Introduction
Work Order : Construction of BUET West
Palashi Campus main gate and
boundary wall.
Amount : 2.327 crore
Contractor : NS Construction
Agreement Date : 19/04/2022
Duration : 90 days
www.themegallery.com
BUET West Palashi Campus Main Gate & Boundary Wall
www.themegallery.com
BUET Main Gate – Column to Column inside distance 6800mm
www.themegallery.com
Elevation of Boundary Wall (Part – Column C/C distance 2700mm)
www.themegallery.com
Company Logo
Layout of West Palashi Main Gate & Boundary Wall
Present Condition
Gate:
1. Foundation - completed
2. Superstructure- 3rd lift
completed.
3. Delaying for decision of
materials.
Gate / Grill
Boundary Wall
1. Stopped for decision of
materials (Stainless
steel, Hairline, bronze
color)
www.themegallery.com
Company Logo
Application of Contractor’s price escalation including rate analysis
(3rd application)
Present Condition
www.themegallery.com
Company Logo
Company Logo
Present Condition
Diagram
Main
Gate
Boundary
Grill
www.themegallery.com
Company Logo
Particulars of BUET Side gate & Boundary Wall Grill:
As Per Schedule (Item no. 53) Proposed
1. Size :
a) Side Entry Gate 1800 x 2400 mm - 2 Nos.
b) Boundary Wall Grill 2500 x 2400 mm – Each
part
2. Boundary Wall Grill sectional dimensions
a) Outer Frame 50x50x2 mm
b) Inner Vertical Bars 20x20xx mm
c) Logo & Gate Number Size 200x200 mm
3. Material will be use for the Grill
a) Stainless Steel
b) Hair Line Bronze Color
c) Matt finished
4. Source of Material
a) Anywhere or Not Mentioned
5) Amount of Cost
a) Unit rate - 11284 Tk.
b) Quantity - 714 sqm
c) Total - 80,57,190 Tk
1. Size :
a) Side Entry Gate1800 x 2400 mm - 2 Nos.
b) Boundary Wall Grill 2500 x 2400 mm – Each
part
2. Boundary Wall sectional dimensions
a) Outer Frame 50x50x2 mm
b) Inner Vertical Bars 20x20xx mm
c) Logo & Gate Number Size 200x200 mm
3. Material will be use for the Grill
a) Stainless Steel
b) Hair Line Bronze Color
c) Matt finished
4. Source of Material
a) China
5) Amount of Cost
a) Unit rate - 16650 Tk.
b) Quantity - 714 sqm
c) Total - 1,18,24,047 Tk
d) Excess - 37,66,857
www.themegallery.com
Company Logo
Particulars of BUET Main gate:
As Per Schedule (Item no. 54) Proposed
1. Size :
a) Main Entry 6600 x 2400 mm - 1 Nos. in 2 parts
2. Main Entry Gate sectional dimensions
a) Outer Frame 50x50x2 mm
b) Inner Vertical Bars 20x20xx mm
c) Logo & Gate Number Size 1000x1000 mm
3. Material will be use for the Gate
a) Stainless Steel
b) Hair Line Bronze Color
c) Matt finished
4. Source of Material
a) Anywhere or Not Mentioned
5) Amount of Cost
a) Unit rate - 10918 Tk.
b) Quantity - 16.32 sqm
c) Total - 1,78,191 Tk
1. Size :
a) Main Entry 6600 x 2400 mm - 1 Nos. in 2 parts
2. Main Entry Gate sectional dimensions
a) Outer Frame 80x80x3 mm
b) Inner Vertical Bars 20x20xx mm
c) Logo & Gate Number Size 1000x1000 mm
3. Material will be use for the Gate
a) Stainless Steel
b) Hair Line Bronze Color
c) Matt finished
4. Source of Material
a) China
5) Amount of Cost
a) Unit rate - 25445 Tk.
b) Quantity - 33.20 sqm
c) Total - 8,44,774 Tk
d) Excess - 6,66,583
Cost for Additional Works
Stainless
Bronze Color
Hairline
Item 53:
•Boundary grill
•Additional Tk.
37.668 lac
needed
Item 54
• Main Gate
•Additional
Tk. 6.666 lac
needed
Grill & Gate
Total Tk 44.33 Lac Additionally Needed
Total excess Amount = 44.32 Lac
Percentage of excess Amount = 19.05%
Table
Item No Item Name
Total (lac)
As per Work
Order
Total (lac)
Proposed
Excess,
Amount
(lac)
Item 53
Boundary
grill
Tk. 80.57 Tk. 118.24 Tk. 37.66
Item 54 Main Gate Tk. 1.78 Tk. 8.44 Tk. 6.66
Total excess Amount = 44.32 Lac
Percentage of excess Amount = 19.05%
Causes of Rate Increase
Locally Unavailability of Materials
Higher Material Costing
High Exchange Rate
Additional
Tk44.33 lac is
needed.
19.05% of
Work Order
Amount
Conclusion
www.themegallery.com
Company Logo
 It may use the local available material
instead of imported one. Aesthetic
aspect will need to sacrifice. It may
required three to five months to
complete the work.
 It may approve the extra amount and contractor will start to import the
materials. It may required six to eight months to complete the work.
LOGO
22/10/2022

