SlideShare a Scribd company logo
1 of 4
A Highly motivated and qualified professional Mechanical Technologist
having experience and can pursue a challengingwork in Mechanical,
Electrical,Plumbingsystems,also in external services and Firefighting storm
water systems etc and related task with development opportunities in fully
competitive environment where my experience, knowledge and capabilities
can be utilized.
To achievea challengingposition in a prestigiousorganization whereI can
use my skillsand knowledge to create valuefor the organization and
contribute towards achievingorganizational goals and createcorporate
governance in the organization.
MS Engineering Management 2014-2015 (Expected)
Bachelor of Technology in Mechanical 2002-2006
Diploma of AssociateEngineer 1998-2001
Matric (Science) 1998
• Manage all the HVAC, Firefighting, compressed air,plumbing,
Cranes and bowser fillingexecution work.
• Coordination with consultantand client.
• Discussion with client,Suggestions,Proposalsand liaison with
Concern Authorities.
• Arrange internal coordinatingmeeting among sub-contractor and
Civil team.
• Arrange and manage material, labor and sub-contractor.
• Arrange coordination meetings with civil and my sub-contractor.
• Arrange maintenance staff for above mentioned system.
• Arrange tools for installation and maintenancepurpose.
• Quality assuranceof the work and material.
• Monitoringthe scheduleof work and also progress of staff.
• Checking of Bill of quantities & runningbillsof sub-contractors.
Organization Izhar Construction (PVT) Ltd
Position ConstructionManager (MEP)
Duration Aug 2009 to Present
FatherName: Muhammad Riaz
NIC: 35202-3910901-5
Domicile: Punjab
Date of birth: April 20,1982
Muhammad Mohsin
Raza
Objective
Academic Qualification
Professional Experience
mohsin.hvacr82
0092-321-4523365
009242-51360
H# 12 Neshter Colony Data
Nagher Badami Bagh Lahore
• Estimationandrate analysisof sub-contractorworks.
• Preparationof Presentation,Project/Site reports&documentationsof the project.
• Review the drawings/works&solve the designproblems.
• To supervise Testing,Startup& commissioningworkof Airconditioning,Fire fighting,
compressedair,plumbing,swimmingpool,Bowserfillingequipment andBMS system.
• Installation & commissioning of 420 Tons Screw Type Chillers, Hot Water Boilers, Air Handling Units,
Mini Fresh Air Handling Units, Humidifiers, Fan Coil Units, Split AC complete with Building
Management System (IBMS) & HEPA Filtration.
• Installation of FireFightingSystem and pump room installation.
• Installation and Supervision of galvanizingplant.
• Army Guest Room Building (DESOM) Lahore (Installation & Commissioning of Two Direct Fired
Absorption Chillers 180 Tons, Air Handling Units, Mini Air Handling Units, Humidifiers & Fan Coil
Units.)
•
• Installation and Commissioningwork on followingprojects
