CV Michal Podstavec, attachment 2


                   Example of responsibilities - project Mazda J6EA

PHASE 1 - Business case
     Design input from customer (ECN,CCs)
     Issue Quoting Model
     Quote to customer
     Price agreement with customer
PHASE 2 - PRODUCT DESIGN AND DEVELOPMENT
     Design input collection
     Design discussion with customer
     EBOM preparation
     Internal drawings preparation
     Customer drawing preparation
     Drawing discussion with customer
     Approval by customer for customer DRW
     Build prototypes
DESIGN VERIFICATION = Product Validation Testing
     Create DVP plan
     Agreement with customer for DVP plan
     Raise test requests
     Testing and reporting
     Check packaging if packaging is OK
     DVP testing completed
PHASE 3 - PRODUCT VALIDATION
     GPDM drawings and BOM release
     AS400 drawings and BOM release
     PROCESS DESIGN & DEVELOPMENT
            Gradually informing plant about new release (obsolete parts)
            Kick off meeting with local team
            Finalize obsolete parts discussion
PROCESS VALIDATION
     Off-Process build No.1 (Internal)
            Order components
            Production trial run
            Production validation testing + sending PSW docs to customer
            getting PSW approval from customer
     Receive customer schedule / forecasts
     Mass production start (SOP)


Agenda
     My responsibility
     Others

More Related Content

What's hot

FLIGHT CONTROL SYSTEM.pptx
FLIGHT CONTROL SYSTEM.pptxFLIGHT CONTROL SYSTEM.pptx
FLIGHT CONTROL SYSTEM.pptxvishalrana390975
 
Future Perfect Continuous Tense
Future Perfect Continuous TenseFuture Perfect Continuous Tense
Future Perfect Continuous TenseSchool
 
final drive and differential
final drive and differentialfinal drive and differential
final drive and differentialscuderiasudhan
 
Brief history of aviation by madhav
Brief history of aviation   by madhavBrief history of aviation   by madhav
Brief history of aviation by madhavksudarsh
 
The science behind how planes fly
The science behind how planes flyThe science behind how planes fly
The science behind how planes flyChenoy Ceil
 
Fluid Power Engineering "Hydraulic Accumulator"
Fluid Power Engineering "Hydraulic Accumulator"Fluid Power Engineering "Hydraulic Accumulator"
Fluid Power Engineering "Hydraulic Accumulator"Harsh Pathak
 
Aerodynamics of a_rotary_wing_type_aircraft
Aerodynamics of a_rotary_wing_type_aircraftAerodynamics of a_rotary_wing_type_aircraft
Aerodynamics of a_rotary_wing_type_aircraftdarshakb
 
PPT on Suspension system in automobiles By Pukhraj palariya
PPT on Suspension system in automobiles By Pukhraj palariyaPPT on Suspension system in automobiles By Pukhraj palariya
PPT on Suspension system in automobiles By Pukhraj palariyapukhraj palariya
 
Variable Valve Timing
Variable Valve TimingVariable Valve Timing
Variable Valve TimingSourav Bagchi
 

What's hot (11)

FLIGHT CONTROL SYSTEM.pptx
FLIGHT CONTROL SYSTEM.pptxFLIGHT CONTROL SYSTEM.pptx
FLIGHT CONTROL SYSTEM.pptx
 
Future Perfect Continuous Tense
Future Perfect Continuous TenseFuture Perfect Continuous Tense
Future Perfect Continuous Tense
 
final drive and differential
final drive and differentialfinal drive and differential
final drive and differential
 
Brief history of aviation by madhav
Brief history of aviation   by madhavBrief history of aviation   by madhav
Brief history of aviation by madhav
 
The science behind how planes fly
The science behind how planes flyThe science behind how planes fly
The science behind how planes fly
 
Torque converter
Torque converterTorque converter
Torque converter
 
Fluid Power Engineering "Hydraulic Accumulator"
Fluid Power Engineering "Hydraulic Accumulator"Fluid Power Engineering "Hydraulic Accumulator"
Fluid Power Engineering "Hydraulic Accumulator"
 
