Pipe Laying Barge DrivePipe Laying Barge Drive
ApplicationApplication
• We were recently asked to retrofit a Pipe laying bargeWe were recently asked to retrofit a Pipe laying barge
with enhanced drive system controls to improve thewith enhanced drive system controls to improve the
performance and reliability of the system. The changesperformance and reliability of the system. The changes
improved operating speed from 30 fpm to 100 fpm.improved operating speed from 30 fpm to 100 fpm.
• We chose the Eurotherm Link System to implement thisWe chose the Eurotherm Link System to implement this
change. Fiber optic networking provides noise immunitychange. Fiber optic networking provides noise immunity
and minimizes electrical wiring.and minimizes electrical wiring.
• We engineered the changes, sold the controls, andWe engineered the changes, sold the controls, and
configured the drive system to meet requirements.configured the drive system to meet requirements.
Standard Link Function blocks provide the desiredStandard Link Function blocks provide the desired
control for each section. Special application needs werecontrol for each section. Special application needs were
met by integration of other function blocks as needed.met by integration of other function blocks as needed.
• We then proceeded to start-up and fine-tune the overallWe then proceeded to start-up and fine-tune the overall
system.system.
Main Crane for Pipe BargeMain Crane for Pipe Barge
• The large crane in centerThe large crane in center
aft is permanentlyaft is permanently
mounted and can handlemounted and can handle
any requirement forany requirement for
loading or offloadingloading or offloading
equipment from theequipment from the
Barge.Barge.
• It is not part of the systemIt is not part of the system
we worked on, but iswe worked on, but is
used to install all theused to install all the
heavy equipment on-heavy equipment on-
board.board.
System Components:System Components:
Forward & Aft Tensioners,Forward & Aft Tensioners,
Straightener-Aligner, & ReelStraightener-Aligner, & Reel
System integrationSystem integration
• The computerized Drive system selects the masterThe computerized Drive system selects the master
Tensioner by the first drive turned on, and for the reel byTensioner by the first drive turned on, and for the reel by
the first reel drive turned on.the first reel drive turned on.
• The Slave Tensioner Drives look at the Master’s current,The Slave Tensioner Drives look at the Master’s current,
and produce an output to assist the Master in controllingand produce an output to assist the Master in controlling
the Pipe movement and Tension on the Pipe.the Pipe movement and Tension on the Pipe.
• The Reel Motors all produce a torque based on theThe Reel Motors all produce a torque based on the
operator set-point, to pull the pipe and bend it for windingoperator set-point, to pull the pipe and bend it for winding
on the Reel. (Or holdback torque when paying out, toon the Reel. (Or holdback torque when paying out, to
straighten the pipe.) The system runs with 2, 3 or 4straighten the pipe.) The system runs with 2, 3 or 4
motors active on the reel. The torque set-point, staticmotors active on the reel. The torque set-point, static
and dynamic compensation, and trim feedback are alland dynamic compensation, and trim feedback are all
scaled automatically depending on the number of motorsscaled automatically depending on the number of motors
active.active.
• The system can be run in 2 modes; Conventional speedThe system can be run in 2 modes; Conventional speed
mode or Tension mode. Reel runs in speed mode, ormode or Tension mode. Reel runs in speed mode, or
pipe can be stacked on board and welded as it pays out,pipe can be stacked on board and welded as it pays out,
(Tension mode).(Tension mode).
Tensioner ControlTensioner Control
• There are Two Tensioners,There are Two Tensioners,
one fore and one aft unit.one fore and one aft unit.
• Each Tensioner consists ofEach Tensioner consists of
two tracks, (similar to Tanktwo tracks, (similar to Tank
tracks), which have rubbertracks), which have rubber
pads mounted on them. Thesepads mounted on them. These
tracks close on the pipe to griptracks close on the pipe to grip
it securely.it securely.
• Each track has two 500HP DCEach track has two 500HP DC
motors geared to the track.motors geared to the track.
• There is one motor designatedThere is one motor designated
as the master, and all otheras the master, and all other
motors on the two Tensionersmotors on the two Tensioners
are slaved to the master unit.are slaved to the master unit.
Motor & Gearboxes for PipeMotor & Gearboxes for Pipe
Winding ReelWinding Reel
• Workers guiding MotorWorkers guiding Motor
assembly into place on-boardassembly into place on-board