• VIRTUAL UNIVERSITY Lahore (DirectFired Absorption Chillers 200 Tons)
• CHEN ONE Multan (Water Cooled PackageAir Conditioners 600 Tons,)
• VANTAGE PRINTERS ( Water Cooled Package Air Conditioners,CoolingTower 350 Tons)
• RIAZ BOTTLERS (PEPSI) Lahore (Commercial Splits Air Conditioners 30Tons)
• SPARCO (Direct Fired Absorption Chiller 700 Tons)
• NISHAT SHUAIBA PAPER PRODUCTS COMPANY ( Water Cooled Water Chillers 400 Tons)
Organization Al-Jawahir Technical Pakistan LLC
Position MEP Project Engineer
Duration Aug 2008 to July2009
Organization MECA TECH International
Position Site Engineer
Duration Feb 2007 to Mar 2008
Organization Captive Aire
Position Site Engineer
Duration Sep 2004 to Feb 2007
Project Engineer
Additional Jobs Performed
Site Engineer
Site Engineer
• HONDA ATLAS Sheikhupura Road, Lahore ( Water Cooled PackageAir Conditioners 50 Tons, Washers
400,000 CFM, Ventilation System 150,000 CFM)
• FORMAN CHRISTEN COLLEGE Lahore ( BMS Controlled Direct Fired Absorption Chillers600 Tons)
• MEDIPHARM Lahore ( BMS Controlled Air Cooled Water Chillers50 Tons)
• Akson PharmaceuticalsMir Pur
• Cirin PharmaceuticalsHattar,Distt.Haripur
• Pharmagen Lahore
• CCL PharmaceuticalsLahore
• Siza International Lahore
• English PharmaceuticalsLahore
• Medipharm Lahore
• Munaver Pharmaceutical Lahore
 DATA DARBAR COMPLEX Lahore (Operation & Maintenance of Direct Fired Absorption Chillers 640 Tons,
Air HandlingUnits & Fan Coil Units)
 DATA DARBAR Lahore (Operation & Maintenance of Air Cooled Water Chillers 160 Tons & Air Handling
Units)
 SHEIKH ZAYED HOSPITAL Lahore (Operation & Maintenance of Steam Fired Absorption Chillers 1500
Tons, Boilers, Air HandlingUnits & Fan Coil Units)
 QATAR AIR WAYS Lahore (Installation of SplitAir Conditioners 25 Tons,Duct Work & DX Pipe Work)
• ALLAMAH IQBAL INTERNATIONAL AIR PORT NEW TERMINAL Lahore (Duct Work)
Organization Ahmad Brothers
Position Site Supervisor
Duration Apr 2003 to Sep2004
Organization Saleem Brothers
Position Site Supervisor
Duration Sep 2002 to Apr 2003
Site Supervisor
DOP TESTING
• SUI NORTHERN GAS Lahore (Duct Work)
• SUFI GROUP OF INDUSTRIES Lahore Office (Duct Work)
• THE VILLAGE HOTEL Lahore (Duct Work)
• Mr. DOGAR RESIDENCE Faisalabad (DuctWork)
• AGRICULTURE BANK OF PAKISTAN Lahore (Maintenance Work)
• FAZAL CARDEX Lahore (MaintenanceWork)
• DATA XS OFFICE Lahore (MaintenanceWork)
• SCHAZOO LABORATORIES Lahore (Maintenance Work)
• One day workshop on IBMS
• One day workshop on Design of cold storage HVAC system
• One day workshop on Screw compressors
• One day workshop Decision making
• Auto Cad
• MicrosoftOffice(MS Word , MS Excel , Power Point)
• MS Project(Planning& Schedulingof Project)
• Primavera (Planning& Schedulingof Project)
Organization Aircon Services
Position Site Supervisor
Duration Feb 2002 to Sep 2002
Training programs
Software Skills
Site Supervisor

