SlideShare a Scribd company logo
1 of 9
Download to read offline
Mohamed Kamal Ibrahim
Address: 2th Youssef Gohar St. El Obor City
City: Cairo
Country: Egypt
Phone: 002-01015533123 or 002-01095166651
E-mail: Archartkamal@Yahoo.com
Objective.
Seeking challenging career opportunity in the field of Architecture
Engineering which is my academic background, personal skills
and people interaction capabilities can be utilized & developed
enabling me to have a growing career.
Educational Ref.
2001-2006
Faculty of Engineering–Architecture department-Modern Academy.
Bachelor of Engineering,2006
Grade [Good]
Graduation Project Grade [Good]
Bachelor's degree V.Good
 
Courses.
AutoCAD 2D in Faculty of Engineering (Cairo University).
Photoshop in Faculty of Engineering (Cairo University).
3dmax course in Faculty of Engineering (Cairo University).
Work Experience
SYSTEM CONTRACTIONG: (April 2015 – Till now)
 
System Contracting was established in 2000 as a specialist company in
aluminum façade's industry. The reliance on different market system
profiles either from the local market or imported from abroad, gave clients
the variety and the ability to choose the proper products in both quality
and price terms.
Job Title: SENIOR DESIGNER IN Technical Department
Responsibilities:
Meeting With the Consultant and Explain to him the
Difference between Aluminum Systems.
Submit Technical Data for
(Structural Glazing, Doors, Windows and System of cladding).
Make Shop drawings and Details according to
The site conditions and global standards.
 Starting purchasing order after approved shop drawings.
 Starting fabrication order according global standard.
Working in the Following Projects
* CENTER VILLE PROJECT: -
Total Price (3,900,000) LE
Total area of Structural glazing 1000 m²
Total area of cladding 2300 m².
* MEGA INVESTMENT PROJECT: -
Total Price (2,500,000) LE
Total area of curtain wall 1000 m²
Total area of cladding 400 m².
(JAN 2012 – April 2013)
HASSAN ABUL ALUMINUM FACTORY
Is one of the Hassan Abul Group of Companies which is
established for more than 55 years In (Kuwait)
HASSAN ABUL is sole agent to WICONA ALUMINUM
Since its inception in 1959, Hassan Abul holding company has become one
of the largest dealers in construction material in the gulf market.
Hassan Abul aluminum factory is one of the most modern factories in the
Middle East for (curtain walls, skylights, doors and windows)
Job Title: SENIOR DESIGNER & PROJECT MANAGER
Responsibilities:
Meeting With the Consultant and Explain to him the
Difference between Aluminum Systems.
Submit Technical Data for
(Structural Glazing, Doors, Windows and System of cladding)
Make Shop drawings, Details and Orders according to
The site conditions and global standards.
 Starting installation after approved shop drawings.
 Submit payments according to progress every month.
Profiles Used in projects I’ve being working with:
*WICONA SYSTEM
Working in the Following Projects
* ALI ABDUL WAHAB TOWER: -
Total Price (250,000) KD.
Total area of curtain wall 2500 m²
Total area of cladding 2500 m².
Photo from Site
* PLATINUM HEALTH CLUB: -
Total Price (175,000) KD.
Total area of curtain wall 1200 m²
Total area of cladding 1400 m²
Photo from Site
(FEB 2011 – JAN 2012) & (April 2013– April 2015)
El GABALAWY GROUP
El Gabalawy is sole agent to REYNAERS ALUMINUM
With almost 40 years’ experience in the building industry, El Gabalawy
Aluminum is one of Europe's market leaders in the development,
commercialization and distribution of high quality aluminum systems for
windows, doors, sliding elements, curtain walls, conservatories and sun
