  1. STAGE 1 PRESENTATION AT….M/S Larsen & Toubro Vishal Kotiya (60012148002) Mentor :- E Narayanan
  2. INTRODUCTION TO L&T • Larsen & Toubro Limited” is India’s premier technology – driven company with leading edge capabilities in the fields related to Engineering, Infrastructure & Basic Industries • The main functioning L&T workshop is located at Hazira, which is spread over an area of 73,600sq.mtrs. • The powai campus of L&T is the oldest facility as well as the most diverse in terms of employee strength and operations • The campus is well equipped with facilites for fabrication, machining, handling & quality control
  3. ORGANISATIONAL STRUCTURE
  4. PRESENT STATUS OF L&T • L&T From the last 7 Decades Serving Vital Human needs have diversified into its each and every range of products and projects. • Ranging from nuclear, hydrocarbon, aerospace, shipbuilding, electrical & electronics • the company produces precision engineering components and have mastered in the manufacturing of heat exchangers and pressure vessels. • L&T now have 23 manufacturing units spread all over the country. • IT aims to build on its traditional strengths and fulfils its vision of becoming a world-class company dedicated to professionalism & excellence.
  5. INTRODUCTION TO FLIGHT SYSTEM BUISNESS UNIT (FSBU)
  6. FLIGHT SYSTEM BUISNESS UNIT • As the name implies, the department is concerned with the production of testing equipment's for defence & space vehicles. • This department manufactures the motor casing of the Polar Satellite Launch Vehicle (PSLV) as well as the booster of the Geo-stationary Satellite Launch Vehicle (GSLV). • Current projects undergoing in the department are Reflector deployment mechanism, Hpersonic wind tunnel system. • manufacture of Rocket Motor Casings: S200 for GSLV Mk III and S139 for PSLV & GSLV. • The group is been divided into 4 sub groups such as Design group, project management group, marketing & quality control.
  7. INTRODUCTION TO PROJECT MANGEMENT GROUP • The group is involved in management and planning of all critical activity which is required for the production of the job. • The department is been subdivided into no of teams which deals with planning of different components to be manufactured from the whole as a project. • For eg of a wind tunnel system different group deals with production of different components individually. •
  8. OBJECTIVES • To study the drawings and to decide the proper sequence for manufacturing of job. • To decide the estimated starting and completion date of the project and to keep a track on project with the help of software’s like MS Project. • To co-ordinate with the shop floor supervisor and workers and to solve the problem if any. • To decide the necessary templates, gauges, tools required for production. • To find out the vendor details if a particular material or component is to be procured from vendor.
  9. FUNCTIONS • To prepare the detailed plate cutting layout (PCL) & plate cutting requisition (PCR) • To prepare the Detailed Process Plan (DPP) for fabrication and machining. • To manage the necessary inventory with the help of software’s like ERP-LN • Preparing design change requisition(DCR) • Checking material requisition (MR).
  10. INTRODUCTION TO WIND TUNNEL SYSTEM
  11. SUBSYSTEMS OF WIND TUNNEL • PRESSURE REGULATING SYSTEM • HEATING SYSTEM • SETTLING CHAMBER • NOZZLE • TEST SECTION • DIFFUSER • CONNECTING DUCT • VACCUM SPHERES
  12. SETTLING CHAMBER • Settling chamber is a large area low velocity section connected to a pipeline it is connevted to a nozzle • It is needed to improve the uniformity of flow entering the nozzle • The settling chamber is used to reduce this turbulence in the flow before it enters the nozzle
  13. NOZZLE • Nozzle are required to accelerate the flow from low speed to high speed • The nozzle are assembled with the settling chamber with the upstream end and with the test section in the downsteam end
  14. Diffuser • The air leaving the test section of the High speed test facility is at high temperatures (high enough to disallow direct exhaust into the atmosphere) and is at velocities at this temperature • Hence, slowing down and cooling the air leaving the test section is an absolute necessity for the safe day-to-day operation of the tunnel.
  15. CONNECTING DUCT • Connecting duct is the interface between the Diffuser & after cooler. It is sloping downwards form inlet to outlet to bridge the height difference between the outlet of Diffuser & inlet of After cooler. • . A manhole is provided on the connecting duct near the after cooler end to enable any inspection / maintenance.
  16. Project 1:- Comparing The Cost of The Weld Through Value Engineering Process • OBJECTIVE: Determining the total welding cost for each welding process for Circumseam seam and Longseam weld for a 6500 x 2000 x 16 THICK plate For flange to shell and total long seam weld. Progress Achieved : cost calculation completed for 1. Shielded metal arc welding (Smaw) 2. Tungsten arc welding (TIG)
  17. Project 2 :- Design And Load Calculation For Trolley of Diffuser System Progress achieved :- 1. Design calculations for screw jack completed 2. Selection of bearing for trolley completed 3. Drawing 3d models in Solidworks