More Related Content

What's hot

Transformer Oil Regeneration Technology
Transformer Oil Regeneration TechnologyTransformer Oil Regeneration Technology
Transformer Oil Regeneration TechnologyRahul Kumar
 
Kalyani Forge- Company Profile
Kalyani Forge- Company ProfileKalyani Forge- Company Profile
Kalyani Forge- Company ProfileMandar Joshi
 
Prince Industries Inc
Prince Industries IncPrince Industries Inc
Prince Industries IncRick
 
Oxyplants India Private Limited, Bengaluru, PSA Oxygen Gas Generators
Oxyplants India Private Limited, Bengaluru, PSA Oxygen Gas GeneratorsOxyplants India Private Limited, Bengaluru, PSA Oxygen Gas Generators
Oxyplants India Private Limited, Bengaluru, PSA Oxygen Gas GeneratorsIndiaMART InterMESH Limited
 
Western heat forge PROFILE
Western heat  forge PROFILEWestern heat  forge PROFILE
Western heat forge PROFILESOHIL VOHRA
 
Jagdamba Engineers & Consultancy, Pune, Pollution Control System
Jagdamba Engineers & Consultancy, Pune, Pollution Control SystemJagdamba Engineers & Consultancy, Pune, Pollution Control System
Jagdamba Engineers & Consultancy, Pune, Pollution Control SystemIndiaMART InterMESH Limited
 
icenta oval gear flow meters
icenta oval gear flow metersicenta oval gear flow meters
icenta oval gear flow metersPaul Gentle
 

What's hot (12)

N. R. Enterprises, Pune, Digital Controller
N. R. Enterprises, Pune, Digital ControllerN. R. Enterprises, Pune, Digital Controller
N. R. Enterprises, Pune, Digital Controller
 
Transformer Oil Regeneration Technology
Transformer Oil Regeneration TechnologyTransformer Oil Regeneration Technology
Transformer Oil Regeneration Technology
 
Kalyani Forge- Company Profile
Kalyani Forge- Company ProfileKalyani Forge- Company Profile
Kalyani Forge- Company Profile
 
Shivam enterprise
Shivam enterpriseShivam enterprise
Shivam enterprise
 
Prince Industries Inc
Prince Industries IncPrince Industries Inc
Prince Industries Inc
 
Oxyplants India Private Limited, Bengaluru, PSA Oxygen Gas Generators
Oxyplants India Private Limited, Bengaluru, PSA Oxygen Gas GeneratorsOxyplants India Private Limited, Bengaluru, PSA Oxygen Gas Generators
Oxyplants India Private Limited, Bengaluru, PSA Oxygen Gas Generators
 
Western heat forge PROFILE
Western heat  forge PROFILEWestern heat  forge PROFILE
Western heat forge PROFILE
 
Jagdamba Engineers & Consultancy, Pune, Pollution Control System
Jagdamba Engineers & Consultancy, Pune, Pollution Control SystemJagdamba Engineers & Consultancy, Pune, Pollution Control System
Jagdamba Engineers & Consultancy, Pune, Pollution Control System
 
Delhi machinery-stores
Delhi machinery-storesDelhi machinery-stores
Delhi machinery-stores
 
Samarth Hvac System, Ahmedabad, HVAC Systems
Samarth Hvac System, Ahmedabad, HVAC SystemsSamarth Hvac System, Ahmedabad, HVAC Systems
Samarth Hvac System, Ahmedabad, HVAC Systems
 
icenta oval gear flow meters
icenta oval gear flow metersicenta oval gear flow meters
icenta oval gear flow meters
 
VERIS Accelabar Flow Meter
VERIS Accelabar Flow MeterVERIS Accelabar Flow Meter
VERIS Accelabar Flow Meter
 

Similar to Experienced MEP Professional Seeks Challenging Role

applications overview
applications overviewapplications overview
applications overviewMark Jutila
 
MANPOWER PROVIDING PRESENTATION
MANPOWER PROVIDING PRESENTATIONMANPOWER PROVIDING PRESENTATION
MANPOWER PROVIDING PRESENTATIONMurat Cengiz
 
RE-LOCATION ENGINEERING SERVICES
RE-LOCATION ENGINEERING SERVICESRE-LOCATION ENGINEERING SERVICES
RE-LOCATION ENGINEERING SERVICESBerr Industry
 
Tanwir Ahmed Power House Manager
Tanwir Ahmed Power House ManagerTanwir Ahmed Power House Manager
Tanwir Ahmed Power House ManagerTanwir ahmed
 
20150709 - Americas Industrial Services
20150709 - Americas Industrial Services20150709 - Americas Industrial Services
20150709 - Americas Industrial ServicesMaribel Renteria
 
Trillium Flow Technologies: Alloa Service Centre Capabilities
Trillium Flow Technologies: Alloa Service Centre CapabilitiesTrillium Flow Technologies: Alloa Service Centre Capabilities
Trillium Flow Technologies: Alloa Service Centre CapabilitiesMatthew Hewett
 
