SlideShare a Scribd company logo
1 of 26
Download to read offline
Matthew Brantley
VP Business Development
brantley@integrityfundcontrol.com
Office +1 (657) 286-0060 ext 1856
Direct +1 (657) 286-0056
Mobile +1 (909)-278-9985
Fax +1 (714) 529-2408
SCAN ME
The Integrity Fund Control
team of dedicated profes-
sionals provides a full array
of services supported by our
state-of-the-art construction
loan management software.
Our team’s specialized
knowledge gives you the
edge in successfully
completing and resolving
complex, non-conforming
construction and funding
matters.
Our ability to problem solve
is what sets us apart from
the other service providers.
The principals of Integrity
have assembled a team of
experts that bring specific
and unique skill sets, tailored
to provide customized
cutting edge services.
Integrity Joint Control Inc., is a licensed joint control agent operating under the governance
of the Department of Business Oversight.
License No. 96DBO-43774
Today, many firms offer fund control services. Most of these firms successfully provide a
very adequate template based services for the accounting, disbursement and inspections
for construction loans.
The benefit the Integrity Fund Control team brings to each and every project we service is
our experience and unique understanding of the disbursement as well as the construction
process. Integrity’s principals and handpicked staff bring the knowledge and ability to inter-
pret each situation to provide effective solutions that create mutually beneficial outcome
and insure that there are no surprises.
Our expertise, and attention to detail will allow you and your staff to concentrate on your
core business with the confidence that Integrity is professionally and diligently overseeing
your disbursement needs.
Unforeseen and non-conforming variables are involved in every construction project. Our
Risk Reduction System allows us to work with you and your clients at the set up stage of
each project and head off many problems before they begin. But in the ever changing con-
struction environment challenges invariable arise, these situations are why Integrity Fund
Control is the choice to make.
IFC maintains a full-service disbursement program to efficient-
ly manage and process construction progress draw requests
quickly and accurately. Comprehensive accounting and
streamlined communication services include disbursement
processing, title search, inspection report, lien waivers, and
escrow accounting.
Services include license verification, bonding and insurance-
validation, work-in-progress study, related experience study,
and detailed reference and background checks.
Includes visit to the property to determine project status, a
review of plans and specifications, and preparation of detailed
line item costs to complete project. We also verify permit and
inspection status with the governing jurisdiction.
CONSTRUCTION PROGRESS INSPECTIONS
Our seasoned professional inspectors visit the construction
site, photograph and evaluate the construction progress, and
complete a thorough, written report to determine funding
decisions.
Matthew Brantley
VP Business Development
brantley@integrityfundcontrol.com
Office +1 (657) 286-0060 ext 1856
Direct +1 (657) 286-0056
Mobile +1 (909)-278-9985
Fax +1 (714) 529-2408
Integrity Joint Control, Inc.
CONSTRUCTION DISBURSEMENT PROCEDURES
IMPORTANT-READ CAREFULLY
DATE:
BANK: LOAN NO.
BORROWER: IFC NO.
JOB ADDRESS
CONTRACTOR:
Overview: Draw requests are submitted to Integrity Joint Control, Inc., dba Integrity Fund Control hereinafter (IFC), by the
general contractor and owner. The requests may be presented in person, by mail, or electronically. The underlying
documentation is reviewed and once all documentation has been collected the draw is entered in to IFC’s disbursement
program. The draw is then analyzed against a current inspection report prepared by IFC. Any deficiencies in documentation
or percentages of completion will be reported to the interested parties. Once all conditions are satisfied, IFC, will present the
draw request, all underlying documentation, budget reports and inspection reports to the lender for funding. Once funding is
received Checks are issued to the payees listed on the payee list provided by the contractor and owner. It may be necessary
for IFC to modify the payee listing from time to time to facilitate the issuance of joint checks as may be required to satisfy
material and other suppliers.
Documents required in support of draw request:
1. The general contractor completes the G-702 and G-703 forms or other similar forms approved by the Lender. The
contractor will also complete the construction fund request form and payee listing together with any line item transfer
requests or change order documentation. The contractor then forwards the complete draw package to the owner together
with all underlying invoices, releases paid receipts, W-9 forms and cancelled checks. The owner reviews the request,
and once approved, the draw is forwarded to IFC for processing.
2. The Construction Fund request must be completed in its entirety and signed by the owner and general contractor
3. The Payee List should include, the date, draw no. exact project address and owners name. The listing shall include the
name of the material supplier and or/or sub-contractor, amount of payment, payee address, corresponding cost
breakdown line item number. This document must be signed by the owner and the contractor.
4. The draw must include all underlying invoices, lien releases, cancelled checks and w-9’s for each payee
5. All draw requests for any reimbursement previously paid for by the general contractor must be supported by ALL of
the following items: A) Material receipts marked “PAID” by the material supplier, B) Paid receipt from persons
performing any labor, C) Copy of canceled checks (front and back), D) Unconditional labor and or material release
(whichever is applicable), In no event will reimbursements be made for any cash payments made by owner, general
contractor, builder, or any sub-contractor regardless of any supplemental documentation submitted with the request.
6. Only those draws for items within the amounts stated on the cost breakdown will be honored. If the amount allotted to
an item on the cost breakdown is not sufficient to pay for its actual cost, the owner AND contractor may request in
writing, by use of reallocation form the surplus funds (from already completed items or items with a surplus verified
by current executed contracts) may be reallocated to the item needing additional funds. The owner AND contractor
may also request the use of any available contingency funds (disbursements of contingency funds shall not exceed the
overall percentage of completion as determined by a current inspection report performed by IFC. The request to
transfer funds is subject to lender approval.
7. Draws will be honored only if our construction inspector has verified that the labor has been performed and/or the
material has been installed and integrated into the site.
8. IFC may take up to five working days, from receipt of draw requests, prior to payment or return of said draw request
to accommodate the disbursement process.
9. Retention of construction funds will be required as agreed to by the Lender and the Owner.
10. All disbursements are subject to the final approval of the Lender
11. IFC is not a building code enforcer. IFC will not inspect for quality of work or be your agent in any manner.
12. Disbursements will be delayed if all of the above stated provisions are not fully satisfied.
I HAVE READ THE CONTENTS CONTAINED HEREIN AND HEREBY AGREE TO FULLY ABIDE BY THE
ABOVE REQUIREMENTS.
LENDER: INTEGRITY JOINT CONTROL INC., dba Integrity
Fund Control
By:________________________________________ By:_______________________________________
(Date) (Date)
BORROWER: CONTRACTOR:
By: ________________________________________ By: ______________________________________
(Date) (Date)
FORM 1
Construction Funds Request
This form provides both IFC and your
institution with a snapshot of the draw
request.
INTEGRITY HAS SIMPLIFIED
THE DRAW PROCESS WITH
AN EASY TO FOLLOW DRAW
PROCESS THAT IS AS EASY
AS 1, 2, 3!
OUR SIMPLE AND EASY TO
FOLLOW FORMS SAVES
YOUR INSTITUION BOTH TIME
AND MONEY.
FORM 1 CONSTRUCTION
FUNDS REQUEST
FORM 2 PAYEE LIST
FORM 3 BUDGET TRANSFER
REQUEST
FORM 4 RELEASES
Our proven process makes disbursing request
Fast, Easy, and Effective!
FORM 2 Payee List
This simple form spells out where the
money is going. It lists who is being
paid and how much. It includes which
line items are being drawn on and
includes a description section that
makes it easy for the contractor to ex-
plain what he is trying to accomplish.
Matthew Brantley
VP Business Development
brantley@integrityfundcontrol.com
Office +1 (657) 286-0060 ext 1856
Direct +1 (657) 286-0056
Mobile +1 (909)-278-9985
Fax +1 (714) 529-2408
REQUEST #:
TO: Integrity Fund Control
307 N Brea Blvd., Suite 202
Brea, CA 92821
DATE:
JOB#:
JOB ADDRESS:
OWNER:
CONTRACTOR:
BANK
CONSTRUCTION AMOUNT:
REVISED CONSTRUCTION AMOUNT:
TOTAL REQUESTED PRIOR:
CURRENT REQUEST:
CONSTRUCTION BALANCE:
Borrwer:
Contractor:
FORM 1 - CONSTRUCTION FUND REQUEST
JOB # JOB NAME:
Total amount of Draw
LINE ITEM # AMOUNT
$0.00
X
OWNER:
X
CONTRACTOR:
FORM 2 - PAYEE LIST
PAYEE DESCRIPTION
** 2 SIGNATURES REQUIRED **
FORM 3
Budget Transfer Request
