Copper and Gold
at Our Core
This presentation contains forward-looking statements within the meaning of the United States Private Securities Litigation Reform Act of 1995 and forward-looking information within the meaning of applicable Canadian
securities laws.
Forward-looking statements include, but are not limited to, statements with respect to the future prices of copper, gold, molybdenum and silver; the estimation of mineral reserves and resources; the realization of mineral
reserve and resource estimates; anticipated future production, capital and operating costs, cash flows and mine life; completion of a Pre-Feasibility study on the Ann Mason Project; the potential impact of future
exploration results on Ann Mason mine design and economics; the potential development of Ann Mason; potential types of mining operations; construction and continued development of the Oyu Tolgoi underground
mine; the anticipated value of Entrée’s interest in the Hugo North Extension deposit; potential size of a mineralized zone; potential expansion of mineralization; potential discovery of new mineralized zones; potential
metallurgical recoveries and grades; plans for future exploration and/or development programs and budgets; permitting time lines; anticipated business activities; corporate strategies; requirements for additional capital;
uses of funds; proposed acquisitions and dispositions of assets; and future financial performance. While the Company has based these forward-looking statements on its expectations about future events as at the date
that such statements were prepared, the statements are not a guarantee of Entrée’s future performance and are based on numerous assumptions regarding present and future business strategies, local and global
economic conditions, legal proceedings and negotiations and the environment in which the Company will operate in the future, including the status of the Company’s relationship and interaction with the Government of
Mongolia, Oyu Tolgoi LLC (“OT LLC”), Rio Tinto and Turquoise Hill Resources. With respect to the construction and continued development of the Oyu Tolgoi underground mine, important risks, uncertainties and factors
which could cause actual results to differ materially from future results expressed or implied by such forward-looking statements and information include, amongst others, the approval of the updated Oyu Tolgoi Feasibility
Study by OT LLC and its shareholders; the timing and cost of the construction and expansion of mining and processing facilities; the timing and availability of a long term power source for the Oyu Tolgoi underground
mine; the impact of the delay in the funding and development of the Oyu Tolgoi underground mine; delays, and the costs which would result from delays, in the development of the underground mine; and production
estimates and the anticipated yearly production of copper, gold and silver at the Oyu Tolgoi underground mine. Other uncertainties and factors which could cause actual results to differ materially from future results
expressed or implied by forward-looking statements and information include, amongst others, whether the size, grade and continuity of deposits and resource and reserve estimates have been interpreted correctly from
exploration results; whether the results of preliminary test work are indicative of what the results of future test work will be; fluctuations in commodity prices and demand; changing foreign exchange rates; actions by Rio
Tinto, Turquoise Hill Resources and/or OT LLC and by government authorities including the Government of Mongolia; the availability of funding on reasonable terms; the impact of changes in interpretation to or changes
in enforcement of, laws, regulations and government practices, including laws, regulations and government practices with respect to mining, foreign investment, royalties and taxation; the terms and timing of obtaining
necessary environmental and other government approvals, consents and permits; the availability and cost of necessary items such as power, water, skilled labour, transportation and appropriate smelting and refining
arrangements; and misjudgements in the course of preparing forward-looking statements. In addition, there are also known and unknown risk factors which may cause the actual results, performances or achievements of
Entrée Gold to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements and information. Such factors include, among others, risks related to
international operations, including legal and political risk in Mongolia; risks associated with changes in the attitudes of governments to foreign investment; risks associated with the conduct of joint ventures; discrepancies
between actual and anticipated production, mineral reserves and resources and metallurgical recoveries; global financial conditions; changes in project parameters as plans continue to be refined; inability to upgrade
Inferred mineral resources to Indicated or Measured mineral resources; inability to convert mineral resources to mineral reserves; conclusions of economic evaluations; future prices of copper, gold, silver and
molybdenum; failure of plant, equipment or processes to operate as anticipated; accidents, labour disputes and other risks of the mining industry; delays in obtaining government approvals, permits or licences or
financing or in the completion of development or construction activities; environmental risks; title disputes; limitations on insurance coverage; as well as those factors discussed in the section entitled “Risk” in Entrée
Gold’s most recently filed Management’s Discussion & Analysis and in the section entitled “Risk Factors” in Entrée Gold’s Annual Information Form dated March 30, 2016, both available at www.sedar.com. There can be
no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Except as required under applicable securities
legislation, Entrée Gold undertakes no obligation to publicly update or revise forward-looking statements.
Entrée Gold's exploration activities are under the supervision of Robert Cinits, P.Geo., Vice President, Corporate Development of Entrée Gold. Mr. Cinits is a “qualified person” as defined in National Instrument 43-101-
Standards of Disclosure for Mineral Projects (“NI 43-101”). Mr. Cinits has approved the technical information in this presentation.
All minerals reserves and mineral resources have been calculated in accordance with the standards of the Canadian Institute of Mining, Metallurgy and Petroleum and NI 43-101. Cautionary Note to United States
Investors: United States investors are advised that while the terms “Measured mineral resources”, “Indicated mineral resources” “Inferred mineral resources” and “Probable mineral reserves” are recognized and required
by Canadian regulations, the United States Securities and Exchange Commission (“SEC”) does not recognize them. United States investors are cautioned not to assume that any part or all of the mineral deposits in
these categories will ever be upgraded to a higher category, or converted into mineral reserves. Inferred mineral resources have a great amount of uncertainty as to their existence, and as to their economic and legal
feasibility. Under Canadian rules, estimates of Inferred mineral resources may not form the basis of feasibility or other economic studies. United States investors are cautioned not to assume that all or any part of an
Inferred mineral resource exists, or is economically or legally minable. Disclosure of “contained ounces” is permitted disclosure under Canadian regulations; however, the SEC normally only permits issuers to report