STAGE 1 PRESENTATION.pptx
STAGE 1 PRESENTATION.pptxSTAGE 1 PRESENTATION.pptx
STAGE 1 PRESENTATION.pptxVishalKotia1
 
MANPOWER - SKILLED LABOR FORCE PROVIDING
MANPOWER - SKILLED LABOR FORCE PROVIDINGMANPOWER - SKILLED LABOR FORCE PROVIDING
MANPOWER - SKILLED LABOR FORCE PROVIDINGBerr Industry
 
4993_PipelineCleaningServices_8page
4993_PipelineCleaningServices_8page4993_PipelineCleaningServices_8page
4993_PipelineCleaningServices_8pageAmy Wood
 
Training presentation of bhel block 3 - abc
Training presentation of bhel block 3 - abcTraining presentation of bhel block 3 - abc
Training presentation of bhel block 3 - abcVishal Dubey
 
Test Rig And Laboratory Machine By Innovative Research Equipments
Test Rig And Laboratory Machine By Innovative Research EquipmentsTest Rig And Laboratory Machine By Innovative Research Equipments
Test Rig And Laboratory Machine By Innovative Research EquipmentsIndiaMART InterMESH Limited
 
AFP Oil and Gas Capability Statement_2015_web
AFP Oil and Gas Capability Statement_2015_webAFP Oil and Gas Capability Statement_2015_web
AFP Oil and Gas Capability Statement_2015_webMartin Kerrigan
 
Mohamed Ahmed (2008)
Mohamed Ahmed  (2008)Mohamed Ahmed  (2008)
Mohamed Ahmed (2008)Mohamed Ahmed
 

Similar to Experienced MEP Professional Seeks Challenging Role (20)

applications overview
applications overviewapplications overview
applications overview
 
MANPOWER PROVIDING PRESENTATION
MANPOWER PROVIDING PRESENTATIONMANPOWER PROVIDING PRESENTATION
MANPOWER PROVIDING PRESENTATION
 
Aamir C.V (1)
Aamir C.V (1)Aamir C.V (1)
Aamir C.V (1)
 
MR. Akhlaq Mohsin.pptx
MR. Akhlaq Mohsin.pptxMR. Akhlaq Mohsin.pptx
MR. Akhlaq Mohsin.pptx
 
RE-LOCATION ENGINEERING SERVICES
RE-LOCATION ENGINEERING SERVICESRE-LOCATION ENGINEERING SERVICES
RE-LOCATION ENGINEERING SERVICES
 
RELOCATION ENGINEERING FOR HEAVY DUTY
RELOCATION ENGINEERING FOR HEAVY DUTYRELOCATION ENGINEERING FOR HEAVY DUTY
RELOCATION ENGINEERING FOR HEAVY DUTY
 
Tanwir Ahmed Power House Manager
Tanwir Ahmed Power House ManagerTanwir Ahmed Power House Manager
Tanwir Ahmed Power House Manager
 
m.bendris
m.bendrism.bendris
m.bendris
 
20150709 - Americas Industrial Services
20150709 - Americas Industrial Services20150709 - Americas Industrial Services
20150709 - Americas Industrial Services
 
Trillium Flow Technologies: Alloa Service Centre Capabilities
Trillium Flow Technologies: Alloa Service Centre CapabilitiesTrillium Flow Technologies: Alloa Service Centre Capabilities
Trillium Flow Technologies: Alloa Service Centre Capabilities
 
STAGE 1 PRESENTATION.pptx
STAGE 1 PRESENTATION.pptxSTAGE 1 PRESENTATION.pptx
STAGE 1 PRESENTATION.pptx
 
MANPOWER - SKILLED LABOR FORCE PROVIDING
MANPOWER - SKILLED LABOR FORCE PROVIDINGMANPOWER - SKILLED LABOR FORCE PROVIDING
MANPOWER - SKILLED LABOR FORCE PROVIDING
 
