517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP
28-29 June 2012| Stockholm - Sweden
Dimitris Raftopoulos
Strategic Leadership Unit
Projects’ Action Plan
 Implementation Methodology – PMI Project Life Cycle
 WP1 - Project Management | Lead: 3LRI
 WP2 - Defining Ageing and Employment Trends in EU |
Lead: University of Social Sciences
 WP3 - Developing Business Concepts for Age Management
& Investment in the HR sector | Lead: UoS
 WP4 - Pilot Projects | Lead: FU-Uppsala
 WP5 - Quality Assurance | Lead: 3LRI
 WP6 - Awareness raising activities | Lead: Documenta
 WP7 - Dissemination of Results | Lead: 3LRI
 WP8 - Mainstreaming and results exploitation | Lead: 3LRI
2
Presentation of PPs and their activity
 3L Research Institute, Greece
 University of Strathclyde, UK
 Folkuniversitetet, Sweden
 University of Social Sciences, Poland
 Documenta, Spain
3
Day 1 - Outline
4
 Presentation of WP.1 Project Management
 Status Update
 Presentation of WP.2 defining ageing & employment trends
 Strategy plan (report) and Exchange information & knowhow (report)
 Presentation of WP.5 Quality Assurance
 Methodological guide for WP.3
 Evaluation of the project
 Presentation of WP.6 Awareness raising activities
 Workshops for the age management concept benefits, Sensitising
entrepreneurs,
 Seminars addressing HR managers, Sensitising the aged workforce
 Presentation of WP.7 Dissemination of results
 Website, brochures, flyer, poster, eNewsletters, press campaign,
Dissemination Conference
Work Packages Analysis WP.1-2
Work Package / Deliverables
Type
Number Title
WP1 Project Management
1.1 Consortium Agreement Other
1.2 Web-based system Service/Product
1.3 Project Partners Meetings Event
1.4 Progress Reports Report
WP2 Defining Ageing and Employment Trends in EU
2.1 Analysing the demographic trends Report
2.2 Analysis of the aged workforce employability Report
2.3 Survey on the aged employed / unemployed workforce Report
2.4 Strategy plan to meet future demographic needs Report
2.5 Exchange information and know-how Report
6
WP.1-Act.1.2
1.2 Web-based system
 Link: http://management.lllprojects.eu/feng/#
 Logins sent to all partners’ personnel
 Instructions .doc file regarding the use of the web-
system was sent as well
 Accessible through the website at the Members Area,
top right
Each responsible manager is to delegate activities to their
personnel participating
7
WP.1-Act.1.3
Activity 1.3: PPs’ meetings
 Done
 Kick-off meeting - Athens: 13-14/12/2011
 2nd meeting - Sweden: 28-29/06/2012
 Remaining
 3rd meeting - Spain: 29-30/11/2012
 4th meeting - Poland: May XX-XX/05/2013
 5th meeting - UK: December XX-XX/12/2013
 Closing meeting - Brussels: September XX-XX/09/2014
8
WP.1-Act.1.4
Activity 1.4: Progress Reports
 1st period: Oct.11 – Mar.12
 2nd period: Apr.12-Sep.12
 Financial excel files through individual Dropbox folders
 Problem? PPs Feedback!!!
 Every six (6) Month Financial & Progress Report
 FolkUniversitetet
 UoS
 Documenta
 University of Management
9
List of Indicators
10
WP.2-Act.2.4-2.5
11
Activity 2.4: Strategy plan to meet future demographic needs
 The current strategy plan will be examined and worked in combination with the analysis of
demographic trends, in order to see how companies could meet the future demographic. The
focal point will be how to increase the positive aspects of ageing workforce, while decreasing
the negative ones. That plan will define the steps needed to be followed and will be used as the
basis on which the workshops will be conducted as well as the pilot actions. The analytical
content of the report will be decided by the Consortium, setting up the methodology for
conducting the research as well as quantitative and qualitative standards.
 Responsible PP: UoS
 Duration: M9, 1 month
Activity 2.5: Exchange information & know-how
 The report will support the exchange of information and Know-How on
building upon innovative processes in the sector of age management
towards developing and testing alternative working conditions in
enterprises. This will be based on the findings of the reports already
conducted in the specific work package.
 Duration: M10, 1 month
 Responsible PP: Documenta
Coffee Break
12
Work Packages Analysis WP.5-6
WP5 Quality Assurance
5.1
Methodological Guide for WP “Defining Ageing and Employment
Trends in EU”
Report
5.2
Methodological Guide for WP “Developing Business Concepts for
Age Management & Investment in the HR sector”
Report
5.3 Methodological Guide for Pilot Projects implementation Report
5.4
Methodological Guide for Awareness raising, Dissemination and
Exploitation of results activities
Report
5.5 Evaluation of the results of the project Report
WP6 Awareness raising activities
6.1 Workshops for the age management concept benefits Event
6.2 Sensitising entrepreneurs Event
6.3 Seminars addressing HR managers Event
6.4 Sensitising the aged workforce Event
13
WP.5-Act.5.2
14
 5.2: Methodological Guide for WP “Developing Business Concepts for
Age Management & Investment in the HR sector”
 Status Update by University of Strathclyde
 Responsible PP: UoS
WP.5-Act.5.4
15
 5.5: Evaluation of the results of the project
 Interim internal evaluation -> online questionnaire filled by PPs only (excluding PC)
 Status Update
 Final external evaluation -> external expert TBC for all PPs (including PC)
 Responsible PP: SWSPIZ
Lunch
16
WP.6-Act.6.1
Activity 6.1: Awareness raising activities
 Update by UoS on their workshop
 Discussion on the following four (4) workshops (one per country) that will involve local
public and private actors, enterprises employees, customers, suppliers, employers and the
community and will discuss as well as examine the benefits enterprises could have from the
proposed strategies. Proposal to PPs.
 These workshops will last half a day and will be organised by each partner in each
participating country, adapting the content to their language, their specific working
conditions, labour market needs and specificities of the attendants.
 Duration: M10-M12, 3 months
