1. 1 2 3 4 5 6 7 8
G
E
C
B
A
T3.1 T3.4
T3.2 T3.3
T3.B
XA
/
FORCONTINUATIONREFERTO
DWGNO:1M10-B2-01
D
AD
FCO
WP
WP
WP F/A
WP F/A
WP
WP
FCO
WP
WPWP
WP WP
WP
WP
WP
WP
WP
AD
AD
AD
WP
FCO
AD
AD
WP
AD AD
FFD
WP
WP WP
WP
WP
WP
WP F/A
WP F/A WP F/A
WP F/A
FCO
WPWP
WP
WPWP
WP
WP
WP
FCO
FFD
FFD
FCO
FCO
WP F/A
WP F/A
WP F/A
AREA DRAIN (TYP)
LIFT SUMP PIT
1NO SUBMERSIBLE PUMP
WP PUMPING LINE
WP F/A
AD
AD
F
T3.A
Project
Manager :
Drawn :
Date :
Drawing Title :
Scale :
Project No :
Key Plan :
North:
Client :
Notes :
Stamp:
True
North
DN
Package
No. Originator Plot Bldg. Level Discipline File
BP25-09 NOR A1 01
DWG
Status :
Project Name & Location:
BP25-09-D-00
Plot: A1-SEEF LUSAIL DEVELOPMENT DOHA,QATAR
RESIDENTIAL DEVELOPMENT
AT LUSAIL
Lead Consultant :
Project Manager :
Sub Consultant :
DWG
Dubai, U.A.E.
info.international@norr.com
Tel : 04-3544439
Fax : 04-3544900
ARCHITECTS ENGINEERS PLANNERS
NORR Group Consultants
International Limited
P.O. Box: 53150
P.O. Box: 44387
Abu Dhabi, U.A.E.
info.international@norr.com
Tel : 02-6763360
Fax : 02-6763361
This drawing has been prepared solely for
the use of LUSAIL CITY
and there are no representations of any kind made by
N.G.C.I. Ltd to any party with whom N.G.C.I. Ltd has not
entered into a contract.
1 : 100
3/24/20167:02:59PM
C:RevitLocalFilesFCDB-150123-LUSAILM_FCDB15-0123_LUSAIL_00_sjohn.rvt
100% SCHEMATIC DESIGN
M10-B2-03
15/MAR/16
BASEMENT LEVEL B2 DRAINAGE
LAYOUT SECTOR-03
FCDB150123
M.M
B.M.
B2 MC
No. Issued For Date Checked
A 100% SCHEMATIC DESIGN 24 MAR 16 K.T