EXPERIENCED MANPOWER SOLUTION
EXPERIENCED MANPOWER SOLUTIONEXPERIENCED MANPOWER SOLUTION
EXPERIENCED MANPOWER SOLUTION
 
4993_PipelineCleaningServices_8page
4993_PipelineCleaningServices_8page4993_PipelineCleaningServices_8page
4993_PipelineCleaningServices_8page
 
Training presentation of bhel block 3 - abc
Training presentation of bhel block 3 - abcTraining presentation of bhel block 3 - abc
Training presentation of bhel block 3 - abc
 
Latest_PEC_Presentation
Latest_PEC_PresentationLatest_PEC_Presentation
Latest_PEC_Presentation
 
Test Rig And Laboratory Machine By Innovative Research Equipments
Test Rig And Laboratory Machine By Innovative Research EquipmentsTest Rig And Laboratory Machine By Innovative Research Equipments
Test Rig And Laboratory Machine By Innovative Research Equipments
 
Resume
ResumeResume
Resume
 
AFP Oil and Gas Capability Statement_2015_web
AFP Oil and Gas Capability Statement_2015_webAFP Oil and Gas Capability Statement_2015_web
AFP Oil and Gas Capability Statement_2015_web
 
Mohamed Ahmed (2008)
Mohamed Ahmed  (2008)Mohamed Ahmed  (2008)
Mohamed Ahmed (2008)
 