mineralization that does not constitute reserves as in place tonnage and grade without reference to unit measures. Accordingly, information contained in this presentation containing descriptions of the Company’s
mineral properties may not be comparable to similar information made public by U.S. companies subject to the reporting and disclosure requirements under the United States federal securities laws and the rules and
regulations thereunder.
The information in this presentation is for informational purposes only. Readers should not rely on the information for any purpose other than to gain general knowledge of Entrée Gold. This information is not intended to
be, and should not be construed as, part of an offering or solicitation of securities.
For additional information regarding the Entrée/Oyu Tolgoi joint venture property, see the technical report titled “Lookout Hill Feasibility Study Update” dated March 29, 2016 (“LHTR16”) prepared by OreWin Pty Ltd, a
copy of which is available on SEDAR at www.sedar.com. For additional information regarding the Ann Mason Project, see the technical report titled “Updated Preliminary Economic Assessment on the Ann Mason
Project, Nevada, U.S.A.”, with an effective date of September 9, 2015 prepared by AGP Mining Consultants Inc. and Amec Foster Wheeler Americas Limited, a copy of which is available on SEDAR at www.sedar.com.
Cautionary Statement
2
3
Why Invest in Entrée Gold?
Positioned
for
Future
Success
Financial
Strength
Quality
Assets
Stakeholders
Diverse
Team
Entrée currently sits within a unique group of junior explorers and
miners who have all of the attributes necessary for success as
market conditions improve.
Financial Strength
4
ETGEGI EKA
C$0.53/$0.25
(TSX)
Treasury
US$15.5 million
(as of March 31, 2016)
Market
Capitalization
~C$57 million
(as of June 30, 2016)
Capital
Structure
153 million
Issued and Outstanding
165 million
Fully Diluted
52 Week
High/Low
Leadership Team
5
Board of Directors
Lord (Michael) Howard of Lympne
Chairman
Stephen Scott
Director
James Harris
Director
Mark Bailey
Director
Management
Stephen Scott
President & CEO
Duane Lo
CFO
Rob Cinits
VP Corporate Development
Susan McLeod
VP Legal Affairs
Monica Hamm
Senior Manager Investor Relations and
Corporate Communications
Alan Edwards
Director
Anna Stylianides
Director
Mongolia: Oyu Tolgoi
Entrée/Oyu Tolgoi JV Structure
6
20%
80/70%
34%
66%
Entrée/Oyu Tolgoi
Joint Venture
Hugo North
Extension & Heruga
Mongolian Government
Turquoise Hill
Oyu Tolgoi LLC
Entrée Gold
80%
 Entrée has 20% carried interest
 Entrée is debt financed at
prime +2% repayable from 90%
of available cash flow
~51% held by Rio Tinto
Mongolia: Oyu Tolgoi
OTLLC’s project is one of the largest copper mines being developed
7
 Oyu Tolgoi expected to become the world’s third largest copper mine*
 Southern Oyu Tolgoi (“SOT”) Open Pit mine achieved commercial production September 2013
 Underground copper grades roughly 3.5 times open pit*
 Underground development of Hugo North Lift 1 is next
 US$4.4 billion project finance facility signed with ~US$4 billion drawn down
 Underground construction targeted to begin mid-2016
 Includes Lift 1 of the Entrée/Oyu Tolgoi JV’s Hugo North Extension deposit
 Development pipeline includes Hugo North (including Hugo North Extension) Lift 2, Hugo South and Heruga
 Entrée has 20% carried interest in two project deposits: Hugo North Extension and Heruga
 JV partner Oyu Tolgoi LLC (OTLLC) owns deposits outside of JV area 100%
*Source Turquoise Hill June 9, 2016 RBC Conference Presentation
Photo: Oyu Tolgoi Website (http://ot.mn/media-category/media-gallery/)
Mongolia: Oyu Tolgoi
Entrée/Oyu Tolgoi JV Deposits
8
Size
Entrée has a 20% carried interest in two large
Cu-Au deposits at Oyu Tolgoi:
Hugo North Extension and Heruga
Partnership
JV with OTLLC
Oyu Tolgoi project managed by global mining
leader Rio Tinto
Grade
Probable reserve at Hugo North Extension Lift 1 is
35 MT grading 1.59% Cu and 0.55 g/t Au (Entrée has
20% interest)
Growth
Future underground development options at Hugo
North Extension Lift 2 and Heruga
 Lift 1 will provide access for Hugo North
(including Hugo North Extension) Lift 2
definition drilling
Longevity
JV deposits form part of a multi-generational
copper-gold asset
9
Mongolia: Oyu Tolgoi
Entrée/JV licences surround Oyu Tolgoi licence
The deposits of the Oyu Tolgoi project stretch over ~12 km.
The most southerly, Heruga, and the most northerly, Hugo North Extension,
are on Entrée/Oyu Tolgoi JV property.
10
A A’
Mongolia: Oyu Tolgoi
Idealized Longitudinal Section (Looking West)
Indicated and Inferred resources from Hugo North Extension Lift 2 and Heruga are included in alternative production cases discussed in Entrée’s technical report titled
"Lookout Hill Feasibility Study Update" dated March 29, 2016 (LHTR16). Under NI 43-101 guidelines, Inferred mineral resources are considered too speculative
geologically to have the economic considerations applied to them that would allow them to be categorised as mineral reserves. There is no certainty that the alternative
production cases will be realized.
*See Entrée’s news release dated May 9, 2016: Entrée Gold Welcomes Notice to Proceed Approval for Underground Development at Oyu Tolgoi.
 Next phase of development includes Hugo North Extension Lift 1,
on Entrée/Oyu Tolgoi JV property
 Re-start of underground development expected in mid-2016*
Mongolia: Oyu Tolgoi
Hugo North Extension Development
11
*LHTR16 Reserve Case
Entrée has a 20% interest in the mineralization of the Hugo North Extension deposit
650 m
Property
boundary
Propertyboundary
Mongolia: Oyu Tolgoi
Hugo North Extension Lift 1 LHTR16 Feasibility Results
12
Entrée/Oyu Tolgoi JV Processed 34.8 Mt
Entrée/Oyu Tolgoi JV Capital Cost
(Shaft 4 and Hugo North Extension Lift 1)
435 US$M
NSR 100.57 US$/t
Cu Grade 1.59%
Au Grade 0.55 g/t
Copper Recovered 1,121 Mlb
Gold Recovered 519 koz
Total Cash Costs After Credits 0.99 US$/lb Payable Copper
Entrée 20% interest NPV (8%) After Tax 106 US$M
* The mineral reserves are not additive to the mineral resources.
* The block cave shell was defined using a NSR cut-off of US$15/t NSR.
** 0.37% CuEq cutoff.
*** CuEq calculated using assumed metal prices of US$3.01/lb for copper, US$1,250/oz for gold, US$20.37/oz for silver, and US$11.90/lb for molybdenum.
Mineral resources that are not mineral reserves do not have demonstrated economic viability.
Hugo North Extension
Cu-Au
Heruga
Cu-Au-Mo
Probable
Mineral
Reserves*
35 Mt @ 1.59% Cu, 0.55 g/t Au
1.1 Blbs Cu / 0.52 Moz Au
---
Measured
and
Indicated
Resources**
129 Mt @ 1.99% CuEq***
4.7 Blbs Cu / 2.3 Moz Au
CuEq @ 1.65% Cu, 0.55 g/t Au
---
Inferred
Resources**
179 Mt @ 1.20% CuEq***
3.9 Blbs Cu / 2.0 Moz Au
CuEq @ 0.99% Cu, 0.34 g/t Au
1,700 Mt @ 0.64% CuEq***
14.6 Blbs Cu / 20.4 Moz Au
CuEq @ 0.39% Cu, 0.37 g/t Au, 0.011% Mo
Mongolia: Oyu Tolgoi
Entrée/Oyu Tolgoi JV Reserves and Resources
13
Entrée has a 20% interest in the above mineral reserves and resources.
Mongolia: Oyu Tolgoi
Multiple Development Options
14
Source: LHTR16
Note: Hugo North includes Hugo North Extension.
Long life, high grade with significant expansion potential
15
 US$4.4 billion financing signed December 2015
 OTLLC has drawn down ~US$4.0 billion (June 2016);
drawdown of additional US$0.4 billion to be finalized
Project
Finance
 Updated 2016 feasibility study completed
Feasibility
Study
 “Notice to Proceed” approvals announced May 2016TRQ, Rio Tinto
and OTLLC
Board Approvals
 Expected mid-2016 with early work currently underway
 Leverage existing infrastructure
 Large resource base provides optionality
Underground
Re-Start
Mongolia: Oyu Tolgoi
Underground re-start as reported by Turquoise Hill