the barge, to Power the Reelthe barge, to Power the Reel
for winding pipe. The reel canfor winding pipe. The reel can
wind up 80 miles of 4”wind up 80 miles of 4”
diameter, or 34 miles of 9”diameter, or 34 miles of 9”
diameter Steel Pipe prior todiameter Steel Pipe prior to
embarking.embarking.
• The mission of the Barge is toThe mission of the Barge is to
lay Pipelines for commerciallay Pipelines for commercial
customers.customers.
• The pipe on the reel is 9”The pipe on the reel is 9”
diameter.diameter.
Motor Controls for systemMotor Controls for system
• One of 12 500HP DCOne of 12 500HP DC
Motor Controls in theMotor Controls in the
Drive housing.Drive housing.
• Four enclosures eachFour enclosures each
house 3 of these Drivehouse 3 of these Drive
units.units.
• All 12 Drives and variousAll 12 Drives and various
analogue and digital I/Oanalogue and digital I/O
are networked to provideare networked to provide
the system integration.the system integration.
• A PLC is integrated intoA PLC is integrated into
the system by anotherthe system by another
contractor.contractor.
Reel in OperationReel in Operation
• After commissioning theAfter commissioning the
system, the operators aresystem, the operators are
winding Pipe for a new job.winding Pipe for a new job.
• The Pipe exits a straightener-The Pipe exits a straightener-
aligner section before windingaligner section before winding
on the reel. This section andon the reel. This section and
both Tensioners move up andboth Tensioners move up and
down with the wraps on thedown with the wraps on the
reel.reel.
• Tension of the Pipe is criticalTension of the Pipe is critical
to prevent damage.to prevent damage.
• The Pipe is straightened againThe Pipe is straightened again
when paying out into thewhen paying out into the
water.water.
Winding PipeWinding Pipe
• As the jobAs the job
progresses, theprogresses, the
system must maintainsystem must maintain
proper tension on theproper tension on the
pipe to keep frompipe to keep from
“dropping wraps”.“dropping wraps”.
• Pipe windingPipe winding
completed for this job,completed for this job,
just prior tojust prior to
embarking for job.embarking for job.
Stinger to Guide Pipe-LayingStinger to Guide Pipe-Laying
• This assembly is attachedThis assembly is attached
to the barge after the aftto the barge after the aft
Tensioner to guide theTensioner to guide the
pipe for proper Lay down.pipe for proper Lay down.
When we arrive atWhen we arrive at
location, it is loweredlocation, it is lowered
below the water line.below the water line.
• Another boat follows theAnother boat follows the
barge to monitor thebarge to monitor the
actual touchdown of theactual touchdown of the
pipe with sonar monitor.pipe with sonar monitor.
Arrive at the job locationArrive at the job location
• The job location is aThe job location is a
drilling rig in the Gulf.drilling rig in the Gulf.
We are attaching toWe are attaching to
the well head andthe well head and
running 16 miles of 10running 16 miles of 10
inch pipe.inch pipe.
News Media arrivalNews Media arrival
• We were able to layWe were able to lay
the pipe at speeds upthe pipe at speeds up
to 101.6 fpm, which isto 101.6 fpm, which is
a world record.a world record.
• News mediaNews media
documented the jobdocumented the job
for publication andfor publication and
company use.company use.
Job CompleteJob Complete
• We completed the jobWe completed the job
in just over 3 ½ days,in just over 3 ½ days,
which was within thewhich was within the
scheduled time.scheduled time.
• This was in spite of aThis was in spite of a
number of unusualnumber of unusual
delays during thedelays during the
process.process.
Computer Access and MonitoringComputer Access and Monitoring
• The upper right window isThe upper right window is
access to all modules inaccess to all modules in
the system.the system.
• The left hand window isThe left hand window is
one of the module’sone of the module’s
configurations opened forconfigurations opened for
making changes tomaking changes to
parameters while theparameters while the
drives are running.drives are running.
• The lower right window isThe lower right window is
a list of parameters beinga list of parameters being
continuously monitored incontinuously monitored in
real-time.real-time.
Job ResultsJob Results
• New Speed record for laying pipe fromNew Speed record for laying pipe from
reel. Design spec is 90 fpm max reelreel. Design spec is 90 fpm max reel
speed, we ran at 101.6 fpm.speed, we ran at 101.6 fpm.
• We met or exceeded all the requirementsWe met or exceeded all the requirements
for the system.for the system.
• Drive controls worked with no changesDrive controls worked with no changes
required to the system during Pipe-layrequired to the system during Pipe-lay
operation.operation.