More Related Content

Similar to Presentation 22.pptx

Atlas Internship report
Atlas Internship reportAtlas Internship report
Atlas Internship reportM Nadeem
 
Steel Bridge for a construction of highway bridge in Nepal
Steel Bridge for a construction of highway bridge in NepalSteel Bridge for a construction of highway bridge in Nepal
Steel Bridge for a construction of highway bridge in NepalPoudel Dinesh
 
Me ies-2014-obj paper-ii
Me ies-2014-obj paper-iiMe ies-2014-obj paper-ii
Me ies-2014-obj paper-iikrutti
 
Storage vessel design
Storage vessel designStorage vessel design
Storage vessel designMASUKUMARA1
 
Injection Molding (MIT 2.008x Lecture Slides)
Injection Molding (MIT 2.008x Lecture Slides)Injection Molding (MIT 2.008x Lecture Slides)
Injection Molding (MIT 2.008x Lecture Slides)A. John Hart
 
Akshay Composter
Akshay ComposterAkshay Composter
Akshay ComposterSanketValse
 
. Narmada Canal ExPresentation for Extradose Bridge for Gandhi Nagar Metro....
.   Narmada Canal ExPresentation for Extradose Bridge for Gandhi Nagar Metro.....   Narmada Canal ExPresentation for Extradose Bridge for Gandhi Nagar Metro....
. Narmada Canal ExPresentation for Extradose Bridge for Gandhi Nagar Metro....IndraNathMishra2
 

Similar to Presentation 22.pptx (10)

Atlas Internship report
Atlas Internship reportAtlas Internship report
Atlas Internship report
 
Steel Bridge for a construction of highway bridge in Nepal
Steel Bridge for a construction of highway bridge in NepalSteel Bridge for a construction of highway bridge in Nepal
Steel Bridge for a construction of highway bridge in Nepal
 
Me ies-2014-obj paper-ii
Me ies-2014-obj paper-iiMe ies-2014-obj paper-ii
Me ies-2014-obj paper-ii
 
121802.Electra4
121802.Electra4121802.Electra4
121802.Electra4
 
Storage vessel design
Storage vessel designStorage vessel design
Storage vessel design
 
The specs of container house
The specs of container houseThe specs of container house
The specs of container house
 
Injection Molding (MIT 2.008x Lecture Slides)
Injection Molding (MIT 2.008x Lecture Slides)Injection Molding (MIT 2.008x Lecture Slides)
Injection Molding (MIT 2.008x Lecture Slides)
 
Fuse box roll forming machine
Fuse box roll forming machineFuse box roll forming machine
Fuse box roll forming machine
 
Akshay Composter
Akshay ComposterAkshay Composter
Akshay Composter
 
. Narmada Canal ExPresentation for Extradose Bridge for Gandhi Nagar Metro....
.   Narmada Canal ExPresentation for Extradose Bridge for Gandhi Nagar Metro.....   Narmada Canal ExPresentation for Extradose Bridge for Gandhi Nagar Metro....
. Narmada Canal ExPresentation for Extradose Bridge for Gandhi Nagar Metro....
 