Contracts are sometimes renegotiated
and need to have funds reallocated.
Our budget transfer form makes track-
ing these changes and explaining them
fast easy.
INTEGRITY HAS SIMPLIFIED
THE DRAW PROCESS WITH
AN EASY TO FOLLOW DRAW
PROCESS THAT IS AS EASY
AS 1, 2, 3!
OUR SIMPLE AND EASY TO
FOLLOW FORMS SAVES
YOUR INSTITUION BOTH TIME
AND MONEY.
FORM 1 CONSTRUCTION
FUNDS REQUEST
FORM 2 PAYEE LIST
FORM 3 BUDGET TRANSFER
REQUEST
FORM 4 RELEASES
Protecting your interests is what we do!
FORM 4 Releases
Perhaps the most important form we
provide are the releases. These forms
are the contractors release of interest
and are critical in avoiding any claims
by the contractor, sub contractor, and
any vendors at the end of the project.
Matthew Brantley
VP Business Development
brantley@integrityfundcontrol.com
Office +1 (657) 286-0060 ext 1856
Direct +1 (657) 286-0056
Mobile +1 (909)-278-9985
Fax +1 (714) 529-2408
Draw #:
DATE:
JOB#:
JOB ADDRESS:
OWNER:
BANK
CONTRACTOR:
BANK APPROVAL,
IF REQUIRED:
*If eliminating items, provide explanation for eliminating items below.
Owner and/or Contractor hereby request transfer of the following items in the nearest whole dollars:
Transfer From:
Item # Item Description Budget Amount Transfer Amount
1 2 -$ -$
-$ -$
-$ -$
-$ -$
-$ -$
-$ -$
TOTAL -$
Transfer To:
Item # Item Description Budget Amount Transfer Amount
-$ -$
-$ -$
-$ -$
-$ -$
-$ -$
-$ -$
TOTAL -$
Eliminating Items:
Item # Reason:
Contractor:
2 SIGNATURES REQUIRED
FORM 3 - BUDGET TRANSFER REQUEST
sign here
Owner:
Identifying Information
Name of Claimant:
Name of Customer:
Job Location:
Owner:
Through Date:
Conditional Waiver and Release
Maker of Check:
Amount of Check:
Check Payable to:
Date(s) of waiver and release:
Amount(s) of unpaid progress payment(s):
Claimant's Signature:
Claimant's Title:
Date of Signature:
REVISION 07-01-12
CONDITIONAL WAIVER AND RELEASE UPON PROGRESS PAYMENT
CALIFORNIA CIVIL CODE § 8132
NOTICE: THIS DOCUMENT WAIVES THE CLAIMANT'S LIEN, STOP PAYMENT NOTICE, AND PAYMENT BOND RIGHTS
EFFECTIVE ON RECEIPT OF PAYMENT. A PERSON SHOULD NOT RELY ON THIS DOCUMENT UNLESS SATISFIED THAT THE
CLAIMANT HAS RECEIVED PAYMENT.
This document waives and releases lien, stop payment notice, and payment bond rights the claimant has for labor and service
provided, and equipment and material delivered, to the customer on this job through the Through Date of this document.
Rights based upon labor or service provided, or equipment or material delivered, pursuant to a written change order that has
been fully executed by the parties prior to the date that this document is signed by the claimant, are waived and released by
this document, unless listed as an Exception below. This document is effective only on the claimant’s receipt of payment from
the financial institution on which the following check is drawn:
INTEGRITY FUND CONTROL
$
Exceptions
This document does not affect any of the following:
(1) Retentions.
(2) Extras for which the claimant has not received payment.
(3) The following progress payments for which the claimant has previously given a conditional waiver and release but has not
$
(4) Contract rights, including (A) a right based on rescission, abandonment, or breach of contract, and (B) the right to recover
compensation for work not compensated by the payment.
Identifying Information
Name of Claimant:
Name of Customer:
Job Location:
Owner:
Conditional Waiver and Release
Maker of Check:
Amount of Check:
Check Payable to:
Exceptions
This document does not affect any of the following:
Disputed claims for extras in the amount of:
Claimant's Signature:
Claimant's Title:
Date of Signature:
REVISION 07-01-12
$
$
CONDITIONAL WAIVER AND RELEASE UPON FINAL PAYMENT
CALIFORNIA CIVIL CODE § 8136
NOTICE: THIS DOCUMENT WAIVES THE CLAIMANT'S LIEN, STOP PAYMENT NOTICE, AND PAYMENT BOND RIGHTS
EFFECTIVE ON RECEIPT OF PAYMENT. A PERSON SHOULD NOT RELY ON THIS DOCUMENT UNLESS SATISFIED THAT THE
CLAIMANT HAS RECEIVED PAYMENT.
This document waives and releases lien, stop payment notice, and payment bond rights the claimant has for labor and
service provided, and equipment and material delivered, to the customer on this job. Rights based upon labor or service
provided, or equipment or material delivered, pursuant to a written change order that has been fully executed by the
parties prior to the date that this document is signed by the claimant, are waived and released by this document, unless
listed as an Exception below. This document is effective only on the claimant's receipt of payment from the financial
institution on which the following check is drawn:
INTEGRITY FUND CONTROL
Identifying Information
Name of Claimant:
Name of Customer:
Job Location:
Owner:
Through Date:
Unconditional Waiver and Release
payment:
Claimant's Signature:
Claimant's Title:
Date of Signature:
REVISION 07-01-12
This document waives and releases lien, stop payment notice, and payment bond rights the claimant has for labor and
service provided, and equipment and material delivered, to the customer on this job through the Through Date of this
document. Rights based upon labor or service provided, or equipment or material delivered, pursuant to a written change
order that has been fully executed by the parties prior to the date that this document is signed by the claimant, are waived
and released by this document, unless listed as an Exception below. The claimant has received the following progress
$
Exceptions
This document does not affect any of the following:
(1) Retentions.
(2) Extras for which the claimant has not received payment.
(3) Contract rights, including (A) a right based on rescission, abandonment, or breach of contract, and (B) the right to
recover compensation for work not compensated by the payment.
UNCONDITIONAL WAIVER AND RELEASE UPON PROGRESS PAYMENT
CALIFORNIA CIVIL CODE § 8134
NOTICE TO CLAIMANT: THIS DOCUMENT WAIVES AND RELEASES LIEN, STOP PAYMENT NOTICE, AND PAYMENT BOND
RIGHTS UNCONDITIONALLY AND STATES THAT YOU HAVE BEEN PAID FOR GIVING UP THOSE RIGHTS. THIS
DOCUMENT IS ENFORCEABLE AGAINST YOU IF YOU SIGN IT, EVEN IF YOU HAVE NOT BEEN PAID. IF YOU HAVE NOT
BEEN PAID, USE A CONDITIONAL WAIVER AND RELEASE FORM.
Identifying Information
Name of Claimant:
Name of Customer:
Job Location:
Owner:
Unconditional Waiver and Release
Exceptions
This document does not affect any of the following:
Disputed claims for extras in the amount of:
Claimant's Signature:
Claimant's Title:
Date of Signature:
REVISION 07-01-12
UNCONDITIONAL WAIVER AND RELEASE UPON FINAL PAYMENT
CALIFORNIA CIVIL CODE § 8138
NOTICE TO CLAIMANT: THIS DOCUMENT WAIVES AND RELEASES LIEN, STOP PAYMENT NOTICE, AND PAYMENT BOND
RIGHTS UNCONDITIONALLY AND STATES THAT YOU HAVE BEEN PAID FOR GIVING UP THOSE RIGHTS. THIS
DOCUMENT IS ENFORCEABLE AGAINST YOU IF YOU SIGN IT, EVEN IF YOU HAVE NOT BEEN PAID. IF YOU HAVE NOT
BEEN PAID, USE A CONDITIONAL WAIVER AND RELEASE FORM.
$
This document waives and releases lien, stop payment notice, and payment bond rights the claimant has for labor and
service provided, and equipment and material delivered, to the customer on this job. Rights based upon labor or service
provided, or equipment or material delivered, pursuant to a written change order that has been fully executed by the
parties prior to the date that this document is signed by the claimant, are waived and released by this document, unless
listed as an Exception below. The claimant has been paid in full.
307 N Brea Blvd. Ste 202 , Brea, CA 92821
OFFICE: +1 (657) 286-0060 FAX: +1 (657) 286-0059 WEB: http://IntegrityFundControl.com
Project Cost Analysis 
Project Name:   Hotel & Resort 
Project Address: Hollywood, CA 
Date Prepared:
Project Description:   
June 6, 2015 
Hotel and Restuarant 
The Budget provided by the borrower appears to be within industry standards for this type of 
project as shown by the following summary.    
Projected Costs Per Analysis $64,619,552.00 
Project Costs Per Client Cost Breakdown $66,000,000.00 
Client Difference Over/(Under) $  1,380,448.00 
%Client Difference Over/‐Under <  2.2% 
June 6, 2014 
Executive Vice President 
Re: Budget Analysis –  Casino 
Dear Mr.  
As Requested, we have completed an analysis of the Hotel and Casino construction budget. The 
subject property, located in Las Vegas, Nevada consists of a multi‐story hotel, casino, and 
parking structure, totaling of 125,585 square feet, 93,440 square feet, and 124,880 square feet. 
The project also includes major site improvements. Finishes appear to be above average. Site 
improvements include extensive grading, paving, and a pool. The plans provided lack specific 
detail to provide a full and comprehensive analysis. 
The analysis included a review of the project’s construction budget for adequacy and 
completeness. Each budget item was independently reviewed with variations, if any, noted and 
highlighted in the attached report. 
The budget used for the analysis included the cost breakdown by the  Building Group, the 
architectural drawings prepared by ________ with a plot date of May 2, 2014 and Improvement 
plans by ________ with a plot date of May 2, 2014. Architectural plans are a design 
development set only. Specific details are not provided. Mechanical, engineering, and plumbing 
plans were not provided. Please note in order to provide a complete and thorough analysis a 