screening systems. El Gabalawy’ systems provide solutions for new-build
and renovation on the residential and project markets.
Job Title: ESTIMATOR & SENIOR DESIGNER in Technical Department
Responsibilities:
Meeting With the Consultant after That show and
Explain to him what the Difference between Aluminum
Systems and give him Technical Data for
(Curtain Wall, Structural Glazing, Semi Structural, Sky Light,
Doors, Windows System of cladding).
Make Shop drawings, Details and Orders according to
The site conditions and global standards.
Profiles Used in projects I’ve being working with:
*REYNAERS
Working in the Following Projects
* MOHANDESIN OFFICE BUILDING: -
Total Price (2,000,000) LE Two Millions.
Make Technical Data, Shop Drawing, Details & fabrication order
Total area of Structural glazing 1600 m²
* BOSTAN EL SOKHNA PROJECT: -
Total Price (2,500,000) LE Two Million Five Hundred
Make Technical Data, Shop Drawing & Details
According To the Site Condition and global Standards
* ROOTS STEEL PROJECT: -
Total Price (1,100,000) LE One Million One Hundred
MAY 2010 – FEB 2011
ALUMANA INDESTRIES FACTORY: is one of the
Redco Almana Group which is established for more than 15 Years
In(Doa,Qata)
Alumana Industries Factory specializes in the design, production
and installation of various kinds of glass panel’s double glass and
laminated glass, aluminum doors, windows & developing the
design, engineering, fabrication
and installation of all types of façade systems and comprehensive
range of advanced aluminum curtain wall like conventional,
structural and unitized also spider system.
JobTitle:PROJECTENGINEER&SENIOR DESIGNER in TechnicalDepartment
Responsibilities
 Project engineer and senior designer for
aluminum, glass, cladding & spider system in
BUSINESS PARK project in Doha, Qatar.
This project consists of five building for offices,
hotel, show room building and five stair cases
also conference building using spider system.
Make Shop drawings, Details and Orders
according to the site conditions and global
standards.
Profiles and spider fitting Used in this project
from:
1) VISTA WALL (ALUMINUM SYSTEM)
2) KIN LONG (SPIDER SYSTEM)
Total Price (52,000,000) QR Fifty Two Millions.
Photo from Site
NOV2008– MAY 2010
ALFANAR ALUMINUM FACTORY: is	one	of	the	
ALFANAR	Group	of	Companies	which	is	established	for	
more	than35years	In (Riyadh, Saudi Arabia)																																																																																																								
Alfanar Aluminum Factory specializes in the design, production and
installation of various kinds of glass panels, aluminum doors, windows
&developing the design, engineering, fabrication and installation of all
types of façade systems and comprehensive range of advanced aluminum
curtain wall like conventional, structural and unitized.
Job Title: Team leader in TechnicalDepartment
Responsibilities:
 Meeting with the Consultant after That show and explain to
him what the Difference between Alfanar Aluminum System
& another System and give him Technical Data for (Curtain
Wall, Structural Glazing, Semi Structural, Sky Light, Doors,
Windows & System of Cladding).
 Make Shop drawings, Details and Orders according to the site
conditions and global standards.
 Profiles Used in projects I’ve being working with:
1) VISTA WALL
2) REYNAERS
3) INSTALLUX
Workingin the FollowingProjects
*Al Fanar Medium Voltage (MV) Factory:-
                  Total Price  (1,000,000) SR One Million                                                                                    
Make Technical Data, Shop Drawing & Details according To the Site Condition and
global Standards 
 