 Budget: 29.706,00€
17
WP.6-Act.6.2-6.3
18
Activity 6.2: Sensitising entrepreneurs
 Project partners will visit each other’s area and will visit businesses that operate with aged work force and have
successful results, for exchanging experience. PPs will discuss with the personnel and owners, gaining valuable experience
and know–how that they could bring back to their organizations as well as countries. Local business people will be part
as well of the study tours.
 These study tours (5 in total, one per country), will last one day and will take place together with the project meetings, in
order to save time and money from travelling.
 Duration: M2, M9, M15, M21, M27, 5 months
 Budget: 2.500,00€ (included in 6.1)
Activity 6.3: Seminars addressing HR managers
 There will be organized 5 seminars, one in each different participating country, addressing to Human Resources
Managers for implementing decisions on staff recruitment, retention and redundancy in view of the formulated Age
Management Concepts. The proposed issues will be deriving from the reports already elaborated in the context of the
project.
 Catch a minimum of 20 participants per seminar.
 These seminars will last half a day and will be organised by each partner in each participating country, adapting the
content to their language, their specific labour market needs and conditions and specificities of the attendants.
 Duration: M18-M22, 5 months
 Budget: 1.700,00€ (included in 6.1)
WP.6-Act.6.4
19
Activity 6.4: Sensitising the aged workforce
 In parallel with the seminars organized focusing in HR managers, another 5 will be
organized, addressing to aged workforce and Unemployed aged 50+, with special focus
on sensitive social groups. It will explain the strengths they have as well as the skills that
they need to gain, in order to remain competitive in the labour market they operate and
even in the EU market.
 Catch a minimum of 20 participants per seminar
 These seminars will last half a day and will be organised by each partner in each
participating country, adapting the content to their language, their specific labour market
needs and conditions and specificities of the attendants.
 Duration: M18-M22, 5 months
 Budget: 1.700,00 € (included in 6.1)
Work Packages Analysis WP.7-8
WP7 Dissemination of Results
7.1 Developing a website Service/Product
7.2 Publicity campaign – Information and sensitisation brochures Other
7.3 Publicity campaign – Dissemination of events Other
7.4 Publicity campaign – Electronic Newsletters Other
7.5 Press campaign Other
7.6 Dissemination conference Event
WP8 Mainstreaming and results exploitation
8.1 Mainstreaming and results exploitation action plan Report
8.2 Developing a business manual Report
8.3 Policies assessment Report
20
WP.7-Act.7.1
21
Activity 7.1: Developing a website
 Presentation of the website.
 The website is available in all partners’ language and will be continuously updated by all
partners.
 Duration: M3, 1 month
 Budget: 29.501,00€
http://like.lllprojects.eu/
Act.7.1: “website structure”
22
Structure
 Home
 Project overview
 Rationale
 EU added value
 Project objectives
 Deliverables
 Expected results & outcomes
 Project Meetings
 Project Calendar
 Media library
 Project Partners
 Documentation Center
 + Forum
 Online Questionnaire
 + Sitemap
WP.7-Act.7.2
23
Activity 7.2: Publicity campaign – Information and Sensitisation
brochures
Four brochures of 4pages will be produced, in the following languages: EN, ES, EL,
SE, PL
 one presenting the project
 one sensitising the aged workforce
 one sensitizing enterprises and
 one presenting the project results
 The Lead Partner of the Work Package will create a common layout (with the approbation
of all partners), including a project logo, to be used in all brochures and overall material,
and a common text, but each partner will adapt the text to local conditions, needs and
specificities
 Proposal for change in the development of the 2nd brochure
 Each brochure (A5) will be printed in 1000 items per country
 Duration: M3, M7, M33, 3 months
 Budget: 11.300,00€
WP.7-Act.7.3-7.4
24
Activity 7.3: Publicity campaign – Dissemination of events
 For each event organised (workshops, seminars, conference), each partner will produce and diffuse flyers and posters to
disseminate the event in order to ensure the largest possible participation.
 This means that 6 different flyers and 6 different posters will be produced in each language. Each flyer (A5) will be
printed in 200 items, each poster (A3) in 20 items.
 The Lead Partner of the Work Package will create a common layout (with the approbation of all partners), to be used in
for flyers and posters, and a common text, but each partner will adapt the text to local conditions, needs and
specificities.
 This dissemination will be done in an electronic way as well.
 Duration: M9, M17, M26, M28-29, 5 months
 Budget: 1.900,00€ (included in 7.1)
Activity 7.4: Publicity campaign – Electronic Newsletters
 6 newsletters on the employability of the aged workforce and presenting the project evolution and outputs during the
project lifetime will be sent electronically, which will be used to promote the main Project initiatives, to inform the
operators of interested sectors on the project implementation, the activity phases still in progress, the possibilities and
modalities of participation, to sensitize the population towards the thematic at the focus of the debate, to spread the
results obtained by the Project.
 The Lead Partner will have the overall coordination of the activity, but all partners will participate in the drafting of the
newsletter and in its dissemination to all relevant EU, national, regional and local actors, not only within the 5
participating countries but also in other European countries, to ensure the largest possible dissemination.
 Duration: M3, M9, M15, M21, M27, M33, 6 months
 Budget: (included in 7.1)
WP.7-Act.7.5
25
Activity 7.5: Press Campaign
 The project will be presented to local actors and local press by each partner during a
