SlideShare a Scribd company logo
1 of 4
Download to read offline
Mark V. Zimmer, RA, MCSE 
858‐449‐9885 cell    MarkZimmer@outlook.com 
 
Professional Profile:  Seasoned Architect with 30+ years of expertise and a passion for managing and 
applying advanced computer technology to enhance the practice of 
Architecture, Engineering and Construction. 
 Architectural Design and Construction ‐ Corporate, Sports, Entertainment, 
Hospitality, Education and Residential projects. 
 BIM Management / CAD Management ‐ Supporting over 100 CAD users 
across 7 offices.  AutoCAD and Revit specialist. 
 Technology Management ‐ Server and networked computer systems 
supporting 300+ users across multiple offices.  Microsoft software specialist. 
 
Accomplishments:  Architectural Project Manager / Project Architect 
 Managed projects from inception through construction including project 
budgets, contracts and schedules, conceptual design, design development, 
construction documents, permit processing, bidding and construction 
administration. 
 Supervised production of over 200 projects with values up to $78 Million. 
 Highest Profile Project ‐ One America Plaza, San Diego, CA ‐ 33 Story high‐
rise office building with 4‐story underground parking structure in downtown 
San Diego.  Designed in association with Murphy/Jahn Architects in Chicago.  
Personally functioned as Project Architect for the office tower including 
extensive use of 3D computer modeling for accurate representation and 
area calculations of the tapering structure. 
  BIM / CAD Manager 
 Lead the research, evaluation, acquisition, deployment, training and support 
of a companywide 100+ user migration and standardization of the primary 
BIM platform to Autodesk Revit. 
 Research, develop and train staff on best practices for BIM procedures and 
project data structures. 
 Installation, Troubleshooting and User Support for: 
o Revit Architecture (since 2005) 
o AutoCAD (since 1986) 
o Revit MEP 
o Navisworks 
o 3ds Max Design 
o Design Review 
o Ecotect 
o Green Building Studio 
o SketchUp 
o Showcase 
o Lumion 
o Bluebeam Revu 
 Built extensive custom menus and scripts for AutoCAD to greatly improve 
productivity and adherence to company standards. 
 Developed a web based knowledge management Intranet called the “Digital 
Design Initiative” (DDI) to capture and disseminate the growing corporate 
knowledgebase, best practices, training seminars and company standards 
on BIM, Revit, AutoCAD and supporting applications. 
 
Mark V. Zimmer 
858‐449‐9885 cell    MarkZimmer@outlook.com 
  IT Manager 
 Microsoft Certified Professional specializing in Windows based corporate 
domain architecture networks spanning multiple offices or locations. 
 Extensive experience with: 
o Microsoft Windows Server 
o Active Directory 
o Group Policy 
o Remote Desktop 
o DNS, DHCP & DFS 
o Backup Exec 
o Windows XP & Windows 7 
o Dell Servers,  Workstations & 
Laptops 
o Microsoft Lync 
o Exchange E‐Mail Server 
o Microsoft Office 
o Microsoft Project 
o Polycom Video Conferencing 
o B&W and Color Printers & Multi‐
Function Copiers 
o Wide Format Plotting & Scanning 
 Working experience with: 
o Server and Workstation 
Virtualization 
o Citrix Server 
o Riverbed WAN Acceleration 
o Sonicwall and Watchguard Firewalls 
o Network Architecture 
o Corporate Anti‐Virus, Anti‐Spam, 
Anti‐Spyware Systems 
o UPS Power Systems 
o Deltek Project Accounting 
o Adobe Creative Suite 
o Adobe Acrobat 
 Lead and executed the technology integration of the corporate acquisition 
of The Stichler Design Group with NTD Architects computer network and 
information systems. 
 Developed and implemented a software installation system that 
automatically installs and uninstalls programs on user’s workstations. This 
system saves the company hundreds of man‐hours in IT and user support 
time and ensures software license compliance. 
  Constructor / Builder 
 Basic skills in residential rough and finish carpentry, framing, structural 
systems, roofing systems, electrical systems and HVAC & solar systems.  
 Completed 2 major residential remodel projects as owner/architect/builder. 
 