Ignition system
Ignition systemIgnition system
Ignition system
 
Aerodynamics of a_rotary_wing_type_aircraft
Aerodynamics of a_rotary_wing_type_aircraftAerodynamics of a_rotary_wing_type_aircraft
Aerodynamics of a_rotary_wing_type_aircraft
 
PPT on Suspension system in automobiles By Pukhraj palariya
PPT on Suspension system in automobiles By Pukhraj palariyaPPT on Suspension system in automobiles By Pukhraj palariya
PPT on Suspension system in automobiles By Pukhraj palariya
 
Variable Valve Timing
Variable Valve TimingVariable Valve Timing
Variable Valve Timing
 

Viewers also liked

English project work i nvention
English  project  work  i nventionEnglish  project  work  i nvention
English project work i nventionPrapawarin Hochin
 
Sample Work - Lush "Hope Soap" advertising proposal (student project)
Sample Work - Lush "Hope Soap" advertising proposal (student project)Sample Work - Lush "Hope Soap" advertising proposal (student project)
Sample Work - Lush "Hope Soap" advertising proposal (student project)Evangeline Fan
 
Project work pi_yip_feng_2013
Project work pi_yip_feng_2013Project work pi_yip_feng_2013
Project work pi_yip_feng_2013Yip Feng
 
PVC Wires and Cables - Manufacturing Plant, Detailed Project Report, Profile,...
PVC Wires and Cables - Manufacturing Plant, Detailed Project Report, Profile,...PVC Wires and Cables - Manufacturing Plant, Detailed Project Report, Profile,...
PVC Wires and Cables - Manufacturing Plant, Detailed Project Report, Profile,...Ajjay Kumar Gupta
 
แบบฟอร์มโครงงานภาษาอังกฤษ
แบบฟอร์มโครงงานภาษาอังกฤษแบบฟอร์มโครงงานภาษาอังกฤษ
แบบฟอร์มโครงงานภาษาอังกฤษสมใจ จันสุกสี
 
โครงงานอังกฤษ Group 1
โครงงานอังกฤษ Group 1โครงงานอังกฤษ Group 1
โครงงานอังกฤษ Group 1Supaporn Nilayakanon
 
Desert Powerpoint
Desert PowerpointDesert Powerpoint
Desert PowerpointMissLeak09
 
Advertisement effect on Lux beauty soap
Advertisement effect on Lux beauty soapAdvertisement effect on Lux beauty soap
Advertisement effect on Lux beauty soapFiroj Md Shah
 
โครงงานสถานที่ท่องเที่ยวในอาเซียน
โครงงานสถานที่ท่องเที่ยวในอาเซียนโครงงานสถานที่ท่องเที่ยวในอาเซียน
โครงงานสถานที่ท่องเที่ยวในอาเซียนiceskywalker
 
Project report on mobile shop management
Project report on mobile shop managementProject report on mobile shop management
Project report on mobile shop managementDinesh Jogdand
 
market research project on lux soaps
market research project on lux soapsmarket research project on lux soaps
market research project on lux soapsRohit Kumar
 
Interchange 4th 1 wb.pdf workbook red
Interchange 4th 1 wb.pdf workbook red Interchange 4th 1 wb.pdf workbook red
Interchange 4th 1 wb.pdf workbook red Leila Belmar
 
marketing strategy of lux soap with reference to HUL
marketing strategy of lux soap with reference to HULmarketing strategy of lux soap with reference to HUL
marketing strategy of lux soap with reference to HULAghna Shamsi
 
Project on parle g biscuits
Project on parle g biscuitsProject on parle g biscuits
Project on parle g biscuitsPallaviGore13
 
Parle-g marketing strategy
Parle-g marketing strategyParle-g marketing strategy
Parle-g marketing strategyDhruv Patar
 
English revision level 1
English revision   level 1English revision   level 1
English revision level 1MargaRenedo
 

Viewers also liked (20)

English project work i nvention
English  project  work  i nventionEnglish  project  work  i nvention
English project work i nvention
 
Sample Work - Lush "Hope Soap" advertising proposal (student project)
Sample Work - Lush "Hope Soap" advertising proposal (student project)Sample Work - Lush "Hope Soap" advertising proposal (student project)
Sample Work - Lush "Hope Soap" advertising proposal (student project)
 
Project work pi_yip_feng_2013
Project work pi_yip_feng_2013Project work pi_yip_feng_2013
Project work pi_yip_feng_2013
 
Desert
Desert Desert
Desert
 
PVC Wires and Cables - Manufacturing Plant, Detailed Project Report, Profile,...
PVC Wires and Cables - Manufacturing Plant, Detailed Project Report, Profile,...PVC Wires and Cables - Manufacturing Plant, Detailed Project Report, Profile,...
PVC Wires and Cables - Manufacturing Plant, Detailed Project Report, Profile,...
 
