SlideShare a Scribd company logo
1 of 3
MUHAMMAD ZUBAIR JUNEJO
MECHANICAL ENGINEER
PEC REGISTRATION # MECH/23668
MOBILE NO: 0346-3424761 & 0302-6228572
EMAIL: zubi_junejo@yahoo.com , engrzubijunejo@gmail.com
ADDRESS: HOUSE NO: F 191/A JAHANGIR QUARTERS OPPOSITE FILMISTAN CINEMA NISHTER ROAD KARACHI
OBJECTIVE:
SEEKING THE ROLE OF MECHANICAL ENGINEER TO HAVE A GROWTH ORIENTED AND CHALLENGING CAREER,
WHERE I CAN CONTRIBUTE MY KNOWLEDGE AND SKILLS TO THE ORGANIZATION AND ENHANCE MY
EXPERIENCE THROUGH CONTINUOUS LEARNING AND TEAMWORK.
I HAVE MORE THAN 4 YEARS EXPERIENCE IN THE PROJECT MANAGEMENT WORKING IN OIL & GAS INDUSTRY,
CURRENTLY I AM WORKING AS A MECHANICAL ENGINEER IN WIND ENERGY TURBINE PROJECT.
PROFESSIONAL EXPERIENCE:
MECHANICAL ENGINEER (QA/QC MECHANICAL) (12TH JAN 2017 TILL TODAY)
POWER CHINA HUADONG ENGINEERING CORPORATION LIMITED
CLIENT: HAWA WIND ENERGY LIMITED
RESPONSIBILITIES:
 TO ASSIST THE PROJECT MANAGER FOR THE IMPLEMENTATION OF THE PROJECT WHICH INCLUDES
FABRICATION, ERECTION, INSTALLATION AND OTHER MECHANICAL RELATED WORK ON WIND ENERGY
TURBINES LOCATED IN JHAMPIR NEAR KARACHI.
 HAVING DISCUSSIONS & MEETINGS WITH THIRD PARTY INSPECTOR & CLIENT AND RESOLVING ISSUES AND
HANDLE THE PROJECT WITH ENGINEERING TECHNIQUES.
 TO COMPLETE THE ANCHOR CAGE INSTALLATION AND IT’S ACCESSORIES ACCORDING TO THE DRAWINGS
AND SPECIFICATION GIVEN BY PROJECT ENGINEER FOR WIND ENERGY TURBINE.
SITE ENGINEER (QC MECHANICAL) (31ST AUG.2016 TO 5TH JAN. 2017)
NATINAL TECHNICAL SERVICES ENGINEERS & CONTRACTORS
CLIENT: PAKISTAN STATE OIL (PSO)
RESPONSIBILITIES:
 TO ENSURE THE PROPER MECHNICAL WORK AT THE SITE FOR REHABILATATION OF STORAGE TANKS (KTB #
309 & 313) AT PAKISTAN STATE OIL COMPANY LTD (PS0) AT KIAMARI TERMINAL ‘’B’’ A ACCORDING TO API
650 & 653 AND ASME SECTION (IX) AS DESCRIBED BY HEC SAFETY POLICY AND CLIENT RECQUREMENTS.
 PREPARING WPS, PQR, MD, AND ALL NECESSARY DOCUMENTATION RELATIVE TO THE PROJECT
MANAGEMENT.
 HAVING DISCUSSIONS & MEETINGS WITH THIRD PARTY INSPECTOR & CLIENT AND RESOLVING ISSUES AND
HANDLE THE PROJECT WITH ENGINEERING TECHNIQUES.
MECHANAICAL ENGINEER (9TH JULY 2013 TO 28TH FEB 2014)
HAJI SIRAJUDDIN SOOMRO CONTRACTORS & ENGINEERS
CLIENT: NSUSC
RESPONSIBILITIES:
 (ICB -03) REHABILITATION OF TAHREE WATER TREATMENT PLANTS, WASTE WATER FACILITIES AT
SUKKUR,KHAIRPUR & SHIKARPUR AND (ICB-04) WATER SUPPLY DISTRIBUTION NETWORK AT SUKKUR,
ROHRI AND KHAIRPUR CITIES.
 INSTALLATION AND COMMISSIONING OF SUBMERSIBLE AND NON CLOGGING PUMPS & MOTORS , M.S
SHED WITH FIBERGLASS SHEETS, OVER HEAD GANTRY CRANE, SLUICE GATE /VALVES, NON RETURN