press-conference presenting the project and addressing specific issues relevant to the
project theme and the local conditions. Each partner will decide on when organising the
press-conference, in order to choose the most appropriate moment for a more effective
and positive event (e.g. before an important event).
 During the press-conferences, folders will be distributed to the journalists with information
about the project, the programme, the transnational actions and the local actions and
added value of the project.
 Regional press-releases will inform target groups about the project and the organised
events and will be issued after the press-conference and more often if possible.
 Project partners will launch a press and radio campaign trying to sensitise as many actors
and target groups as possible.
 Duration: M1-M36, 36 months
 Budget: 250,00 € (included in 7.1)
WP.7-Act.7.6
26
Activity 7.6: Dissemination Conference
 A dissemination conference of the project will be organized in Brussels to present the project results and
disseminate all project products and outputs and to open the ground to new collaborations and partnerships
for the continuity of the project activities. This conference will have as general objectives:
 To assure the largest information and raising awareness for the project by EU actors;
 To inform the public opinion on the role developed by local institutions, European Union and Project partners
in the realization of the Project;
 To inform about the project’s outputs and results, the impact of the Project’s interventions, the findings of it.
 To communicate about age management concept, training of the aged workers and business organization
issues
 The target groups (EU stakeholders, representatives of regions, lobbies, think tanks, representatives of
enterprises, unions of enterprises, unions of employees, policy makers, social partners, training and
education providers and agencies…) will be targeted by the partners through the promotion of the project
and through direct communication via the events organised, meetings, emails and phone calls in order to
catch a minimum of 80 participants.
 The conference will last half a day and will be organised by P1 in Brussels, for acceding EU decision-makers
and for ensuring an easy access to attendants from all over Europe. Each partner will participate in it and
bring about 10 national and local stakeholders in order to ensure transnationality to the event.
 Duration: M33, 1 month
 Budget: 37.800,00€
Dissemination & Valorisation
WP 6, Awareness raising activities
 As in most cases aged persons are unaware of the fact that they are being discriminated, special activities
aim at sensitizing both employers and aged workforce are planned to be implemented, such as workshops
on age management concept benefits, study tours for sensitising entrepreneurs, seminars for HR managers
and for aged workforce.
WP7, Dissemination of results
 Following a methodology to be defined by the consortium, a communication plan will accompany the project
all over its duration, that will include: a publicity campaign (website and discussion forum, brochures, flyers,
posters, electronic newsletters, electronic dissemination of outputs) for paper and electronic dissemination of
the project, a press campaign (press-conferences, press-releases, radio spots) and a Dissemination
Conference. The Discussion Forum will be used as a tool for transferring outputs at regional, national and
European level.
WP8, Mainstreaming and results exploitation
 This work package will last one year, to prepare the project for its exploitation even after the end of the
project life time. The mainstreaming of the project results and outputs is designed to limit early retirement
and encourage the recruitment and retention of older workers. A Mainstreaming Action Plan is planned
within the framework of the project in order to support the transfer of practices and methodologies
experimented to different systems. Furthermore, a Results Exploitation Action Plan will be delivered in order
to identify results to be utilised and transferred. The mainstreaming and exploitation strategy will be
multilevel (from local to European) and multi-actor oriented.
27
Time Table
28
Indicators
 Review of the indicators list
 Partners problems, feedback
 Guide of the partners about the next indicators period
 1st period: Oct.2011 – Marc.2011
 2nd period: Apr.2012 – Sep.2012
 3rd period: Oct.2012 – Marc.2013
29
Work Packages Analysis WP.3
WP3
Developing Business Concepts for Age Management &
Investment in the HR sector
3.1 Designing model for enterprises on age management Report
3.2 Guide for management optimisation performance Report
3.3 Development of measurable performance indicators Report
3.4 Analysis of older workforce work traits Report
3.5 Employment opportunities for older workers Report
30
WP.3-Act.3.1-3.2
Activity 3.1: Designing model for enterprises on age management
 Focus on the development of innovative business concepts related to age management processes.
To this end, a study will be conducted to design a model for enterprises on introducing age
management concepts, flexible working arrangements and succession management, using the
finding of the report already elaborated in WP2.
 Duration: M15, 1 month
 Budget: 13.627,00€
 The 40 pages report will be firstly available in English and in electronic version and then
translated in Greek, Spanish, Polish and Swedish
Activity 3.2: Guide for management optimisation performance
 The above guide will cross examine the management systems currently deployed in the
companies of the EU with those suggested in the first action of WP3 and will lead to the
development of a methodological guide which will point what actions need to be taken in order
to optimize the performance of management systems used in the EU market.
 Duration: M17, 1 month
 Budget: 2.674,00€
 The 40 pages report will be available in English
31
 Thank you for your attention
32