	*Complex Principality of Jazan:-
             Total Price  (1,015,000) SR One Million Fifteen Thousand 
Marked Technical Data, Shop Drawing & Details according To the Site Condition and
global Standards  
AUG 2006 – NOV 2008
MOBICA COMPANY: Mobica was established in
1976 with one factory at Abou Rawash industrial zone
producing office furniture. In 2004 Mobica's industrial
base had been expanded to include 15 factories
occupying an area of 280,000m² and covering a large
scope of business varying from Office, Medical,
Educational & Contract Furniture to Automotive Supplies. 
 
Job Title: Architecture Engineer in Facades Department
Responsibilities:
 Meeting Clients after That show Anew Facades Systems (Spider System –
Curtain Wall System –Traditional Facades )And Show different Between
Material (Aluminum Cladding, Porcelain And Stainless Steel)
 Make Shop drawings, Details and fabrication Orders according to the site
conditions and global standards.
 Adjust the price list and prepare the B.O.Q. for the client.
 
Workingin the FollowingProjects
 
         *(HSBC) Bank in theFollowingBranches:-
 Sidi Gabber in Alex Make (Shop Drawing–Details and Fab. orders)
 Shooting Club Make (Shop Drawing–Details and Fab. orders)
 Ritz in Sharm Elshik Make (Shop Drawing–Details and Fab. orders)
 El Azhar Make (Shop Drawing–Details and Fab. orders)
 Vini Make (Shop Drawing–Details and Fab. orders)
*(CIB) Bank in theFollowingBranches:-
 Gamete El Dewal Make (Shop Drawing–Details and Fab. orders)
 Mmlok Mall in Hurgada Make (Shop Drawing–Details and Fab. orders)
 El Harass Elgomhory Make (Shop Drawing–Details and Fab. orders)
*Other Projects:-
 (NSGB Bank Branch) El Manual Make (Shop Drawing–Details and Fab.
orders)
 Alex Air in Airport Make (Shop Drawing–Details and Fab. orders)
 Sweet Center Heliopolis Make (Shop Drawing–Details and Fab. orders)
 Academy of Cardiac Surgeries Make (Shop Drawing–
Details and Fab. Order for glass) total area 1000 m².
The project is spider system glass facade in curvature shape of height 50 meter and
width 16.9 meter which the spider fixed on vertical pipes have the same curve of the
facade which the pipe fixed on 7 space truss frames between 2 cores (shear walls ).
 Bridge of Mobica Make (Shop Drawing–Details and Fab.
Order for glass) (Spider System)
Computer Skills
 
 AutoCAD 2D&3D (all versions)
 ArchiCAD.
 Adobe Photoshop 7(all versions)
 Microsoft Excel & Word.
 Sketch Up.
Personal Skills
 
 Interactive and fast learner.
 High Communication Skills.
 Self-Motivated.
 Able to work in a group or individually according to the job
requirements.
 Well organized.
 Creative.
 Hard Worker.
 High social abilities.
Additional Information
 Gender: male
 Nationality: Egyptian
 Birth Day: April. 08, 1984
 Marital Status: Married
 Languages:
 Arabic Native Language
 English Good in Read/Write/Speak

More Related Content

What's hot

Facade Consultancy Enveloptechnik
Facade Consultancy EnveloptechnikFacade Consultancy Enveloptechnik
Facade Consultancy EnveloptechnikManjunath Shetty
 
THE ESSENTIALS IN HOTEL OPENINGS - Part I
THE ESSENTIALS IN HOTEL OPENINGS - Part ITHE ESSENTIALS IN HOTEL OPENINGS - Part I
THE ESSENTIALS IN HOTEL OPENINGS - Part IAhmet Seymen
 
ארבל פידל אדריכלים
ארבל פידל אדריכליםארבל פידל אדריכלים
ארבל פידל אדריכליםitai
 
السيرة الذاتية إبراهيم العتر
السيرة الذاتية إبراهيم العترالسيرة الذاتية إبراهيم العتر
السيرة الذاتية إبراهيم العترibrahim shukri el-eter
 
Vinod Resume
Vinod ResumeVinod Resume
Vinod ResumeVinod Rai
 
ADOLFO HERNANDEZ Updated Resume_March_21_2016
ADOLFO HERNANDEZ Updated Resume_March_21_2016ADOLFO HERNANDEZ Updated Resume_March_21_2016
ADOLFO HERNANDEZ Updated Resume_March_21_2016Adolfo Hernandez Sabillon
 
carmelo_romano_8.8.16[1]
carmelo_romano_8.8.16[1]carmelo_romano_8.8.16[1]
carmelo_romano_8.8.16[1]Carmelo Romano
 
Omar Abu-Dahoud CV 11.2016
Omar Abu-Dahoud CV 11.2016Omar Abu-Dahoud CV 11.2016
Omar Abu-Dahoud CV 11.2016Omar Abu-Dahoud
 
Administrative Projects from " DESIGNERS Consultants "
Administrative Projects from " DESIGNERS Consultants " Administrative Projects from " DESIGNERS Consultants "
Administrative Projects from " DESIGNERS Consultants " Sherine Milad
 