VALVES, STRAINERS, ALUM DOSING STEEL TANKS , STAINLESS STEEL PUMPS FOR ALUM DOSING, HYPO
CHLORINATION SYSTEM PLANT.
 BUTT FUSION JOINTING OF POLY ETHYLENE PIPES OF DIFFERENT DIAMETER (3”,4”,6”,8”,10”,12”,16”,18”
& 24” INCHES ) FOR WATER SUPPLY.
 WELDING OF M.S PIPES OF DIFFERENT DIAMETERS ( 3”,4”,6”,8”,10”,12”,16”,18” & 24” INCHES ) FOR
WATER SUPPLY AND WASTE WATER.
 REVIEW MECHANICAL SPECIFICATIONS, DATA SHEETS, DRAWINGS, MATERIAL SELECTION, INSPECTION &
TESTING REQUIREMENTS FOR PIPING & PUMPS.
TRAINEE MECHANICAL ENGINEER (28TH JUNE 2010 TO 26 SEP. 2011)
GASCO ENGINEERING (PVT.) LTD, KARACHI
CLIENT: OMV PAKISTAN LTD
RESPONSIBILITIES:
 TO REVIEW/PREPARE PROCEDURES AND SPECIFICATIONS (PWHT, STORAGE OF WELDING CONSUMABLES,
HYDROSTATIC, WELDING REPAIRS, QUALITY CONTROL AND SAND BLASTING & PAINTING) ACCORDING TO
THE PROJECT REQUIREMENTS.
 CONDUCT CLIENT INSPECTION & MATERIAL RECEIVING INSPECTION.
 MARKING OF WELDED JOINTS AND OFFERED FOR REQUIRED (NDT) LIKE RT, UT, MT AND PT.
 FIT UP AND WELD VISUAL INSPECTION, WELDER QUALIFICATION, WPS AND PQR REVIEW.
 PREPARATION OF WEEKLY REPORTS (PERFORMANCE/WELD REJECTION RATE).
 CHECK DOCUMENTATION (FINAL DOSSIER) OF QUALITY RECORDS AS PER ISO STANDARDS.
SKILLS & PROFICIENCIES:
 STUDY OF SPECIFICATIONS, TECHNICAL DATA SHEETS & BOQ FOR EXECUTION AS WELL AS FOR BID
PREPARATION OF MECHANICAL PROJECTS.
 ABILITY TO INTERPRET P&IDS, ISOMETRICS & PIPING DRAWINGS.
 EXPOSURE TO STANDARDS / SPECIFICATIONS: ANSI, ASME, ASTM, API STANDARDS.
QUALIFICATION:
 MASTER OF ENGINEERING IN ENERGY SYSTEM ENGINEERING FROM MEHRAN UNIVERSITY OF ENGINERING
SCIENCE & TECHNOLOGY JAMSHORO WITH 3.24 CGPA OUT OF 4 IN 2016 .
 BACHELOR OF MECHANICAL ENGINEERING FROM QUAID-E-AWAM UNIVERSITY OF ENGINEERING
NAWABSHAH WITH 65% IN 2010.
 INTERMEDIATE (PRE-ENGINEERING) FROM EVER SHINE HIGHER SECONDARY SCHOOL RANIPUR FROM
SUKKUR BOARD WITH 71% IN 2005.
 MATRIC (SCIENCE) FROMEVERSHINE HIGHER SECONDARY SCHOOL RANIPUR FROM SUKKUR BOARD WITH
79% IN 2003.
COMPUTER & PROFESSIONAL CERTIFICATIONS:
 AAUTO CAD 2D 3D FROM QUAID-E-AWAM UNIVERSITY OF ENGIEERING SCIENCE & TECHNOLOGY
NAWABSHAH 2009.
 DIT FROM SABHEETA ACADEMY RANIPUR IN 2009.
 OFFICE AUTOMATION FROM GOVERNMENT IT CENTRE KHAIRPUR MIRS IN 2011.( BASIC, MS WORD,MS
EXCEL,POWER POINT).
FINAL YEAR PROJECT:
 CASE STUDY OF GAS ENGINE INSTALLED IN LATIF TEXTILE IANDUSTRY NOORI ABAD
PROFESSIONAL REFERENCES:
 ENGINEER ABDUL AZIZ SHAR PROCUREMENT ENGINEER NSUSC .
 ENGINEER MUKHTIAR AHMED PROJECT ENGINEER GASCO ENGINEERING PVT LTD