complete set of plans is required. The analysis was conducted using several methods of cost 
validation including comparison to current material costs and reference to Marshall and Swift 
Valuations, R.S. Means Building Construction Cost Data, and Xactimate Estimating Software  
v27.5. Lacking detailed plans, the basis for our analysis is a comparison of similar expected costs 
for like‐kind projects in the Las Vegas area and unit cost analysis.  
Although items were found to be in the upper expected cost ranges, the provided budget 
appears complete, fair, and reasonable. Budgets were comprehensive and appear adequate to 
complete the project. Contingencies are in line with industry standards. Overall costs appear in 
the upper acceptable range of similar projects. 
The noted difference of $1,380,448.00 is due to the hand written addition of “additional finish 
allowance”, no details are provided. The added amount would not skew this analysis beyond 
the acceptable range. Also excluded from this analysis is the cost of the central plant. This 
structure appears to be removed from the budget and no design details have been provided. 
The opinion of cost has been based on industry standard references and historical data of costs 
from similar projects. Since IFC has no control over the cost of labor, material, or equipment or 
over the contractor’s method of determining prices, or over competitive bidding or market 
conditions, the opinion of budget analysis and costs provided herein are made on the basis of 
professional experience and qualifications. This opinion represents IFC’s best judgment as a 
consultant familiar with the construction industry. However, IFC cannot and does not guarantee 
that proposals, bids, or the actual construction costs will not vary from the opinions of probable 
cost prepared for them. Only items that appeared in the budget were analyzed, which appear 
to be all‐inclusive for normal construction activities. The following items have not been 
considered in this analysis: land costs, hazardous materials mitigation, and unforeseen site 
conditions. 
We hope this report provides you with the information you need. If you require additional 
information, please feel free to contact us. 
Thank you, 
Integrity Joint Control Inc. 
Big Construction Project
123 Park Place
Los Angeles, CA
Item
No Description Of Work
BORROWER:
PROJECT NAME LOCATION:
Inspection Review Sheet
LOAN No: 987654
LOAN ID: 1234
LOAN REP: AP
REQUEST:
INSPECTION DATE:
Revised
Estimate
Previously
Disbursed
Previous
%
Current
%
01/01/2016
01/01/2016
Funds
Approve
100 Excavation & 52,225.00 52,225.00 100% 100%52,225.000.9% 0.9%
120 Retaining Wallls / Site 32,672.10 0% 0%0.000.6% 1.5%
130 Structural Steel 193,325.00 193,325.00 100% 100%193,325.003.5% 5.1%
140 Concrete Foundations / 54,960.00 54,960.00 100% 100%54,960.001.0% 6.1%
150 Rough Lumber 141,000.00 141,000.00 100% 100%141,000.002.6% 8.6%
160 Rough Framing (lumber 151,800.00 151,800.00 100% 100%151,800.002.8% 11.4%
170 170 / 180 Finish 1,338,346.49 1,195,723.49 99% 100%1,338,346.4924.3% 35.7%
200 Fireplaces 75,240.00 75,240.00 100% 100%75,240.001.4% 37.1%
210 Plumbing Labor 67,138.63 58,069.74 100% 100%67,138.631.2% 38.3%
230 Electrical 81,913.51 54,604.40 95% 95%77,817.831.5% 39.8%
250 Utility Improvement 12,225.00 12,225.00 100% 100%12,225.000.2% 40.0%
260 Roofing Labor & 148,785.00 118,506.00 98% 100%148,785.002.7% 42.7%
280 Brick Masonry (veneer) 290,000.00 289,631.80 98% 100%290,000.005.3% 48.0%
290 Plaster - Interior / 323,902.00 264,995.00 85% 90%291,511.805.9% 53.9%
300 HVAC 58,600.00 31,878.00 96% 95%55,670.001.1% 55.0%
310 Sheet Metal and 104,981.00 99,063.88 98% 95%99,731.951.9% 56.9%
350 Windows / Exterior 217,212.20 217,212.20 100% 100%217,212.204.0% 60.8%
380 Entry Doors 0.00 50% 50%0.000.0% 60.8%
410 Cabinets 69,512.50 30,000.00 60% 75%52,134.381.3% 62.1%
Big Constuction Project
Page 2
Application and Certificate for Payment Continued...
FROM: Big Construction Project LOAN No: 40000200
Item
No Description Of Work
Revised
Estimate
Previously
Disbursed
Previous
%
Current
%
Funds
Approve
430 Finish Hardware 19,000.00 2,337.06 15% 15%2,850.000.3% 62.4%
440 Drywall 123.53 123.53 100% 100%123.530.0% 62.4%
450 Insulation 10,656.00 10,656.00 100% 100%10,656.000.2% 62.6%
460 Gypcrete 0.00 0% 0%0.000.0% 62.6%
500 Tile/Stone Counters, 63,056.00 23,912.05 45% 60%37,833.601.1% 63.8%
530 Hardwood Flooring 83,610.00 53,899.00 65% 65%54,346.501.5% 65.3%
540 Carpet 37,921.00 0% 0%0.000.7% 66.0%
550 Painting 87,000.00 37,285.50 45% 60%52,200.001.6% 67.6%
570 Appliances 30,123.36 6,671.59 30% 30%9,037.010.5% 68.1%
580 Weatherstripping 5,000.00 0% 0%0.000.1% 68.2%
590 Garage Doors 54,000.00 13,304.00 90% 90%48,600.001.0% 69.2%
600 Elevators 39,750.00 15,800.00 40% 50%19,875.000.7% 69.9%
610 Shower Door 2,300.00 20% 20%460.000.0% 70.0%
630 Fire Sprinklers 9,493.68 9,493.68 100% 100%9,493.680.2% 70.1%
660 Waste Management 3,394.68 3,394.68 80% 85%2,885.480.1% 70.2%
670 Clean Up 10,000.00 80% 80%8,000.000.2% 70.4%
720 Security System 14,682.75 14,682.75 100% 100%14,682.750.3% 70.6%
730 Landscaping 70,720.00 300.00 15% 40%28,288.001.3% 71.9%
740 Exterior Yard Lighting / 21,600.00 0% 10%2,160.000.4% 72.3%
750 Decorative Metals 24,690.00 10,912.50 50% 50%12,345.000.4% 72.8%
770 Exterior Paving / 354,111.04 10% 10%35,411.106.4% 79.2%
790 Pool & Spa 101,166.00 0% 0%0.001.8% 81.1%
800 Water Features 58,240.00 6% 10%5,824.001.1% 82.1%
810 Waterproofing 41,141.70 41,141.70 100% 100%41,141.700.7% 82.9%
830 Cast Concrete 157,800.00 157,800.00 100% 100%157,800.002.9% 85.7%
850 Security System 7,090.00 3,545.00 100% 100%7,090.000.1% 85.9%
870 Safe 0.00 100% 100%0.000.0% 85.9%
910 Utilities 16,222.28 15,399.26 100% 100%16,222.280.3% 86.2%
920 Permits 2,999.71 1,016.31 80% 90%2,699.740.1% 86.2%
940 Insurance / Bonds 42,217.00 36,643.87 100% 100%42,217.000.8% 87.0%
950 Project Manager / 200,000.00 122,978.80 80% 85%170,000.003.6% 90.6%
971 Water Filtration/ 10,552.88 100% 100%10,552.880.2% 90.8%
972 Specific Inspections 520.00 520.00 100% 100%520.000.0% 90.8%
973 Jobsite Office 0.00 80% 0.000.0% 90.8%
© 2004 - 2016 Eclectus Inc. All rights reserved. This is form (198 - PRT Inspdtl_InspectionReview w Budget Percents) was produced with Fund Control software.
Page 3
Application and Certificate for Payment Continued...
FROM: Big Construction Project LOAN No: 40000200
Item
No Description Of Work
Revised
Estimate
Previously
Disbursed
Previous
%
Current
%
Funds
Approve
974 Site Drainage, Backfill, 27,072.00 12,125.00 75% 75%20,304.000.5% 91.3%
976 Scaffold 23,224.00 23,224.00 100% 100%23,224.000.4% 91.7%
977 Marble Cleaning / 3,500.00 0% 0%0.000.1% 91.8%
978 Garage Floor Finish 3,650.00 0% 0%0.000.1% 91.9%
979 Hotmopping 625.00 625.00 100% 100%625.000.0% 91.9%
990 Contractor Fee 446,992.00 366,438.49 82% 85%379,943.208.1% 100.0%
1000 0.00 100% 100%0.000.0% 100.0%
1003 0.00 100% 100%0.000.0% 100.0%
TOTALS: 5,498,083.04 4,024,689.28 81% 83%4,546,534.73
© 2004 - 2016 Eclectus Inc. All rights reserved. This is form (198 - PRT Inspdtl_InspectionReview w Budget Percents) was produced with Fund Control software.
Inspection Report
Enrty monuments under
construction. Roof complete
site work underway
Stored plant material for
landscaping. Some mature
trees already installed.
Phone +1 (657) 286-0060 - Fax +1 (657) 286-0059 - Web IntegrityFundControl.com
307 N Brea Boulevard, Brea CA 92821
Inspection Report
Kitchen cabinets installed and
partial molding detail.
Countertops and backsplash
installed in kitchen
Phone +1 (657) 286-0060 - Fax +1 (657) 286-0059 - Web IntegrityFundControl.com
307 N Brea Boulevard, Brea CA 92821
Inspection Report
Elevator lift mechanism
installed.
Example of plaster finish and
paint currently underway
throughout the house.
Phone +1 (657) 286-0060 - Fax +1 (657) 286-0059 - Web IntegrityFundControl.com
307 N Brea Boulevard, Brea CA 92821
Inspection Report
Masterbathroom shower tile
complete.
Secondary bedroom bath
showere tile complete.
Phone +1 (657) 286-0060 - Fax +1 (657) 286-0059 - Web IntegrityFundControl.com
307 N Brea Boulevard, Brea CA 92821
Big Construction Company
BUILDER/PHONE:
Inspections Report - +1 (657) 286-0060
SITE CONDITIONS: Good
JOB PROGRESS: Good
SUPERVISION: Present
TRADES PRESENT: superintendent, flooring, masonary, tile, cabinet installers, finishers, and paint
MATERIALS STORED: plubming, flooring, stone material and cabinets, plant material
COMMENTS: All finsh trades are in full swing,A1 crews of tile, flooring and cabinet installers.. Work continues to be conducted in a
professional manner site appears neat and organized and subcontractors adhering to all general conditions.
Phone +1 (657) 286-0060 - Fax +1 (657) 286-0059 - Web IntegrityFundControl.com
307 N Brea Boulevard, Brea CA 92821
Professional analysis of “cost to com-
plete” budgets providing powerful insight
to help your institution mitigate risk.
Customizable management of draw re-
quests and disbursements to fit your
institutions requirements.
Inspections of your projects making
disbursements a breeze.
Administration of 1099’s directly to ven-
dors and the IRS.
Fees are based on many factors including but not limited to
 Size and scope of project
 Project Location
 Duration of project
Contact an IFC Specialist to get your personalized quote!
+1 (657) 286-0060
Project Size Fee
Up to $249,000 Flat $1200
$250,000 to $4,999,99 0.35% to 0.50%
Over $5,000,000 0.20% to 0.45%