2015JCFQ work portfolio light
2015JCFQ work portfolio light2015JCFQ work portfolio light
2015JCFQ work portfolio lightChang Jacky
 

What's hot (17)

willem cv
willem cvwillem cv
willem cv
 
Facade Consultancy Enveloptechnik
Facade Consultancy EnveloptechnikFacade Consultancy Enveloptechnik
Facade Consultancy Enveloptechnik
 
THE ESSENTIALS IN HOTEL OPENINGS - Part I
THE ESSENTIALS IN HOTEL OPENINGS - Part ITHE ESSENTIALS IN HOTEL OPENINGS - Part I
THE ESSENTIALS IN HOTEL OPENINGS - Part I
 
mohammed soliman 4-2014
mohammed soliman 4-2014mohammed soliman 4-2014
mohammed soliman 4-2014
 
ארבל פידל אדריכלים
ארבל פידל אדריכליםארבל פידל אדריכלים
ארבל פידל אדריכלים
 
السيرة الذاتية إبراهيم العتر
السيرة الذاتية إبراهيم العترالسيرة الذاتية إبراهيم العتر
السيرة الذاتية إبراهيم العتر
 
Vinod Resume
Vinod ResumeVinod Resume
Vinod Resume
 
M.Salah cv1
M.Salah cv1M.Salah cv1
M.Salah cv1
 
Tarek C.V
Tarek C.VTarek C.V
Tarek C.V
 
resume_BFR
resume_BFRresume_BFR
resume_BFR
 
ADOLFO HERNANDEZ Updated Resume_March_21_2016
ADOLFO HERNANDEZ Updated Resume_March_21_2016ADOLFO HERNANDEZ Updated Resume_March_21_2016
ADOLFO HERNANDEZ Updated Resume_March_21_2016
 
aldarat
aldarataldarat
aldarat
 
carmelo_romano_8.8.16[1]
carmelo_romano_8.8.16[1]carmelo_romano_8.8.16[1]
carmelo_romano_8.8.16[1]
 
Omar Abu-Dahoud CV 11.2016
Omar Abu-Dahoud CV 11.2016Omar Abu-Dahoud CV 11.2016
Omar Abu-Dahoud CV 11.2016
 
Administrative Projects from " DESIGNERS Consultants "
Administrative Projects from " DESIGNERS Consultants " Administrative Projects from " DESIGNERS Consultants "
Administrative Projects from " DESIGNERS Consultants "
 
2015JCFQ work portfolio light
2015JCFQ work portfolio light2015JCFQ work portfolio light
2015JCFQ work portfolio light
 
RESUME KUWAIT
RESUME KUWAITRESUME KUWAIT
RESUME KUWAIT
 

Viewers also liked

OFFERING DE ARMAXIMUS
OFFERING DE ARMAXIMUSOFFERING DE ARMAXIMUS
OFFERING DE ARMAXIMUSguestc87a58d
 
2017年01月21日 AITCシニア技術者勉強会 第3回「各種センサーを使ってみよう!~温湿度と加速度~」
2017年01月21日 AITCシニア技術者勉強会 第3回「各種センサーを使ってみよう!~温湿度と加速度~」2017年01月21日 AITCシニア技術者勉強会 第3回「各種センサーを使ってみよう!~温湿度と加速度~」
2017年01月21日 AITCシニア技術者勉強会 第3回「各種センサーを使ってみよう!~温湿度と加速度~」aitc_jp
 
Payel_Banik_resume
Payel_Banik_resumePayel_Banik_resume
Payel_Banik_resumePAYEL BANIK
 
The mystery of bermuda triangle
The mystery of bermuda triangleThe mystery of bermuda triangle
The mystery of bermuda triangleRiya Singh
 

Viewers also liked (10)

anglian water
anglian wateranglian water
anglian water
 
P12
P12P12
P12
 
Días blancos 2017
Días blancos 2017Días blancos 2017
Días blancos 2017
 
OFFERING DE ARMAXIMUS
OFFERING DE ARMAXIMUSOFFERING DE ARMAXIMUS
OFFERING DE ARMAXIMUS
 
Bomba zar
Bomba zarBomba zar
Bomba zar
 
When the main risk comes from the management process itself
When the main risk comes from the management process itselfWhen the main risk comes from the management process itself
When the main risk comes from the management process itself
 
