665 5869 6.11 31.89 14.32 39.61 39.96 05/09/22 GJ 16 AV 1560 4555 5721 8.18 33.33 16.27 38.67 36.88 05/09/22 GJ 16 AV 1888 4838 5896 7.06 32.66 17.94 41.39 33.61 05/09/22 GJ 16 AV 4049 4812 5964 6.39 33.00 16.96 40.02 36.63 06/09/22 GJ 21 W 7405 4643 5909 8.22 34.18 16.23 36.82 38.73 06/09/22 GJ 21 W 7662 4727 5985 7.25 33.72 16.08 37.28 39.39 07/09/22 GJ 21 V 0433 4690 5964 7.64 34.57 16.80 36.76 38.80 07/09/22 GJ 21 W 6708 4884 6178 6.59 31.52 13.37 41.81 38.23
  • 12. 1 ACTIVITY INITIATED FOR FLY ASH % MONITORING BOILER FLY ASH ANALYSIS REPORT MONTH- SEPT-2022 BOILER FLY ASH ANALYSIS REPORT MONTH- AUG-2022 Date UNBURN % 9/7/2022 10.86% 9/11/2022 7.2% 9/18/2022 8.34% 9/20/2022 7.67% 9/21/2022 8.9% 9/22/2022 8.21% 9/23/2022 7.82% 9/24/2022 7.02% Date UNBURN % 8/5/2022 10.22% 8/9/2022 10.37% 9/10/2022 9.35% 8/17/2022 8.97% 8/21/2022 9.89% 8/25/2022 8.05% 8/27/2022 9.61% 8/30/2022 10.02%
  • 13. 1 ACTIVITY INITIATED FOR DEAERATOR TEMP. DEAERATOR TEMPERATUR REPORT MONTH- AUG-2022 DATE 7AM 9AM 11AM 1PM 3PM 5PM 7PM 9PM 11PM 1AM 3AM 5AM 8/4/2022 90 90 88 91 96 85 92 90 90 92 90 92 8/5/2022 92 96 94 99 96 93 94 93 93 91 90 91 8/6/2022 90 90 92 90 92 90 93 95 90 96 91 92 8/7/2022 95 88 88 82 87 90 92 93 91 94 96 92 8/8/2022 92 92 90 92 95 95 95 94 90 92 95 91 8/9/2022 90 95 92 90 89 87 91 90 95 93 94 91 8/10/2022 91 88 90 87 90 93 95 93 90 91 94 96 8/16/2022 95 90 95 95 96 93 91 91 95 92 93 95 8/17/2022 93 90 91 90 90 95 95 95 96 92 93 91 8/18/2022 98 99 97 98 97 97 100 99 98 91 96 95 8/19/2022 90 97 93 91 92 91 93 97 92 90 91 90 8/20/2022 95 95 93 90 96 94 94 97 98 97 96 96 8/21/2022 94 96 92 96 93 97 89 90 92 93 96 93 8/22/2022 94 98 94 95 93 94 90 90 92 90 91 97 8/23/2022 94 96 90 90 97 90 98 95 91 94 98 90 8/24/2022 92 87 98 95 97 93 96 93 90 91 94 91 8/25/2022 97 98 92 95 90 93 96 95 94 98 92 97 8/26/2022 92 96 98 95 95 92 94 93 90 94 96 94 8/27/2022 96 91 90 90 90 92 92 92 96 91 90 95 8/28/2022 95 89 89 91 89 92 89 92 94 97 90 94 8/29/2022 95 98 92 94 91 93 94 93 91 96 96 94 8/30/2022 91 92 90 92 94 93 90 92 95 96 99 91 8/31/2022 94 101 98 95 99 97 96 95 94 93 96 97 AVG. DEAERATOR TEMP. 94 *C /DAILY
  • 14. WAY FORWARD – STEAM & FUEL CFT – Steam & Fuel :-1. Mr. M.M. Kidwai, 2. Mr. Sudip Banerjee 3. Mr. Santosh 4. Mr. Amit Rathore Energy Conservation Plan & Status S.No. Job Description Action Responsibility TCD 1 BU-1 MIXER /4-ROLL area steam line pressure reduced from 16 bar to 7 bar Tapping change over from HP to LP steam line Kidwai Ji DONE 17.07.2022 2 MAIN HEADER TO STEAM PRS condensate Darin line cover with ROP ,Replace with LRB /Alum. Cladding ,total 9 no's pipeline app 60-meter 1/2" pipeline Insulatio provide with clading Santosh Done 23.09.2022 3 CURING TO MIXER PROCESS OIL tank condensate drain line open condition, cover with LRB /Alum. cladding ,total 15 no's pipeline app 120-meter 1/2" pipeline Insulatio provide with clading Santosh Work going on 4 Continously steam used in process oil & day tank ,Steam valve on/off base on temp . On/Off valve to be provided based on temp. Amit Rathore Ji 10/10/2022 5 All curing presses flot type steam trap to be tunned ,TD trap servicing to be done Trap valve to be tunned Sudeep Banerjee DONE 03.08.2022 6 curing area over head mixer area 2" steam line to be insulated app. 18 mtr Insulatio provide with clading Santosh DONE 16.08.2022 7 RO-1 Reject water recovery project through Softner plant Tank arranged & pipeline work going on Santosh 5/10/2022