This document is a drainage layout plan showing the drainage system for Basement Level B2 of a residential development in Lusail, Qatar. It includes labels for various drainage system components like sump pits, oil and sand interceptors, pumping lines, and area drains. Reference is made to another drawing for continuation of details. Dimensioning and a scale of 1:100 is provided. It also contains standard title block information like the project name and location, codes, dates, and approval and revision details.
1. 16 17
H
G
E
19
T1.J
T1.F
T1.D
T1.B
T1.A
T1.R1
C
B
T1.1
T1.K
18
Z2
Y2
YA
YB
YC
YD
/
FORCONTINUATIONREFERTO
DWGNO:1M10-B2-02
D
WPWP
WP
W
P
W
P
W
P
WP
WP
WP
WP
WP
WP
WPWP
WP WP
WP
WP
WP
WP
WP
WP
WP
WP
WP
WP
WP
WP
W
P
WP
WP
W
P
WP
WP
W
P
AD
WP F/A
FCO
WP F/A
AD
FCO
WP F/A
WP F/A
WP F/A
FFD
FFD
FCO
FCO
FFD
FFD
LIFT SUMP PIT
SUMP PIT
OIL INTERCEPTOR
SAND INTERCEPTOR
WP PUMPING LINE
AD
AD
WP F/A
WP F/A
WP F/A
AREA DRAIN (TYP)
1NO SUBMERSIBLE PUMP
F
20 T1.2
T1.R2
Project
Manager :
Drawn :
Date :
Drawing Title :
Scale :
Project No :
Key Plan :
North:
Client :
Notes :
Stamp:
True
North
DN
Package
No. Originator Plot Bldg. Level Discipline File
BP25-09 NOR A1 01
DWG
Status :
Project Name & Location:
BP25-09-D-00
Plot: A1-SEEF LUSAIL DEVELOPMENT DOHA,QATAR
RESIDENTIAL DEVELOPMENT
AT LUSAIL
Lead Consultant :
Project Manager :
Sub Consultant :
DWG
Dubai, U.A.E.
info.international@norr.com
Tel : 04-3544439
Fax : 04-3544900
ARCHITECTS ENGINEERS PLANNERS
NORR Group Consultants
International Limited
P.O. Box: 53150
P.O. Box: 44387
Abu Dhabi, U.A.E.
info.international@norr.com
Tel : 02-6763360
Fax : 02-6763361
This drawing has been prepared solely for
the use of LUSAIL CITY
and there are no representations of any kind made by
N.G.C.I. Ltd to any party with whom N.G.C.I. Ltd has not
entered into a contract.
1 : 100
3/24/20167:02:48PM
C:RevitLocalFilesFCDB-150123-LUSAILM_FCDB15-0123_LUSAIL_00_sjohn.rvt
100% SCHEMATIC DESIGN
M10-B2-01
15/MAR/16
BASEMENT LEVEL B2 DRAINAGE
LAYOUT SECTOR-01
FCDB150123
M.M
B.M.
B2 MC
No. Issued For Date Checked
A 100% SCHEMATIC DESIGN 24 MAR 16 K.T