2017年01月21日 AITCシニア技術者勉強会 第3回「各種センサーを使ってみよう!~温湿度と加速度~」
2017年01月21日 AITCシニア技術者勉強会 第3回「各種センサーを使ってみよう!~温湿度と加速度~」2017年01月21日 AITCシニア技術者勉強会 第3回「各種センサーを使ってみよう!~温湿度と加速度~」
2017年01月21日 AITCシニア技術者勉強会 第3回「各種センサーを使ってみよう!~温湿度と加速度~」
 
Payel_Banik_resume
Payel_Banik_resumePayel_Banik_resume
Payel_Banik_resume
 
Analis Kesehatan
Analis KesehatanAnalis Kesehatan
Analis Kesehatan
 
The mystery of bermuda triangle
The mystery of bermuda triangleThe mystery of bermuda triangle
The mystery of bermuda triangle
 

Similar to Mohamed Kamal (C.V)

emad_azab_CV
emad_azab_CVemad_azab_CV
emad_azab_CVEmad Azab
 
Mohamed Diab-Electrical Engineer CV
Mohamed Diab-Electrical Engineer CVMohamed Diab-Electrical Engineer CV
Mohamed Diab-Electrical Engineer CVMohamed Diab
 
Aec_Facade_Presentation
Aec_Facade_PresentationAec_Facade_Presentation
Aec_Facade_PresentationAnkur Sardana
 
Alaa_Attiya resume
Alaa_Attiya resumeAlaa_Attiya resume
Alaa_Attiya resumeAlaa Attiya
 
NAVITAS - cata jan 2016
NAVITAS - cata jan 2016NAVITAS - cata jan 2016
NAVITAS - cata jan 2016Khaled Nukho
 
1-Ahmed Amin's C.V
1-Ahmed Amin's C.V1-Ahmed Amin's C.V
1-Ahmed Amin's C.VAhmed Amin
 
Eng. M. El-Shorbagy CV and relater certificates ( project manager - pmp) 8.09 mb
Eng. M. El-Shorbagy CV and relater certificates ( project manager - pmp) 8.09 mbEng. M. El-Shorbagy CV and relater certificates ( project manager - pmp) 8.09 mb
Eng. M. El-Shorbagy CV and relater certificates ( project manager - pmp) 8.09 mbMohamed ElShourbagy (PMP)
 
1-ahmed ghieh- CV
1-ahmed ghieh- CV1-ahmed ghieh- CV
1-ahmed ghieh- CVAhmed Ghieh
 
Eng. Ayman Mitkees Cv.
Eng. Ayman Mitkees Cv.Eng. Ayman Mitkees Cv.
Eng. Ayman Mitkees Cv.Ayman Mitkees
 
mohamed fawzy cv 2712016
mohamed fawzy cv 2712016mohamed fawzy cv 2712016
mohamed fawzy cv 2712016Mohamed Fawzy
 
mohamed fawzy cv 2712016
mohamed fawzy cv 2712016mohamed fawzy cv 2712016
mohamed fawzy cv 2712016Mohamed Fawzy
 
Presentation. jkr lawatan IBS kilang HC Precast System
Presentation.   jkr lawatan IBS kilang HC Precast SystemPresentation.   jkr lawatan IBS kilang HC Precast System
Presentation. jkr lawatan IBS kilang HC Precast SystemTeow Beng Hur
 

Similar to Mohamed Kamal (C.V) (20)

Ahmed el gohary cv
Ahmed el gohary cvAhmed el gohary cv
Ahmed el gohary cv
 
haitham cv
haitham cvhaitham cv
haitham cv
 
emad_azab_CV
emad_azab_CVemad_azab_CV
emad_azab_CV
 
Company brochure
Company brochureCompany brochure
Company brochure
 
Mohamed Diab-Electrical Engineer CV
Mohamed Diab-Electrical Engineer CVMohamed Diab-Electrical Engineer CV
Mohamed Diab-Electrical Engineer CV
 