More Related Content

Similar to {LIKE} 2nd PM PPT

Transfer of Innovation project VOW+IPLM- The Value of Work for Individual Pos...
Transfer of Innovation project VOW+IPLM- The Value of Work for Individual Pos...Transfer of Innovation project VOW+IPLM- The Value of Work for Individual Pos...
Transfer of Innovation project VOW+IPLM- The Value of Work for Individual Pos...Grecu Liliana
 
MITKE Good Practice Aug 2010
MITKE Good Practice Aug 2010MITKE Good Practice Aug 2010
MITKE Good Practice Aug 2010mickeymck
 
SINERGIE's organisation profile
SINERGIE's organisation profileSINERGIE's organisation profile
SINERGIE's organisation profileGiovanni Pede
 
Emf project angels network 28_nov2011_bxl_mmib
Emf project angels network 28_nov2011_bxl_mmibEmf project angels network 28_nov2011_bxl_mmib
Emf project angels network 28_nov2011_bxl_mmibidowido
 
Ecovem project presentation ing 2021 03
Ecovem project presentation ing 2021 03Ecovem project presentation ing 2021 03
Ecovem project presentation ing 2021 03Manuel Castro
 
The pm²-story-nicos.kourounakis.2017.share
The pm²-story-nicos.kourounakis.2017.shareThe pm²-story-nicos.kourounakis.2017.share
The pm²-story-nicos.kourounakis.2017.shareNicos Kourounakis
 
ECoVEM DL IEEE EdSoc Tunis UNED 2022 07 final.pptx
ECoVEM DL IEEE EdSoc Tunis UNED 2022 07 final.pptxECoVEM DL IEEE EdSoc Tunis UNED 2022 07 final.pptx
ECoVEM DL IEEE EdSoc Tunis UNED 2022 07 final.pptxManuel Castro
 
FUPOL Workpackage 7 - Large Scale Demonstrators
FUPOL Workpackage 7 - Large Scale DemonstratorsFUPOL Workpackage 7 - Large Scale Demonstrators
FUPOL Workpackage 7 - Large Scale DemonstratorsFUPOL
 
Talents up craig alan_20_05_2013
Talents up craig alan_20_05_2013Talents up craig alan_20_05_2013
Talents up craig alan_20_05_2013AREA Science Park
 
MEET-BIS Vietnam TOR_ ES_2013
MEET-BIS Vietnam TOR_ ES_2013MEET-BIS Vietnam TOR_ ES_2013
MEET-BIS Vietnam TOR_ ES_2013Thuy_Dang
 
Fostering solar technology in the Mediterranean area - Communication Plan
Fostering solar technology in the Mediterranean area - Communication PlanFostering solar technology in the Mediterranean area - Communication Plan
Fostering solar technology in the Mediterranean area - Communication PlanFOSTEr in MED
 
Fostering Solar Technology in the Mediterranean Area (www.fosterinmed.eu)
Fostering Solar Technology in the Mediterranean Area (www.fosterinmed.eu)Fostering Solar Technology in the Mediterranean Area (www.fosterinmed.eu)
Fostering Solar Technology in the Mediterranean Area (www.fosterinmed.eu)Agencia Andaluza de la Energía
 
HoCare Interreg Europe project
HoCare Interreg Europe projectHoCare Interreg Europe project
HoCare Interreg Europe projectJan Kubalík
 
Step4all guide 3 How to apply and how to manage successful European projects
Step4all guide 3 How to apply and how to manage successful European projectsStep4all guide 3 How to apply and how to manage successful European projects
Step4all guide 3 How to apply and how to manage successful European projectsGIANLUCA COPPOLA
 
ISO 140001 integration into SEAP plans
ISO 140001 integration into SEAP plansISO 140001 integration into SEAP plans
ISO 140001 integration into SEAP plansserena boccardo
 
#TCI2019 Clusters3 Final Conference - Interreg Europe: state of play
#TCI2019 Clusters3 Final Conference - Interreg Europe: state of play#TCI2019 Clusters3 Final Conference - Interreg Europe: state of play
#TCI2019 Clusters3 Final Conference - Interreg Europe: state of playTCI Network
 

Similar to {LIKE} 2nd PM PPT (20)

Transfer of Innovation project VOW+IPLM- The Value of Work for Individual Pos...
Transfer of Innovation project VOW+IPLM- The Value of Work for Individual Pos...Transfer of Innovation project VOW+IPLM- The Value of Work for Individual Pos...
Transfer of Innovation project VOW+IPLM- The Value of Work for Individual Pos...
 
