I have spent many years working in various remote areas including Arnhem Land, Gove,
Moranbah, Tanami Desert, Maralinga, Tom Price, Dampier, Karratha, Moomba and a large
number of shutdowns throughout Australia.
These Construction and Maintenance positions have involved working alongside
Boilermakers, Mechanical Fitters, Pipe Fitters, Welders and Wharf Replenishment.
I have worked in Power Stations, Ports, Oil Refineries, and Bauxite Mines.
I work hard, every day. I am extremely honest, reliable and capable of doing any task that is
put to me.
Working safely is a high priority and I often take on an extra safety role in my various
positions.
Work History
Late Aug/Sept 15/ Major shutdown Shell Refinery Geelong. VIC
April /May 15/Shutdowns at Caltex Refinery Lynton. QLD
UGL Limited
July14/April 15 Shutdowns at Vales Point and Eraring Power Stations for CBH Engineering.
Feb14/Mar 14 Safety support for BMA Mines in the Bowen Basin QLD
Mentoring and training Contractors on dragline shutdowns. Reporting to BMA.
June13/Feb14 Construction of gas plant, pump compression station. Surat basin QLD.
Aug 12/Jan13 T/A Fitter Caltex Refinery Kurnell.
Shutdown throughout the refinery UGL.
Jan/July-12 Safety support for BMA Mines in the Bowen Basin QLD
Safety for BMA Drag line shutdowns on various mine sites throughout the Bowen Basin.
August-11- Nov 11 T/A Fitter
Shell- Mobil Refineries Vic. Shutdown TSL / UGL.
April-11 – August 11 Safety Advisor
BMA Goonyella Riverside Coalmine,Bowen Basin, QLD
Dragline 3 Major Shutdown
Jan-11-April 11 Trades Assistant Fitter
Transfield Services Altona, VIC
Qenos Polypropolyene Plant ,Scale 2,Shutdown
2. Sept-10-Jan-11 Trades Assistant Fitter
Transworley power services, NSW
Vales Point Power Station,
May – Sept-10 Trades Assistant Fitter
United Group Resources – Moranbah, QLD
Ammonia Nitrate Plant Construction
March - May 10 Trades Assistant Fitter
United Group Resources – Gove, NT. Installing Conveyor System.
Feb - March 10 Trades Assistant Fitter
United Group Resources – Caltex Refinery Kurnell
Major Bensat Shutdown (LTI free)
Aug - Nov 09 Trades Assistant Fitter
United Group - Shell Refinery - Geelong, VIC
Major Shutdown
Feb - July 09 Trades Assistant
United Group - Karratha, WA
Construction Karratha Power Station
Sept - Feb. 09 Trades Assistant Fitter
United Group - Moranbah, QLD.
Ammonia Nitrate Plant Construction
2008 - 2008 Fitter
United Group, Shell Refinery Clyde Sydney
Mechanical Fitter
2005 - 2007 Trades Assistant
McConnell Dowell, Dampier W.A.
Wharf Extensions for Rio Tinto
Power Station Shutdowns
Certificates:
Certificate IV Training and Assessment (TAA40104)
OH&S Safety Representative
Confined Space Entry Permit
Working at Heights Permit
Referees:
Paul Colton Mechanical Supervisor United Group PH: 042879426
Peter Cutbush Director/Safety Principal of Concise Training Solutions
for BMA Shutdown team. PH: 0401412913
Mick Savcin Mechanical Supervisor United Group PH: 0404 036 005
John Volaski Mechanical Supervisor United Group PH: 0412 817 510
Keith McCreedy Superintendent McConnell Dowell PH: 0417 876 145