The notice to proceed approvals were the final requirement for the re-start of the
underground development at the Hugo North Lift 1 block cave,
including Lift 1 of the Entrée/Oyu Tolgoi JV’s Hugo North Extension deposit.

 All necessary permits grantedPermits

Nevada: Ann Mason
Large copper deposit in one of the best jurisdictions
16
Size
100% interest in a large Cu-Mo deposit amenable to
open pit mining and sulphide flotation mill (Ann
Mason deposit)
Jurisdiction
Nevada: one of the best jurisdictions for mining
Strong local support in the Yerington District
Longevity
Potential mine life of over 21 years
Updated PEA completed in 2015
Growth
Convert remaining Inferred resources to Measured
or Indicated with small drill program
Additional studies to move to Pre-Feasibility
Potential to expand oxide and sulphide resources
at the Blue Hill deposit
Partnership
Positioned to attract strategic investment
Infrastructure
Rail, road and power
Nevada: Ann Mason
The Yerington Copper District
1717
 Historic mining region
 Top mining jurisdiction
 Strong community support
 Excellent infrastructure
 Consolidation potential
18
ANN MASON DEPOSIT MINERAL RESOURCES
0.20% Cu Cut-off grade, effective September 9, 2015
Classification
Tonnage
(Mt)
Grade Contained Metal
Cu
(%)
Mo
(%)
Au
(g/t)
Ag
(g/t)
Cu
(Mlb)
Mo
(Mlb)
Au
(Moz)
Ag
(Moz)
Measured 412 0.33 0.006 0.03 0.64 3,037.6 58.1 0.37 8.46
Indicated 988 0.31 0.006 0.03 0.66 6,853.3 128.5 0.97 21.00
Measured
and Indicated
1,400 0.32 0.006 0.03 0.65 9,890.9 186.6 1.33 29.46
Inferred 623 0.29 0.007 0.03 0.66 3,987.2 96.2 0.58 13.16
 Mineral resources are reported within a constraining pit shell developed using Whittle™ software.
 Assumptions include 100% mining recovery.
 An external dilution factor was not considered during this resource estimation.
 Internal dilution within a 20 metre x 20 metre x 15 metre SMU (selective mining unit) was considered.
 The 0.4% net smelter returns royalty held by Sandstorm Gold Ltd. was not considered during the preparation of the conceptual pit.
 Mineral resources that are not mineral reserves do not have demonstrated economic viability.
18
Nevada: Ann Mason
Resource Estimate
Nevada: Ann Mason
2015 PEA Highlights – Attractive Project Economics
19
LOM Production* (120,000 tpd mill throughput) 877 million tonnes
LOM – Strip ratio 2:1
Development capital costs (pre-production + Year 1) US$1.35 billion
Average cash costs (net of by-product sales)** US$1.49/lb copper
All-in sustaining costs (net of by-product sales)** US$1.57/lb copper
Average net annual undiscounted cash flow** US$298 million
LOM – Average copper recovery 92%
Copper concentrate grade 30%
LOM – Copper production 5.1 billion lbs
Note: The PEA is preliminary in nature, it includes Inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable
them to be categorized as mineral reserves, and there is no certainty that the PEA will be realized. Mineralized resources that are not mineral reserves do not have demonstrated economic viability.
*835 Mt at 0.30% copper, 0.005% molybdenum, 0.03 g/t gold and 0.59 g/t silver are Measured and Indicated material, and 42 Mt at 0.27% copper, 0.005% molybdenum, 0.03 g/t gold and 0.58 g/t
silver are Inferred material.
**Pre-tax. “Cash costs” and “all-in sustaining costs” are non-U.S. GAAP Performance Measurements. These performance measurements are included because these statistics are widely accepted
as the standard of reporting cash costs of production in North America. These performance measurements do not have a meaning within U.S. GAAP and therefore, amounts presented may not be
comparable to similar data presented by other mining companies. These performance measurements should not be considered in isolation as a substitute for measures of performance in accordance
with U.S. GAAP.
20
Nevada: Ann Mason
2015 PEA Financial Outputs
ANN MASON 2015 PEA
SENSITIVITY OF THE KEY FINANCIAL OUTPUTS (Post-Tax)
Economic
Scenario
Cu*
(US$/lb)
NPV7.5%
(US$ Million)
IRR
(%)
Pay-back
(Years)
Net Average Annual
Free Cash Flow
(US$ Million)
Low Case 2.75 339 10.3 8.7 189
Base Case 3.00 770 13.7 6.9 238
High Case 3.25 1,189 16.8 5.7 287
Note: The Base Case metal prices are based on a review of current analyst consensus reports and recent SEDAR filings for similar reports. The 2015 PEA is preliminary in nature and
includes Inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral
reserves, and there is no certainty that the 2015 PEA will be realized. Mineral resources that are not mineral reserves do not have demonstrated economic viability.
*Other metal prices:
Low Case: Mo $9 (US$/lb), Ag $15 (US$/oz), Au $1,100 (US$/oz)
Base Case: Mo $11 (US$/lb), Ag $20 (US$/oz), Au $1,200 (US$/oz)
High Case: Mo $13 (US$/lb), Ag $25 (US$/oz), Au $1,300 (US$/oz)
Nevada: Ann Mason
3-D View of Deposit
500 m
N
>0.15% Cu grade shell
21
Deposit Dimensions
2.8 km NW x 1.3 km NE x ~1.2 km vertical
22
Nevada: Ann Mason
Project Potential
*Reported in the Ann Mason 2015 PEA. The mineral resource estimate has an effective date of July 31, 2012 and was prepared by M. Waldegger, P. Geo. under the
supervision of P. Desautels, P.Geo. of AGP. Mineral resources that are not mineral reserves do not have demonstrated economic viability. Entrée has a 100% interest
in the claims comprising the Blue Hill deposit, subject to a 0.4% net smelter returns royalty in favour of Sandstorm Gold.
 PFS level metallurgy complete
 Minimal drilling to update remaining Inferred resource within
Phase 5 pit
 Additional studies to move to PFS: geotechnical drilling,
environmental and engineering
Ann Mason
 Inferred resources of 72 Mt @ 0.17% Cu (leachable) plus 50 Mt @
0.23% Cu (sulphide)*
 Potential to expand oxide and sulphide resources
 Potential heap-leach “starter” operation
Blue Hill
 Large portion of the property remains unexplored
 Several high priority exploration targets on the property
Exploration
Targets
 Well positioned to attract investment and partnersPartnership
23
Positioned to Deliver Value
Oyu Tolgoi Underground Mine Plan agreement signed (2015)
Hugo North Extension Lift 1 financed (2015)
Underground development decision approved (May 2016)
Copper fundamentals strong in
mid-long term
Ann Mason updated PEA (2015); positioned to
attract strategic investment & partners
Lordsburg future growth opportunity
Strong balance sheet provides financial
flexibility and security
For more information, please contact:
Monica Hamm
Senior Manager Investor Relations and
Corporate Communications
mhamm@entreegold.com
604-687-4777
www.entreegold.com

More Related Content

What's hot

Entree Gold Corporate Presentation January 2016
Entree Gold Corporate Presentation January 2016 Entree Gold Corporate Presentation January 2016
Entree Gold Corporate Presentation January 2016 Monica Hamm
 
2015 November Corporate Presentation
2015 November Corporate Presentation2015 November Corporate Presentation
2015 November Corporate PresentationCompany Spotlight
 
2015 09 14_entree_gold_presentation_september_final
2015 09 14_entree_gold_presentation_september_final2015 09 14_entree_gold_presentation_september_final
2015 09 14_entree_gold_presentation_september_finalCompany Spotlight
 
2015 02 25_entree_gold_web_final_v001_e5pa80
2015 02 25_entree_gold_web_final_v001_e5pa802015 02 25_entree_gold_web_final_v001_e5pa80
2015 02 25_entree_gold_web_final_v001_e5pa80Adam Martin
 
Entree Gold: Restructuring for Success March 2017
Entree Gold:  Restructuring for Success March 2017Entree Gold:  Restructuring for Success March 2017
Entree Gold: Restructuring for Success March 2017Monica Hamm
 
Entree Resources Corporate Presentation - Nov 2017
Entree Resources Corporate Presentation - Nov 2017Entree Resources Corporate Presentation - Nov 2017
Entree Resources Corporate Presentation - Nov 2017Entree Resources Ltd.
 
Entrée Gold, Inc. - Corporate Presentation
Entrée Gold, Inc. - Corporate PresentationEntrée Gold, Inc. - Corporate Presentation
Entrée Gold, Inc. - Corporate PresentationCompany Spotlight
 
19.11.2013 Corporate Presentation: Entrée Gold, Mona Forster
19.11.2013 Corporate Presentation: Entrée Gold, Mona Forster19.11.2013 Corporate Presentation: Entrée Gold, Mona Forster
19.11.2013 Corporate Presentation: Entrée Gold, Mona ForsterThe Business Council of Mongolia
 
Entree Gold Rresentation Nov 2013
Entree Gold Rresentation Nov 2013Entree Gold Rresentation Nov 2013
Entree Gold Rresentation Nov 2013Company Spotlight
 
Entree goldmay13presentation
Entree goldmay13presentationEntree goldmay13presentation
Entree goldmay13presentationCompany Spotlight
 
Entree Gold Annual General and Special Meeting 2017 Presenatation
Entree Gold Annual General and Special Meeting 2017 PresenatationEntree Gold Annual General and Special Meeting 2017 Presenatation
Entree Gold Annual General and Special Meeting 2017 PresenatationMonica Hamm
 
Entree Gold Annual General and Special Meeting 2017 Presentation
Entree Gold Annual General and Special Meeting 2017 PresentationEntree Gold Annual General and Special Meeting 2017 Presentation
Entree Gold Annual General and Special Meeting 2017 PresentationMonica Hamm
 
Entree Resources April 2019 Corporate Presentation
Entree Resources   April 2019 Corporate PresentationEntree Resources   April 2019 Corporate Presentation
Entree Resources April 2019 Corporate PresentationEntree Resources Ltd.
 