Ahmed_c.v
Ahmed_c.vAhmed_c.v
Ahmed_c.v
 
Aec_Facade_Presentation
Aec_Facade_PresentationAec_Facade_Presentation
Aec_Facade_Presentation
 
Alaa CV
Alaa CVAlaa CV
Alaa CV
 
Ahmed Abdel Salam 03.2016
Ahmed Abdel Salam 03.2016Ahmed Abdel Salam 03.2016
Ahmed Abdel Salam 03.2016
 
Alaa_Attiya resume
Alaa_Attiya resumeAlaa_Attiya resume
Alaa_Attiya resume
 
NAVITAS - cata jan 2016
NAVITAS - cata jan 2016NAVITAS - cata jan 2016
NAVITAS - cata jan 2016
 
1-Ahmed Amin's C.V
1-Ahmed Amin's C.V1-Ahmed Amin's C.V
1-Ahmed Amin's C.V
 
Eng. M. El-Shorbagy CV and relater certificates ( project manager - pmp) 8.09 mb
Eng. M. El-Shorbagy CV and relater certificates ( project manager - pmp) 8.09 mbEng. M. El-Shorbagy CV and relater certificates ( project manager - pmp) 8.09 mb
Eng. M. El-Shorbagy CV and relater certificates ( project manager - pmp) 8.09 mb
 
emad salehInv
emad salehInvemad salehInv
emad salehInv
 
1-ahmed ghieh- CV
1-ahmed ghieh- CV1-ahmed ghieh- CV
1-ahmed ghieh- CV
 
RESUME
RESUMERESUME
RESUME
 
Eng. Ayman Mitkees Cv.
Eng. Ayman Mitkees Cv.Eng. Ayman Mitkees Cv.
Eng. Ayman Mitkees Cv.
 
mohamed fawzy cv 2712016
mohamed fawzy cv 2712016mohamed fawzy cv 2712016
mohamed fawzy cv 2712016
 
mohamed fawzy cv 2712016
mohamed fawzy cv 2712016mohamed fawzy cv 2712016
mohamed fawzy cv 2712016
 
Presentation. jkr lawatan IBS kilang HC Precast System
Presentation.   jkr lawatan IBS kilang HC Precast SystemPresentation.   jkr lawatan IBS kilang HC Precast System
Presentation. jkr lawatan IBS kilang HC Precast System
 

Mohamed Kamal (C.V)

