SCHOOL OF ARCHITECTURE, BUILDING & DESIGN
Research Unit for Modern Architecture Studies in Southeast Asia
Foundation in Natural and Build Environment (FNBE)
Introduction to the Construction Industry [QSB30105]
Prerequisite: None
Lecturers: Hasmanira Mokhtar, Jaqurliyn Ann See Peng
_____________________________________________________________________
FINAL PROJECT
Development Proposal
40% of final marks (10% Group and 30% Individual)
Submission date: 16th July 2015
__________________________________________________________________
Introduction
“Trying to manage a project without project management is like trying to play a football game without a
game plan”. K. Tate
Objectives of Project
The objectives of this project are as follows:
1. To enable students to develop an understanding of the building team, its organization, duties and
inter-relations.
2. To develop an awareness of their professional responsibilities and to appreciate their profession in
the construction industry.
Learning Outcomes of this Project
On successful completion of this assignment, students will be able to demonstrate the following:
1. Explain the need to coordinate and develop an understanding of coherent working relations among
various industry players and to improve the communication channels.
2. Ability to document their observations and understanding from interview session and research
resources as well as to communicate their findings in a systematic and convincing presentation
and reports.
3. Ability to justify the feasibility of a development and improve the proposal to serve the purpose of
the development.
Tasks - Methodology
In a group of 2 students, you need to find a specific empty land to initiate a small construction project. The
size of the land shall between 50m x 50m (2500m2) – 50m x 70m (3500m2).
Individually, you are to propose ONE project that serves on any ONE (1) or combination of TWO (2) or
more of the following purposes. Subsequently, you are required to identify the professions required in
your development. List down the tasks each profession needs to do.
1. Recreation area
2. Commercial area
3. Industrial area
4. Agricultural area
5. Tourism area
6. Residential area
In your Development Brief report, you are required to include (but not limited to):
Group component:
- Introduction to the site - Site plan, Site analysis and observation (It is advisible to visit the site)
Individual component
- Your suggestion and proposal
- The rationale, benefits and impacts of your project to the client and the surrounding
community/end user
- Sketch plan of your proposal (Please note that your proposal should be as close to reality as
possible).
- Sketches of your concept/ideas; images of your ideas.
- List of professions involved and their tasks
Additional Info (bonus and optional)
- Diagram i.e. bubble diagram, flow chart and etc. which you use to develop your proposal.
- Some basic information of the authority procedures or flow that you need to encounter/deal with in
order to get the project done from the inception to the completion i.e the building plan approval
process and procedures.
- Costing
Submission Requirement
A4 sized bounded report of min 20 pages in total. (Compile group and individual components in one report)
You are also required to submit soft copy to your class representative. Class representative is then required
to compile all the softcopies in a CD and submit it to Ms. Ann (not later than 30th July 2015).
Assessment criteria
The assessment for this assignment will be based on your
- demonstrated understanding and intention of the brief
- quality and clarity of content
- method of documenting and composition of the report
- overall compilation and presentation

More Related Content

Similar to ICI Final Project March 2015.pdf

Icifinalprojectjan2015
Icifinalprojectjan2015Icifinalprojectjan2015
Icifinalprojectjan2015KingEdge
 
Icifinalprojectjan2015
Icifinalprojectjan2015Icifinalprojectjan2015
Icifinalprojectjan2015Dameerster
 
Ici final project jan 2015
 Ici final project jan 2015 Ici final project jan 2015
Ici final project jan 2015christinelee1996
 
Icifinalprojectjan2015
Icifinalprojectjan2015Icifinalprojectjan2015
Icifinalprojectjan2015Sarah Esa
 
Ici final brief
Ici final briefIci final brief
Ici final briefashleyyeap
 
Ici project 2
Ici project 2 Ici project 2
Ici project 2 SongKit96
 
Brief ici final
Brief ici finalBrief ici final
Brief ici finalQuo Ming
 
ICI Finale Brief
ICI Finale BriefICI Finale Brief
ICI Finale BriefTamZhaoWei
 
Icifinalprojectjan2015
Icifinalprojectjan2015Icifinalprojectjan2015
Icifinalprojectjan2015barbaraxchang
 
Ici finalprojectjan2015
Ici finalprojectjan2015Ici finalprojectjan2015
Ici finalprojectjan2015G-ny Gynie
 
Icifinalprojectjan2015 (2)
Icifinalprojectjan2015 (2)Icifinalprojectjan2015 (2)
Icifinalprojectjan2015 (2)Amelisa Collins
 
Icifinalprojectjan2015 (1)
Icifinalprojectjan2015 (1)Icifinalprojectjan2015 (1)
Icifinalprojectjan2015 (1)chuenmin
 
Icifinalprojectjan2015 150627142723-lva1-app6891
Icifinalprojectjan2015 150627142723-lva1-app6891Icifinalprojectjan2015 150627142723-lva1-app6891
Icifinalprojectjan2015 150627142723-lva1-app6891Darryl Harvey
 