Project starting report iktimed 2 nov
Project starting report iktimed 2  novProject starting report iktimed 2  nov
Project starting report iktimed 2 nov
 
MITKE Good Practice Aug 2010
MITKE Good Practice Aug 2010MITKE Good Practice Aug 2010
MITKE Good Practice Aug 2010
 
SINERGIE's organisation profile
SINERGIE's organisation profileSINERGIE's organisation profile
SINERGIE's organisation profile
 
Emf project angels network 28_nov2011_bxl_mmib
Emf project angels network 28_nov2011_bxl_mmibEmf project angels network 28_nov2011_bxl_mmib
Emf project angels network 28_nov2011_bxl_mmib
 
Ecovem project presentation ing 2021 03
Ecovem project presentation ing 2021 03Ecovem project presentation ing 2021 03
Ecovem project presentation ing 2021 03
 
The pm²-story-nicos.kourounakis.2017.share
The pm²-story-nicos.kourounakis.2017.shareThe pm²-story-nicos.kourounakis.2017.share
The pm²-story-nicos.kourounakis.2017.share
 
ECoVEM DL IEEE EdSoc Tunis UNED 2022 07 final.pptx
ECoVEM DL IEEE EdSoc Tunis UNED 2022 07 final.pptxECoVEM DL IEEE EdSoc Tunis UNED 2022 07 final.pptx
ECoVEM DL IEEE EdSoc Tunis UNED 2022 07 final.pptx
 
FUPOL Workpackage 7 - Large Scale Demonstrators
FUPOL Workpackage 7 - Large Scale DemonstratorsFUPOL Workpackage 7 - Large Scale Demonstrators
FUPOL Workpackage 7 - Large Scale Demonstrators
 
Talents up craig alan_20_05_2013
Talents up craig alan_20_05_2013Talents up craig alan_20_05_2013
Talents up craig alan_20_05_2013
 
MEET-BIS Vietnam TOR_ ES_2013
MEET-BIS Vietnam TOR_ ES_2013MEET-BIS Vietnam TOR_ ES_2013
MEET-BIS Vietnam TOR_ ES_2013
 
Go green wp2_valencia
Go green wp2_valenciaGo green wp2_valencia
Go green wp2_valencia
 
Fostering solar technology in the Mediterranean area - Communication Plan
Fostering solar technology in the Mediterranean area - Communication PlanFostering solar technology in the Mediterranean area - Communication Plan
Fostering solar technology in the Mediterranean area - Communication Plan
 
Fostering Solar Technology in the Mediterranean Area (www.fosterinmed.eu)
Fostering Solar Technology in the Mediterranean Area (www.fosterinmed.eu)Fostering Solar Technology in the Mediterranean Area (www.fosterinmed.eu)
Fostering Solar Technology in the Mediterranean Area (www.fosterinmed.eu)
 
6th COBWEB Consortium Meeting
6th COBWEB Consortium Meeting6th COBWEB Consortium Meeting
6th COBWEB Consortium Meeting
 
HoCare Interreg Europe project
HoCare Interreg Europe projectHoCare Interreg Europe project
HoCare Interreg Europe project
 
OECD/DAC - Results Community October 2018 Workshop - Results approaches for t...
OECD/DAC - Results Community October 2018 Workshop - Results approaches for t...OECD/DAC - Results Community October 2018 Workshop - Results approaches for t...
OECD/DAC - Results Community October 2018 Workshop - Results approaches for t...
 
Step4all guide 3 How to apply and how to manage successful European projects
Step4all guide 3 How to apply and how to manage successful European projectsStep4all guide 3 How to apply and how to manage successful European projects
Step4all guide 3 How to apply and how to manage successful European projects
 
ISO 140001 integration into SEAP plans
ISO 140001 integration into SEAP plansISO 140001 integration into SEAP plans
ISO 140001 integration into SEAP plans
 
#TCI2019 Clusters3 Final Conference - Interreg Europe: state of play
#TCI2019 Clusters3 Final Conference - Interreg Europe: state of play#TCI2019 Clusters3 Final Conference - Interreg Europe: state of play
#TCI2019 Clusters3 Final Conference - Interreg Europe: state of play
 

Recently uploaded

General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...Poonam Aher Patil
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701bronxfugly43
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxEsquimalt MFRC
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the ClassroomPooky Knightsmith
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSCeline George
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxVishalSingh1417
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfSherif Taha
 
Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Association for Project Management
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.pptRamjanShidvankar
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...pradhanghanshyam7136
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfNirmal Dwivedi
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024Elizabeth Walsh
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfagholdier
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxRamakrishna Reddy Bijjam
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - Englishneillewis46
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptxMaritesTamaniVerdade
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfPoh-Sun Goh
 

Recently uploaded (20)

General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the Classroom
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 
Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 

