Hot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort Service
Testing implementation kel 11
1. Testing
RANCANG BANGUN APLIKASI INSTALASI RAWAT
INAP DENGAN PARADIGMA PENGEMBANGAN
TERINTEGRASI MENGGUNAKAN ENTERPRISE SERVICE BUS (ESB)
Task 6
By :
Julia Carolina Daud 5209100059
Luthfiya Ulinnuha 5209100115
2. The testing process
Determining the
test methodology
Planning the test
Designing the
test
Performing the
test
3. 1. Determining the test methodology
The testing methodology that we use in this software testing
are;
The appropriate required software quality standard
The software testing strategy.
4. The appropiate required software
quality
Standart level that we use for software quality is:
Highest software quality standard
Software package requires highest software quality standard
considering the effect of software failure
5. Software testing Strategy
Incremental testing strategy
Why Incremental?
Because incremental do test per section in the software
modules (unit testing), followed by testing each module
integration (integration test), then the whole package is
tested (system testing)
What Incremental we use?
Incremental Top- Down
7. 2. Planning the test
Performance Testing
1. Evaluate the program's ability to operate properly viewed from
the side of the reference needs. for example: data flow, the size
of the memory used, speed of execution, etc.
2. Find out the work load or the conditions of the
program configuration.
3. Specification of performance is defined at the specification
stage or design. Can be used for testing the limits of the
environment program.
8. Planning the test (cont’d)
What to test:
Every functional requirement on public hospital
Which sources to use for test case:
SRS
Requirement Traceability Matrix
Who is to perform the tests:
Julia Carolina Daud
Luthfia Ulinnuha
Where to perform the tests:
Classrom and Laboratory
When to terminate the tests:
April, 16th 2012
9. 3. Designing the test
1. Scope of the test
1.1 Software package name:
RANCANG BANGUN APLIKASI INSTALASI RAWAT
INAP DENGAN PARADIGMA PENGEMBANGAN
TERINTEGRASI MENGGUNAKAN ENTERPRISE SERVICE BUS
(ESB)
1.2 Documents that provide the basis:
Final Project
o Rancang Bangun Aplikasi Instalasi Rawat Inap Dengan Paradigma
Pengembangan Terintegrasi menggunakan Enterprise Service Bus (ESB)
10. Designing the test (cont’d)
2.2 Required hardware and firmware
2. Testing
environment Specification
2.1 Testing site Processor Intel® Core™2 Duo CPU
Hardware
-Ebussiness Laboratory E7500 @2.93 GHz 2.93 GHz
RAM 2.00 GB
Operation Windows 7 Ultimate
System
Web Server Apache Tomcat 6
Software
Database MySQL
Language Java, ZK
Programming
Editor Netbeans 6.8
ESB Synapse
11. Designing the test (cont’d)
3. Test details
3.1 Test Identification
Before we do the testing phase, we have RTM as our guidance
3.2 Test Objective
1. To find out as many as error as possible and to make software more
reliable and easily maintainable
2. to verify the affordibility
3. to verify the user friendliness
4. to verify the usefullness
5. to verify the performance
6. to verify the appearance
12. 3.3 Cross-reference to the relevant design document and the requirement
document
Use Case SRS
Test Case RTM
3.4 Test level:
Performance testing
4 Test schedule
4.1 Preparation
• 2 weeks preparation
4.2 Testing
o April, 16th 2012
13. 4. Performing the test
Software test report
1 Test identification
1.1 Name:
RANCANG BANGUN APLIKASI INSTALASI RAWAT
INAP DENGAN PARADIGMA PENGEMBANGAN
TERINTEGRASI MENGGUNAKAN ENTERPRISE SERVICE BUS
(ESB)
1.2 Documents:
• Use Case SRS
• Test Case RTM
1.3 Test site
• Ebiss Laboratory
1.4 Tes team members
• 2
14. 2. Test environment
2.1 Hardware & Software
o Intel® Core™2 Duo CPU E7500 @2.93 GHz 2.93 GHz
o 2.00 GB
o Windows 7 Ultimate
o Apache Tomcat 6
o MySQL
o Java, ZK
o Netbeans 6.8
o Synapse
2.2 Preparation and training
• 2 months