Entree Resources Corporate Presentation - March 2019
Entree Resources Corporate Presentation - March 2019Entree Resources Corporate Presentation - March 2019
Entree Resources Corporate Presentation - March 2019Entree Resources Ltd.
 

What's hot (19)

Entree Gold Corporate Presentation January 2016
Entree Gold Corporate Presentation January 2016 Entree Gold Corporate Presentation January 2016
Entree Gold Corporate Presentation January 2016
 
Entree Gold Presentation
Entree Gold Presentation Entree Gold Presentation
Entree Gold Presentation
 
2015 November Corporate Presentation
2015 November Corporate Presentation2015 November Corporate Presentation
2015 November Corporate Presentation
 
2015 09 14_entree_gold_presentation_september_final
2015 09 14_entree_gold_presentation_september_final2015 09 14_entree_gold_presentation_september_final
2015 09 14_entree_gold_presentation_september_final
 
Entree Gold Inc.
Entree Gold Inc.Entree Gold Inc.
Entree Gold Inc.
 
2015 02 25_entree_gold_web_final_v001_e5pa80
2015 02 25_entree_gold_web_final_v001_e5pa802015 02 25_entree_gold_web_final_v001_e5pa80
2015 02 25_entree_gold_web_final_v001_e5pa80
 
Entree gold presentation14
Entree gold presentation14Entree gold presentation14
Entree gold presentation14
 
Entree Gold: Restructuring for Success March 2017
Entree Gold:  Restructuring for Success March 2017Entree Gold:  Restructuring for Success March 2017
Entree Gold: Restructuring for Success March 2017
 
Entree Resources Corporate Presentation - Nov 2017
Entree Resources Corporate Presentation - Nov 2017Entree Resources Corporate Presentation - Nov 2017
Entree Resources Corporate Presentation - Nov 2017
 
Entrée Gold, Inc. - Corporate Presentation
Entrée Gold, Inc. - Corporate PresentationEntrée Gold, Inc. - Corporate Presentation
Entrée Gold, Inc. - Corporate Presentation
 
Entree goldjul13pres
Entree goldjul13presEntree goldjul13pres
Entree goldjul13pres
 
19.11.2013 Corporate Presentation: Entrée Gold, Mona Forster
19.11.2013 Corporate Presentation: Entrée Gold, Mona Forster19.11.2013 Corporate Presentation: Entrée Gold, Mona Forster
19.11.2013 Corporate Presentation: Entrée Gold, Mona Forster
 
Entree Gold Rresentation Nov 2013
Entree Gold Rresentation Nov 2013Entree Gold Rresentation Nov 2013
Entree Gold Rresentation Nov 2013
 
Entree gold presentation
Entree gold presentationEntree gold presentation
Entree gold presentation
 
Entree goldmay13presentation
Entree goldmay13presentationEntree goldmay13presentation
Entree goldmay13presentation
 
Entree Gold Annual General and Special Meeting 2017 Presenatation
Entree Gold Annual General and Special Meeting 2017 PresenatationEntree Gold Annual General and Special Meeting 2017 Presenatation
Entree Gold Annual General and Special Meeting 2017 Presenatation
 
Entree Gold Annual General and Special Meeting 2017 Presentation
Entree Gold Annual General and Special Meeting 2017 PresentationEntree Gold Annual General and Special Meeting 2017 Presentation
Entree Gold Annual General and Special Meeting 2017 Presentation
 
Entree Resources April 2019 Corporate Presentation
Entree Resources   April 2019 Corporate PresentationEntree Resources   April 2019 Corporate Presentation
Entree Resources April 2019 Corporate Presentation
 
Entree Resources Corporate Presentation - March 2019
Entree Resources Corporate Presentation - March 2019Entree Resources Corporate Presentation - March 2019
Entree Resources Corporate Presentation - March 2019
 

Similar to July2016 presentation final

April2016 presentation web
April2016 presentation webApril2016 presentation web
April2016 presentation webMonica Hamm
 
PDAC March 2016 Presentation
PDAC March 2016 PresentationPDAC March 2016 Presentation
PDAC March 2016 PresentationMonica Hamm
 
Entree - Corporate Presentation Feb 2014
Entree - Corporate Presentation Feb 2014Entree - Corporate Presentation Feb 2014
Entree - Corporate Presentation Feb 2014Company Spotlight
 
Entree Resources Corporate Presentation - May 2018
Entree Resources Corporate Presentation - May 2018Entree Resources Corporate Presentation - May 2018
Entree Resources Corporate Presentation - May 2018Entree Resources Ltd.
 
Entree Resources Corporate Presentation - Aug 2017
Entree Resources Corporate Presentation - Aug 2017Entree Resources Corporate Presentation - Aug 2017
Entree Resources Corporate Presentation - Aug 2017Entree Resources Ltd.
 
Entree Resources Corporate Presentation - March 2018
Entree Resources Corporate Presentation - March 2018Entree Resources Corporate Presentation - March 2018
Entree Resources Corporate Presentation - March 2018Entree Resources Ltd.
 
Entree Resources Jan 2018 corporate presentation
Entree Resources Jan 2018 corporate presentationEntree Resources Jan 2018 corporate presentation
Entree Resources Jan 2018 corporate presentationEntree Resources Ltd.
 
Entree Resources Corporate Presentation - Feb 2018
Entree Resources Corporate Presentation - Feb 2018Entree Resources Corporate Presentation - Feb 2018
Entree Resources Corporate Presentation - Feb 2018Entree Resources Ltd.
 
Entree Resources - June 2019 - Corporate Presentation
Entree Resources - June 2019 - Corporate PresentationEntree Resources - June 2019 - Corporate Presentation
Entree Resources - June 2019 - Corporate PresentationEntree Resources Ltd.
 
Entree Resources - March 2020 Corporate Presentation
Entree Resources - March 2020 Corporate PresentationEntree Resources - March 2020 Corporate Presentation
Entree Resources - March 2020 Corporate PresentationEntree Resources Ltd.
 
Entree Resources - Corporate Presentation - November 2019
Entree Resources - Corporate Presentation - November 2019Entree Resources - Corporate Presentation - November 2019
Entree Resources - Corporate Presentation - November 2019Entree Resources Ltd.
 

Similar to July2016 presentation final (12)

April2016 presentation web
April2016 presentation webApril2016 presentation web
April2016 presentation web
 
PDAC March 2016 Presentation
PDAC March 2016 PresentationPDAC March 2016 Presentation
PDAC March 2016 Presentation
 
Entree - Corporate Presentation Feb 2014
Entree - Corporate Presentation Feb 2014Entree - Corporate Presentation Feb 2014
Entree - Corporate Presentation Feb 2014
 
Entree Resources Corporate Presentation - May 2018
Entree Resources Corporate Presentation - May 2018Entree Resources Corporate Presentation - May 2018
Entree Resources Corporate Presentation - May 2018
 
Entree Resources Corporate Presentation - Aug 2017
Entree Resources Corporate Presentation - Aug 2017Entree Resources Corporate Presentation - Aug 2017
Entree Resources Corporate Presentation - Aug 2017
 
Entree Resources Corporate Presentation - March 2018
Entree Resources Corporate Presentation - March 2018Entree Resources Corporate Presentation - March 2018
Entree Resources Corporate Presentation - March 2018
 
Entree Resources Jan 2018 corporate presentation
Entree Resources Jan 2018 corporate presentationEntree Resources Jan 2018 corporate presentation
Entree Resources Jan 2018 corporate presentation
 
Entree Resources Corporate Presentation - Feb 2018
Entree Resources Corporate Presentation - Feb 2018Entree Resources Corporate Presentation - Feb 2018
Entree Resources Corporate Presentation - Feb 2018
 