Employment:  NTD Studio of Little – NTD Architecture, San Diego, CA  June 2000 ‐ Present 
  IT Manager ‐ BIM / CAD Manager – Senior Associate 
 
  Altevers Associates, San Diego, CA  January 1999 ‐ June 2000 
  Project Architect ‐ Information Systems Manager 
 
  KMA Architecture & Engineering, San Diego, CA  June 1986 ‐ June 1998 
  Senior Associate ‐ Project Manager ‐ Computer Systems Manager 
 
  Vavrus Associates (Charlie Club), Joliet, Ill  August 1983 ‐ June 1986 
  Project Designer/Drafter 
 
Education:  Microsoft Certified Systems Engineer: (MCSE) (MCP+I) #1157078  1998 
  Registered Architect:      Illinois (001‐011744) 1986,   California (C21040) 1990 
  B. S. Architectural Engineering:  University of Kansas, Lawrence, 1983 
 
Mark V. Zimmer 
858‐449‐9885 cell    MarkZimmer@outlook.com 
 
 
 
Architectural Project Experience 
Entertainment Facilities: 
 Pacific Theatres Gaslamp 15 ‐ new downtown 2 level 15‐plex with stadium style seating. 
 Pacific Theatres Clairemont 14 ‐ new 14‐plex with stadium style seating. 
 Consolidated Amusement Kaka’Ako 24, Hawaii ‐ schematic design for a new 2 level 24‐plex 
movie theatre with stadium style seating over a 3 level parking structure. 
 Consolidated Amusement Pearl Ridge, Temple Valley, Kona, Kapolei & Kaahumanu, Hawaii ‐ 
conceptual designs for remodeling and expanding existing movie theatre facilities for retrofit of 
stadium style seating. 
 The Bishops School Auditorium ‐ new teaching facility for the performing arts. 
 Pacific Theatres Grossmont Center 8 ‐ 5 auditorium addition and remodel to an existing 3‐plex 
with traditional style seating.  
 Pacific Theatres Carmel Mountain 12 ‐ new 12‐plex with traditional style seating. 
 Pacific Theatres Grossmont Trolley 8 ‐ new 8‐plex with traditional style seating. 
Hospitality Facilities: 
 Siena – a Summerlin Village – Schematic design through construction administration for the 
common community facilities in a new 1800 home active adult golf course community in Las 
Vegas including a 14,000 sf Golf Clubhouse, 18,000 sf Fitness Center, 36,000 sf Village Center 
and various other support buildings. 
 Marriott Courtyard Carlsbad – schematic design and Design Review Board processing for a new 
152 room hotel. 
 Charlie Club, Michigan Avenue, Chicago, Illinois ‐ remodel and expansion (added 6 stories to the 
top) of a historic 12 story building originally built in 1912 incorporating a new full service health 
club with pool, spa, indoor track, racquetball courts & aerobic dance studios, 120 hotel rooms, 
restaurant and 4 level night club. 
 Charlie Club, Arlington, Texas ‐ new 200,000 sf complex including a full service health club, 200 
hotel rooms and a restaurant & bar. 
Corporate Facilities: 
 Peninsula Bank ‐ 26,000 sf data processing center TI and remodel into an existing 3 level facility 
including a large computer room. 
 Greyhound Exposition Services (GES) ‐ new 111,000 sf office / warehouse / distribution facility 
design / build with Koll Construction. 
 SMAC ‐ new 28,400 sf corporate headquarters office / manufacturing facility. 
 Iron Mountain ‐ new 80,000 sf 5 level document storage & distribution facility design / build 
with Koll Construction and phase 2 64,000 sf expansion. 
 Corsair Marine ‐ schematic design and Building Code analysis for a new hazardous (H) 
occupancy manufacturing facility. 
 Kyocera America Inc. ‐ interior remodel including class 10,000 clean rooms for electronic device 
manufacturing and assembling. 
 Medtronic Interventional Vascular ‐ 100,000 sf regional headquarters TI including over 14,000 
sf of class 10,000 and class 1,000 clean rooms for medical device manufacturing and assembling. 
 