{LIKE} 2nd PM PPT

  • 1. 517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP 28-29 June 2012| Stockholm - Sweden Dimitris Raftopoulos Strategic Leadership Unit
  • 2. Projects’ Action Plan  Implementation Methodology – PMI Project Life Cycle  WP1 - Project Management | Lead: 3LRI  WP2 - Defining Ageing and Employment Trends in EU | Lead: University of Social Sciences  WP3 - Developing Business Concepts for Age Management & Investment in the HR sector | Lead: UoS  WP4 - Pilot Projects | Lead: FU-Uppsala  WP5 - Quality Assurance | Lead: 3LRI  WP6 - Awareness raising activities | Lead: Documenta  WP7 - Dissemination of Results | Lead: 3LRI  WP8 - Mainstreaming and results exploitation | Lead: 3LRI 2
  • 3. Presentation of PPs and their activity  3L Research Institute, Greece  University of Strathclyde, UK  Folkuniversitetet, Sweden  University of Social Sciences, Poland  Documenta, Spain 3
  • 4. Day 1 - Outline 4  Presentation of WP.1 Project Management  Status Update  Presentation of WP.2 defining ageing & employment trends  Strategy plan (report) and Exchange information & knowhow (report)  Presentation of WP.5 Quality Assurance  Methodological guide for WP.3  Evaluation of the project  Presentation of WP.6 Awareness raising activities  Workshops for the age management concept benefits, Sensitising entrepreneurs,  Seminars addressing HR managers, Sensitising the aged workforce  Presentation of WP.7 Dissemination of results  Website, brochures, flyer, poster, eNewsletters, press campaign, Dissemination Conference
  • 5. Work Packages Analysis WP.1-2 Work Package / Deliverables Type Number Title WP1 Project Management 1.1 Consortium Agreement Other 1.2 Web-based system Service/Product 1.3 Project Partners Meetings Event 1.4 Progress Reports Report WP2 Defining Ageing and Employment Trends in EU 2.1 Analysing the demographic trends Report 2.2 Analysis of the aged workforce employability Report 2.3 Survey on the aged employed / unemployed workforce Report 2.4 Strategy plan to meet future demographic needs Report 2.5 Exchange information and know-how Report 6
  • 6. WP.1-Act.1.2 1.2 Web-based system  Link: http://management.lllprojects.eu/feng/#  Logins sent to all partners’ personnel  Instructions .doc file regarding the use of the web- system was sent as well  Accessible through the website at the Members Area, top right Each responsible manager is to delegate activities to their personnel participating 7
  • 7. WP.1-Act.1.3 Activity 1.3: PPs’ meetings  Done  Kick-off meeting - Athens: 13-14/12/2011  2nd meeting - Sweden: 28-29/06/2012  Remaining  3rd meeting - Spain: 29-30/11/2012  4th meeting - Poland: May XX-XX/05/2013  5th meeting - UK: December XX-XX/12/2013  Closing meeting - Brussels: September XX-XX/09/2014 8
  • 8. WP.1-Act.1.4 Activity 1.4: Progress Reports  1st period: Oct.11 – Mar.12  2nd period: Apr.12-Sep.12  Financial excel files through individual Dropbox folders  Problem? PPs Feedback!!!  Every six (6) Month Financial & Progress Report  FolkUniversitetet  UoS  Documenta  University of Management 9
  • 10. WP.2-Act.2.4-2.5 11 Activity 2.4: Strategy plan to meet future demographic needs  The current strategy plan will be examined and worked in combination with the analysis of demographic trends, in order to see how companies could meet the future demographic. The focal point will be how to increase the positive aspects of ageing workforce, while decreasing the negative ones. That plan will define the steps needed to be followed and will be used as the basis on which the workshops will be conducted as well as the pilot actions. The analytical content of the report will be decided by the Consortium, setting up the methodology for conducting the research as well as quantitative and qualitative standards.  Responsible PP: UoS  Duration: M9, 1 month Activity 2.5: Exchange information & know-how  The report will support the exchange of information and Know-How on building upon innovative processes in the sector of age management towards developing and testing alternative working conditions in enterprises. This will be based on the findings of the reports already conducted in the specific work package.  Duration: M10, 1 month  Responsible PP: Documenta
  • 12. Work Packages Analysis WP.5-6 WP5 Quality Assurance 5.1 Methodological Guide for WP “Defining Ageing and Employment Trends in EU” Report 5.2 Methodological Guide for WP “Developing Business Concepts for Age Management & Investment in the HR sector” Report 5.3 Methodological Guide for Pilot Projects implementation Report 5.4 Methodological Guide for Awareness raising, Dissemination and Exploitation of results activities Report 5.5 Evaluation of the results of the project Report WP6 Awareness raising activities 6.1 Workshops for the age management concept benefits Event 6.2 Sensitising entrepreneurs Event 6.3 Seminars addressing HR managers Event 6.4 Sensitising the aged workforce Event 13
  • 13. WP.5-Act.5.2 14  5.2: Methodological Guide for WP “Developing Business Concepts for Age Management & Investment in the HR sector”  Status Update by University of Strathclyde  Responsible PP: UoS
  • 14. WP.5-Act.5.4 15  5.5: Evaluation of the results of the project  Interim internal evaluation -> online questionnaire filled by PPs only (excluding PC)  Status Update  Final external evaluation -> external expert TBC for all PPs (including PC)  Responsible PP: SWSPIZ
  • 16. WP.6-Act.6.1 Activity 6.1: Awareness raising activities  Update by UoS on their workshop  Discussion on the following four (4) workshops (one per country) that will involve local public and private actors, enterprises employees, customers, suppliers, employers and the community and will discuss as well as examine the benefits enterprises could have from the proposed strategies. Proposal to PPs.  These workshops will last half a day and will be organised by each partner in each participating country, adapting the content to their language, their specific working conditions, labour market needs and specificities of the attendants.  Duration: M10-M12, 3 months  Budget: 29.706,00€ 17
