Columbia Junior High
New Junior High School and City Park for Fife, Washington
Owner
Fife School District
Building Data
Capacity 800
students
Area of Building
79,000 sq ft
Construction Cost
Mechanical-
$2,060,000
Electrical-
$2,000,000
Mechanical
Systems
Four pipe fan coil
Gas Boilers
Chiller
Electrical Systems
Lighting/power
Fire/security
Clock/intercom
Completion Date
September 2002
Project Description
The new junior high school in Fife was
built in to house 809 students, 25
administration and 40 teachers.
Construction of the 93,000 square foot
facility started in July 2001 with final
completion in September 2003. The
facility consists of an administration
area, library, computer center, large
central commons and three classroom
wings. The school has two
gymnasiums, weight room, locker
rooms and full service kitchen.
Special classrooms include four
Science labs, band room, choir room
and large art facility. A central feature
of the project included a full auditorium
and stage facility to serve the school
as well as the community.
Mechanical systems include full
heating and air conditioning through a
four pipe system to individual air
handling units serving each zone.
The site includes a full track and
several playing fields along with a
concession stand.
Mechanical/Electrical Room
NTS
A large room behind the gym provides
space and common serviceability for
central plant mechanical/electrical
systems.
STUDENT ENTRANCE
MAIN GYM DUCTWORK/LIGHTS
COMMONS LIGHTING
LIBRARY LIGHTING

More Related Content

Similar to New Junior High School and City Park for Fife, Washington

Matthew Thomas Education Sector Portfolio 2011
Matthew Thomas   Education Sector Portfolio 2011Matthew Thomas   Education Sector Portfolio 2011
Matthew Thomas Education Sector Portfolio 2011Matthewthomas11
 
046-057_Monterey Bay
046-057_Monterey Bay046-057_Monterey Bay
046-057_Monterey BayJeff Blaevoet
 
Derek Hendry WEC Biography
Derek Hendry WEC BiographyDerek Hendry WEC Biography
Derek Hendry WEC BiographyDerek Hendry
 
James Elser Project List 2009
James Elser Project List 2009James Elser Project List 2009
James Elser Project List 2009jelser4228
 

Similar to New Junior High School and City Park for Fife, Washington (6)

Park Millennium (2)
Park Millennium (2)Park Millennium (2)
Park Millennium (2)
 
Linked In
Linked InLinked In
Linked In
 
Matthew Thomas Education Sector Portfolio 2011
Matthew Thomas   Education Sector Portfolio 2011Matthew Thomas   Education Sector Portfolio 2011
Matthew Thomas Education Sector Portfolio 2011
 
046-057_Monterey Bay
046-057_Monterey Bay046-057_Monterey Bay
046-057_Monterey Bay
 
Derek Hendry WEC Biography
Derek Hendry WEC BiographyDerek Hendry WEC Biography
Derek Hendry WEC Biography
 
James Elser Project List 2009
James Elser Project List 2009James Elser Project List 2009
James Elser Project List 2009
 

New Junior High School and City Park for Fife, Washington

  • 1. Columbia Junior High New Junior High School and City Park for Fife, Washington Owner Fife School District Building Data Capacity 800 students Area of Building 79,000 sq ft Construction Cost Mechanical- $2,060,000 Electrical- $2,000,000 Mechanical Systems Four pipe fan coil Gas Boilers Chiller Electrical Systems Lighting/power Fire/security Clock/intercom Completion Date September 2002 Project Description The new junior high school in Fife was built in to house 809 students, 25 administration and 40 teachers. Construction of the 93,000 square foot facility started in July 2001 with final completion in September 2003. The facility consists of an administration area, library, computer center, large central commons and three classroom wings. The school has two gymnasiums, weight room, locker rooms and full service kitchen. Special classrooms include four Science labs, band room, choir room and large art facility. A central feature of the project included a full auditorium and stage facility to serve the school as well as the community. Mechanical systems include full heating and air conditioning through a four pipe system to individual air handling units serving each zone. The site includes a full track and several playing fields along with a concession stand. Mechanical/Electrical Room NTS A large room behind the gym provides space and common serviceability for central plant mechanical/electrical systems. STUDENT ENTRANCE MAIN GYM DUCTWORK/LIGHTS COMMONS LIGHTING LIBRARY LIGHTING