More Related Content

What's hot

Servo motor and AVR Atmel Atmega 16
Servo motor and AVR  Atmel Atmega 16Servo motor and AVR  Atmel Atmega 16
Servo motor and AVR Atmel Atmega 16Robo India
 
Mitsubishi inverter fr-e700 catalog-dienhathe.vn
Mitsubishi inverter fr-e700 catalog-dienhathe.vnMitsubishi inverter fr-e700 catalog-dienhathe.vn
Mitsubishi inverter fr-e700 catalog-dienhathe.vnDien Ha The
 
OneGear SMC 15kV Soft Starter
OneGear SMC 15kV Soft StarterOneGear SMC 15kV Soft Starter
OneGear SMC 15kV Soft StarterPaul Plavicheanu
 
Mitsubishi inverter freqrol-a700 series dienhathe.vn
Mitsubishi inverter freqrol-a700 series dienhathe.vnMitsubishi inverter freqrol-a700 series dienhathe.vn
Mitsubishi inverter freqrol-a700 series dienhathe.vnDien Ha The
 
Limitorque QX Electronic Actuator User Instructions
Limitorque QX Electronic Actuator User InstructionsLimitorque QX Electronic Actuator User Instructions
Limitorque QX Electronic Actuator User InstructionsMead O'Brien, Inc.
 
Variable Frequency Drives
Variable Frequency DrivesVariable Frequency Drives
Variable Frequency DrivesAvanceon-Lahore
 
Control loading-for-simulation-en
Control loading-for-simulation-enControl loading-for-simulation-en
Control loading-for-simulation-enRonaldoAlves108
 
Servo Motors Adjust
Servo Motors Adjust Servo Motors Adjust
Servo Motors Adjust Marc Vendrell
 
Iai scon ca_specsheet
Iai scon ca_specsheetIai scon ca_specsheet
Iai scon ca_specsheetElectromate
 
Variable Frequency Drives
Variable Frequency DrivesVariable Frequency Drives
Variable Frequency DrivesSaqib Saeed
 
Cac ung dung bien tan lsis trong thuc te dienhathe.vn
Cac ung dung bien tan lsis trong thuc te dienhathe.vnCac ung dung bien tan lsis trong thuc te dienhathe.vn
Cac ung dung bien tan lsis trong thuc te dienhathe.vnDien Ha The
 

What's hot (12)

Servo motor and AVR Atmel Atmega 16
Servo motor and AVR  Atmel Atmega 16Servo motor and AVR  Atmel Atmega 16
Servo motor and AVR Atmel Atmega 16
 
Mitsubishi inverter fr-e700 catalog-dienhathe.vn
Mitsubishi inverter fr-e700 catalog-dienhathe.vnMitsubishi inverter fr-e700 catalog-dienhathe.vn
Mitsubishi inverter fr-e700 catalog-dienhathe.vn
 