Recently uploaded

Wellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxWellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxJisc
 
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxExploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxPooja Bhuva
 
How to Manage Call for Tendor in Odoo 17
How to Manage Call for Tendor in Odoo 17How to Manage Call for Tendor in Odoo 17
How to Manage Call for Tendor in Odoo 17Celine George
 
How to Add a Tool Tip to a Field in Odoo 17
How to Add a Tool Tip to a Field in Odoo 17How to Add a Tool Tip to a Field in Odoo 17
How to Add a Tool Tip to a Field in Odoo 17Celine George
 
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Pooja Bhuva
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17Celine George
 
21st_Century_Skills_Framework_Final_Presentation_2.pptx
21st_Century_Skills_Framework_Final_Presentation_2.pptx21st_Century_Skills_Framework_Final_Presentation_2.pptx
21st_Century_Skills_Framework_Final_Presentation_2.pptxJoelynRubio1
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...Amil baba
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024Elizabeth Walsh
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Jisc
 
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Pooja Bhuva
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxPooja Bhuva
 
Details on CBSE Compartment Exam.pptx1111
Details on CBSE Compartment Exam.pptx1111Details on CBSE Compartment Exam.pptx1111
Details on CBSE Compartment Exam.pptx1111GangaMaiya1
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxDenish Jangid
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxmarlenawright1
 
REMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxREMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxDr. Ravikiran H M Gowda
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and ModificationsMJDuyan
 
Tatlong Kwento ni Lola basyang-1.pdf arts
Tatlong Kwento ni Lola basyang-1.pdf artsTatlong Kwento ni Lola basyang-1.pdf arts
Tatlong Kwento ni Lola basyang-1.pdf artsNbelano25
 
Simple, Complex, and Compound Sentences Exercises.pdf
Simple, Complex, and Compound Sentences Exercises.pdfSimple, Complex, and Compound Sentences Exercises.pdf
Simple, Complex, and Compound Sentences Exercises.pdfstareducators107
 

Recently uploaded (20)

Wellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxWellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptx
 
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxExploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
 
How to Manage Call for Tendor in Odoo 17
How to Manage Call for Tendor in Odoo 17How to Manage Call for Tendor in Odoo 17
How to Manage Call for Tendor in Odoo 17
 
How to Add a Tool Tip to a Field in Odoo 17
How to Add a Tool Tip to a Field in Odoo 17How to Add a Tool Tip to a Field in Odoo 17
How to Add a Tool Tip to a Field in Odoo 17
 
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
21st_Century_Skills_Framework_Final_Presentation_2.pptx
21st_Century_Skills_Framework_Final_Presentation_2.pptx21st_Century_Skills_Framework_Final_Presentation_2.pptx
21st_Century_Skills_Framework_Final_Presentation_2.pptx
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptx
 
Details on CBSE Compartment Exam.pptx1111
Details on CBSE Compartment Exam.pptx1111Details on CBSE Compartment Exam.pptx1111
Details on CBSE Compartment Exam.pptx1111
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
 
REMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxREMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptx
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
Tatlong Kwento ni Lola basyang-1.pdf arts
Tatlong Kwento ni Lola basyang-1.pdf artsTatlong Kwento ni Lola basyang-1.pdf arts
Tatlong Kwento ni Lola basyang-1.pdf arts
 
Simple, Complex, and Compound Sentences Exercises.pdf
Simple, Complex, and Compound Sentences Exercises.pdfSimple, Complex, and Compound Sentences Exercises.pdf
Simple, Complex, and Compound Sentences Exercises.pdf
 