Entree Resources - June 2019 - Corporate Presentation
Entree Resources - June 2019 - Corporate PresentationEntree Resources - June 2019 - Corporate Presentation
Entree Resources - June 2019 - Corporate Presentation
 
Entree goldpres
Entree goldpresEntree goldpres
Entree goldpres
 
Entree Resources - March 2020 Corporate Presentation
Entree Resources - March 2020 Corporate PresentationEntree Resources - March 2020 Corporate Presentation
Entree Resources - March 2020 Corporate Presentation
 
Entree Resources - Corporate Presentation - November 2019
Entree Resources - Corporate Presentation - November 2019Entree Resources - Corporate Presentation - November 2019
Entree Resources - Corporate Presentation - November 2019
 

Recently uploaded

Chemical Tests; flame test, positive and negative ions test Edexcel Internati...
Chemical Tests; flame test, positive and negative ions test Edexcel Internati...Chemical Tests; flame test, positive and negative ions test Edexcel Internati...
Chemical Tests; flame test, positive and negative ions test Edexcel Internati...ssuser79fe74
 
Zoology 5th semester notes( Sumit_yadav).pdf
Zoology 5th semester notes( Sumit_yadav).pdfZoology 5th semester notes( Sumit_yadav).pdf
Zoology 5th semester notes( Sumit_yadav).pdfSumit Kumar yadav
 
GBSN - Microbiology (Unit 3)
GBSN - Microbiology (Unit 3)GBSN - Microbiology (Unit 3)
GBSN - Microbiology (Unit 3)Areesha Ahmad
 
GBSN - Microbiology (Unit 2)
GBSN - Microbiology (Unit 2)GBSN - Microbiology (Unit 2)
GBSN - Microbiology (Unit 2)Areesha Ahmad
 
Factory Acceptance Test( FAT).pptx .
Factory Acceptance Test( FAT).pptx       .Factory Acceptance Test( FAT).pptx       .
Factory Acceptance Test( FAT).pptx .Poonam Aher Patil
 
Dopamine neurotransmitter determination using graphite sheet- graphene nano-s...
Dopamine neurotransmitter determination using graphite sheet- graphene nano-s...Dopamine neurotransmitter determination using graphite sheet- graphene nano-s...
Dopamine neurotransmitter determination using graphite sheet- graphene nano-s...Mohammad Khajehpour
 
Connaught Place, Delhi Call girls :8448380779 Model Escorts | 100% verified
Connaught Place, Delhi Call girls :8448380779 Model Escorts | 100% verifiedConnaught Place, Delhi Call girls :8448380779 Model Escorts | 100% verified
Connaught Place, Delhi Call girls :8448380779 Model Escorts | 100% verifiedDelhi Call girls
 
Pests of cotton_Borer_Pests_Binomics_Dr.UPR.pdf
Pests of cotton_Borer_Pests_Binomics_Dr.UPR.pdfPests of cotton_Borer_Pests_Binomics_Dr.UPR.pdf
Pests of cotton_Borer_Pests_Binomics_Dr.UPR.pdfPirithiRaju
 
biology HL practice questions IB BIOLOGY
biology HL practice questions IB BIOLOGYbiology HL practice questions IB BIOLOGY
biology HL practice questions IB BIOLOGY1301aanya
 
PSYCHOSOCIAL NEEDS. in nursing II sem pptx
PSYCHOSOCIAL NEEDS. in nursing II sem pptxPSYCHOSOCIAL NEEDS. in nursing II sem pptx
PSYCHOSOCIAL NEEDS. in nursing II sem pptxSuji236384
 
Biogenic Sulfur Gases as Biosignatures on Temperate Sub-Neptune Waterworlds
Biogenic Sulfur Gases as Biosignatures on Temperate Sub-Neptune WaterworldsBiogenic Sulfur Gases as Biosignatures on Temperate Sub-Neptune Waterworlds
Biogenic Sulfur Gases as Biosignatures on Temperate Sub-Neptune WaterworldsSérgio Sacani
 
Conjugation, transduction and transformation
Conjugation, transduction and transformationConjugation, transduction and transformation
Conjugation, transduction and transformationAreesha Ahmad
 
Unit5-Cloud.pptx for lpu course cse121 o
Unit5-Cloud.pptx for lpu course cse121 oUnit5-Cloud.pptx for lpu course cse121 o
Unit5-Cloud.pptx for lpu course cse121 oManavSingh202607
 
STS-UNIT 4 CLIMATE CHANGE POWERPOINT PRESENTATION
STS-UNIT 4 CLIMATE CHANGE POWERPOINT PRESENTATIONSTS-UNIT 4 CLIMATE CHANGE POWERPOINT PRESENTATION
STS-UNIT 4 CLIMATE CHANGE POWERPOINT PRESENTATIONrouseeyyy
 
module for grade 9 for distance learning
module for grade 9 for distance learningmodule for grade 9 for distance learning
module for grade 9 for distance learninglevieagacer
 
9999266834 Call Girls In Noida Sector 22 (Delhi) Call Girl Service
9999266834 Call Girls In Noida Sector 22 (Delhi) Call Girl Service9999266834 Call Girls In Noida Sector 22 (Delhi) Call Girl Service
9999266834 Call Girls In Noida Sector 22 (Delhi) Call Girl Servicenishacall1
 
GBSN - Biochemistry (Unit 1)
GBSN - Biochemistry (Unit 1)GBSN - Biochemistry (Unit 1)
GBSN - Biochemistry (Unit 1)Areesha Ahmad
 
Seismic Method Estimate velocity from seismic data.pptx
Seismic Method Estimate velocity from seismic  data.pptxSeismic Method Estimate velocity from seismic  data.pptx
Seismic Method Estimate velocity from seismic data.pptxAlMamun560346
 
COST ESTIMATION FOR A RESEARCH PROJECT.pptx
COST ESTIMATION FOR A RESEARCH PROJECT.pptxCOST ESTIMATION FOR A RESEARCH PROJECT.pptx
COST ESTIMATION FOR A RESEARCH PROJECT.pptxFarihaAbdulRasheed
 

Recently uploaded (20)

Chemical Tests; flame test, positive and negative ions test Edexcel Internati...
Chemical Tests; flame test, positive and negative ions test Edexcel Internati...Chemical Tests; flame test, positive and negative ions test Edexcel Internati...
Chemical Tests; flame test, positive and negative ions test Edexcel Internati...
 
Zoology 5th semester notes( Sumit_yadav).pdf
Zoology 5th semester notes( Sumit_yadav).pdfZoology 5th semester notes( Sumit_yadav).pdf
Zoology 5th semester notes( Sumit_yadav).pdf
 
GBSN - Microbiology (Unit 3)
GBSN - Microbiology (Unit 3)GBSN - Microbiology (Unit 3)
GBSN - Microbiology (Unit 3)
 
GBSN - Microbiology (Unit 2)
GBSN - Microbiology (Unit 2)GBSN - Microbiology (Unit 2)
GBSN - Microbiology (Unit 2)
 
Factory Acceptance Test( FAT).pptx .
Factory Acceptance Test( FAT).pptx       .Factory Acceptance Test( FAT).pptx       .
Factory Acceptance Test( FAT).pptx .
 
Dopamine neurotransmitter determination using graphite sheet- graphene nano-s...
Dopamine neurotransmitter determination using graphite sheet- graphene nano-s...Dopamine neurotransmitter determination using graphite sheet- graphene nano-s...
Dopamine neurotransmitter determination using graphite sheet- graphene nano-s...
 