  • 1. Mohamed Kamal Ibrahim Address: 2th Youssef Gohar St. El Obor City City: Cairo Country: Egypt Phone: 002-01015533123 or 002-01095166651 E-mail: Archartkamal@Yahoo.com Objective. Seeking challenging career opportunity in the field of Architecture Engineering which is my academic background, personal skills and people interaction capabilities can be utilized & developed enabling me to have a growing career. Educational Ref. 2001-2006 Faculty of Engineering–Architecture department-Modern Academy. Bachelor of Engineering,2006 Grade [Good] Graduation Project Grade [Good] Bachelor's degree V.Good   Courses. AutoCAD 2D in Faculty of Engineering (Cairo University). Photoshop in Faculty of Engineering (Cairo University). 3dmax course in Faculty of Engineering (Cairo University).
  • 2. Work Experience SYSTEM CONTRACTIONG: (April 2015 – Till now)   System Contracting was established in 2000 as a specialist company in aluminum façade's industry. The reliance on different market system profiles either from the local market or imported from abroad, gave clients the variety and the ability to choose the proper products in both quality and price terms. Job Title: SENIOR DESIGNER IN Technical Department Responsibilities: Meeting With the Consultant and Explain to him the Difference between Aluminum Systems. Submit Technical Data for (Structural Glazing, Doors, Windows and System of cladding). Make Shop drawings and Details according to The site conditions and global standards.  Starting purchasing order after approved shop drawings.  Starting fabrication order according global standard. Working in the Following Projects * CENTER VILLE PROJECT: - Total Price (3,900,000) LE Total area of Structural glazing 1000 m² Total area of cladding 2300 m². * MEGA INVESTMENT PROJECT: - Total Price (2,500,000) LE Total area of curtain wall 1000 m² Total area of cladding 400 m².
  • 3. (JAN 2012 – April 2013) HASSAN ABUL ALUMINUM FACTORY Is one of the Hassan Abul Group of Companies which is established for more than 55 years In (Kuwait) HASSAN ABUL is sole agent to WICONA ALUMINUM Since its inception in 1959, Hassan Abul holding company has become one of the largest dealers in construction material in the gulf market. Hassan Abul aluminum factory is one of the most modern factories in the Middle East for (curtain walls, skylights, doors and windows) Job Title: SENIOR DESIGNER & PROJECT MANAGER Responsibilities: Meeting With the Consultant and Explain to him the Difference between Aluminum Systems. Submit Technical Data for (Structural Glazing, Doors, Windows and System of cladding) Make Shop drawings, Details and Orders according to The site conditions and global standards.  Starting installation after approved shop drawings.  Submit payments according to progress every month. Profiles Used in projects I’ve being working with: *WICONA SYSTEM Working in the Following Projects * ALI ABDUL WAHAB TOWER: - Total Price (250,000) KD. Total area of curtain wall 2500 m² Total area of cladding 2500 m². Photo from Site * PLATINUM HEALTH CLUB: - Total Price (175,000) KD. Total area of curtain wall 1200 m² Total area of cladding 1400 m² Photo from Site
  • 4. (FEB 2011 – JAN 2012) & (April 2013– April 2015) El GABALAWY GROUP El Gabalawy is sole agent to REYNAERS ALUMINUM With almost 40 years’ experience in the building industry, El Gabalawy Aluminum is one of Europe's market leaders in the development, commercialization and distribution of high quality aluminum systems for windows, doors, sliding elements, curtain walls, conservatories and sun screening systems. El Gabalawy’ systems provide solutions for new-build and renovation on the residential and project markets. Job Title: ESTIMATOR & SENIOR DESIGNER in Technical Department Responsibilities: Meeting With the Consultant after That show and Explain to him what the Difference between Aluminum Systems and give him Technical Data for (Curtain Wall, Structural Glazing, Semi Structural, Sky Light, Doors, Windows System of cladding). Make Shop drawings, Details and Orders according to The site conditions and global standards. Profiles Used in projects I’ve being working with: *REYNAERS Working in the Following Projects * MOHANDESIN OFFICE BUILDING: - Total Price (2,000,000) LE Two Millions. Make Technical Data, Shop Drawing, Details & fabrication order Total area of Structural glazing 1600 m² * BOSTAN EL SOKHNA PROJECT: - Total Price (2,500,000) LE Two Million Five Hundred Make Technical Data, Shop Drawing & Details According To the Site Condition and global Standards * ROOTS STEEL PROJECT: - Total Price (1,100,000) LE One Million One Hundred