แบบฟอร์มโครงงานภาษาอังกฤษ
แบบฟอร์มโครงงานภาษาอังกฤษแบบฟอร์มโครงงานภาษาอังกฤษ
แบบฟอร์มโครงงานภาษาอังกฤษ
 
My first steps in English
My first steps in EnglishMy first steps in English
My first steps in English
 
โครงงานอังกฤษ Group 1
โครงงานอังกฤษ Group 1โครงงานอังกฤษ Group 1
โครงงานอังกฤษ Group 1
 
Desert Powerpoint
Desert PowerpointDesert Powerpoint
Desert Powerpoint
 
Advertisement effect on Lux beauty soap
Advertisement effect on Lux beauty soapAdvertisement effect on Lux beauty soap
Advertisement effect on Lux beauty soap
 
โครงงานสถานที่ท่องเที่ยวในอาเซียน
โครงงานสถานที่ท่องเที่ยวในอาเซียนโครงงานสถานที่ท่องเที่ยวในอาเซียน
โครงงานสถานที่ท่องเที่ยวในอาเซียน
 
Acknowledgements
AcknowledgementsAcknowledgements
Acknowledgements
 
Project report on mobile shop management
Project report on mobile shop managementProject report on mobile shop management
Project report on mobile shop management
 
market research project on lux soaps
market research project on lux soapsmarket research project on lux soaps
market research project on lux soaps
 
Interchange 4th 1 wb.pdf workbook red
Interchange 4th 1 wb.pdf workbook red Interchange 4th 1 wb.pdf workbook red
Interchange 4th 1 wb.pdf workbook red
 
marketing strategy of lux soap with reference to HUL
marketing strategy of lux soap with reference to HULmarketing strategy of lux soap with reference to HUL
marketing strategy of lux soap with reference to HUL
 
Acknowledgement
AcknowledgementAcknowledgement
Acknowledgement
 
Project on parle g biscuits
Project on parle g biscuitsProject on parle g biscuits
Project on parle g biscuits
 
Parle-g marketing strategy
Parle-g marketing strategyParle-g marketing strategy
Parle-g marketing strategy
 
English revision level 1
English revision   level 1English revision   level 1
English revision level 1
 

Similar to Example of project work

Apqp+english+version[1]
Apqp+english+version[1]Apqp+english+version[1]
Apqp+english+version[1]Murat Terzi
 
V model of project development
V model of project developmentV model of project development
V model of project developmentBreach_P
 
QM.02._Goods Receipts for PO
QM.02._Goods Receipts for POQM.02._Goods Receipts for PO
QM.02._Goods Receipts for PORonen Madar
 
Case Study Design Build Line
Case Study   Design Build LineCase Study   Design Build Line
Case Study Design Build Linelksnyder
 
Alcance del proyecto
Alcance del proyectoAlcance del proyecto
Alcance del proyectoLucia Uriona
 
The qfd process sutton f03
The qfd process sutton f03The qfd process sutton f03
The qfd process sutton f03Surya Ratheesh
 
Sw Software Development Models
Sw Software Development ModelsSw Software Development Models
Sw Software Development Modelsjonathan077070
 
OpenERP - Project Methodology
OpenERP - Project MethodologyOpenERP - Project Methodology
OpenERP - Project MethodologyQuang Ngoc
 
VDA_Maturity level assurance (MLA) _3rd_2022_English.pdf
VDA_Maturity level assurance (MLA) _3rd_2022_English.pdfVDA_Maturity level assurance (MLA) _3rd_2022_English.pdf
VDA_Maturity level assurance (MLA) _3rd_2022_English.pdfcdming
 