Mark V. Zimmer 
858‐449‐9885 cell    MarkZimmer@outlook.com 
 
 
 One America Plaza ‐ 196,000 sf 33 story class A high‐rise office building over a 4 level 
underground parking garage done in association with Murphy/Jahn Architects. 
 Great American Bank ‐ various new and remodels to existing branch banks. 
Developer / Tilt‐up Projects: 
 Mission Trails Industrial Park ‐ Trammell Crow ‐ 5 building 400,000+ sf office / manufacturing / 
warehouse complex. 
 San Diego International Center ‐ California Traditions ‐ 2 building 240,000 sf office / warehouse 
facility. 
 University Technology Center Lot 2 ‐ Whitaker Investments ‐ 150,000 sf office / manufacturing 
facility. 
 4S Ranch Business Center Lots 60, 61 & 62 ‐ Bycor Contractors ‐ 108,000 sf office / 
manufacturing / warehouse facility. 
 Oakridge Industrial Center Lot 7 ‐ Mitsui Fudosan ‐ 48,000 sf office / manufacturing / 
warehouse facility. 
 Carlsbad Oaks East Lots 10 & 11 ‐ Mission West Properties ‐ 3 building multi‐tenant complex. 
 Rancho California ‐ Koll Development ‐ 3 building multi‐tenant complex. 
 Carlsbad Oaks Lot 21 ‐ Winger Development ‐ 6 building office / warehouse complex. 
 Carlsbad Oaks East Lot 36 ‐ Tchang Development ‐ 38,000 sf office / warehouse facility. 
 Rancho Del Oro Lot 9 ‐ Ferguson Partnership ‐ 5 building office / manufacturing / warehouse 
complex. 
 Oakridge Business Center Lots 4 & 5 ‐ Mitsui Fudosan ‐ 6 building office / manufacturing / 
warehouse complex. 
Constructor / Builder: 
 7172 Whipple Ave, San Diego, CA ‐ 740 sf 2‐story addition with redwood deck and complete 
interior remodel to an existing 980 sf single family residence. 
 5004 Kate Sessions Way, San Diego, CA ‐ 1174 sf 2‐story addition with 700 sf view deck and 
complete interior remodel to an existing 2682 sf single family residence. 
Computer 3D Modeling: 
 Carlsbad Company Stores ‐ 300,000 sf factory outlet center ‐ supervised staff during 
construction and rendering of detailed 3D computer model and produced various animations 
showing interior of mall and detailed sunlight animation studies. 
 Pacific Theatres Grossmont Trolley Center ‐ produced detailed 3D computer models of various 
designs for design analysis and presentation to City Design Review Board. 
 Koll Huntington ‐ produced 3D computer model of proposed 40‐story tower and placed within 
San Diego City model (see below) for massing and skyline analysis. 
 One America Plaza ‐ produced several 3D computer models including a 100 square block model 
of downtown San Diego for building massing studies and sight line view corridor analysis.  
Additional models developed for detailed analysis of building geometry and accurate square 
footage calculations.  San Diego model also utilized for marketing and pre‐leasing of facility as it 
could demonstrate to a prospective tenant what their views would be like from any floor years 
before the building was completed. 
 Hazard Center ‐ produced 3D computer model of geometrically complex retail facility for 
accurate perspective generation and rendering. 

More Related Content

Viewers also liked

Aaron McGinnis Resume and Cover Letter Teaching
Aaron McGinnis Resume and Cover Letter TeachingAaron McGinnis Resume and Cover Letter Teaching
Aaron McGinnis Resume and Cover Letter TeachingAaron McGinnis
 
John Marks - Resume October 2015
John Marks - Resume October 2015John Marks - Resume October 2015
John Marks - Resume October 2015John Marks
 
Wong Kien Hoe Resume
Wong Kien Hoe ResumeWong Kien Hoe Resume
Wong Kien Hoe ResumeKien Hoe Wong
 
Carly Skone Acting Resume Aug 2016
Carly Skone Acting Resume Aug 2016Carly Skone Acting Resume Aug 2016
Carly Skone Acting Resume Aug 2016Carly Skone
 
Ship Engineer Resume 21
Ship Engineer Resume 21Ship Engineer Resume 21
Ship Engineer Resume 21William Furrow
 
Mike Miller Resume 2016 - Ver 2
Mike Miller Resume 2016 - Ver 2Mike Miller Resume 2016 - Ver 2
Mike Miller Resume 2016 - Ver 2Mike Miller
 
Resume new it_format
Resume new it_formatResume new it_format
Resume new it_formatRajiv Saini
 