More Related Content

What's hot

Drafting Construction Contracts
Drafting Construction ContractsDrafting Construction Contracts
Drafting Construction ContractsMelissa Brumback
 
Assurance Screening Introduction
Assurance Screening IntroductionAssurance Screening Introduction
Assurance Screening IntroductionAssurance Screening
 
Fidic conditions of contract presentation
Fidic conditions of contract presentationFidic conditions of contract presentation
Fidic conditions of contract presentationJeff B
 
Customer Loan Origination System - Part 2 (Web)
Customer Loan Origination System - Part 2 (Web)Customer Loan Origination System - Part 2 (Web)
Customer Loan Origination System - Part 2 (Web)Sandeep Verma
 
RWY CIPAA 2012 - Scope and Applicability
RWY CIPAA 2012 - Scope and ApplicabilityRWY CIPAA 2012 - Scope and Applicability
RWY CIPAA 2012 - Scope and Applicabilityjyhling
 
Payment in construction contracts: how to get paid
Payment in construction contracts: how to get paidPayment in construction contracts: how to get paid
Payment in construction contracts: how to get paidBarry Hembling
 
Application for H Street NE Small Business Capital Improvement Grant
Application for H Street NE Small Business Capital Improvement GrantApplication for H Street NE Small Business Capital Improvement Grant
Application for H Street NE Small Business Capital Improvement GrantWashington, DC Economic Partnership
 
Payments in the construction industry
Payments in the construction industryPayments in the construction industry
Payments in the construction industryKheng Hoe Advocates
 
Clause 14.1 The Contract Price- Understanding Clauses in FIDIC ‘Conditions of...
Clause 14.1 The Contract Price- Understanding Clauses in FIDIC ‘Conditions of...Clause 14.1 The Contract Price- Understanding Clauses in FIDIC ‘Conditions of...
Clause 14.1 The Contract Price- Understanding Clauses in FIDIC ‘Conditions of...Divyanshu Dayal
 
CIPAA presentation
CIPAA presentationCIPAA presentation
CIPAA presentationDoreen Yeo
 
Complex Variable Interest Entity [sanitized]
Complex Variable Interest Entity [sanitized] Complex Variable Interest Entity [sanitized]
Complex Variable Interest Entity [sanitized] Michael Burgess
 
FIDIC 2016 Day01-1450 Managing Claims Under FIDIC, PPT Adrias Tan
FIDIC 2016 Day01-1450 Managing Claims Under FIDIC, PPT Adrias TanFIDIC 2016 Day01-1450 Managing Claims Under FIDIC, PPT Adrias Tan
FIDIC 2016 Day01-1450 Managing Claims Under FIDIC, PPT Adrias TanAdrias TAN
 

What's hot (13)

Drafting Construction Contracts
Drafting Construction ContractsDrafting Construction Contracts
Drafting Construction Contracts
 
Claims and Counterclaims Preparation, Analysis, Assessment and Successful Set...
Claims and Counterclaims Preparation, Analysis, Assessment and Successful Set...Claims and Counterclaims Preparation, Analysis, Assessment and Successful Set...
Claims and Counterclaims Preparation, Analysis, Assessment and Successful Set...
 
Assurance Screening Introduction
Assurance Screening IntroductionAssurance Screening Introduction
Assurance Screening Introduction
 
Fidic conditions of contract presentation
Fidic conditions of contract presentationFidic conditions of contract presentation
Fidic conditions of contract presentation
 
Customer Loan Origination System - Part 2 (Web)
Customer Loan Origination System - Part 2 (Web)Customer Loan Origination System - Part 2 (Web)
Customer Loan Origination System - Part 2 (Web)
 
RWY CIPAA 2012 - Scope and Applicability
RWY CIPAA 2012 - Scope and ApplicabilityRWY CIPAA 2012 - Scope and Applicability
RWY CIPAA 2012 - Scope and Applicability
 
Payment in construction contracts: how to get paid
Payment in construction contracts: how to get paidPayment in construction contracts: how to get paid
Payment in construction contracts: how to get paid
 
Application for H Street NE Small Business Capital Improvement Grant
Application for H Street NE Small Business Capital Improvement GrantApplication for H Street NE Small Business Capital Improvement Grant
Application for H Street NE Small Business Capital Improvement Grant
 
Payments in the construction industry
Payments in the construction industryPayments in the construction industry
Payments in the construction industry
 
Clause 14.1 The Contract Price- Understanding Clauses in FIDIC ‘Conditions of...
Clause 14.1 The Contract Price- Understanding Clauses in FIDIC ‘Conditions of...Clause 14.1 The Contract Price- Understanding Clauses in FIDIC ‘Conditions of...
Clause 14.1 The Contract Price- Understanding Clauses in FIDIC ‘Conditions of...
 