Icifinalprojectjan2015
Icifinalprojectjan2015Icifinalprojectjan2015
Icifinalprojectjan2015Lee Fong Yen
 
Icifinalprojectjan2015
Icifinalprojectjan2015Icifinalprojectjan2015
Icifinalprojectjan2015Louise Foong
 

Similar to ICI Final Project March 2015.pdf (16)

Icifinalprojectjan2015
Icifinalprojectjan2015Icifinalprojectjan2015
Icifinalprojectjan2015
 
Icifinalprojectjan2015
Icifinalprojectjan2015Icifinalprojectjan2015
Icifinalprojectjan2015
 
Ici final project jan 2015
 Ici final project jan 2015 Ici final project jan 2015
Ici final project jan 2015
 
Icifinalprojectjan2015
Icifinalprojectjan2015Icifinalprojectjan2015
Icifinalprojectjan2015
 
Ici final brief
Ici final briefIci final brief
Ici final brief
 
Ici project 2
Ici project 2 Ici project 2
Ici project 2
 
Ici project 2
Ici project 2Ici project 2
Ici project 2
 
Brief ici final
Brief ici finalBrief ici final
Brief ici final
 
ICI Finale Brief
ICI Finale BriefICI Finale Brief
ICI Finale Brief
 
Icifinalprojectjan2015
Icifinalprojectjan2015Icifinalprojectjan2015
Icifinalprojectjan2015
 
Ici finalprojectjan2015
Ici finalprojectjan2015Ici finalprojectjan2015
Ici finalprojectjan2015
 
Icifinalprojectjan2015 (2)
Icifinalprojectjan2015 (2)Icifinalprojectjan2015 (2)
Icifinalprojectjan2015 (2)
 
Icifinalprojectjan2015 (1)
Icifinalprojectjan2015 (1)Icifinalprojectjan2015 (1)
Icifinalprojectjan2015 (1)
 
Icifinalprojectjan2015 150627142723-lva1-app6891
Icifinalprojectjan2015 150627142723-lva1-app6891Icifinalprojectjan2015 150627142723-lva1-app6891
Icifinalprojectjan2015 150627142723-lva1-app6891
 
Icifinalprojectjan2015
Icifinalprojectjan2015Icifinalprojectjan2015
Icifinalprojectjan2015
 
Icifinalprojectjan2015
Icifinalprojectjan2015Icifinalprojectjan2015
Icifinalprojectjan2015
 

More from 温 庄壁

Social psychology
Social psychologySocial psychology
Social psychology温 庄壁
 
Itd project 1b brief rev01 (1)
Itd project 1b brief rev01 (1)Itd project 1b brief rev01 (1)
Itd project 1b brief rev01 (1)温 庄壁
 
Cn c briefp1092015
Cn c briefp1092015Cn c briefp1092015
Cn c briefp1092015温 庄壁
 
Itd sept 2015 p1_a (1)
Itd sept 2015 p1_a (1)Itd sept 2015 p1_a (1)
Itd sept 2015 p1_a (1)温 庄壁
 
Module outline itd sns sept2015
Module outline itd sns sept2015Module outline itd sns sept2015
Module outline itd sns sept2015温 庄壁
 
Enbeenhanceslide 150814140916-lva1-app6891
Enbeenhanceslide 150814140916-lva1-app6891Enbeenhanceslide 150814140916-lva1-app6891
Enbeenhanceslide 150814140916-lva1-app6891温 庄壁
 
Drawing final project studio unit living_march 2015
Drawing final project studio unit living_march 2015Drawing final project studio unit living_march 2015
Drawing final project studio unit living_march 2015温 庄壁
 
Process in planning and making
Process in planning and makingProcess in planning and making
Process in planning and making温 庄壁
 
Measuringtape itd
Measuringtape itdMeasuringtape itd
Measuringtape itd温 庄壁
 
Quantity surveyor
Quantity surveyorQuantity surveyor
Quantity surveyor温 庄壁
 
Project 1 integration march 2015 (2)
Project 1 integration march 2015 (2)Project 1 integration march 2015 (2)
Project 1 integration march 2015 (2)温 庄壁
 
Project 1 integration march 2015
Project 1 integration march 2015Project 1 integration march 2015
Project 1 integration march 2015温 庄壁
 
Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015温 庄壁
 
Project 2 design process research & analysis mac 2015
Project 2 design process research & analysis mac 2015Project 2 design process research & analysis mac 2015
Project 2 design process research & analysis mac 2015温 庄壁
 

More from 温 庄壁 (20)

Social psychology
Social psychologySocial psychology
Social psychology
 
Itd project 1b brief rev01 (1)
Itd project 1b brief rev01 (1)Itd project 1b brief rev01 (1)
Itd project 1b brief rev01 (1)
 