Akshay_salvi_Resume (1)
Akshay_salvi_Resume (1)Akshay_salvi_Resume (1)
Akshay_salvi_Resume (1)Akshay Salvi
 
Yolanda R. Reid Resume July 2015
Yolanda R. Reid Resume July 2015Yolanda R. Reid Resume July 2015
Yolanda R. Reid Resume July 2015Yolanda Reid
 
RESUME_AdjunctFaculty
RESUME_AdjunctFacultyRESUME_AdjunctFaculty
RESUME_AdjunctFacultyJames Fink
 
Top 8 application engineer resume samples
Top 8 application engineer resume samplesTop 8 application engineer resume samples
Top 8 application engineer resume samplesDemiLovato999
 
Top 8 domestic supervisor resume samples
Top 8 domestic supervisor resume samplesTop 8 domestic supervisor resume samples
Top 8 domestic supervisor resume samplesbrownnathan958
 

Viewers also liked (18)

Aaron McGinnis Resume and Cover Letter Teaching
Aaron McGinnis Resume and Cover Letter TeachingAaron McGinnis Resume and Cover Letter Teaching
Aaron McGinnis Resume and Cover Letter Teaching
 
John Marks - Resume October 2015
John Marks - Resume October 2015John Marks - Resume October 2015
John Marks - Resume October 2015
 
Wong Kien Hoe Resume
Wong Kien Hoe ResumeWong Kien Hoe Resume
Wong Kien Hoe Resume
 
Carly Skone Acting Resume Aug 2016
Carly Skone Acting Resume Aug 2016Carly Skone Acting Resume Aug 2016
Carly Skone Acting Resume Aug 2016
 
Ship Engineer Resume 21
Ship Engineer Resume 21Ship Engineer Resume 21
Ship Engineer Resume 21
 
Ritesh Resume
Ritesh Resume Ritesh Resume
Ritesh Resume
 
Mike Miller Resume 2016 - Ver 2
Mike Miller Resume 2016 - Ver 2Mike Miller Resume 2016 - Ver 2
Mike Miller Resume 2016 - Ver 2
 
Resume new it_format
Resume new it_formatResume new it_format
Resume new it_format
 
RESUME 2 Z
RESUME 2 ZRESUME 2 Z
RESUME 2 Z
 
Akshay_salvi_Resume (1)
Akshay_salvi_Resume (1)Akshay_salvi_Resume (1)
Akshay_salvi_Resume (1)
 
Yolanda R. Reid Resume July 2015
Yolanda R. Reid Resume July 2015Yolanda R. Reid Resume July 2015
Yolanda R. Reid Resume July 2015
 
Resume_2016
Resume_2016Resume_2016
Resume_2016
 
Erin Conduff Resume 12.12.16
Erin Conduff Resume 12.12.16Erin Conduff Resume 12.12.16
Erin Conduff Resume 12.12.16
 
RESUME_3
RESUME_3RESUME_3
RESUME_3
 
RESUME_AdjunctFaculty
RESUME_AdjunctFacultyRESUME_AdjunctFaculty
RESUME_AdjunctFaculty
 
Top 8 application engineer resume samples
Top 8 application engineer resume samplesTop 8 application engineer resume samples
Top 8 application engineer resume samples
 
Top 8 domestic supervisor resume samples
Top 8 domestic supervisor resume samplesTop 8 domestic supervisor resume samples
Top 8 domestic supervisor resume samples
 
Resume-Linkedin
Resume-LinkedinResume-Linkedin
Resume-Linkedin
 

Similar to Mark V Zimmer - Resume & Projects

Similar to Mark V Zimmer - Resume & Projects (20)

DaRosa 16
DaRosa 16DaRosa 16
DaRosa 16
 
Beshoy Effat
Beshoy EffatBeshoy Effat
Beshoy Effat
 
FIROZ SHA AHAMED-CV-1
FIROZ SHA AHAMED-CV-1FIROZ SHA AHAMED-CV-1
FIROZ SHA AHAMED-CV-1
 
Resume (Jeff)
Resume (Jeff)Resume (Jeff)
Resume (Jeff)
 
Resumemanishsharma (1)
Resumemanishsharma (1)Resumemanishsharma (1)
Resumemanishsharma (1)
 