CIPAA presentation
CIPAA presentationCIPAA presentation
CIPAA presentation
 
Complex Variable Interest Entity [sanitized]
Complex Variable Interest Entity [sanitized] Complex Variable Interest Entity [sanitized]
Complex Variable Interest Entity [sanitized]
 
FIDIC 2016 Day01-1450 Managing Claims Under FIDIC, PPT Adrias Tan
FIDIC 2016 Day01-1450 Managing Claims Under FIDIC, PPT Adrias TanFIDIC 2016 Day01-1450 Managing Claims Under FIDIC, PPT Adrias Tan
FIDIC 2016 Day01-1450 Managing Claims Under FIDIC, PPT Adrias Tan
 

Viewers also liked (6)

Revisoria fiscal
Revisoria fiscalRevisoria fiscal
Revisoria fiscal
 
O Taxista
O TaxistaO Taxista
O Taxista
 
Función económica de la educación
Función económica de la educaciónFunción económica de la educación
Función económica de la educación
 
Archivo secuencial indexado
Archivo secuencial indexadoArchivo secuencial indexado
Archivo secuencial indexado
 
Funciones y formulas de excel
Funciones y formulas de excelFunciones y formulas de excel
Funciones y formulas de excel
 
Visual basic
Visual basicVisual basic
Visual basic
 

Similar to IFC Package Brantley Scan

Mechanics Lien Coverage
Mechanics Lien CoverageMechanics Lien Coverage
Mechanics Lien Coveragedtownsend
 
Priming the cash flow pump
Priming the cash flow pumpPriming the cash flow pump
Priming the cash flow pumpCharlotte Lawson
 
Progress billing definition
Progress billing definitionProgress billing definition
Progress billing definitionAkosichelle
 
SBA Releases New SOP 50 10 5(k)
SBA Releases New SOP 50 10 5(k)SBA Releases New SOP 50 10 5(k)
SBA Releases New SOP 50 10 5(k)lerchearly
 
Presentation on vigilance in banks and financial institutions in India
Presentation on vigilance in banks and financial institutions in IndiaPresentation on vigilance in banks and financial institutions in India
Presentation on vigilance in banks and financial institutions in IndiaRammohanpnb
 
Legal language and technology - Bill Lutz
Legal language and technology - Bill LutzLegal language and technology - Bill Lutz
Legal language and technology - Bill LutzClarity2010
 
Contracts & Claims Management Workshop (Session-1)
Contracts & Claims Management Workshop (Session-1)Contracts & Claims Management Workshop (Session-1)
Contracts & Claims Management Workshop (Session-1)Tahir B Mirza
 
Debra kirvin resume 2016
Debra kirvin resume 2016Debra kirvin resume 2016
Debra kirvin resume 2016Debra Kirvin
 
Funding General Parameters
Funding General ParametersFunding General Parameters
Funding General Parametersgueste9299a5
 
Revenue assurance in service industries
Revenue assurance in service industriesRevenue assurance in service industries
Revenue assurance in service industriesRaju Mn
 
Asbo Vendor Performance Eval Chicago 092509
Asbo Vendor Performance Eval   Chicago   092509Asbo Vendor Performance Eval   Chicago   092509
Asbo Vendor Performance Eval Chicago 092509Richard Gay, CPPO, RSBO
 
Ease of Doing Business - Building Permission Daignosis
Ease of Doing Business - Building Permission DaignosisEase of Doing Business - Building Permission Daignosis
Ease of Doing Business - Building Permission DaignosisKartikey Joshi
 
Renee.Galvin Updated Resume 08.2015
Renee.Galvin Updated Resume 08.2015Renee.Galvin Updated Resume 08.2015
Renee.Galvin Updated Resume 08.2015Renee Galvin
 

Similar to IFC Package Brantley Scan (20)

Mechanics Lien Coverage
Mechanics Lien CoverageMechanics Lien Coverage
Mechanics Lien Coverage
 
Priming the cash flow pump
Priming the cash flow pumpPriming the cash flow pump
Priming the cash flow pump
 
Progress billing definition
Progress billing definitionProgress billing definition
Progress billing definition
 
Red flag plan
Red flag planRed flag plan
Red flag plan
 
SBA Releases New SOP 50 10 5(k)
SBA Releases New SOP 50 10 5(k)SBA Releases New SOP 50 10 5(k)
SBA Releases New SOP 50 10 5(k)
 
Presentation on vigilance in banks and financial institutions in India
Presentation on vigilance in banks and financial institutions in IndiaPresentation on vigilance in banks and financial institutions in India
Presentation on vigilance in banks and financial institutions in India
 
Legal language and technology - Bill Lutz
Legal language and technology - Bill LutzLegal language and technology - Bill Lutz
Legal language and technology - Bill Lutz
 
Contracts & Claims Management Workshop (Session-1)
Contracts & Claims Management Workshop (Session-1)Contracts & Claims Management Workshop (Session-1)
Contracts & Claims Management Workshop (Session-1)
 
Debra kirvin resume 2016
Debra kirvin resume 2016Debra kirvin resume 2016
Debra kirvin resume 2016
 
Bridget Resume1
Bridget  Resume1Bridget  Resume1
Bridget Resume1
 
Funding General Parameters
Funding General ParametersFunding General Parameters
Funding General Parameters
 
Angela McCollum
Angela McCollumAngela McCollum
Angela McCollum
 
Revenue assurance in service industries
Revenue assurance in service industriesRevenue assurance in service industries
Revenue assurance in service industries
 
Follow the Money_Subcontractor Payment Practices
Follow the Money_Subcontractor Payment PracticesFollow the Money_Subcontractor Payment Practices
Follow the Money_Subcontractor Payment Practices
 
Asbo Vendor Performance Eval Chicago 092509
Asbo Vendor Performance Eval   Chicago   092509Asbo Vendor Performance Eval   Chicago   092509
Asbo Vendor Performance Eval Chicago 092509
 
Ease of Doing Business - Building Permission Daignosis
Ease of Doing Business - Building Permission DaignosisEase of Doing Business - Building Permission Daignosis
Ease of Doing Business - Building Permission Daignosis
 
Risk Managment
Risk ManagmentRisk Managment
Risk Managment
 
Renee.Galvin Updated Resume 08.2015
Renee.Galvin Updated Resume 08.2015Renee.Galvin Updated Resume 08.2015
Renee.Galvin Updated Resume 08.2015
 
Assignment of banking
Assignment of bankingAssignment of banking
Assignment of banking
 
