Navigating the Ecosystem of Pivotal Cloud Foundry Tiles
BASIS
1. Technical Summary:
3 Full Cycle Implementations and 1 Post Go live Support
Worked in Support Team for Multiple Projects
Hands on experience in installation of SAP servers in High Availability(HA) Cluster in
ECC,PI,MII,BI,BOBJ servers
Done Disaster Recovery(DR) server for ECC,PI,MII and BI servers with DB2 Database
Done Installation of below SAP Products
SAP PRODUCT VERSION
Enterprise Central Component (ECC) ECC6 EHP6,ECC6 EHP7
Process Integration (PI) SAP NW 7.31,NW7.4(ABAP + JAVA)
Business Intelligence (BI) SAP NW 7.31,NW 7.4(ABAP)
Solution Manager(SOLMAN) SOLMAN 7.1 SPS11/SPS12
Business Object (BOBJ) BOBJ 4.1
Manufacturing Intelligence and Integration
(MII)
SAP NW 7.31 (JAVA)
Document Management Server(DMS) Content server version 640
SAP FIORI SAP NW 7.4SR1
Business Planning and Consolidation(BPC) SAP NW7.31
Enterprise Portal (EP) SAP NW7.4
Configuration of BI, BOBJ, MII, PI, SOLMAN servers and SAP Router
Integration of PI with ECC, BI with ECC, MII with ECC and DMS with ECC
JDBC driver installation for PI server to integrate with external Database
Support Stack Calculation using SOLMAN MOPZ
Experience in applying Support Patches using SPAM Tool and also using SUM
MOPZ,EWA and Service Desk Configuration in SOLMAN
Client Administration and Client Copy (Local, RFC, Export/Import)
Server Monitoring and Troubleshooting
Experience in administration of Database Sybase-15.7 and DB2 9.7 and 10.1,Oracle 11
System Export and Import
2. Email, NWBC and Printer configuration and Spool administration
Transport Management System Configuration
DB2,Sybase and Oracle Backup and Restoration
Background Job Administration
Router Configuration and SAP OSS Configuration
Security Administration – User and Role Creation and Administration
Worked on Linux, AIX and Windows Operating System.
PROJECT DETAILS:
PROJECT1 (Implementation)
Name of the Project Dr.Batras Homeopathy
Position SAP BASIS CONSULTANT
Environment LINUX/ SYBASE
Location MUMBAI
Activities Server Installation(ECC, PI,BI,EP, SOLMAN)
SOLMAN Configuration
BI installation and Configuration
EP server installation and Configuration
Backup Configuration
Support pack and kernel Upgrade
User and Authorization administration
Transport Domain Configuration
JDBC Driver Deployment
3. PROJECT 2 (Implementation)
Name of the Project A.BAURS PRIVATE LIMITED
Position SAP BASIS CONSULTANT
Environment AIX/DB2
Location SRILANKA
Activities Server Installation(ECC, PI,BI,BOBJ,MII, SOLMAN)
BOBJ Configuration with BI
SOLMAN Server MOPZ and EWA Configuration
MII Configuration
Support Patch upgrade using SOLMAN MOPZ
Disaster Recovery[DR] server installation
DR server Configuration
Backup Configuration
NWBC Configuration
Support pack and kernel Upgrade
User and Authorization administration
Transport Domain Configuration
DB2 Administration
Client Administration
Http configuration
Server Monitoring
PROJECT3 (Implementation)
Name of the Project THE CAPITAL MAHARAJA ORGANISATION LIMITED
Position SAP BASIS CONSULTANT
Environment AIX / SYBASE
Location SRILANKA
Activities Server Installation(ECC, PI,BI,BOBJ,BPC,DMS, SOLMAN)
BI Configuration and interconnecting with ECC
BOBJ SSO Configuration
Sybase Database Patch Upgrade
SOLMAN Configuration
PI Post configuration
PI JDBC driver installation
Backup Configuration
Support pack and kernel Upgrade
User and Authorization administration
Transport Domain Configuration
Client Administration
NWBC Configuration
DMS server integration with ECC
BPC server Configuration
4. PROJECT 4 (Post Go Live Support)
Name of the Project HAYLEYS ADVANTIS
Position SAP BASIS CONSULTANT
Environment AIX / DB2
Location SRILANKA
Activities SOLMAN server installation
SOLMAN service desk configuration
Email alert configuration in Service desk
NWBC Configuration
PI JDBC driver installation
Support pack and kernel Upgrade
User and Authorization administration
Transport Domain Configuration
Client Administration
Backup Restoration Testing
Troubleshooting system problems by analyzing system log, ABAP dumps
Email Configuration