OneGear SMC 15kV Soft Starter
OneGear SMC 15kV Soft StarterOneGear SMC 15kV Soft Starter
OneGear SMC 15kV Soft Starter
 
Mitsubishi inverter freqrol-a700 series dienhathe.vn
Mitsubishi inverter freqrol-a700 series dienhathe.vnMitsubishi inverter freqrol-a700 series dienhathe.vn
Mitsubishi inverter freqrol-a700 series dienhathe.vn
 
Limitorque QX Electronic Actuator User Instructions
Limitorque QX Electronic Actuator User InstructionsLimitorque QX Electronic Actuator User Instructions
Limitorque QX Electronic Actuator User Instructions
 
Thông số kỹ thuật bộ điều khiển tốc độ DKM catalogue speed control DKM
Thông số kỹ thuật bộ điều khiển tốc độ DKM catalogue speed control DKMThông số kỹ thuật bộ điều khiển tốc độ DKM catalogue speed control DKM
Thông số kỹ thuật bộ điều khiển tốc độ DKM catalogue speed control DKM
 
Variable Frequency Drives
Variable Frequency DrivesVariable Frequency Drives
Variable Frequency Drives
 
Control loading-for-simulation-en
Control loading-for-simulation-enControl loading-for-simulation-en
Control loading-for-simulation-en
 
Servo Motors Adjust
Servo Motors Adjust Servo Motors Adjust
Servo Motors Adjust
 
Iai scon ca_specsheet
Iai scon ca_specsheetIai scon ca_specsheet
Iai scon ca_specsheet
 
Variable Frequency Drives
Variable Frequency DrivesVariable Frequency Drives
Variable Frequency Drives
 
Cac ung dung bien tan lsis trong thuc te dienhathe.vn
Cac ung dung bien tan lsis trong thuc te dienhathe.vnCac ung dung bien tan lsis trong thuc te dienhathe.vn
Cac ung dung bien tan lsis trong thuc te dienhathe.vn
 

Similar to Pipe laying barge

Extrusion Thermoforming Line
Extrusion Thermoforming LineExtrusion Thermoforming Line
Extrusion Thermoforming LineLyle F Eveleigh
 
18EE81_PSOC_8th Semester.pptx
18EE81_PSOC_8th Semester.pptx18EE81_PSOC_8th Semester.pptx
18EE81_PSOC_8th Semester.pptxVinayAS13
 
CCC_Turbomachinery_Controls_System.pdf
CCC_Turbomachinery_Controls_System.pdfCCC_Turbomachinery_Controls_System.pdf
CCC_Turbomachinery_Controls_System.pdfssuser5599ce
 
Electric submersible pump(esp)
Electric submersible pump(esp)Electric submersible pump(esp)
Electric submersible pump(esp)Win Nyunt Aung
 
Chapter1_Introduction_to_Control_System.pptx
Chapter1_Introduction_to_Control_System.pptxChapter1_Introduction_to_Control_System.pptx
Chapter1_Introduction_to_Control_System.pptxAkemmy123
 
Inst maint practices
Inst maint practicesInst maint practices
Inst maint practicesPrem Baboo
 
Inst maint practices
Inst maint practicesInst maint practices
Inst maint practicesPrem Baboo
 
Closed loop control of converter fed motor
Closed loop control of converter fed motorClosed loop control of converter fed motor
Closed loop control of converter fed motorRishabh Dutt Shukla
 
Hydro Power Plant Auxaleries
Hydro Power Plant AuxaleriesHydro Power Plant Auxaleries
Hydro Power Plant AuxaleriesMahajan Saurabh
 
Oil field equipment the part two (2)pptx
Oil field equipment the part two (2)pptxOil field equipment the part two (2)pptx
Oil field equipment the part two (2)pptxssuser355c2a
 
Advancement-in-spinning-Techniques-seminar-report-1.ppt
Advancement-in-spinning-Techniques-seminar-report-1.pptAdvancement-in-spinning-Techniques-seminar-report-1.ppt
Advancement-in-spinning-Techniques-seminar-report-1.pptRoshanGupta85
 