More Related Content

What's hot (16)

aaa
aaaaaa
aaa
 
Estimation Engineer
Estimation EngineerEstimation Engineer
Estimation Engineer
 
Utilities and Estimation Engineer (Civil)
Utilities and Estimation Engineer (Civil)Utilities and Estimation Engineer (Civil)
Utilities and Estimation Engineer (Civil)
 
cv
cvcv
cv
 
ADITYA MISHRA_RESUME
ADITYA MISHRA_RESUMEADITYA MISHRA_RESUME
ADITYA MISHRA_RESUME
 
Resume
ResumeResume
Resume
 
Ahmed abd elazim c.v
Ahmed abd elazim c.vAhmed abd elazim c.v
Ahmed abd elazim c.v
 
Planning Engineer CV
Planning Engineer CVPlanning Engineer CV
Planning Engineer CV
 
Saurabh Shah Piping Engineer CV
Saurabh Shah Piping Engineer CVSaurabh Shah Piping Engineer CV
Saurabh Shah Piping Engineer CV
 
CV
CVCV
CV
 
UMA MAHESWAR RAO
UMA MAHESWAR RAOUMA MAHESWAR RAO
UMA MAHESWAR RAO
 
Imran Resume HVAC Engineer
Imran Resume HVAC EngineerImran Resume HVAC Engineer
Imran Resume HVAC Engineer
 
CV BAIJU
CV  BAIJUCV  BAIJU
CV BAIJU
 
Vinothkumar
VinothkumarVinothkumar
Vinothkumar
 
Ahmed Hesham - Mechanical Engineer - CV
Ahmed Hesham - Mechanical Engineer - CVAhmed Hesham - Mechanical Engineer - CV
Ahmed Hesham - Mechanical Engineer - CV
 
Bhimasen Yadawad-3
Bhimasen Yadawad-3Bhimasen Yadawad-3
Bhimasen Yadawad-3
 

Viewers also liked (8)

Konnect-TA
Konnect-TAKonnect-TA
Konnect-TA
 
Format factory
Format factoryFormat factory
Format factory
 
Erasmus-sal külföldön
Erasmus-sal külföldönErasmus-sal külföldön
Erasmus-sal külföldön
 
Join
JoinJoin
Join
 
Segundo Parcial - Introducción a las TIC
Segundo Parcial - Introducción a las TICSegundo Parcial - Introducción a las TIC
Segundo Parcial - Introducción a las TIC
 
Howcraigslistworks
HowcraigslistworksHowcraigslistworks
Howcraigslistworks
 
Patton Resume 20161206
Patton Resume 20161206Patton Resume 20161206
Patton Resume 20161206
 
Contoh Laporan Pembuatan Etil Asetat (mpd)
Contoh Laporan Pembuatan Etil Asetat (mpd)Contoh Laporan Pembuatan Etil Asetat (mpd)
Contoh Laporan Pembuatan Etil Asetat (mpd)
 