Presentation 22.pptx

  • 1. LOGO Presentation on West Palashi Campus Main Gate & Boundary Wall. 22/10/2022
  • 2. Introduction Work Order : Construction of BUET West Palashi Campus main gate and boundary wall. Amount : 2.327 crore Contractor : NS Construction Agreement Date : 19/04/2022 Duration : 90 days
  • 3. www.themegallery.com BUET West Palashi Campus Main Gate & Boundary Wall
  • 4. www.themegallery.com BUET Main Gate – Column to Column inside distance 6800mm
  • 5. www.themegallery.com Elevation of Boundary Wall (Part – Column C/C distance 2700mm)
  • 6. www.themegallery.com Company Logo Layout of West Palashi Main Gate & Boundary Wall
  • 7. Present Condition Gate: 1. Foundation - completed 2. Superstructure- 3rd lift completed. 3. Delaying for decision of materials. Gate / Grill Boundary Wall 1. Stopped for decision of materials (Stainless steel, Hairline, bronze color)
  • 8. www.themegallery.com Company Logo Application of Contractor’s price escalation including rate analysis (3rd application) Present Condition
  • 12. www.themegallery.com Company Logo Particulars of BUET Side gate & Boundary Wall Grill: As Per Schedule (Item no. 53) Proposed 1. Size : a) Side Entry Gate 1800 x 2400 mm - 2 Nos. b) Boundary Wall Grill 2500 x 2400 mm – Each part 2. Boundary Wall Grill sectional dimensions a) Outer Frame 50x50x2 mm b) Inner Vertical Bars 20x20xx mm c) Logo & Gate Number Size 200x200 mm 3. Material will be use for the Grill a) Stainless Steel b) Hair Line Bronze Color c) Matt finished 4. Source of Material a) Anywhere or Not Mentioned 5) Amount of Cost a) Unit rate - 11284 Tk. b) Quantity - 714 sqm c) Total - 80,57,190 Tk 1. Size : a) Side Entry Gate1800 x 2400 mm - 2 Nos. b) Boundary Wall Grill 2500 x 2400 mm – Each part 2. Boundary Wall sectional dimensions a) Outer Frame 50x50x2 mm b) Inner Vertical Bars 20x20xx mm c) Logo & Gate Number Size 200x200 mm 3. Material will be use for the Grill a) Stainless Steel b) Hair Line Bronze Color c) Matt finished 4. Source of Material a) China 5) Amount of Cost a) Unit rate - 16650 Tk. b) Quantity - 714 sqm c) Total - 1,18,24,047 Tk d) Excess - 37,66,857
  • 13. www.themegallery.com Company Logo Particulars of BUET Main gate: As Per Schedule (Item no. 54) Proposed 1. Size : a) Main Entry 6600 x 2400 mm - 1 Nos. in 2 parts 2. Main Entry Gate sectional dimensions a) Outer Frame 50x50x2 mm b) Inner Vertical Bars 20x20xx mm c) Logo & Gate Number Size 1000x1000 mm 3. Material will be use for the Gate a) Stainless Steel b) Hair Line Bronze Color c) Matt finished 4. Source of Material a) Anywhere or Not Mentioned 5) Amount of Cost a) Unit rate - 10918 Tk. b) Quantity - 16.32 sqm c) Total - 1,78,191 Tk 1. Size : a) Main Entry 6600 x 2400 mm - 1 Nos. in 2 parts 2. Main Entry Gate sectional dimensions a) Outer Frame 80x80x3 mm b) Inner Vertical Bars 20x20xx mm c) Logo & Gate Number Size 1000x1000 mm 3. Material will be use for the Gate a) Stainless Steel b) Hair Line Bronze Color c) Matt finished 4. Source of Material a) China 5) Amount of Cost a) Unit rate - 25445 Tk. b) Quantity - 33.20 sqm c) Total - 8,44,774 Tk d) Excess - 6,66,583
  • 14. Cost for Additional Works Stainless Bronze Color Hairline Item 53: •Boundary grill •Additional Tk. 37.668 lac needed Item 54 • Main Gate •Additional Tk. 6.666 lac needed Grill & Gate Total Tk 44.33 Lac Additionally Needed Total excess Amount = 44.32 Lac Percentage of excess Amount = 19.05%
  • 15. Table Item No Item Name Total (lac) As per Work Order Total (lac) Proposed Excess, Amount (lac) Item 53 Boundary grill Tk. 80.57 Tk. 118.24 Tk. 37.66 Item 54 Main Gate Tk. 1.78 Tk. 8.44 Tk. 6.66 Total excess Amount = 44.32 Lac Percentage of excess Amount = 19.05%
  • 16. Causes of Rate Increase Locally Unavailability of Materials Higher Material Costing High Exchange Rate Additional Tk44.33 lac is needed. 19.05% of Work Order Amount
  • 17. Conclusion www.themegallery.com Company Logo  It may use the local available material instead of imported one. Aesthetic aspect will need to sacrifice. It may required three to five months to complete the work.  It may approve the extra amount and contractor will start to import the materials. It may required six to eight months to complete the work.