Resumemanishsharma (1)
Resumemanishsharma (1)Resumemanishsharma (1)
Resumemanishsharma (1)
 
Construction Project Manager_RE
Construction Project Manager_REConstruction Project Manager_RE
Construction Project Manager_RE
 
Niloofar Shirazi
Niloofar ShiraziNiloofar Shirazi
Niloofar Shirazi
 
BIM Project Lead
BIM Project LeadBIM Project Lead
BIM Project Lead
 
Resume MANOJ SHARMA
Resume MANOJ SHARMAResume MANOJ SHARMA
Resume MANOJ SHARMA
 
Resume
ResumeResume
Resume
 
Word Version for Resume Mark Dimmitt 2.5.15
Word Version for Resume Mark Dimmitt 2.5.15Word Version for Resume Mark Dimmitt 2.5.15
Word Version for Resume Mark Dimmitt 2.5.15
 
ghada gamal al-dIn PMP
ghada gamal al-dIn PMPghada gamal al-dIn PMP
ghada gamal al-dIn PMP
 
Resume_Katrina Lasco_2015
Resume_Katrina Lasco_2015Resume_Katrina Lasco_2015
Resume_Katrina Lasco_2015
 
Zzarchitect resume template
Zzarchitect resume templateZzarchitect resume template
Zzarchitect resume template
 
Virtual Construction Engineer II
Virtual Construction Engineer IIVirtual Construction Engineer II
Virtual Construction Engineer II
 
BIM Boss Portfolio
BIM Boss PortfolioBIM Boss Portfolio
BIM Boss Portfolio
 
cv-new-Mohamed Ragab
cv-new-Mohamed Ragabcv-new-Mohamed Ragab
cv-new-Mohamed Ragab
 
CV_Ameen
CV_AmeenCV_Ameen
CV_Ameen
 
Current Builders Brochure
Current Builders BrochureCurrent Builders Brochure
Current Builders Brochure
 