Similar to Pipe laying barge (20)

Extrusion Thermoforming Line
Extrusion Thermoforming LineExtrusion Thermoforming Line
Extrusion Thermoforming Line
 
Chapter1
Chapter1Chapter1
Chapter1
 
Lecture 2 Wind Energy Course
Lecture 2  Wind Energy Course Lecture 2  Wind Energy Course
Lecture 2 Wind Energy Course
 
18EE81_PSOC_8th Semester.pptx
18EE81_PSOC_8th Semester.pptx18EE81_PSOC_8th Semester.pptx
18EE81_PSOC_8th Semester.pptx
 
CCC_Turbomachinery_Controls_System.pdf
CCC_Turbomachinery_Controls_System.pdfCCC_Turbomachinery_Controls_System.pdf
CCC_Turbomachinery_Controls_System.pdf
 
Electric submersible pump(esp)
Electric submersible pump(esp)Electric submersible pump(esp)
Electric submersible pump(esp)
 
BP[1] Copy
BP[1] CopyBP[1] Copy
BP[1] Copy
 
SitrackVibes - Nuclear
SitrackVibes - NuclearSitrackVibes - Nuclear
SitrackVibes - Nuclear
 
Boeing Poster
Boeing PosterBoeing Poster
Boeing Poster
 
Alignment.pptx
Alignment.pptxAlignment.pptx
Alignment.pptx
 
Chapter1_Introduction_to_Control_System.pptx
Chapter1_Introduction_to_Control_System.pptxChapter1_Introduction_to_Control_System.pptx
Chapter1_Introduction_to_Control_System.pptx
 
Inst maint practices
Inst maint practicesInst maint practices
Inst maint practices
 
Inst maint practices
Inst maint practicesInst maint practices
Inst maint practices
 
85 0066-b rev 2 hq ultimate series installation
85 0066-b rev 2 hq ultimate series installation85 0066-b rev 2 hq ultimate series installation
85 0066-b rev 2 hq ultimate series installation
 
85 0066-b hq ultimate series installation
85 0066-b hq ultimate series installation85 0066-b hq ultimate series installation
85 0066-b hq ultimate series installation
 
Closed loop control of converter fed motor
Closed loop control of converter fed motorClosed loop control of converter fed motor
Closed loop control of converter fed motor
 
Hydro Power Plant Auxaleries
Hydro Power Plant AuxaleriesHydro Power Plant Auxaleries
Hydro Power Plant Auxaleries
 
Work History 2008
Work History 2008Work History 2008
Work History 2008
 
Oil field equipment the part two (2)pptx
Oil field equipment the part two (2)pptxOil field equipment the part two (2)pptx
Oil field equipment the part two (2)pptx
 
Advancement-in-spinning-Techniques-seminar-report-1.ppt
Advancement-in-spinning-Techniques-seminar-report-1.pptAdvancement-in-spinning-Techniques-seminar-report-1.ppt
Advancement-in-spinning-Techniques-seminar-report-1.ppt
 

Recently uploaded

AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGSIVASHANKAR N
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 

Recently uploaded (20)

AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 

Pipe laying barge

  • 1. Pipe Laying Barge DrivePipe Laying Barge Drive ApplicationApplication • We were recently asked to retrofit a Pipe laying bargeWe were recently asked to retrofit a Pipe laying barge with enhanced drive system controls to improve thewith enhanced drive system controls to improve the performance and reliability of the system. The changesperformance and reliability of the system. The changes improved operating speed from 30 fpm to 100 fpm.improved operating speed from 30 fpm to 100 fpm. • We chose the Eurotherm Link System to implement thisWe chose the Eurotherm Link System to implement this change. Fiber optic networking provides noise immunitychange. Fiber optic networking provides noise immunity and minimizes electrical wiring.and minimizes electrical wiring. • We engineered the changes, sold the controls, andWe engineered the changes, sold the controls, and configured the drive system to meet requirements.configured the drive system to meet requirements. Standard Link Function blocks provide the desiredStandard Link Function blocks provide the desired control for each section. Special application needs werecontrol for each section. Special application needs were met by integration of other function blocks as needed.met by integration of other function blocks as needed. • We then proceeded to start-up and fine-tune the overallWe then proceeded to start-up and fine-tune the overall system.system.
  • 2. Main Crane for Pipe BargeMain Crane for Pipe Barge • The large crane in centerThe large crane in center aft is permanentlyaft is permanently mounted and can handlemounted and can handle any requirement forany requirement for loading or offloadingloading or offloading equipment from theequipment from the Barge.Barge. • It is not part of the systemIt is not part of the system we worked on, but iswe worked on, but is used to install all theused to install all the heavy equipment on-heavy equipment on- board.board.
  • 3. System Components:System Components: Forward & Aft Tensioners,Forward & Aft Tensioners, Straightener-Aligner, & ReelStraightener-Aligner, & Reel
  • 4. System integrationSystem integration • The computerized Drive system selects the masterThe computerized Drive system selects the master Tensioner by the first drive turned on, and for the reel byTensioner by the first drive turned on, and for the reel by the first reel drive turned on.the first reel drive turned on. • The Slave Tensioner Drives look at the Master’s current,The Slave Tensioner Drives look at the Master’s current, and produce an output to assist the Master in controllingand produce an output to assist the Master in controlling the Pipe movement and Tension on the Pipe.the Pipe movement and Tension on the Pipe. • The Reel Motors all produce a torque based on theThe Reel Motors all produce a torque based on the operator set-point, to pull the pipe and bend it for windingoperator set-point, to pull the pipe and bend it for winding on the Reel. (Or holdback torque when paying out, toon the Reel. (Or holdback torque when paying out, to straighten the pipe.) The system runs with 2, 3 or 4straighten the pipe.) The system runs with 2, 3 or 4 motors active on the reel. The torque set-point, staticmotors active on the reel. The torque set-point, static and dynamic compensation, and trim feedback are alland dynamic compensation, and trim feedback are all scaled automatically depending on the number of motorsscaled automatically depending on the number of motors active.active. • The system can be run in 2 modes; Conventional speedThe system can be run in 2 modes; Conventional speed mode or Tension mode. Reel runs in speed mode, ormode or Tension mode. Reel runs in speed mode, or pipe can be stacked on board and welded as it pays out,pipe can be stacked on board and welded as it pays out, (Tension mode).(Tension mode).
  • 5. Tensioner ControlTensioner Control • There are Two Tensioners,There are Two Tensioners, one fore and one aft unit.one fore and one aft unit. • Each Tensioner consists ofEach Tensioner consists of two tracks, (similar to Tanktwo tracks, (similar to Tank tracks), which have rubbertracks), which have rubber pads mounted on them. Thesepads mounted on them. These tracks close on the pipe to griptracks close on the pipe to grip it securely.it securely. • Each track has two 500HP DCEach track has two 500HP DC motors geared to the track.motors geared to the track. • There is one motor designatedThere is one motor designated as the master, and all otheras the master, and all other motors on the two Tensionersmotors on the two Tensioners are slaved to the master unit.are slaved to the master unit.
