7. SEQD C M
Water Consumption– Ltr./Kg
Comments :
-Leakage checking in
every shift
--GIDC main supply line
leakage month of April-
2022 ( water loss 3000kl
app)
-GIDC water line leakage
month of AUG-2022
(water loss 450KL)
Month FY22-23 Apr-22 May-22 Jun-22 Jul-22 Aug-22 Sep-22 Oct-22 Nov-22 Dec-22 Jan-23 Feb-23 Mar-23
Actual 4.25 6.53 4.42 3.94 2.63 3.72 2.50
Target (22-23) 3.63 4.00 4.00 4.00 3.75 3.75 3.75 3.50 3.50 3.50 3.25 3.25 3.25
3.63
3.960
4.00 4.00 4.00
3.75 3.75 3.75
3.50 3.50 3.50
3.25 3.25 3.25
6.53
4.42
3.94
2.63
3.73
2.50
0.000
1.000
2.000
3.000
4.000
5.000
6.000
7.000 Target
-
YTD
Apr-22
May-22
Jun-22
Jul-22
Aug-22
Sep-22
Oct-22
Nov-22
Dec-22
Jan-23
Feb-23
Mar-23
YTD
22-23
YTD 22-23 SPC -FY2122 Target SPC -FY22/23
8. 1
Maintain the Coal Consumption Pattern
Month
Production
(MT)
Steam
Generation [M3
]
Coal [MT]
Steam -
Production Ratio
[KG/Kg]
Fuel - Production
Ratio [Kg/Kg]
Apr. 2022 1545.18 2729.04 674.29 1.77 0.44
May. 2022 1749.84 3260.38 855.41 1.86 0.49
June. 2022 1512.37 2991.54 824.44 1.98 0.55
July. 2022 1509.52 3107.82 771.97 2.06 0.51
Aug. 2022 1282.40 2555.30 629.12 1.99 0.49
Sep-22 1143.24 2267.57 562.32 1.98 0.49
TARGET :- 700MT COAL @1500MT PRODUCTION
9. 1
ACTIVITY INITIATED FOR STEAM SAVING
Insulation Skin Temperature Report Main Steam Header
(Boiler to 4-Roll Calendar)
07.8.2022 10.9.2022
Sr.
No.
Location Temp.( 0
C ) Temp.( 0
C )
1 Main Line Boiler to Steam Distribution Header 34.3 33.0
2 Main Steam Distribution Header point -1 (In-let from Boiler to Header) 31.2 35.4
3 Main Steam Distribution Header point -2 (Out-let Header to PRS) 31.3 33.1
4 10" main header to PRS - before 1 st Expansion loop 30.5 38.5
5 10" main header to PRS - on 1 st Expansion loop 29.9 32.0
6 10" main header to PRS - before 2 nd Expansion loop 34.1 34.4
7 10" main header to PRS - on 2 nd Expansion loop 33.0 33.6
8 10" main header to PRS - before 3 rd Expansion loop 35.4 35.4
9 10" main header to PRS - on 3 rd Expansion loop 32.9 32.9
10 10" main header to PRS - before 4 th Expansion loop 38.5 32.4
11 10" main header to PRS - on 4 th Expansion loop 32.0 34.1
12 10" main header to PRS - in between 4 th Expansion loop & PRS 32.7 34.7
13 Inlet to PRS 27.3 35.2
14 H.P. steam line from PRS to Curing 27.3 32.7
15 M.P. steam line from PRS to Curing 26.8 31.9
16 HP Down-comer line (Trench-3) 32.8 32.6
17 HP line before Expansion loop (Trench -3) 31.2 32.2
18 HP line after Expansion loop (Trench -3) 31.2 35.3
19 HP line at Dummy end (Trench -3) 31.5 34.8
20 MP Down-comer line (Trench-3) 30.8 30.8
21 MP line Dummy end (Trench -3) 30.4 30.4
22 HP Down-comer line (Trench-2) 32.9 32.9
23 HP line before Expansion loop (Trench -2) 39.8 39.8
24 HP line after Expansion loop (Trench -2) 37.8 37.8
25 HP line at Dummy end (Trench -2) 36.8 36.2
26 MP Down-comer line (Trench-2) 33.9 33.5
27 MP line before Expansion loop (Trench -2) 36.4 35.2
28 MP line after Expansion loop (Trench -2) 38.5 36.5
29 MP line Dummy end (Trench -2) 45.5 37.5
30 MP Line at Dummy point (On Howrah Bridge) 31.1 32.4
31 HP Line at Isolation valve for 4-Roll Calendar(On Howrah Bridge) 32.5 34.1
32 Steam Line at Loop-1 (MFG) 32.4 34.7
33 Steam Line at Loop-2 (MFG) 33.4 35.2
34 Steam Line at Loop-3 (MFG) 34.4 32.7
35 Steam Line at Loop-4 (MFG) 33.7 31.9
36 Steam Line at Loop-5 (Mixing) 31.8 32.6
37 Steam Line at Loop-6 (RMS) 31.3 32.2
38 Steam line at Mixing PRS 31.8 35.3
39 Steam line at Calendar PRS 36.0 34.8
INSULATION SKIN TEMP.
TRAP CHECK SHEET
14. WAY FORWARD – STEAM & FUEL
CFT – Steam & Fuel :-1. Mr. M.M. Kidwai, 2. Mr. Sudip Banerjee 3. Mr. Santosh 4. Mr. Amit Rathore
Energy Conservation Plan & Status
S.No. Job Description Action Responsibility TCD
1 BU-1 MIXER /4-ROLL area steam line pressure reduced from 16
bar to 7 bar
Tapping change over from HP to
LP steam line
Kidwai Ji DONE 17.07.2022
2
MAIN HEADER TO STEAM PRS condensate Darin line cover with
ROP ,Replace with LRB /Alum. Cladding ,total 9 no's pipeline
app 60-meter 1/2" pipeline
Insulatio provide with clading Santosh Done 23.09.2022
3
CURING TO MIXER PROCESS OIL tank condensate drain line
open condition, cover with LRB /Alum. cladding ,total 15 no's
pipeline app 120-meter 1/2" pipeline
Insulatio provide with clading Santosh Work going on
4
Continously steam used in process oil & day tank ,Steam valve
on/off base on temp .
On/Off valve to be provided
based on temp.
Amit Rathore Ji 10/10/2022
5 All curing presses flot type steam trap to be tunned ,TD trap
servicing to be done
Trap valve to be tunned Sudeep Banerjee DONE 03.08.2022
6 curing area over head mixer area 2" steam line to be insulated
app. 18 mtr
Insulatio provide with clading Santosh DONE 16.08.2022
7
RO-1 Reject water recovery project through Softner plant
Tank arranged & pipeline work
going on
Santosh 5/10/2022