  • 5. MAY 2010 – FEB 2011 ALUMANA INDESTRIES FACTORY: is one of the Redco Almana Group which is established for more than 15 Years In(Doa,Qata) Alumana Industries Factory specializes in the design, production and installation of various kinds of glass panel’s double glass and laminated glass, aluminum doors, windows & developing the design, engineering, fabrication and installation of all types of façade systems and comprehensive range of advanced aluminum curtain wall like conventional, structural and unitized also spider system. JobTitle:PROJECTENGINEER&SENIOR DESIGNER in TechnicalDepartment Responsibilities  Project engineer and senior designer for aluminum, glass, cladding & spider system in BUSINESS PARK project in Doha, Qatar. This project consists of five building for offices, hotel, show room building and five stair cases also conference building using spider system. Make Shop drawings, Details and Orders according to the site conditions and global standards. Profiles and spider fitting Used in this project from: 1) VISTA WALL (ALUMINUM SYSTEM) 2) KIN LONG (SPIDER SYSTEM) Total Price (52,000,000) QR Fifty Two Millions. Photo from Site
  • 6. NOV2008– MAY 2010 ALFANAR ALUMINUM FACTORY: is one of the ALFANAR Group of Companies which is established for more than35years In (Riyadh, Saudi Arabia) Alfanar Aluminum Factory specializes in the design, production and installation of various kinds of glass panels, aluminum doors, windows &developing the design, engineering, fabrication and installation of all types of façade systems and comprehensive range of advanced aluminum curtain wall like conventional, structural and unitized. Job Title: Team leader in TechnicalDepartment Responsibilities:  Meeting with the Consultant after That show and explain to him what the Difference between Alfanar Aluminum System & another System and give him Technical Data for (Curtain Wall, Structural Glazing, Semi Structural, Sky Light, Doors, Windows & System of Cladding).  Make Shop drawings, Details and Orders according to the site conditions and global standards.  Profiles Used in projects I’ve being working with: 1) VISTA WALL 2) REYNAERS 3) INSTALLUX Workingin the FollowingProjects *Al Fanar Medium Voltage (MV) Factory:-                   Total Price  (1,000,000) SR One Million                                                                                     Make Technical Data, Shop Drawing & Details according To the Site Condition and global Standards    *Complex Principality of Jazan:-              Total Price  (1,015,000) SR One Million Fifteen Thousand  Marked Technical Data, Shop Drawing & Details according To the Site Condition and global Standards  
  • 7. AUG 2006 – NOV 2008 MOBICA COMPANY: Mobica was established in 1976 with one factory at Abou Rawash industrial zone producing office furniture. In 2004 Mobica's industrial base had been expanded to include 15 factories occupying an area of 280,000m² and covering a large scope of business varying from Office, Medical, Educational & Contract Furniture to Automotive Supplies.    Job Title: Architecture Engineer in Facades Department Responsibilities:  Meeting Clients after That show Anew Facades Systems (Spider System – Curtain Wall System –Traditional Facades )And Show different Between Material (Aluminum Cladding, Porcelain And Stainless Steel)  Make Shop drawings, Details and fabrication Orders according to the site conditions and global standards.  Adjust the price list and prepare the B.O.Q. for the client.   Workingin the FollowingProjects            *(HSBC) Bank in theFollowingBranches:-  Sidi Gabber in Alex Make (Shop Drawing–Details and Fab. orders)  Shooting Club Make (Shop Drawing–Details and Fab. orders)  Ritz in Sharm Elshik Make (Shop Drawing–Details and Fab. orders)  El Azhar Make (Shop Drawing–Details and Fab. orders)  Vini Make (Shop Drawing–Details and Fab. orders)
  • 8. *(CIB) Bank in theFollowingBranches:-  Gamete El Dewal Make (Shop Drawing–Details and Fab. orders)  Mmlok Mall in Hurgada Make (Shop Drawing–Details and Fab. orders)  El Harass Elgomhory Make (Shop Drawing–Details and Fab. orders) *Other Projects:-  (NSGB Bank Branch) El Manual Make (Shop Drawing–Details and Fab. orders)  Alex Air in Airport Make (Shop Drawing–Details and Fab. orders)  Sweet Center Heliopolis Make (Shop Drawing–Details and Fab. orders)  Academy of Cardiac Surgeries Make (Shop Drawing– Details and Fab. Order for glass) total area 1000 m². The project is spider system glass facade in curvature shape of height 50 meter and width 16.9 meter which the spider fixed on vertical pipes have the same curve of the facade which the pipe fixed on 7 space truss frames between 2 cores (shear walls ).  Bridge of Mobica Make (Shop Drawing–Details and Fab. Order for glass) (Spider System)
  • 9. Computer Skills    AutoCAD 2D&3D (all versions)  ArchiCAD.  Adobe Photoshop 7(all versions)  Microsoft Excel & Word.  Sketch Up. Personal Skills    Interactive and fast learner.  High Communication Skills.  Self-Motivated.  Able to work in a group or individually according to the job requirements.  Well organized.  Creative.  Hard Worker.  High social abilities. Additional Information  Gender: male  Nationality: Egyptian  Birth Day: April. 08, 1984  Marital Status: Married  Languages:  Arabic Native Language  English Good in Read/Write/Speak