January 2017
January  2017January  2017
January 2017
 

IFC Package Brantley Scan

  • 1. Matthew Brantley VP Business Development brantley@integrityfundcontrol.com Office +1 (657) 286-0060 ext 1856 Direct +1 (657) 286-0056 Mobile +1 (909)-278-9985 Fax +1 (714) 529-2408 SCAN ME
  • 2. The Integrity Fund Control team of dedicated profes- sionals provides a full array of services supported by our state-of-the-art construction loan management software. Our team’s specialized knowledge gives you the edge in successfully completing and resolving complex, non-conforming construction and funding matters. Our ability to problem solve is what sets us apart from the other service providers. The principals of Integrity have assembled a team of experts that bring specific and unique skill sets, tailored to provide customized cutting edge services. Integrity Joint Control Inc., is a licensed joint control agent operating under the governance of the Department of Business Oversight. License No. 96DBO-43774 Today, many firms offer fund control services. Most of these firms successfully provide a very adequate template based services for the accounting, disbursement and inspections for construction loans. The benefit the Integrity Fund Control team brings to each and every project we service is our experience and unique understanding of the disbursement as well as the construction process. Integrity’s principals and handpicked staff bring the knowledge and ability to inter- pret each situation to provide effective solutions that create mutually beneficial outcome and insure that there are no surprises. Our expertise, and attention to detail will allow you and your staff to concentrate on your core business with the confidence that Integrity is professionally and diligently overseeing your disbursement needs. Unforeseen and non-conforming variables are involved in every construction project. Our Risk Reduction System allows us to work with you and your clients at the set up stage of each project and head off many problems before they begin. But in the ever changing con- struction environment challenges invariable arise, these situations are why Integrity Fund Control is the choice to make.
  • 3. IFC maintains a full-service disbursement program to efficient- ly manage and process construction progress draw requests quickly and accurately. Comprehensive accounting and streamlined communication services include disbursement processing, title search, inspection report, lien waivers, and escrow accounting. Services include license verification, bonding and insurance- validation, work-in-progress study, related experience study, and detailed reference and background checks. Includes visit to the property to determine project status, a review of plans and specifications, and preparation of detailed line item costs to complete project. We also verify permit and inspection status with the governing jurisdiction. CONSTRUCTION PROGRESS INSPECTIONS Our seasoned professional inspectors visit the construction site, photograph and evaluate the construction progress, and complete a thorough, written report to determine funding decisions. Matthew Brantley VP Business Development brantley@integrityfundcontrol.com Office +1 (657) 286-0060 ext 1856 Direct +1 (657) 286-0056 Mobile +1 (909)-278-9985 Fax +1 (714) 529-2408
  • 4. Integrity Joint Control, Inc. CONSTRUCTION DISBURSEMENT PROCEDURES IMPORTANT-READ CAREFULLY DATE: BANK: LOAN NO. BORROWER: IFC NO. JOB ADDRESS CONTRACTOR: Overview: Draw requests are submitted to Integrity Joint Control, Inc., dba Integrity Fund Control hereinafter (IFC), by the general contractor and owner. The requests may be presented in person, by mail, or electronically. The underlying documentation is reviewed and once all documentation has been collected the draw is entered in to IFC’s disbursement program. The draw is then analyzed against a current inspection report prepared by IFC. Any deficiencies in documentation or percentages of completion will be reported to the interested parties. Once all conditions are satisfied, IFC, will present the draw request, all underlying documentation, budget reports and inspection reports to the lender for funding. Once funding is received Checks are issued to the payees listed on the payee list provided by the contractor and owner. It may be necessary for IFC to modify the payee listing from time to time to facilitate the issuance of joint checks as may be required to satisfy material and other suppliers. Documents required in support of draw request: 1. The general contractor completes the G-702 and G-703 forms or other similar forms approved by the Lender. The contractor will also complete the construction fund request form and payee listing together with any line item transfer requests or change order documentation. The contractor then forwards the complete draw package to the owner together with all underlying invoices, releases paid receipts, W-9 forms and cancelled checks. The owner reviews the request, and once approved, the draw is forwarded to IFC for processing. 2. The Construction Fund request must be completed in its entirety and signed by the owner and general contractor 3. The Payee List should include, the date, draw no. exact project address and owners name. The listing shall include the name of the material supplier and or/or sub-contractor, amount of payment, payee address, corresponding cost breakdown line item number. This document must be signed by the owner and the contractor. 4. The draw must include all underlying invoices, lien releases, cancelled checks and w-9’s for each payee 5. All draw requests for any reimbursement previously paid for by the general contractor must be supported by ALL of the following items: A) Material receipts marked “PAID” by the material supplier, B) Paid receipt from persons performing any labor, C) Copy of canceled checks (front and back), D) Unconditional labor and or material release (whichever is applicable), In no event will reimbursements be made for any cash payments made by owner, general contractor, builder, or any sub-contractor regardless of any supplemental documentation submitted with the request. 6. Only those draws for items within the amounts stated on the cost breakdown will be honored. If the amount allotted to an item on the cost breakdown is not sufficient to pay for its actual cost, the owner AND contractor may request in writing, by use of reallocation form the surplus funds (from already completed items or items with a surplus verified by current executed contracts) may be reallocated to the item needing additional funds. The owner AND contractor may also request the use of any available contingency funds (disbursements of contingency funds shall not exceed the overall percentage of completion as determined by a current inspection report performed by IFC. The request to transfer funds is subject to lender approval. 7. Draws will be honored only if our construction inspector has verified that the labor has been performed and/or the material has been installed and integrated into the site. 8. IFC may take up to five working days, from receipt of draw requests, prior to payment or return of said draw request to accommodate the disbursement process. 9. Retention of construction funds will be required as agreed to by the Lender and the Owner. 10. All disbursements are subject to the final approval of the Lender 11. IFC is not a building code enforcer. IFC will not inspect for quality of work or be your agent in any manner. 12. Disbursements will be delayed if all of the above stated provisions are not fully satisfied. I HAVE READ THE CONTENTS CONTAINED HEREIN AND HEREBY AGREE TO FULLY ABIDE BY THE ABOVE REQUIREMENTS.
  • 5. LENDER: INTEGRITY JOINT CONTROL INC., dba Integrity Fund Control By:________________________________________ By:_______________________________________ (Date) (Date) BORROWER: CONTRACTOR: By: ________________________________________ By: ______________________________________ (Date) (Date)
  • 6. FORM 1 Construction Funds Request This form provides both IFC and your institution with a snapshot of the draw request. INTEGRITY HAS SIMPLIFIED THE DRAW PROCESS WITH AN EASY TO FOLLOW DRAW PROCESS THAT IS AS EASY AS 1, 2, 3! OUR SIMPLE AND EASY TO FOLLOW FORMS SAVES YOUR INSTITUION BOTH TIME AND MONEY. FORM 1 CONSTRUCTION FUNDS REQUEST FORM 2 PAYEE LIST FORM 3 BUDGET TRANSFER REQUEST FORM 4 RELEASES Our proven process makes disbursing request Fast, Easy, and Effective! FORM 2 Payee List This simple form spells out where the money is going. It lists who is being paid and how much. It includes which line items are being drawn on and includes a description section that makes it easy for the contractor to ex- plain what he is trying to accomplish. Matthew Brantley VP Business Development brantley@integrityfundcontrol.com Office +1 (657) 286-0060 ext 1856 Direct +1 (657) 286-0056 Mobile +1 (909)-278-9985 Fax +1 (714) 529-2408
  • 7. REQUEST #: TO: Integrity Fund Control 307 N Brea Blvd., Suite 202 Brea, CA 92821 DATE: JOB#: JOB ADDRESS: OWNER: CONTRACTOR: BANK CONSTRUCTION AMOUNT: REVISED CONSTRUCTION AMOUNT: TOTAL REQUESTED PRIOR: CURRENT REQUEST: CONSTRUCTION BALANCE: Borrwer: Contractor: FORM 1 - CONSTRUCTION FUND REQUEST
  • 8. JOB # JOB NAME: Total amount of Draw LINE ITEM # AMOUNT $0.00 X OWNER: X CONTRACTOR: FORM 2 - PAYEE LIST PAYEE DESCRIPTION ** 2 SIGNATURES REQUIRED **