Connaught Place, Delhi Call girls :8448380779 Model Escorts | 100% verified
Connaught Place, Delhi Call girls :8448380779 Model Escorts | 100% verifiedConnaught Place, Delhi Call girls :8448380779 Model Escorts | 100% verified
Connaught Place, Delhi Call girls :8448380779 Model Escorts | 100% verified
 
Pests of cotton_Borer_Pests_Binomics_Dr.UPR.pdf
Pests of cotton_Borer_Pests_Binomics_Dr.UPR.pdfPests of cotton_Borer_Pests_Binomics_Dr.UPR.pdf
Pests of cotton_Borer_Pests_Binomics_Dr.UPR.pdf
 
biology HL practice questions IB BIOLOGY
biology HL practice questions IB BIOLOGYbiology HL practice questions IB BIOLOGY
biology HL practice questions IB BIOLOGY
 
PSYCHOSOCIAL NEEDS. in nursing II sem pptx
PSYCHOSOCIAL NEEDS. in nursing II sem pptxPSYCHOSOCIAL NEEDS. in nursing II sem pptx
PSYCHOSOCIAL NEEDS. in nursing II sem pptx
 
Biogenic Sulfur Gases as Biosignatures on Temperate Sub-Neptune Waterworlds
Biogenic Sulfur Gases as Biosignatures on Temperate Sub-Neptune WaterworldsBiogenic Sulfur Gases as Biosignatures on Temperate Sub-Neptune Waterworlds
Biogenic Sulfur Gases as Biosignatures on Temperate Sub-Neptune Waterworlds
 
Clean In Place(CIP).pptx .
Clean In Place(CIP).pptx                 .Clean In Place(CIP).pptx                 .
Clean In Place(CIP).pptx .
 
Conjugation, transduction and transformation
Conjugation, transduction and transformationConjugation, transduction and transformation
Conjugation, transduction and transformation
 
Unit5-Cloud.pptx for lpu course cse121 o
Unit5-Cloud.pptx for lpu course cse121 oUnit5-Cloud.pptx for lpu course cse121 o
Unit5-Cloud.pptx for lpu course cse121 o
 
STS-UNIT 4 CLIMATE CHANGE POWERPOINT PRESENTATION
STS-UNIT 4 CLIMATE CHANGE POWERPOINT PRESENTATIONSTS-UNIT 4 CLIMATE CHANGE POWERPOINT PRESENTATION
STS-UNIT 4 CLIMATE CHANGE POWERPOINT PRESENTATION
 
module for grade 9 for distance learning
module for grade 9 for distance learningmodule for grade 9 for distance learning
module for grade 9 for distance learning
 
9999266834 Call Girls In Noida Sector 22 (Delhi) Call Girl Service
9999266834 Call Girls In Noida Sector 22 (Delhi) Call Girl Service9999266834 Call Girls In Noida Sector 22 (Delhi) Call Girl Service
9999266834 Call Girls In Noida Sector 22 (Delhi) Call Girl Service
 
GBSN - Biochemistry (Unit 1)
GBSN - Biochemistry (Unit 1)GBSN - Biochemistry (Unit 1)
GBSN - Biochemistry (Unit 1)
 
Seismic Method Estimate velocity from seismic data.pptx
Seismic Method Estimate velocity from seismic  data.pptxSeismic Method Estimate velocity from seismic  data.pptx
Seismic Method Estimate velocity from seismic data.pptx
 
COST ESTIMATION FOR A RESEARCH PROJECT.pptx
COST ESTIMATION FOR A RESEARCH PROJECT.pptxCOST ESTIMATION FOR A RESEARCH PROJECT.pptx
COST ESTIMATION FOR A RESEARCH PROJECT.pptx
 