Mark V Zimmer - Resume & Projects

  • 1. Mark V. Zimmer, RA, MCSE  858‐449‐9885 cell    MarkZimmer@outlook.com    Professional Profile:  Seasoned Architect with 30+ years of expertise and a passion for managing and  applying advanced computer technology to enhance the practice of  Architecture, Engineering and Construction.   Architectural Design and Construction ‐ Corporate, Sports, Entertainment,  Hospitality, Education and Residential projects.   BIM Management / CAD Management ‐ Supporting over 100 CAD users  across 7 offices.  AutoCAD and Revit specialist.   Technology Management ‐ Server and networked computer systems  supporting 300+ users across multiple offices.  Microsoft software specialist.    Accomplishments:  Architectural Project Manager / Project Architect   Managed projects from inception through construction including project  budgets, contracts and schedules, conceptual design, design development,  construction documents, permit processing, bidding and construction  administration.   Supervised production of over 200 projects with values up to $78 Million.   Highest Profile Project ‐ One America Plaza, San Diego, CA ‐ 33 Story high‐ rise office building with 4‐story underground parking structure in downtown  San Diego.  Designed in association with Murphy/Jahn Architects in Chicago.   Personally functioned as Project Architect for the office tower including  extensive use of 3D computer modeling for accurate representation and  area calculations of the tapering structure.    BIM / CAD Manager   Lead the research, evaluation, acquisition, deployment, training and support  of a companywide 100+ user migration and standardization of the primary  BIM platform to Autodesk Revit.   Research, develop and train staff on best practices for BIM procedures and  project data structures.   Installation, Troubleshooting and User Support for:  o Revit Architecture (since 2005)  o AutoCAD (since 1986)  o Revit MEP  o Navisworks  o 3ds Max Design  o Design Review  o Ecotect  o Green Building Studio  o SketchUp  o Showcase  o Lumion  o Bluebeam Revu   Built extensive custom menus and scripts for AutoCAD to greatly improve  productivity and adherence to company standards.   Developed a web based knowledge management Intranet called the “Digital  Design Initiative” (DDI) to capture and disseminate the growing corporate  knowledgebase, best practices, training seminars and company standards  on BIM, Revit, AutoCAD and supporting applications. 
  • 2.   Mark V. Zimmer  858‐449‐9885 cell    MarkZimmer@outlook.com    IT Manager   Microsoft Certified Professional specializing in Windows based corporate  domain architecture networks spanning multiple offices or locations.   Extensive experience with:  o Microsoft Windows Server  o Active Directory  o Group Policy  o Remote Desktop  o DNS, DHCP & DFS  o Backup Exec  o Windows XP & Windows 7  o Dell Servers,  Workstations &  Laptops  o Microsoft Lync  o Exchange E‐Mail Server  o Microsoft Office  o Microsoft Project  o Polycom Video Conferencing  o B&W and Color Printers & Multi‐ Function Copiers  o Wide Format Plotting & Scanning   Working experience with:  o Server and Workstation  Virtualization  o Citrix Server  o Riverbed WAN Acceleration  o Sonicwall and Watchguard Firewalls  o Network Architecture  o Corporate Anti‐Virus, Anti‐Spam,  Anti‐Spyware Systems  o UPS Power Systems  o Deltek Project Accounting  o Adobe Creative Suite  o Adobe Acrobat   Lead and executed the technology integration of the corporate acquisition  of The Stichler Design Group with NTD Architects computer network and  information systems.   Developed and implemented a software installation system that  automatically installs and uninstalls programs on user’s workstations. This  system saves the company hundreds of man‐hours in IT and user support  time and ensures software license compliance.    Constructor / Builder   Basic skills in residential rough and finish carpentry, framing, structural  systems, roofing systems, electrical systems and HVAC & solar systems.    Completed 2 major residential remodel projects as owner/architect/builder.    Employment:  NTD Studio of Little – NTD Architecture, San Diego, CA  June 2000 ‐ Present    IT Manager ‐ BIM / CAD Manager – Senior Associate      Altevers Associates, San Diego, CA  January 1999 ‐ June 2000    Project Architect ‐ Information Systems Manager      KMA Architecture & Engineering, San Diego, CA  June 1986 ‐ June 1998    Senior Associate ‐ Project Manager ‐ Computer Systems Manager      Vavrus Associates (Charlie Club), Joliet, Ill  August 1983 ‐ June 1986    Project Designer/Drafter    Education:  Microsoft Certified Systems Engineer: (MCSE) (MCP+I) #1157078  1998    Registered Architect:      Illinois (001‐011744) 1986,   California (C21040) 1990    B. S. Architectural Engineering:  University of Kansas, Lawrence, 1983 