  • 17. WP.6-Act.6.2-6.3 18 Activity 6.2: Sensitising entrepreneurs  Project partners will visit each other’s area and will visit businesses that operate with aged work force and have successful results, for exchanging experience. PPs will discuss with the personnel and owners, gaining valuable experience and know–how that they could bring back to their organizations as well as countries. Local business people will be part as well of the study tours.  These study tours (5 in total, one per country), will last one day and will take place together with the project meetings, in order to save time and money from travelling.  Duration: M2, M9, M15, M21, M27, 5 months  Budget: 2.500,00€ (included in 6.1) Activity 6.3: Seminars addressing HR managers  There will be organized 5 seminars, one in each different participating country, addressing to Human Resources Managers for implementing decisions on staff recruitment, retention and redundancy in view of the formulated Age Management Concepts. The proposed issues will be deriving from the reports already elaborated in the context of the project.  Catch a minimum of 20 participants per seminar.  These seminars will last half a day and will be organised by each partner in each participating country, adapting the content to their language, their specific labour market needs and conditions and specificities of the attendants.  Duration: M18-M22, 5 months  Budget: 1.700,00€ (included in 6.1)
  • 18. WP.6-Act.6.4 19 Activity 6.4: Sensitising the aged workforce  In parallel with the seminars organized focusing in HR managers, another 5 will be organized, addressing to aged workforce and Unemployed aged 50+, with special focus on sensitive social groups. It will explain the strengths they have as well as the skills that they need to gain, in order to remain competitive in the labour market they operate and even in the EU market.  Catch a minimum of 20 participants per seminar  These seminars will last half a day and will be organised by each partner in each participating country, adapting the content to their language, their specific labour market needs and conditions and specificities of the attendants.  Duration: M18-M22, 5 months  Budget: 1.700,00 € (included in 6.1)
  • 19. Work Packages Analysis WP.7-8 WP7 Dissemination of Results 7.1 Developing a website Service/Product 7.2 Publicity campaign – Information and sensitisation brochures Other 7.3 Publicity campaign – Dissemination of events Other 7.4 Publicity campaign – Electronic Newsletters Other 7.5 Press campaign Other 7.6 Dissemination conference Event WP8 Mainstreaming and results exploitation 8.1 Mainstreaming and results exploitation action plan Report 8.2 Developing a business manual Report 8.3 Policies assessment Report 20
  • 20. WP.7-Act.7.1 21 Activity 7.1: Developing a website  Presentation of the website.  The website is available in all partners’ language and will be continuously updated by all partners.  Duration: M3, 1 month  Budget: 29.501,00€ http://like.lllprojects.eu/
  • 21. Act.7.1: “website structure” 22 Structure  Home  Project overview  Rationale  EU added value  Project objectives  Deliverables  Expected results & outcomes  Project Meetings  Project Calendar  Media library  Project Partners  Documentation Center  + Forum  Online Questionnaire  + Sitemap
  • 22. WP.7-Act.7.2 23 Activity 7.2: Publicity campaign – Information and Sensitisation brochures Four brochures of 4pages will be produced, in the following languages: EN, ES, EL, SE, PL  one presenting the project  one sensitising the aged workforce  one sensitizing enterprises and  one presenting the project results  The Lead Partner of the Work Package will create a common layout (with the approbation of all partners), including a project logo, to be used in all brochures and overall material, and a common text, but each partner will adapt the text to local conditions, needs and specificities  Proposal for change in the development of the 2nd brochure  Each brochure (A5) will be printed in 1000 items per country  Duration: M3, M7, M33, 3 months  Budget: 11.300,00€
  • 23. WP.7-Act.7.3-7.4 24 Activity 7.3: Publicity campaign – Dissemination of events  For each event organised (workshops, seminars, conference), each partner will produce and diffuse flyers and posters to disseminate the event in order to ensure the largest possible participation.  This means that 6 different flyers and 6 different posters will be produced in each language. Each flyer (A5) will be printed in 200 items, each poster (A3) in 20 items.  The Lead Partner of the Work Package will create a common layout (with the approbation of all partners), to be used in for flyers and posters, and a common text, but each partner will adapt the text to local conditions, needs and specificities.  This dissemination will be done in an electronic way as well.  Duration: M9, M17, M26, M28-29, 5 months  Budget: 1.900,00€ (included in 7.1) Activity 7.4: Publicity campaign – Electronic Newsletters  6 newsletters on the employability of the aged workforce and presenting the project evolution and outputs during the project lifetime will be sent electronically, which will be used to promote the main Project initiatives, to inform the operators of interested sectors on the project implementation, the activity phases still in progress, the possibilities and modalities of participation, to sensitize the population towards the thematic at the focus of the debate, to spread the results obtained by the Project.  The Lead Partner will have the overall coordination of the activity, but all partners will participate in the drafting of the newsletter and in its dissemination to all relevant EU, national, regional and local actors, not only within the 5 participating countries but also in other European countries, to ensure the largest possible dissemination.  Duration: M3, M9, M15, M21, M27, M33, 6 months  Budget: (included in 7.1)