Similar to Site Engineer 2 (QC Mechanical)

Similar to Site Engineer 2 (QC Mechanical) (20)

Site Engineer (QC Mechanical)
Site Engineer (QC Mechanical)Site Engineer (QC Mechanical)
Site Engineer (QC Mechanical)
 
MECHANICAL
MECHANICALMECHANICAL
MECHANICAL
 
resume yuvraj 1pdf
resume yuvraj 1pdfresume yuvraj 1pdf
resume yuvraj 1pdf
 
ELECTRICAL ENGR.WITH 20YRS.EXP.up-dated CV
ELECTRICAL ENGR.WITH 20YRS.EXP.up-dated CVELECTRICAL ENGR.WITH 20YRS.EXP.up-dated CV
ELECTRICAL ENGR.WITH 20YRS.EXP.up-dated CV
 
Welding Inspector Mohammad Taher .docx
Welding Inspector Mohammad Taher .docxWelding Inspector Mohammad Taher .docx
Welding Inspector Mohammad Taher .docx
 
Cv ejaz ahmad
Cv ejaz ahmadCv ejaz ahmad
Cv ejaz ahmad
 
vineeth p v( CV)
vineeth p v( CV)vineeth p v( CV)
vineeth p v( CV)
 
Arun_Resume
Arun_ResumeArun_Resume
Arun_Resume
 
Firoz Babu K - Sr. Mechanical Engineer - CV
Firoz Babu K - Sr. Mechanical Engineer - CVFiroz Babu K - Sr. Mechanical Engineer - CV
Firoz Babu K - Sr. Mechanical Engineer - CV
 
Amol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docxAmol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docx
 
Pdf soummmm
Pdf soummmmPdf soummmm
Pdf soummmm
 
Pdf soummmm
Pdf soummmmPdf soummmm
Pdf soummmm
 
Rotating Equipment Engineer
Rotating Equipment  EngineerRotating Equipment  Engineer
Rotating Equipment Engineer
 
Latest CV Engr. Zubair
Latest CV Engr. ZubairLatest CV Engr. Zubair
Latest CV Engr. Zubair
 
Latest cv engr. zubair
Latest cv engr. zubairLatest cv engr. zubair
Latest cv engr. zubair
 
RESUME BHAGATSINH VERMA
RESUME BHAGATSINH VERMA RESUME BHAGATSINH VERMA
RESUME BHAGATSINH VERMA
 
Vinoop nk resume all
Vinoop nk  resume all Vinoop nk  resume all
Vinoop nk resume all
 
Resume- Ram Raj Yadav
Resume- Ram Raj YadavResume- Ram Raj Yadav
Resume- Ram Raj Yadav
 
Updated cv (2)
Updated cv (2)Updated cv (2)
Updated cv (2)
 
Vijayendra CV
Vijayendra CVVijayendra CV
Vijayendra CV
 

Site Engineer 2 (QC Mechanical)