July2016 presentation final

  • 1. TSX: ETG | NYSE MKT: EGI | FRANKFURT: EKA July 2016 Copper and Gold at Our Core
  • 2. This presentation contains forward-looking statements within the meaning of the United States Private Securities Litigation Reform Act of 1995 and forward-looking information within the meaning of applicable Canadian securities laws. Forward-looking statements include, but are not limited to, statements with respect to the future prices of copper, gold, molybdenum and silver; the estimation of mineral reserves and resources; the realization of mineral reserve and resource estimates; anticipated future production, capital and operating costs, cash flows and mine life; completion of a Pre-Feasibility study on the Ann Mason Project; the potential impact of future exploration results on Ann Mason mine design and economics; the potential development of Ann Mason; potential types of mining operations; construction and continued development of the Oyu Tolgoi underground mine; the anticipated value of Entrée’s interest in the Hugo North Extension deposit; potential size of a mineralized zone; potential expansion of mineralization; potential discovery of new mineralized zones; potential metallurgical recoveries and grades; plans for future exploration and/or development programs and budgets; permitting time lines; anticipated business activities; corporate strategies; requirements for additional capital; uses of funds; proposed acquisitions and dispositions of assets; and future financial performance. While the Company has based these forward-looking statements on its expectations about future events as at the date that such statements were prepared, the statements are not a guarantee of Entrée’s future performance and are based on numerous assumptions regarding present and future business strategies, local and global economic conditions, legal proceedings and negotiations and the environment in which the Company will operate in the future, including the status of the Company’s relationship and interaction with the Government of Mongolia, Oyu Tolgoi LLC (“OT LLC”), Rio Tinto and Turquoise Hill Resources. With respect to the construction and continued development of the Oyu Tolgoi underground mine, important risks, uncertainties and factors which could cause actual results to differ materially from future results expressed or implied by such forward-looking statements and information include, amongst others, the approval of the updated Oyu Tolgoi Feasibility Study by OT LLC and its shareholders; the timing and cost of the construction and expansion of mining and processing facilities; the timing and availability of a long term power source for the Oyu Tolgoi underground mine; the impact of the delay in the funding and development of the Oyu Tolgoi underground mine; delays, and the costs which would result from delays, in the development of the underground mine; and production estimates and the anticipated yearly production of copper, gold and silver at the Oyu Tolgoi underground mine. Other uncertainties and factors which could cause actual results to differ materially from future results expressed or implied by forward-looking statements and information include, amongst others, whether the size, grade and continuity of deposits and resource and reserve estimates have been interpreted correctly from exploration results; whether the results of preliminary test work are indicative of what the results of future test work will be; fluctuations in commodity prices and demand; changing foreign exchange rates; actions by Rio Tinto, Turquoise Hill Resources and/or OT LLC and by government authorities including the Government of Mongolia; the availability of funding on reasonable terms; the impact of changes in interpretation to or changes in enforcement of, laws, regulations and government practices, including laws, regulations and government practices with respect to mining, foreign investment, royalties and taxation; the terms and timing of obtaining necessary environmental and other government approvals, consents and permits; the availability and cost of necessary items such as power, water, skilled labour, transportation and appropriate smelting and refining arrangements; and misjudgements in the course of preparing forward-looking statements. In addition, there are also known and unknown risk factors which may cause the actual results, performances or achievements of Entrée Gold to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements and information. Such factors include, among others, risks related to international operations, including legal and political risk in Mongolia; risks associated with changes in the attitudes of governments to foreign investment; risks associated with the conduct of joint ventures; discrepancies between actual and anticipated production, mineral reserves and resources and metallurgical recoveries; global financial conditions; changes in project parameters as plans continue to be refined; inability to upgrade Inferred mineral resources to Indicated or Measured mineral resources; inability to convert mineral resources to mineral reserves; conclusions of economic evaluations; future prices of copper, gold, silver and molybdenum; failure of plant, equipment or processes to operate as anticipated; accidents, labour disputes and other risks of the mining industry; delays in obtaining government approvals, permits or licences or financing or in the completion of development or construction activities; environmental risks; title disputes; limitations on insurance coverage; as well as those factors discussed in the section entitled “Risk” in Entrée Gold’s most recently filed Management’s Discussion & Analysis and in the section entitled “Risk Factors” in Entrée Gold’s Annual Information Form dated March 30, 2016, both available at www.sedar.com. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Except as required under applicable securities legislation, Entrée Gold undertakes no obligation to publicly update or revise forward-looking statements. Entrée Gold's exploration activities are under the supervision of Robert Cinits, P.Geo., Vice President, Corporate Development of Entrée Gold. Mr. Cinits is a “qualified person” as defined in National Instrument 43-101- Standards of Disclosure for Mineral Projects (“NI 43-101”). Mr. Cinits has approved the technical information in this presentation. All minerals reserves and mineral resources have been calculated in accordance with the standards of the Canadian Institute of Mining, Metallurgy and Petroleum and NI 43-101. Cautionary Note to United States Investors: United States investors are advised that while the terms “Measured mineral resources”, “Indicated mineral resources” “Inferred mineral resources” and “Probable mineral reserves” are recognized and required by Canadian regulations, the United States Securities and Exchange Commission (“SEC”) does not recognize them. United States investors are cautioned not to assume that any part or all of the mineral deposits in these categories will ever be upgraded to a higher category, or converted into mineral reserves. Inferred mineral resources have a great amount of uncertainty as to their existence, and as to their economic and legal feasibility. Under Canadian rules, estimates of Inferred mineral resources may not form the basis of feasibility or other economic studies. United States investors are cautioned not to assume that all or any part of an Inferred mineral resource exists, or is economically or legally minable. Disclosure of “contained ounces” is permitted disclosure under Canadian regulations; however, the SEC normally only permits issuers to report mineralization that does not constitute reserves as in place tonnage and grade without reference to unit measures. Accordingly, information contained in this presentation containing descriptions of the Company’s mineral properties may not be comparable to similar information made public by U.S. companies subject to the reporting and disclosure requirements under the United States federal securities laws and the rules and regulations thereunder. The information in this presentation is for informational purposes only. Readers should not rely on the information for any purpose other than to gain general knowledge of Entrée Gold. This information is not intended to be, and should not be construed as, part of an offering or solicitation of securities. For additional information regarding the Entrée/Oyu Tolgoi joint venture property, see the technical report titled “Lookout Hill Feasibility Study Update” dated March 29, 2016 (“LHTR16”) prepared by OreWin Pty Ltd, a copy of which is available on SEDAR at www.sedar.com. For additional information regarding the Ann Mason Project, see the technical report titled “Updated Preliminary Economic Assessment on the Ann Mason Project, Nevada, U.S.A.”, with an effective date of September 9, 2015 prepared by AGP Mining Consultants Inc. and Amec Foster Wheeler Americas Limited, a copy of which is available on SEDAR at www.sedar.com. Cautionary Statement 2
  • 3. 3 Why Invest in Entrée Gold? Positioned for Future Success Financial Strength Quality Assets Stakeholders Diverse Team Entrée currently sits within a unique group of junior explorers and miners who have all of the attributes necessary for success as market conditions improve.
  • 4. Financial Strength 4 ETGEGI EKA C$0.53/$0.25 (TSX) Treasury US$15.5 million (as of March 31, 2016) Market Capitalization ~C$57 million (as of June 30, 2016) Capital Structure 153 million Issued and Outstanding 165 million Fully Diluted 52 Week High/Low
  • 5. Leadership Team 5 Board of Directors Lord (Michael) Howard of Lympne Chairman Stephen Scott Director James Harris Director Mark Bailey Director Management Stephen Scott President & CEO Duane Lo CFO Rob Cinits VP Corporate Development Susan McLeod VP Legal Affairs Monica Hamm Senior Manager Investor Relations and Corporate Communications Alan Edwards Director Anna Stylianides Director
  • 6. Mongolia: Oyu Tolgoi Entrée/Oyu Tolgoi JV Structure 6 20% 80/70% 34% 66% Entrée/Oyu Tolgoi Joint Venture Hugo North Extension & Heruga Mongolian Government Turquoise Hill Oyu Tolgoi LLC Entrée Gold 80%  Entrée has 20% carried interest  Entrée is debt financed at prime +2% repayable from 90% of available cash flow ~51% held by Rio Tinto
  • 7. Mongolia: Oyu Tolgoi OTLLC’s project is one of the largest copper mines being developed 7  Oyu Tolgoi expected to become the world’s third largest copper mine*  Southern Oyu Tolgoi (“SOT”) Open Pit mine achieved commercial production September 2013  Underground copper grades roughly 3.5 times open pit*  Underground development of Hugo North Lift 1 is next  US$4.4 billion project finance facility signed with ~US$4 billion drawn down  Underground construction targeted to begin mid-2016  Includes Lift 1 of the Entrée/Oyu Tolgoi JV’s Hugo North Extension deposit  Development pipeline includes Hugo North (including Hugo North Extension) Lift 2, Hugo South and Heruga  Entrée has 20% carried interest in two project deposits: Hugo North Extension and Heruga  JV partner Oyu Tolgoi LLC (OTLLC) owns deposits outside of JV area 100% *Source Turquoise Hill June 9, 2016 RBC Conference Presentation Photo: Oyu Tolgoi Website (http://ot.mn/media-category/media-gallery/)