  • 3.   Mark V. Zimmer  858‐449‐9885 cell    MarkZimmer@outlook.com        Architectural Project Experience  Entertainment Facilities:   Pacific Theatres Gaslamp 15 ‐ new downtown 2 level 15‐plex with stadium style seating.   Pacific Theatres Clairemont 14 ‐ new 14‐plex with stadium style seating.   Consolidated Amusement Kaka’Ako 24, Hawaii ‐ schematic design for a new 2 level 24‐plex  movie theatre with stadium style seating over a 3 level parking structure.   Consolidated Amusement Pearl Ridge, Temple Valley, Kona, Kapolei & Kaahumanu, Hawaii ‐  conceptual designs for remodeling and expanding existing movie theatre facilities for retrofit of  stadium style seating.   The Bishops School Auditorium ‐ new teaching facility for the performing arts.   Pacific Theatres Grossmont Center 8 ‐ 5 auditorium addition and remodel to an existing 3‐plex  with traditional style seating.    Pacific Theatres Carmel Mountain 12 ‐ new 12‐plex with traditional style seating.   Pacific Theatres Grossmont Trolley 8 ‐ new 8‐plex with traditional style seating.  Hospitality Facilities:   Siena – a Summerlin Village – Schematic design through construction administration for the  common community facilities in a new 1800 home active adult golf course community in Las  Vegas including a 14,000 sf Golf Clubhouse, 18,000 sf Fitness Center, 36,000 sf Village Center  and various other support buildings.   Marriott Courtyard Carlsbad – schematic design and Design Review Board processing for a new  152 room hotel.   Charlie Club, Michigan Avenue, Chicago, Illinois ‐ remodel and expansion (added 6 stories to the  top) of a historic 12 story building originally built in 1912 incorporating a new full service health  club with pool, spa, indoor track, racquetball courts & aerobic dance studios, 120 hotel rooms,  restaurant and 4 level night club.   Charlie Club, Arlington, Texas ‐ new 200,000 sf complex including a full service health club, 200  hotel rooms and a restaurant & bar.  Corporate Facilities:   Peninsula Bank ‐ 26,000 sf data processing center TI and remodel into an existing 3 level facility  including a large computer room.   Greyhound Exposition Services (GES) ‐ new 111,000 sf office / warehouse / distribution facility  design / build with Koll Construction.   SMAC ‐ new 28,400 sf corporate headquarters office / manufacturing facility.   Iron Mountain ‐ new 80,000 sf 5 level document storage & distribution facility design / build  with Koll Construction and phase 2 64,000 sf expansion.   Corsair Marine ‐ schematic design and Building Code analysis for a new hazardous (H)  occupancy manufacturing facility.   Kyocera America Inc. ‐ interior remodel including class 10,000 clean rooms for electronic device  manufacturing and assembling.   Medtronic Interventional Vascular ‐ 100,000 sf regional headquarters TI including over 14,000  sf of class 10,000 and class 1,000 clean rooms for medical device manufacturing and assembling. 
  • 4.   Mark V. Zimmer  858‐449‐9885 cell    MarkZimmer@outlook.com       One America Plaza ‐ 196,000 sf 33 story class A high‐rise office building over a 4 level  underground parking garage done in association with Murphy/Jahn Architects.   Great American Bank ‐ various new and remodels to existing branch banks.  Developer / Tilt‐up Projects:   Mission Trails Industrial Park ‐ Trammell Crow ‐ 5 building 400,000+ sf office / manufacturing /  warehouse complex.   San Diego International Center ‐ California Traditions ‐ 2 building 240,000 sf office / warehouse  facility.   University Technology Center Lot 2 ‐ Whitaker Investments ‐ 150,000 sf office / manufacturing  facility.   4S Ranch Business Center Lots 60, 61 & 62 ‐ Bycor Contractors ‐ 108,000 sf office /  manufacturing / warehouse facility.   Oakridge Industrial Center Lot 7 ‐ Mitsui Fudosan ‐ 48,000 sf office / manufacturing /  warehouse facility.   Carlsbad Oaks East Lots 10 & 11 ‐ Mission West Properties ‐ 3 building multi‐tenant complex.   Rancho California ‐ Koll Development ‐ 3 building multi‐tenant complex.   Carlsbad Oaks Lot 21 ‐ Winger Development ‐ 6 building office / warehouse complex.   Carlsbad Oaks East Lot 36 ‐ Tchang Development ‐ 38,000 sf office / warehouse facility.   Rancho Del Oro Lot 9 ‐ Ferguson Partnership ‐ 5 building office / manufacturing / warehouse  complex.   Oakridge Business Center Lots 4 & 5 ‐ Mitsui Fudosan ‐ 6 building office / manufacturing /  warehouse complex.  Constructor / Builder:   7172 Whipple Ave, San Diego, CA ‐ 740 sf 2‐story addition with redwood deck and complete  interior remodel to an existing 980 sf single family residence.   5004 Kate Sessions Way, San Diego, CA ‐ 1174 sf 2‐story addition with 700 sf view deck and  complete interior remodel to an existing 2682 sf single family residence.  Computer 3D Modeling:   Carlsbad Company Stores ‐ 300,000 sf factory outlet center ‐ supervised staff during  construction and rendering of detailed 3D computer model and produced various animations  showing interior of mall and detailed sunlight animation studies.   Pacific Theatres Grossmont Trolley Center ‐ produced detailed 3D computer models of various  designs for design analysis and presentation to City Design Review Board.   Koll Huntington ‐ produced 3D computer model of proposed 40‐story tower and placed within  San Diego City model (see below) for massing and skyline analysis.   One America Plaza ‐ produced several 3D computer models including a 100 square block model  of downtown San Diego for building massing studies and sight line view corridor analysis.   Additional models developed for detailed analysis of building geometry and accurate square  footage calculations.  San Diego model also utilized for marketing and pre‐leasing of facility as it  could demonstrate to a prospective tenant what their views would be like from any floor years  before the building was completed.   Hazard Center ‐ produced 3D computer model of geometrically complex retail facility for  accurate perspective generation and rendering.