  • 6. Motor & Gearboxes for PipeMotor & Gearboxes for Pipe Winding ReelWinding Reel • Workers guiding MotorWorkers guiding Motor assembly into place on-boardassembly into place on-board the barge, to Power the Reelthe barge, to Power the Reel for winding pipe. The reel canfor winding pipe. The reel can wind up 80 miles of 4”wind up 80 miles of 4” diameter, or 34 miles of 9”diameter, or 34 miles of 9” diameter Steel Pipe prior todiameter Steel Pipe prior to embarking.embarking. • The mission of the Barge is toThe mission of the Barge is to lay Pipelines for commerciallay Pipelines for commercial customers.customers. • The pipe on the reel is 9”The pipe on the reel is 9” diameter.diameter.
  • 7. Motor Controls for systemMotor Controls for system • One of 12 500HP DCOne of 12 500HP DC Motor Controls in theMotor Controls in the Drive housing.Drive housing. • Four enclosures eachFour enclosures each house 3 of these Drivehouse 3 of these Drive units.units. • All 12 Drives and variousAll 12 Drives and various analogue and digital I/Oanalogue and digital I/O are networked to provideare networked to provide the system integration.the system integration. • A PLC is integrated intoA PLC is integrated into the system by anotherthe system by another contractor.contractor.
  • 8. Reel in OperationReel in Operation • After commissioning theAfter commissioning the system, the operators aresystem, the operators are winding Pipe for a new job.winding Pipe for a new job. • The Pipe exits a straightener-The Pipe exits a straightener- aligner section before windingaligner section before winding on the reel. This section andon the reel. This section and both Tensioners move up andboth Tensioners move up and down with the wraps on thedown with the wraps on the reel.reel. • Tension of the Pipe is criticalTension of the Pipe is critical to prevent damage.to prevent damage. • The Pipe is straightened againThe Pipe is straightened again when paying out into thewhen paying out into the water.water.
  • 9. Winding PipeWinding Pipe • As the jobAs the job progresses, theprogresses, the system must maintainsystem must maintain proper tension on theproper tension on the pipe to keep frompipe to keep from “dropping wraps”.“dropping wraps”. • Pipe windingPipe winding completed for this job,completed for this job, just prior tojust prior to embarking for job.embarking for job.
  • 10. Stinger to Guide Pipe-LayingStinger to Guide Pipe-Laying • This assembly is attachedThis assembly is attached to the barge after the aftto the barge after the aft Tensioner to guide theTensioner to guide the pipe for proper Lay down.pipe for proper Lay down. When we arrive atWhen we arrive at location, it is loweredlocation, it is lowered below the water line.below the water line. • Another boat follows theAnother boat follows the barge to monitor thebarge to monitor the actual touchdown of theactual touchdown of the pipe with sonar monitor.pipe with sonar monitor.
  • 11. Arrive at the job locationArrive at the job location • The job location is aThe job location is a drilling rig in the Gulf.drilling rig in the Gulf. We are attaching toWe are attaching to the well head andthe well head and running 16 miles of 10running 16 miles of 10 inch pipe.inch pipe.
  • 12. News Media arrivalNews Media arrival • We were able to layWe were able to lay the pipe at speeds upthe pipe at speeds up to 101.6 fpm, which isto 101.6 fpm, which is a world record.a world record. • News mediaNews media documented the jobdocumented the job for publication andfor publication and company use.company use.
  • 13. Job CompleteJob Complete • We completed the jobWe completed the job in just over 3 ½ days,in just over 3 ½ days, which was within thewhich was within the scheduled time.scheduled time. • This was in spite of aThis was in spite of a number of unusualnumber of unusual delays during thedelays during the process.process.
  • 14. Computer Access and MonitoringComputer Access and Monitoring • The upper right window isThe upper right window is access to all modules inaccess to all modules in the system.the system. • The left hand window isThe left hand window is one of the module’sone of the module’s configurations opened forconfigurations opened for making changes tomaking changes to parameters while theparameters while the drives are running.drives are running. • The lower right window isThe lower right window is a list of parameters beinga list of parameters being continuously monitored incontinuously monitored in real-time.real-time.
  • 15. Job ResultsJob Results • New Speed record for laying pipe fromNew Speed record for laying pipe from reel. Design spec is 90 fpm max reelreel. Design spec is 90 fpm max reel speed, we ran at 101.6 fpm.speed, we ran at 101.6 fpm. • We met or exceeded all the requirementsWe met or exceeded all the requirements for the system.for the system. • Drive controls worked with no changesDrive controls worked with no changes required to the system during Pipe-layrequired to the system during Pipe-lay operation.operation.