  • 24. WP.7-Act.7.5 25 Activity 7.5: Press Campaign  The project will be presented to local actors and local press by each partner during a press-conference presenting the project and addressing specific issues relevant to the project theme and the local conditions. Each partner will decide on when organising the press-conference, in order to choose the most appropriate moment for a more effective and positive event (e.g. before an important event).  During the press-conferences, folders will be distributed to the journalists with information about the project, the programme, the transnational actions and the local actions and added value of the project.  Regional press-releases will inform target groups about the project and the organised events and will be issued after the press-conference and more often if possible.  Project partners will launch a press and radio campaign trying to sensitise as many actors and target groups as possible.  Duration: M1-M36, 36 months  Budget: 250,00 € (included in 7.1)
  • 25. WP.7-Act.7.6 26 Activity 7.6: Dissemination Conference  A dissemination conference of the project will be organized in Brussels to present the project results and disseminate all project products and outputs and to open the ground to new collaborations and partnerships for the continuity of the project activities. This conference will have as general objectives:  To assure the largest information and raising awareness for the project by EU actors;  To inform the public opinion on the role developed by local institutions, European Union and Project partners in the realization of the Project;  To inform about the project’s outputs and results, the impact of the Project’s interventions, the findings of it.  To communicate about age management concept, training of the aged workers and business organization issues  The target groups (EU stakeholders, representatives of regions, lobbies, think tanks, representatives of enterprises, unions of enterprises, unions of employees, policy makers, social partners, training and education providers and agencies…) will be targeted by the partners through the promotion of the project and through direct communication via the events organised, meetings, emails and phone calls in order to catch a minimum of 80 participants.  The conference will last half a day and will be organised by P1 in Brussels, for acceding EU decision-makers and for ensuring an easy access to attendants from all over Europe. Each partner will participate in it and bring about 10 national and local stakeholders in order to ensure transnationality to the event.  Duration: M33, 1 month  Budget: 37.800,00€
  • 26. Dissemination & Valorisation WP 6, Awareness raising activities  As in most cases aged persons are unaware of the fact that they are being discriminated, special activities aim at sensitizing both employers and aged workforce are planned to be implemented, such as workshops on age management concept benefits, study tours for sensitising entrepreneurs, seminars for HR managers and for aged workforce. WP7, Dissemination of results  Following a methodology to be defined by the consortium, a communication plan will accompany the project all over its duration, that will include: a publicity campaign (website and discussion forum, brochures, flyers, posters, electronic newsletters, electronic dissemination of outputs) for paper and electronic dissemination of the project, a press campaign (press-conferences, press-releases, radio spots) and a Dissemination Conference. The Discussion Forum will be used as a tool for transferring outputs at regional, national and European level. WP8, Mainstreaming and results exploitation  This work package will last one year, to prepare the project for its exploitation even after the end of the project life time. The mainstreaming of the project results and outputs is designed to limit early retirement and encourage the recruitment and retention of older workers. A Mainstreaming Action Plan is planned within the framework of the project in order to support the transfer of practices and methodologies experimented to different systems. Furthermore, a Results Exploitation Action Plan will be delivered in order to identify results to be utilised and transferred. The mainstreaming and exploitation strategy will be multilevel (from local to European) and multi-actor oriented. 27
  • 28. Indicators  Review of the indicators list  Partners problems, feedback  Guide of the partners about the next indicators period  1st period: Oct.2011 – Marc.2011  2nd period: Apr.2012 – Sep.2012  3rd period: Oct.2012 – Marc.2013 29
  • 29. Work Packages Analysis WP.3 WP3 Developing Business Concepts for Age Management & Investment in the HR sector 3.1 Designing model for enterprises on age management Report 3.2 Guide for management optimisation performance Report 3.3 Development of measurable performance indicators Report 3.4 Analysis of older workforce work traits Report 3.5 Employment opportunities for older workers Report 30
  • 30. WP.3-Act.3.1-3.2 Activity 3.1: Designing model for enterprises on age management  Focus on the development of innovative business concepts related to age management processes. To this end, a study will be conducted to design a model for enterprises on introducing age management concepts, flexible working arrangements and succession management, using the finding of the report already elaborated in WP2.  Duration: M15, 1 month  Budget: 13.627,00€  The 40 pages report will be firstly available in English and in electronic version and then translated in Greek, Spanish, Polish and Swedish Activity 3.2: Guide for management optimisation performance  The above guide will cross examine the management systems currently deployed in the companies of the EU with those suggested in the first action of WP3 and will lead to the development of a methodological guide which will point what actions need to be taken in order to optimize the performance of management systems used in the EU market.  Duration: M17, 1 month  Budget: 2.674,00€  The 40 pages report will be available in English 31
  • 31.  Thank you for your attention 32