  • 1. MUHAMMAD ZUBAIR JUNEJO MECHANICAL ENGINEER PEC REGISTRATION # MECH/23668 MOBILE NO: 0346-3424761 & 0302-6228572 EMAIL: zubi_junejo@yahoo.com , engrzubijunejo@gmail.com ADDRESS: HOUSE NO: F 191/A JAHANGIR QUARTERS OPPOSITE FILMISTAN CINEMA NISHTER ROAD KARACHI OBJECTIVE: SEEKING THE ROLE OF MECHANICAL ENGINEER TO HAVE A GROWTH ORIENTED AND CHALLENGING CAREER, WHERE I CAN CONTRIBUTE MY KNOWLEDGE AND SKILLS TO THE ORGANIZATION AND ENHANCE MY EXPERIENCE THROUGH CONTINUOUS LEARNING AND TEAMWORK. I HAVE MORE THAN 4 YEARS EXPERIENCE IN THE PROJECT MANAGEMENT WORKING IN OIL & GAS INDUSTRY, CURRENTLY I AM WORKING AS A MECHANICAL ENGINEER IN WIND ENERGY TURBINE PROJECT. PROFESSIONAL EXPERIENCE: MECHANICAL ENGINEER (QA/QC MECHANICAL) (12TH JAN 2017 TILL TODAY) POWER CHINA HUADONG ENGINEERING CORPORATION LIMITED CLIENT: HAWA WIND ENERGY LIMITED RESPONSIBILITIES:  TO ASSIST THE PROJECT MANAGER FOR THE IMPLEMENTATION OF THE PROJECT WHICH INCLUDES FABRICATION, ERECTION, INSTALLATION AND OTHER MECHANICAL RELATED WORK ON WIND ENERGY TURBINES LOCATED IN JHAMPIR NEAR KARACHI.  HAVING DISCUSSIONS & MEETINGS WITH THIRD PARTY INSPECTOR & CLIENT AND RESOLVING ISSUES AND HANDLE THE PROJECT WITH ENGINEERING TECHNIQUES.  TO COMPLETE THE ANCHOR CAGE INSTALLATION AND IT’S ACCESSORIES ACCORDING TO THE DRAWINGS AND SPECIFICATION GIVEN BY PROJECT ENGINEER FOR WIND ENERGY TURBINE. SITE ENGINEER (QC MECHANICAL) (31ST AUG.2016 TO 5TH JAN. 2017) NATINAL TECHNICAL SERVICES ENGINEERS & CONTRACTORS CLIENT: PAKISTAN STATE OIL (PSO) RESPONSIBILITIES:  TO ENSURE THE PROPER MECHNICAL WORK AT THE SITE FOR REHABILATATION OF STORAGE TANKS (KTB # 309 & 313) AT PAKISTAN STATE OIL COMPANY LTD (PS0) AT KIAMARI TERMINAL ‘’B’’ A ACCORDING TO API 650 & 653 AND ASME SECTION (IX) AS DESCRIBED BY HEC SAFETY POLICY AND CLIENT RECQUREMENTS.  PREPARING WPS, PQR, MD, AND ALL NECESSARY DOCUMENTATION RELATIVE TO THE PROJECT MANAGEMENT.  HAVING DISCUSSIONS & MEETINGS WITH THIRD PARTY INSPECTOR & CLIENT AND RESOLVING ISSUES AND HANDLE THE PROJECT WITH ENGINEERING TECHNIQUES.
  • 2. MECHANAICAL ENGINEER (9TH JULY 2013 TO 28TH FEB 2014) HAJI SIRAJUDDIN SOOMRO CONTRACTORS & ENGINEERS CLIENT: NSUSC RESPONSIBILITIES:  (ICB -03) REHABILITATION OF TAHREE WATER TREATMENT PLANTS, WASTE WATER FACILITIES AT SUKKUR,KHAIRPUR & SHIKARPUR AND (ICB-04) WATER SUPPLY DISTRIBUTION NETWORK AT SUKKUR, ROHRI AND KHAIRPUR CITIES.  INSTALLATION AND COMMISSIONING OF SUBMERSIBLE AND NON CLOGGING PUMPS & MOTORS , M.S SHED WITH FIBERGLASS SHEETS, OVER HEAD GANTRY CRANE, SLUICE GATE /VALVES, NON RETURN VALVES, STRAINERS, ALUM DOSING STEEL TANKS , STAINLESS STEEL PUMPS FOR ALUM DOSING, HYPO CHLORINATION SYSTEM PLANT.  