Preliminary Scope Statement Template
Preliminary Scope Statement TemplatePreliminary Scope Statement Template
Preliminary Scope Statement TemplateMelanieRos
 
2.05 scope management 1
2.05 scope management 12.05 scope management 1
2.05 scope management 1reddvise
 
Top 10 signs you should do in engineering
Top 10 signs you should do in engineeringTop 10 signs you should do in engineering
Top 10 signs you should do in engineeringvijaya Lakshmi
 
Top 10 signs you should do in engineering
Top 10 signs you should do in engineeringTop 10 signs you should do in engineering
Top 10 signs you should do in engineeringvijaya Lakshmi
 

Similar to Example of project work (20)

Apqp+english+version[1]
Apqp+english+version[1]Apqp+english+version[1]
Apqp+english+version[1]
 
V model of project development
V model of project developmentV model of project development
V model of project development
 
QM.02._Goods Receipts for PO
QM.02._Goods Receipts for POQM.02._Goods Receipts for PO
QM.02._Goods Receipts for PO
 
Case Study Design Build Line
Case Study   Design Build LineCase Study   Design Build Line
Case Study Design Build Line
 
Process methodology
Process methodologyProcess methodology
Process methodology
 
Alcance del proyecto
Alcance del proyectoAlcance del proyecto
Alcance del proyecto
 
Session 4 gdas pmp study group presentation
Session 4   gdas pmp study group presentationSession 4   gdas pmp study group presentation
Session 4 gdas pmp study group presentation
 
The qfd process sutton f03
The qfd process sutton f03The qfd process sutton f03
The qfd process sutton f03
 
Apqp ppt
Apqp pptApqp ppt
Apqp ppt
 
Sw Software Development Models
Sw Software Development ModelsSw Software Development Models
Sw Software Development Models
 
OpenERP - Project Methodology
OpenERP - Project MethodologyOpenERP - Project Methodology
OpenERP - Project Methodology
 
Class2
Class2Class2
Class2
 
Karthi resume 1
Karthi resume 1Karthi resume 1
Karthi resume 1
 
VDA_Maturity level assurance (MLA) _3rd_2022_English.pdf
VDA_Maturity level assurance (MLA) _3rd_2022_English.pdfVDA_Maturity level assurance (MLA) _3rd_2022_English.pdf
VDA_Maturity level assurance (MLA) _3rd_2022_English.pdf
 
Preliminary Scope Statement Template
Preliminary Scope Statement TemplatePreliminary Scope Statement Template
Preliminary Scope Statement Template
 
2.05 scope management 1
2.05 scope management 12.05 scope management 1
2.05 scope management 1
 
Top 10 signs you should do in engineering
Top 10 signs you should do in engineeringTop 10 signs you should do in engineering
Top 10 signs you should do in engineering
 
R-1 Resume
R-1 ResumeR-1 Resume
R-1 Resume
 
Apqp la
Apqp laApqp la
Apqp la
 
Top 10 signs you should do in engineering
Top 10 signs you should do in engineeringTop 10 signs you should do in engineering
Top 10 signs you should do in engineering
 

Example of project work

  • 1. CV Michal Podstavec, attachment 2 Example of responsibilities - project Mazda J6EA PHASE 1 - Business case Design input from customer (ECN,CCs) Issue Quoting Model Quote to customer Price agreement with customer PHASE 2 - PRODUCT DESIGN AND DEVELOPMENT Design input collection Design discussion with customer EBOM preparation Internal drawings preparation Customer drawing preparation Drawing discussion with customer Approval by customer for customer DRW Build prototypes DESIGN VERIFICATION = Product Validation Testing Create DVP plan Agreement with customer for DVP plan Raise test requests Testing and reporting Check packaging if packaging is OK DVP testing completed PHASE 3 - PRODUCT VALIDATION GPDM drawings and BOM release AS400 drawings and BOM release PROCESS DESIGN & DEVELOPMENT Gradually informing plant about new release (obsolete parts) Kick off meeting with local team Finalize obsolete parts discussion PROCESS VALIDATION Off-Process build No.1 (Internal) Order components Production trial run Production validation testing + sending PSW docs to customer getting PSW approval from customer Receive customer schedule / forecasts Mass production start (SOP) Agenda My responsibility Others