  • 9. FORM 3 Budget Transfer Request Contracts are sometimes renegotiated and need to have funds reallocated. Our budget transfer form makes track- ing these changes and explaining them fast easy. INTEGRITY HAS SIMPLIFIED THE DRAW PROCESS WITH AN EASY TO FOLLOW DRAW PROCESS THAT IS AS EASY AS 1, 2, 3! OUR SIMPLE AND EASY TO FOLLOW FORMS SAVES YOUR INSTITUION BOTH TIME AND MONEY. FORM 1 CONSTRUCTION FUNDS REQUEST FORM 2 PAYEE LIST FORM 3 BUDGET TRANSFER REQUEST FORM 4 RELEASES Protecting your interests is what we do! FORM 4 Releases Perhaps the most important form we provide are the releases. These forms are the contractors release of interest and are critical in avoiding any claims by the contractor, sub contractor, and any vendors at the end of the project. Matthew Brantley VP Business Development brantley@integrityfundcontrol.com Office +1 (657) 286-0060 ext 1856 Direct +1 (657) 286-0056 Mobile +1 (909)-278-9985 Fax +1 (714) 529-2408
  • 10. Draw #: DATE: JOB#: JOB ADDRESS: OWNER: BANK CONTRACTOR: BANK APPROVAL, IF REQUIRED: *If eliminating items, provide explanation for eliminating items below. Owner and/or Contractor hereby request transfer of the following items in the nearest whole dollars: Transfer From: Item # Item Description Budget Amount Transfer Amount 1 2 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ TOTAL -$ Transfer To: Item # Item Description Budget Amount Transfer Amount -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ TOTAL -$ Eliminating Items: Item # Reason: Contractor: 2 SIGNATURES REQUIRED FORM 3 - BUDGET TRANSFER REQUEST sign here Owner:
  • 11. Identifying Information Name of Claimant: Name of Customer: Job Location: Owner: Through Date: Conditional Waiver and Release Maker of Check: Amount of Check: Check Payable to: Date(s) of waiver and release: Amount(s) of unpaid progress payment(s): Claimant's Signature: Claimant's Title: Date of Signature: REVISION 07-01-12 CONDITIONAL WAIVER AND RELEASE UPON PROGRESS PAYMENT CALIFORNIA CIVIL CODE § 8132 NOTICE: THIS DOCUMENT WAIVES THE CLAIMANT'S LIEN, STOP PAYMENT NOTICE, AND PAYMENT BOND RIGHTS EFFECTIVE ON RECEIPT OF PAYMENT. A PERSON SHOULD NOT RELY ON THIS DOCUMENT UNLESS SATISFIED THAT THE CLAIMANT HAS RECEIVED PAYMENT. This document waives and releases lien, stop payment notice, and payment bond rights the claimant has for labor and service provided, and equipment and material delivered, to the customer on this job through the Through Date of this document. Rights based upon labor or service provided, or equipment or material delivered, pursuant to a written change order that has been fully executed by the parties prior to the date that this document is signed by the claimant, are waived and released by this document, unless listed as an Exception below. This document is effective only on the claimant’s receipt of payment from the financial institution on which the following check is drawn: INTEGRITY FUND CONTROL $ Exceptions This document does not affect any of the following: (1) Retentions. (2) Extras for which the claimant has not received payment. (3) The following progress payments for which the claimant has previously given a conditional waiver and release but has not $ (4) Contract rights, including (A) a right based on rescission, abandonment, or breach of contract, and (B) the right to recover compensation for work not compensated by the payment.
  • 12. Identifying Information Name of Claimant: Name of Customer: Job Location: Owner: Conditional Waiver and Release Maker of Check: Amount of Check: Check Payable to: Exceptions This document does not affect any of the following: Disputed claims for extras in the amount of: Claimant's Signature: Claimant's Title: Date of Signature: REVISION 07-01-12 $ $ CONDITIONAL WAIVER AND RELEASE UPON FINAL PAYMENT CALIFORNIA CIVIL CODE § 8136 NOTICE: THIS DOCUMENT WAIVES THE CLAIMANT'S LIEN, STOP PAYMENT NOTICE, AND PAYMENT BOND RIGHTS EFFECTIVE ON RECEIPT OF PAYMENT. A PERSON SHOULD NOT RELY ON THIS DOCUMENT UNLESS SATISFIED THAT THE CLAIMANT HAS RECEIVED PAYMENT. This document waives and releases lien, stop payment notice, and payment bond rights the claimant has for labor and service provided, and equipment and material delivered, to the customer on this job. Rights based upon labor or service provided, or equipment or material delivered, pursuant to a written change order that has been fully executed by the parties prior to the date that this document is signed by the claimant, are waived and released by this document, unless listed as an Exception below. This document is effective only on the claimant's receipt of payment from the financial institution on which the following check is drawn: INTEGRITY FUND CONTROL
  • 13. Identifying Information Name of Claimant: Name of Customer: Job Location: Owner: Through Date: Unconditional Waiver and Release payment: Claimant's Signature: Claimant's Title: Date of Signature: REVISION 07-01-12 This document waives and releases lien, stop payment notice, and payment bond rights the claimant has for labor and service provided, and equipment and material delivered, to the customer on this job through the Through Date of this document. Rights based upon labor or service provided, or equipment or material delivered, pursuant to a written change order that has been fully executed by the parties prior to the date that this document is signed by the claimant, are waived and released by this document, unless listed as an Exception below. The claimant has received the following progress $ Exceptions This document does not affect any of the following: (1) Retentions. (2) Extras for which the claimant has not received payment. (3) Contract rights, including (A) a right based on rescission, abandonment, or breach of contract, and (B) the right to recover compensation for work not compensated by the payment. UNCONDITIONAL WAIVER AND RELEASE UPON PROGRESS PAYMENT CALIFORNIA CIVIL CODE § 8134 NOTICE TO CLAIMANT: THIS DOCUMENT WAIVES AND RELEASES LIEN, STOP PAYMENT NOTICE, AND PAYMENT BOND RIGHTS UNCONDITIONALLY AND STATES THAT YOU HAVE BEEN PAID FOR GIVING UP THOSE RIGHTS. THIS DOCUMENT IS ENFORCEABLE AGAINST YOU IF YOU SIGN IT, EVEN IF YOU HAVE NOT BEEN PAID. IF YOU HAVE NOT BEEN PAID, USE A CONDITIONAL WAIVER AND RELEASE FORM.
  • 14. Identifying Information Name of Claimant: Name of Customer: Job Location: Owner: Unconditional Waiver and Release Exceptions This document does not affect any of the following: Disputed claims for extras in the amount of: Claimant's Signature: Claimant's Title: Date of Signature: REVISION 07-01-12 UNCONDITIONAL WAIVER AND RELEASE UPON FINAL PAYMENT CALIFORNIA CIVIL CODE § 8138 NOTICE TO CLAIMANT: THIS DOCUMENT WAIVES AND RELEASES LIEN, STOP PAYMENT NOTICE, AND PAYMENT BOND RIGHTS UNCONDITIONALLY AND STATES THAT YOU HAVE BEEN PAID FOR GIVING UP THOSE RIGHTS. THIS DOCUMENT IS ENFORCEABLE AGAINST YOU IF YOU SIGN IT, EVEN IF YOU HAVE NOT BEEN PAID. IF YOU HAVE NOT BEEN PAID, USE A CONDITIONAL WAIVER AND RELEASE FORM. $ This document waives and releases lien, stop payment notice, and payment bond rights the claimant has for labor and service provided, and equipment and material delivered, to the customer on this job. Rights based upon labor or service provided, or equipment or material delivered, pursuant to a written change order that has been fully executed by the parties prior to the date that this document is signed by the claimant, are waived and released by this document, unless listed as an Exception below. The claimant has been paid in full.
  • 15. 307 N Brea Blvd. Ste 202 , Brea, CA 92821 OFFICE: +1 (657) 286-0060 FAX: +1 (657) 286-0059 WEB: http://IntegrityFundControl.com Project Cost Analysis  Project Name:   Hotel & Resort  Project Address: Hollywood, CA  Date Prepared: Project Description:    June 6, 2015  Hotel and Restuarant  The Budget provided by the borrower appears to be within industry standards for this type of  project as shown by the following summary.    
  • 16. Projected Costs Per Analysis $64,619,552.00  Project Costs Per Client Cost Breakdown $66,000,000.00  Client Difference Over/(Under) $  1,380,448.00  %Client Difference Over/‐Under <  2.2%  June 6, 2014  Executive Vice President  Re: Budget Analysis –  Casino  Dear Mr.   As Requested, we have completed an analysis of the Hotel and Casino construction budget. The  subject property, located in Las Vegas, Nevada consists of a multi‐story hotel, casino, and  parking structure, totaling of 125,585 square feet, 93,440 square feet, and 124,880 square feet.  The project also includes major site improvements. Finishes appear to be above average. Site  improvements include extensive grading, paving, and a pool. The plans provided lack specific  detail to provide a full and comprehensive analysis.  The analysis included a review of the project’s construction budget for adequacy and  completeness. Each budget item was independently reviewed with variations, if any, noted and  highlighted in the attached report.  The budget used for the analysis included the cost breakdown by the  Building Group, the  architectural drawings prepared by ________ with a plot date of May 2, 2014 and Improvement  plans by ________ with a plot date of May 2, 2014. Architectural plans are a design  development set only. Specific details are not provided. Mechanical, engineering, and plumbing  plans were not provided. Please note in order to provide a complete and thorough analysis a  complete set of plans is required. The analysis was conducted using several methods of cost  validation including comparison to current material costs and reference to Marshall and Swift  Valuations, R.S. Means Building Construction Cost Data, and Xactimate Estimating Software   v27.5. Lacking detailed plans, the basis for our analysis is a comparison of similar expected costs  for like‐kind projects in the Las Vegas area and unit cost analysis.  