BUTT FUSION JOINTING OF POLY ETHYLENE PIPES OF DIFFERENT DIAMETER (3”,4”,6”,8”,10”,12”,16”,18” & 24” INCHES ) FOR WATER SUPPLY.  WELDING OF M.S PIPES OF DIFFERENT DIAMETERS ( 3”,4”,6”,8”,10”,12”,16”,18” & 24” INCHES ) FOR WATER SUPPLY AND WASTE WATER.  REVIEW MECHANICAL SPECIFICATIONS, DATA SHEETS, DRAWINGS, MATERIAL SELECTION, INSPECTION & TESTING REQUIREMENTS FOR PIPING & PUMPS. TRAINEE MECHANICAL ENGINEER (28TH JUNE 2010 TO 26 SEP. 2011) GASCO ENGINEERING (PVT.) LTD, KARACHI CLIENT: OMV PAKISTAN LTD RESPONSIBILITIES:  TO REVIEW/PREPARE PROCEDURES AND SPECIFICATIONS (PWHT, STORAGE OF WELDING CONSUMABLES, HYDROSTATIC, WELDING REPAIRS, QUALITY CONTROL AND SAND BLASTING & PAINTING) ACCORDING TO THE PROJECT REQUIREMENTS.  CONDUCT CLIENT INSPECTION & MATERIAL RECEIVING INSPECTION.  MARKING OF WELDED JOINTS AND OFFERED FOR REQUIRED (NDT) LIKE RT, UT, MT AND PT.  FIT UP AND WELD VISUAL INSPECTION, WELDER QUALIFICATION, WPS AND PQR REVIEW.  PREPARATION OF WEEKLY REPORTS (PERFORMANCE/WELD REJECTION RATE).  CHECK DOCUMENTATION (FINAL DOSSIER) OF QUALITY RECORDS AS PER ISO STANDARDS. SKILLS & PROFICIENCIES:  STUDY OF SPECIFICATIONS, TECHNICAL DATA SHEETS & BOQ FOR EXECUTION AS WELL AS FOR BID PREPARATION OF MECHANICAL PROJECTS.  ABILITY TO INTERPRET P&IDS, ISOMETRICS & PIPING DRAWINGS.  EXPOSURE TO STANDARDS / SPECIFICATIONS: ANSI, ASME, ASTM, API STANDARDS.
  • 3. QUALIFICATION:  MASTER OF ENGINEERING IN ENERGY SYSTEM ENGINEERING FROM MEHRAN UNIVERSITY OF ENGINERING SCIENCE & TECHNOLOGY JAMSHORO WITH 3.24 CGPA OUT OF 4 IN 2016 .  BACHELOR OF MECHANICAL ENGINEERING FROM QUAID-E-AWAM UNIVERSITY OF ENGINEERING NAWABSHAH WITH 65% IN 2010.  INTERMEDIATE (PRE-ENGINEERING) FROM EVER SHINE HIGHER SECONDARY SCHOOL RANIPUR FROM SUKKUR BOARD WITH 71% IN 2005.  MATRIC (SCIENCE) FROMEVERSHINE HIGHER SECONDARY SCHOOL RANIPUR FROM SUKKUR BOARD WITH 79% IN 2003. COMPUTER & PROFESSIONAL CERTIFICATIONS:  AAUTO CAD 2D 3D FROM QUAID-E-AWAM UNIVERSITY OF ENGIEERING SCIENCE & TECHNOLOGY NAWABSHAH 2009.  DIT FROM SABHEETA ACADEMY RANIPUR IN 2009.  OFFICE AUTOMATION FROM GOVERNMENT IT CENTRE KHAIRPUR MIRS IN 2011.( BASIC, MS WORD,MS EXCEL,POWER POINT). FINAL YEAR PROJECT:  CASE STUDY OF GAS ENGINE INSTALLED IN LATIF TEXTILE IANDUSTRY NOORI ABAD PROFESSIONAL REFERENCES:  ENGINEER ABDUL AZIZ SHAR PROCUREMENT ENGINEER NSUSC .  ENGINEER MUKHTIAR AHMED PROJECT ENGINEER GASCO ENGINEERING PVT LTD