Experienced MEP Professional Seeks Challenging Role

  • 1. A Highly motivated and qualified professional Mechanical Technologist having experience and can pursue a challengingwork in Mechanical, Electrical,Plumbingsystems,also in external services and Firefighting storm water systems etc and related task with development opportunities in fully competitive environment where my experience, knowledge and capabilities can be utilized. To achievea challengingposition in a prestigiousorganization whereI can use my skillsand knowledge to create valuefor the organization and contribute towards achievingorganizational goals and createcorporate governance in the organization. MS Engineering Management 2014-2015 (Expected) Bachelor of Technology in Mechanical 2002-2006 Diploma of AssociateEngineer 1998-2001 Matric (Science) 1998 • Manage all the HVAC, Firefighting, compressed air,plumbing, Cranes and bowser fillingexecution work. • Coordination with consultantand client. • Discussion with client,Suggestions,Proposalsand liaison with Concern Authorities. • Arrange internal coordinatingmeeting among sub-contractor and Civil team. • Arrange and manage material, labor and sub-contractor. • Arrange coordination meetings with civil and my sub-contractor. • Arrange maintenance staff for above mentioned system. • Arrange tools for installation and maintenancepurpose. • Quality assuranceof the work and material. • Monitoringthe scheduleof work and also progress of staff. • Checking of Bill of quantities & runningbillsof sub-contractors. Organization Izhar Construction (PVT) Ltd Position ConstructionManager (MEP) Duration Aug 2009 to Present FatherName: Muhammad Riaz NIC: 35202-3910901-5 Domicile: Punjab Date of birth: April 20,1982 Muhammad Mohsin Raza Objective Academic Qualification Professional Experience mohsin.hvacr82 0092-321-4523365 009242-51360 H# 12 Neshter Colony Data Nagher Badami Bagh Lahore
  • 2. • Estimationandrate analysisof sub-contractorworks. • Preparationof Presentation,Project/Site reports&documentationsof the project. • Review the drawings/works&solve the designproblems. • To supervise Testing,Startup& commissioningworkof Airconditioning,Fire fighting, compressedair,plumbing,swimmingpool,Bowserfillingequipment andBMS system. • Installation & commissioning of 420 Tons Screw Type Chillers, Hot Water Boilers, Air Handling Units, Mini Fresh Air Handling Units, Humidifiers, Fan Coil Units, Split AC complete with Building Management System (IBMS) & HEPA Filtration. • Installation of FireFightingSystem and pump room installation. • Installation and Supervision of galvanizingplant. • Army Guest Room Building (DESOM) Lahore (Installation & Commissioning of Two Direct Fired Absorption Chillers 180 Tons, Air Handling Units, Mini Air Handling Units, Humidifiers & Fan Coil Units.) • • Installation and Commissioningwork on followingprojects • VIRTUAL UNIVERSITY Lahore (DirectFired Absorption Chillers 200 Tons) • CHEN ONE Multan (Water Cooled PackageAir Conditioners 600 Tons,) • VANTAGE PRINTERS ( Water Cooled Package Air Conditioners,CoolingTower 350 Tons) • RIAZ BOTTLERS (PEPSI) Lahore (Commercial Splits Air Conditioners 30Tons) • SPARCO (Direct Fired Absorption Chiller 700 Tons) • NISHAT SHUAIBA PAPER PRODUCTS COMPANY ( Water Cooled Water Chillers 400 Tons) Organization Al-Jawahir Technical Pakistan LLC Position MEP Project Engineer Duration Aug 2008 to July2009 Organization MECA TECH International Position Site Engineer Duration Feb 2007 to Mar 2008 Organization Captive Aire Position Site Engineer Duration Sep 2004 to Feb 2007 Project Engineer Additional Jobs Performed Site Engineer Site Engineer
  • 3. • HONDA ATLAS Sheikhupura Road, Lahore ( Water Cooled PackageAir Conditioners 50 Tons, Washers 400,000 CFM, Ventilation System 150,000 CFM) • FORMAN CHRISTEN COLLEGE Lahore ( BMS Controlled Direct Fired Absorption Chillers600 Tons) • MEDIPHARM Lahore ( BMS Controlled Air Cooled Water Chillers50 Tons) • Akson PharmaceuticalsMir Pur • Cirin PharmaceuticalsHattar,Distt.Haripur • Pharmagen Lahore • CCL PharmaceuticalsLahore • Siza International Lahore • English PharmaceuticalsLahore • Medipharm Lahore • Munaver Pharmaceutical Lahore  DATA DARBAR COMPLEX Lahore (Operation & Maintenance of Direct Fired Absorption Chillers 640 Tons, Air HandlingUnits & Fan Coil Units)  DATA DARBAR Lahore (Operation & Maintenance of Air Cooled Water Chillers 160 Tons & Air Handling Units)  SHEIKH ZAYED HOSPITAL Lahore (Operation & Maintenance of Steam Fired Absorption Chillers 1500 Tons, Boilers, Air HandlingUnits & Fan Coil Units)  QATAR AIR WAYS Lahore (Installation of SplitAir Conditioners 25 Tons,Duct Work & DX Pipe Work) • ALLAMAH IQBAL INTERNATIONAL AIR PORT NEW TERMINAL Lahore (Duct Work) Organization Ahmad Brothers Position Site Supervisor Duration Apr 2003 to Sep2004 Organization Saleem Brothers Position Site Supervisor Duration Sep 2002 to Apr 2003 Site Supervisor DOP TESTING
  • 4. • SUI NORTHERN GAS Lahore (Duct Work) • SUFI GROUP OF INDUSTRIES Lahore Office (Duct Work) • THE VILLAGE HOTEL Lahore (Duct Work) • Mr. DOGAR RESIDENCE Faisalabad (DuctWork) • AGRICULTURE BANK OF PAKISTAN Lahore (Maintenance Work) • FAZAL CARDEX Lahore (MaintenanceWork) • DATA XS OFFICE Lahore (MaintenanceWork) • SCHAZOO LABORATORIES Lahore (Maintenance Work) • One day workshop on IBMS • One day workshop on Design of cold storage HVAC system • One day workshop on Screw compressors • One day workshop Decision making • Auto Cad • MicrosoftOffice(MS Word , MS Excel , Power Point) • MS Project(Planning& Schedulingof Project) • Primavera (Planning& Schedulingof Project) Organization Aircon Services Position Site Supervisor Duration Feb 2002 to Sep 2002 Training programs Software Skills Site Supervisor