  • 8. Mongolia: Oyu Tolgoi Entrée/Oyu Tolgoi JV Deposits 8 Size Entrée has a 20% carried interest in two large Cu-Au deposits at Oyu Tolgoi: Hugo North Extension and Heruga Partnership JV with OTLLC Oyu Tolgoi project managed by global mining leader Rio Tinto Grade Probable reserve at Hugo North Extension Lift 1 is 35 MT grading 1.59% Cu and 0.55 g/t Au (Entrée has 20% interest) Growth Future underground development options at Hugo North Extension Lift 2 and Heruga  Lift 1 will provide access for Hugo North (including Hugo North Extension) Lift 2 definition drilling Longevity JV deposits form part of a multi-generational copper-gold asset
  • 9. 9 Mongolia: Oyu Tolgoi Entrée/JV licences surround Oyu Tolgoi licence The deposits of the Oyu Tolgoi project stretch over ~12 km. The most southerly, Heruga, and the most northerly, Hugo North Extension, are on Entrée/Oyu Tolgoi JV property.
  • 10. 10 A A’ Mongolia: Oyu Tolgoi Idealized Longitudinal Section (Looking West) Indicated and Inferred resources from Hugo North Extension Lift 2 and Heruga are included in alternative production cases discussed in Entrée’s technical report titled "Lookout Hill Feasibility Study Update" dated March 29, 2016 (LHTR16). Under NI 43-101 guidelines, Inferred mineral resources are considered too speculative geologically to have the economic considerations applied to them that would allow them to be categorised as mineral reserves. There is no certainty that the alternative production cases will be realized. *See Entrée’s news release dated May 9, 2016: Entrée Gold Welcomes Notice to Proceed Approval for Underground Development at Oyu Tolgoi.  Next phase of development includes Hugo North Extension Lift 1, on Entrée/Oyu Tolgoi JV property  Re-start of underground development expected in mid-2016*
  • 11. Mongolia: Oyu Tolgoi Hugo North Extension Development 11 *LHTR16 Reserve Case Entrée has a 20% interest in the mineralization of the Hugo North Extension deposit 650 m Property boundary Propertyboundary
  • 12. Mongolia: Oyu Tolgoi Hugo North Extension Lift 1 LHTR16 Feasibility Results 12 Entrée/Oyu Tolgoi JV Processed 34.8 Mt Entrée/Oyu Tolgoi JV Capital Cost (Shaft 4 and Hugo North Extension Lift 1) 435 US$M NSR 100.57 US$/t Cu Grade 1.59% Au Grade 0.55 g/t Copper Recovered 1,121 Mlb Gold Recovered 519 koz Total Cash Costs After Credits 0.99 US$/lb Payable Copper Entrée 20% interest NPV (8%) After Tax 106 US$M
  • 13. * The mineral reserves are not additive to the mineral resources. * The block cave shell was defined using a NSR cut-off of US$15/t NSR. ** 0.37% CuEq cutoff. *** CuEq calculated using assumed metal prices of US$3.01/lb for copper, US$1,250/oz for gold, US$20.37/oz for silver, and US$11.90/lb for molybdenum. Mineral resources that are not mineral reserves do not have demonstrated economic viability. Hugo North Extension Cu-Au Heruga Cu-Au-Mo Probable Mineral Reserves* 35 Mt @ 1.59% Cu, 0.55 g/t Au 1.1 Blbs Cu / 0.52 Moz Au --- Measured and Indicated Resources** 129 Mt @ 1.99% CuEq*** 4.7 Blbs Cu / 2.3 Moz Au CuEq @ 1.65% Cu, 0.55 g/t Au --- Inferred Resources** 179 Mt @ 1.20% CuEq*** 3.9 Blbs Cu / 2.0 Moz Au CuEq @ 0.99% Cu, 0.34 g/t Au 1,700 Mt @ 0.64% CuEq*** 14.6 Blbs Cu / 20.4 Moz Au CuEq @ 0.39% Cu, 0.37 g/t Au, 0.011% Mo Mongolia: Oyu Tolgoi Entrée/Oyu Tolgoi JV Reserves and Resources 13 Entrée has a 20% interest in the above mineral reserves and resources.
  • 14. Mongolia: Oyu Tolgoi Multiple Development Options 14 Source: LHTR16 Note: Hugo North includes Hugo North Extension. Long life, high grade with significant expansion potential
  • 15. 15  US$4.4 billion financing signed December 2015  OTLLC has drawn down ~US$4.0 billion (June 2016); drawdown of additional US$0.4 billion to be finalized Project Finance  Updated 2016 feasibility study completed Feasibility Study  “Notice to Proceed” approvals announced May 2016TRQ, Rio Tinto and OTLLC Board Approvals  Expected mid-2016 with early work currently underway  Leverage existing infrastructure  Large resource base provides optionality Underground Re-Start Mongolia: Oyu Tolgoi Underground re-start as reported by Turquoise Hill   The notice to proceed approvals were the final requirement for the re-start of the underground development at the Hugo North Lift 1 block cave, including Lift 1 of the Entrée/Oyu Tolgoi JV’s Hugo North Extension deposit.   All necessary permits grantedPermits 
  • 16. Nevada: Ann Mason Large copper deposit in one of the best jurisdictions 16 Size 100% interest in a large Cu-Mo deposit amenable to open pit mining and sulphide flotation mill (Ann Mason deposit) Jurisdiction Nevada: one of the best jurisdictions for mining Strong local support in the Yerington District Longevity Potential mine life of over 21 years Updated PEA completed in 2015 Growth Convert remaining Inferred resources to Measured or Indicated with small drill program Additional studies to move to Pre-Feasibility Potential to expand oxide and sulphide resources at the Blue Hill deposit Partnership Positioned to attract strategic investment Infrastructure Rail, road and power
  • 17. Nevada: Ann Mason The Yerington Copper District 1717  Historic mining region  Top mining jurisdiction  Strong community support  Excellent infrastructure  Consolidation potential
  • 18. 18 ANN MASON DEPOSIT MINERAL RESOURCES 0.20% Cu Cut-off grade, effective September 9, 2015 Classification Tonnage (Mt) Grade Contained Metal Cu (%) Mo (%) Au (g/t) Ag (g/t) Cu (Mlb) Mo (Mlb) Au (Moz) Ag (Moz) Measured 412 0.33 0.006 0.03 0.64 3,037.6 58.1 0.37 8.46 Indicated 988 0.31 0.006 0.03 0.66 6,853.3 128.5 0.97 21.00 Measured and Indicated 1,400 0.32 0.006 0.03 0.65 9,890.9 186.6 1.33 29.46 Inferred 623 0.29 0.007 0.03 0.66 3,987.2 96.2 0.58 13.16  Mineral resources are reported within a constraining pit shell developed using Whittle™ software.  Assumptions include 100% mining recovery.  An external dilution factor was not considered during this resource estimation.  Internal dilution within a 20 metre x 20 metre x 15 metre SMU (selective mining unit) was considered.  The 0.4% net smelter returns royalty held by Sandstorm Gold Ltd. was not considered during the preparation of the conceptual pit.  Mineral resources that are not mineral reserves do not have demonstrated economic viability. 18 Nevada: Ann Mason Resource Estimate
  • 19. Nevada: Ann Mason 2015 PEA Highlights – Attractive Project Economics 19 LOM Production* (120,000 tpd mill throughput) 877 million tonnes LOM – Strip ratio 2:1 Development capital costs (pre-production + Year 1) US$1.35 billion Average cash costs (net of by-product sales)** US$1.49/lb copper All-in sustaining costs (net of by-product sales)** US$1.57/lb copper Average net annual undiscounted cash flow** US$298 million LOM – Average copper recovery 92% Copper concentrate grade 30% LOM – Copper production 5.1 billion lbs Note: The PEA is preliminary in nature, it includes Inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves, and there is no certainty that the PEA will be realized. Mineralized resources that are not mineral reserves do not have demonstrated economic viability. *835 Mt at 0.30% copper, 0.005% molybdenum, 0.03 g/t gold and 0.59 g/t silver are Measured and Indicated material, and 42 Mt at 0.27% copper, 0.005% molybdenum, 0.03 g/t gold and 0.58 g/t silver are Inferred material. **Pre-tax. “Cash costs” and “all-in sustaining costs” are non-U.S. GAAP Performance Measurements. These performance measurements are included because these statistics are widely accepted as the standard of reporting cash costs of production in North America. These performance measurements do not have a meaning within U.S. GAAP and therefore, amounts presented may not be comparable to similar data presented by other mining companies. These performance measurements should not be considered in isolation as a substitute for measures of performance in accordance with U.S. GAAP.
  • 20. 20 Nevada: Ann Mason 2015 PEA Financial Outputs ANN MASON 2015 PEA SENSITIVITY OF THE KEY FINANCIAL OUTPUTS (Post-Tax) Economic Scenario Cu* (US$/lb) NPV7.5% (US$ Million) IRR (%) Pay-back (Years) Net Average Annual Free Cash Flow (US$ Million) Low Case 2.75 339 10.3 8.7 189 Base Case 3.00 770 13.7 6.9 238 High Case 3.25 1,189 16.8 5.7 287 Note: The Base Case metal prices are based on a review of current analyst consensus reports and recent SEDAR filings for similar reports. The 2015 PEA is preliminary in nature and includes Inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves, and there is no certainty that the 2015 PEA will be realized. Mineral resources that are not mineral reserves do not have demonstrated economic viability. *Other metal prices: Low Case: Mo $9 (US$/lb), Ag $15 (US$/oz), Au $1,100 (US$/oz) Base Case: Mo $11 (US$/lb), Ag $20 (US$/oz), Au $1,200 (US$/oz) High Case: Mo $13 (US$/lb), Ag $25 (US$/oz), Au $1,300 (US$/oz)
  • 21. Nevada: Ann Mason 3-D View of Deposit 500 m N >0.15% Cu grade shell 21 Deposit Dimensions 2.8 km NW x 1.3 km NE x ~1.2 km vertical
  • 22. 22 Nevada: Ann Mason Project Potential *Reported in the Ann Mason 2015 PEA. The mineral resource estimate has an effective date of July 31, 2012 and was prepared by M. Waldegger, P. Geo. under the supervision of P. Desautels, P.Geo. of AGP. Mineral resources that are not mineral reserves do not have demonstrated economic viability. Entrée has a 100% interest in the claims comprising the Blue Hill deposit, subject to a 0.4% net smelter returns royalty in favour of Sandstorm Gold.  PFS level metallurgy complete  Minimal drilling to update remaining Inferred resource within Phase 5 pit  Additional studies to move to PFS: geotechnical drilling, environmental and engineering Ann Mason  Inferred resources of 72 Mt @ 0.17% Cu (leachable) plus 50 Mt @ 0.23% Cu (sulphide)*  Potential to expand oxide and sulphide resources  Potential heap-leach “starter” operation Blue Hill  Large portion of the property remains unexplored  Several high priority exploration targets on the property Exploration Targets  Well positioned to attract investment and partnersPartnership
  • 23. 23 Positioned to Deliver Value Oyu Tolgoi Underground Mine Plan agreement signed (2015) Hugo North Extension Lift 1 financed (2015) Underground development decision approved (May 2016) Copper fundamentals strong in mid-long term Ann Mason updated PEA (2015); positioned to attract strategic investment & partners Lordsburg future growth opportunity Strong balance sheet provides financial flexibility and security
  • 24. For more information, please contact: Monica Hamm Senior Manager Investor Relations and Corporate Communications mhamm@entreegold.com 604-687-4777 www.entreegold.com