  • 17. Although items were found to be in the upper expected cost ranges, the provided budget  appears complete, fair, and reasonable. Budgets were comprehensive and appear adequate to  complete the project. Contingencies are in line with industry standards. Overall costs appear in  the upper acceptable range of similar projects.  The noted difference of $1,380,448.00 is due to the hand written addition of “additional finish  allowance”, no details are provided. The added amount would not skew this analysis beyond  the acceptable range. Also excluded from this analysis is the cost of the central plant. This  structure appears to be removed from the budget and no design details have been provided.  The opinion of cost has been based on industry standard references and historical data of costs  from similar projects. Since IFC has no control over the cost of labor, material, or equipment or  over the contractor’s method of determining prices, or over competitive bidding or market  conditions, the opinion of budget analysis and costs provided herein are made on the basis of  professional experience and qualifications. This opinion represents IFC’s best judgment as a  consultant familiar with the construction industry. However, IFC cannot and does not guarantee  that proposals, bids, or the actual construction costs will not vary from the opinions of probable  cost prepared for them. Only items that appeared in the budget were analyzed, which appear  to be all‐inclusive for normal construction activities. The following items have not been  considered in this analysis: land costs, hazardous materials mitigation, and unforeseen site  conditions.  We hope this report provides you with the information you need. If you require additional  information, please feel free to contact us.  Thank you,  Integrity Joint Control Inc. 
  • 18. Big Construction Project 123 Park Place Los Angeles, CA Item No Description Of Work BORROWER: PROJECT NAME LOCATION: Inspection Review Sheet LOAN No: 987654 LOAN ID: 1234 LOAN REP: AP REQUEST: INSPECTION DATE: Revised Estimate Previously Disbursed Previous % Current % 01/01/2016 01/01/2016 Funds Approve 100 Excavation & 52,225.00 52,225.00 100% 100%52,225.000.9% 0.9% 120 Retaining Wallls / Site 32,672.10 0% 0%0.000.6% 1.5% 130 Structural Steel 193,325.00 193,325.00 100% 100%193,325.003.5% 5.1% 140 Concrete Foundations / 54,960.00 54,960.00 100% 100%54,960.001.0% 6.1% 150 Rough Lumber 141,000.00 141,000.00 100% 100%141,000.002.6% 8.6% 160 Rough Framing (lumber 151,800.00 151,800.00 100% 100%151,800.002.8% 11.4% 170 170 / 180 Finish 1,338,346.49 1,195,723.49 99% 100%1,338,346.4924.3% 35.7% 200 Fireplaces 75,240.00 75,240.00 100% 100%75,240.001.4% 37.1% 210 Plumbing Labor 67,138.63 58,069.74 100% 100%67,138.631.2% 38.3% 230 Electrical 81,913.51 54,604.40 95% 95%77,817.831.5% 39.8% 250 Utility Improvement 12,225.00 12,225.00 100% 100%12,225.000.2% 40.0% 260 Roofing Labor & 148,785.00 118,506.00 98% 100%148,785.002.7% 42.7% 280 Brick Masonry (veneer) 290,000.00 289,631.80 98% 100%290,000.005.3% 48.0% 290 Plaster - Interior / 323,902.00 264,995.00 85% 90%291,511.805.9% 53.9% 300 HVAC 58,600.00 31,878.00 96% 95%55,670.001.1% 55.0% 310 Sheet Metal and 104,981.00 99,063.88 98% 95%99,731.951.9% 56.9% 350 Windows / Exterior 217,212.20 217,212.20 100% 100%217,212.204.0% 60.8% 380 Entry Doors 0.00 50% 50%0.000.0% 60.8% 410 Cabinets 69,512.50 30,000.00 60% 75%52,134.381.3% 62.1% Big Constuction Project
  • 19. Page 2 Application and Certificate for Payment Continued... FROM: Big Construction Project LOAN No: 40000200 Item No Description Of Work Revised Estimate Previously Disbursed Previous % Current % Funds Approve 430 Finish Hardware 19,000.00 2,337.06 15% 15%2,850.000.3% 62.4% 440 Drywall 123.53 123.53 100% 100%123.530.0% 62.4% 450 Insulation 10,656.00 10,656.00 100% 100%10,656.000.2% 62.6% 460 Gypcrete 0.00 0% 0%0.000.0% 62.6% 500 Tile/Stone Counters, 63,056.00 23,912.05 45% 60%37,833.601.1% 63.8% 530 Hardwood Flooring 83,610.00 53,899.00 65% 65%54,346.501.5% 65.3% 540 Carpet 37,921.00 0% 0%0.000.7% 66.0% 550 Painting 87,000.00 37,285.50 45% 60%52,200.001.6% 67.6% 570 Appliances 30,123.36 6,671.59 30% 30%9,037.010.5% 68.1% 580 Weatherstripping 5,000.00 0% 0%0.000.1% 68.2% 590 Garage Doors 54,000.00 13,304.00 90% 90%48,600.001.0% 69.2% 600 Elevators 39,750.00 15,800.00 40% 50%19,875.000.7% 69.9% 610 Shower Door 2,300.00 20% 20%460.000.0% 70.0% 630 Fire Sprinklers 9,493.68 9,493.68 100% 100%9,493.680.2% 70.1% 660 Waste Management 3,394.68 3,394.68 80% 85%2,885.480.1% 70.2% 670 Clean Up 10,000.00 80% 80%8,000.000.2% 70.4% 720 Security System 14,682.75 14,682.75 100% 100%14,682.750.3% 70.6% 730 Landscaping 70,720.00 300.00 15% 40%28,288.001.3% 71.9% 740 Exterior Yard Lighting / 21,600.00 0% 10%2,160.000.4% 72.3% 750 Decorative Metals 24,690.00 10,912.50 50% 50%12,345.000.4% 72.8% 770 Exterior Paving / 354,111.04 10% 10%35,411.106.4% 79.2% 790 Pool & Spa 101,166.00 0% 0%0.001.8% 81.1% 800 Water Features 58,240.00 6% 10%5,824.001.1% 82.1% 810 Waterproofing 41,141.70 41,141.70 100% 100%41,141.700.7% 82.9% 830 Cast Concrete 157,800.00 157,800.00 100% 100%157,800.002.9% 85.7% 850 Security System 7,090.00 3,545.00 100% 100%7,090.000.1% 85.9% 870 Safe 0.00 100% 100%0.000.0% 85.9% 910 Utilities 16,222.28 15,399.26 100% 100%16,222.280.3% 86.2% 920 Permits 2,999.71 1,016.31 80% 90%2,699.740.1% 86.2% 940 Insurance / Bonds 42,217.00 36,643.87 100% 100%42,217.000.8% 87.0% 950 Project Manager / 200,000.00 122,978.80 80% 85%170,000.003.6% 90.6% 971 Water Filtration/ 10,552.88 100% 100%10,552.880.2% 90.8% 972 Specific Inspections 520.00 520.00 100% 100%520.000.0% 90.8% 973 Jobsite Office 0.00 80% 0.000.0% 90.8% © 2004 - 2016 Eclectus Inc. All rights reserved. This is form (198 - PRT Inspdtl_InspectionReview w Budget Percents) was produced with Fund Control software.
  • 20. Page 3 Application and Certificate for Payment Continued... FROM: Big Construction Project LOAN No: 40000200 Item No Description Of Work Revised Estimate Previously Disbursed Previous % Current % Funds Approve 974 Site Drainage, Backfill, 27,072.00 12,125.00 75% 75%20,304.000.5% 91.3% 976 Scaffold 23,224.00 23,224.00 100% 100%23,224.000.4% 91.7% 977 Marble Cleaning / 3,500.00 0% 0%0.000.1% 91.8% 978 Garage Floor Finish 3,650.00 0% 0%0.000.1% 91.9% 979 Hotmopping 625.00 625.00 100% 100%625.000.0% 91.9% 990 Contractor Fee 446,992.00 366,438.49 82% 85%379,943.208.1% 100.0% 1000 0.00 100% 100%0.000.0% 100.0% 1003 0.00 100% 100%0.000.0% 100.0% TOTALS: 5,498,083.04 4,024,689.28 81% 83%4,546,534.73 © 2004 - 2016 Eclectus Inc. All rights reserved. This is form (198 - PRT Inspdtl_InspectionReview w Budget Percents) was produced with Fund Control software.
  • 21. Inspection Report Enrty monuments under construction. Roof complete site work underway Stored plant material for landscaping. Some mature trees already installed. Phone +1 (657) 286-0060 - Fax +1 (657) 286-0059 - Web IntegrityFundControl.com 307 N Brea Boulevard, Brea CA 92821
  • 22. Inspection Report Kitchen cabinets installed and partial molding detail. Countertops and backsplash installed in kitchen Phone +1 (657) 286-0060 - Fax +1 (657) 286-0059 - Web IntegrityFundControl.com 307 N Brea Boulevard, Brea CA 92821
  • 23. Inspection Report Elevator lift mechanism installed. Example of plaster finish and paint currently underway throughout the house. Phone +1 (657) 286-0060 - Fax +1 (657) 286-0059 - Web IntegrityFundControl.com 307 N Brea Boulevard, Brea CA 92821
  • 24. Inspection Report Masterbathroom shower tile complete. Secondary bedroom bath showere tile complete. Phone +1 (657) 286-0060 - Fax +1 (657) 286-0059 - Web IntegrityFundControl.com 307 N Brea Boulevard, Brea CA 92821
  • 25. Big Construction Company BUILDER/PHONE: Inspections Report - +1 (657) 286-0060 SITE CONDITIONS: Good JOB PROGRESS: Good SUPERVISION: Present TRADES PRESENT: superintendent, flooring, masonary, tile, cabinet installers, finishers, and paint MATERIALS STORED: plubming, flooring, stone material and cabinets, plant material COMMENTS: All finsh trades are in full swing,A1 crews of tile, flooring and cabinet installers.. Work continues to be conducted in a professional manner site appears neat and organized and subcontractors adhering to all general conditions. Phone +1 (657) 286-0060 - Fax +1 (657) 286-0059 - Web IntegrityFundControl.com 307 N Brea Boulevard, Brea CA 92821
  • 26. Professional analysis of “cost to com- plete” budgets providing powerful insight to help your institution mitigate risk. Customizable management of draw re- quests and disbursements to fit your institutions requirements. Inspections of your projects making disbursements a breeze. Administration of 1099’s directly to ven- dors and the IRS. Fees are based on many factors including but not limited to  Size and scope of project  Project Location  Duration of project Contact an IFC Specialist to get your personalized quote! +1 (657) 286-0060 Project Size Fee Up to $249,000 Flat $1200 $250,000 to $4,999,99 0.35% to 0.50% Over $5,000,000 0.20% to 0.45%