Cn c briefp1092015
Cn c briefp1092015Cn c briefp1092015
Cn c briefp1092015
 
Itd sept 2015 p1_a (1)
Itd sept 2015 p1_a (1)Itd sept 2015 p1_a (1)
Itd sept 2015 p1_a (1)
 
Module outline itd sns sept2015
Module outline itd sns sept2015Module outline itd sns sept2015
Module outline itd sns sept2015
 
Lecture 8
Lecture 8Lecture 8
Lecture 8
 
Lecture 7
Lecture 7Lecture 7
Lecture 7
 
Lecture 5
Lecture 5Lecture 5
Lecture 5
 
Enbeenhanceslide 150814140916-lva1-app6891
Enbeenhanceslide 150814140916-lva1-app6891Enbeenhanceslide 150814140916-lva1-app6891
Enbeenhanceslide 150814140916-lva1-app6891
 
Drawing final project studio unit living_march 2015
Drawing final project studio unit living_march 2015Drawing final project studio unit living_march 2015
Drawing final project studio unit living_march 2015
 
Process in planning and making
Process in planning and makingProcess in planning and making
Process in planning and making
 
Measuringtape itd
Measuringtape itdMeasuringtape itd
Measuringtape itd
 
Itd stapler
Itd staplerItd stapler
Itd stapler
 
Quantity surveyor
Quantity surveyorQuantity surveyor
Quantity surveyor
 
Project 1 integration march 2015 (2)
Project 1 integration march 2015 (2)Project 1 integration march 2015 (2)
Project 1 integration march 2015 (2)
 
Project 1 integration march 2015
Project 1 integration march 2015Project 1 integration march 2015
Project 1 integration march 2015
 
Project 2 itd
Project 2 itdProject 2 itd
Project 2 itd
 
Ici magazine
Ici magazineIci magazine
Ici magazine
 
Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015
 
Project 2 design process research & analysis mac 2015
Project 2 design process research & analysis mac 2015Project 2 design process research & analysis mac 2015
Project 2 design process research & analysis mac 2015
 

ICI Final Project March 2015.pdf

  • 1. SCHOOL OF ARCHITECTURE, BUILDING & DESIGN Research Unit for Modern Architecture Studies in Southeast Asia Foundation in Natural and Build Environment (FNBE) Introduction to the Construction Industry [QSB30105] Prerequisite: None Lecturers: Hasmanira Mokhtar, Jaqurliyn Ann See Peng _____________________________________________________________________ FINAL PROJECT Development Proposal 40% of final marks (10% Group and 30% Individual) Submission date: 16th July 2015 __________________________________________________________________ Introduction “Trying to manage a project without project management is like trying to play a football game without a game plan”. K. Tate Objectives of Project The objectives of this project are as follows: 1. To enable students to develop an understanding of the building team, its organization, duties and inter-relations. 2. To develop an awareness of their professional responsibilities and to appreciate their profession in the construction industry. Learning Outcomes of this Project On successful completion of this assignment, students will be able to demonstrate the following: 1. Explain the need to coordinate and develop an understanding of coherent working relations among various industry players and to improve the communication channels. 2. Ability to document their observations and understanding from interview session and research resources as well as to communicate their findings in a systematic and convincing presentation and reports. 3. Ability to justify the feasibility of a development and improve the proposal to serve the purpose of the development.
  • 2. Tasks - Methodology In a group of 2 students, you need to find a specific empty land to initiate a small construction project. The size of the land shall between 50m x 50m (2500m2) – 50m x 70m (3500m2). Individually, you are to propose ONE project that serves on any ONE (1) or combination of TWO (2) or more of the following purposes. Subsequently, you are required to identify the professions required in your development. List down the tasks each profession needs to do. 1. Recreation area 2. Commercial area 3. Industrial area 4. Agricultural area 5. Tourism area 6. Residential area In your Development Brief report, you are required to include (but not limited to): Group component: - Introduction to the site - Site plan, Site analysis and observation (It is advisible to visit the site) Individual component - Your suggestion and proposal - The rationale, benefits and impacts of your project to the client and the surrounding community/end user - Sketch plan of your proposal (Please note that your proposal should be as close to reality as possible). - Sketches of your concept/ideas; images of your ideas. - List of professions involved and their tasks Additional Info (bonus and optional) - Diagram i.e. bubble diagram, flow chart and etc. which you use to develop your proposal. - Some basic information of the authority procedures or flow that you need to encounter/deal with in order to get the project done from the inception to the completion i.e the building plan approval process and procedures. - Costing Submission Requirement A4 sized bounded report of min 20 pages in total. (Compile group and individual components in one report) You are also required to submit soft copy to your class representative. Class representative is then required to compile all the softcopies in a CD and submit it to Ms. Ann (not later than 30th July 2015). Assessment criteria The assessment for this assignment will be based on your - demonstrated understanding and intention of the brief - quality and clarity of content - method of documenting and composition of the report - overall compilation and presentation