New Build Project Killingbeck Fire Station
Leeds District
Station Commander Graham Heath
Project Co-ordinator Leeds District
Foreword
The West Yorkshire Fire and Rescue Service (WYFRS) has been extremely successful over the last
decade in reducing the amount of fire calls it receives. This has been achieved by a number of initiatives
for example our Home Fire Safety Check for householders. This reduction, as well as a drive from
Central Government for greater efficiency savings, has led us to look at how we can provide the best
operational cover for the resources allocated. The relocation and merging of stations allows us to place
those available resources in optimum geographical positions based on the risks communities face. It is
part of a range of changes across the county that will enable us to continue to provide community
protection and response services to the highest possible standards across the whole of West Yorkshire.
The new site at Killingbeck will take up a prominent position at the gateway to East Leeds, adjacent to
the A64 main arterial road. Access via York Road will allow good links to the surrounding communities,
and a new right turn facility will allow quick access to Gipton, Harehills and Burmantofts utilising a
revolutionary ‘green wave’ system which adjusts traffic lights to give a continuous right of way to fire
engines responding to an emergency. The station will be staffed by 44 whole time firefighters delivering
a 24 hour immediate response to the community. The new building has been designed with a modern
appearance utilising brickwork and steel cladding and will become an easily recognised landmark
welcoming commuters to the East Leeds area. The building will have two floors, the ground floor
consisting of office space, equipment storage and a garage area, which will house two fire engines. The
first floor will provide welfare facilities for on-call firefighters. A large area to the rear of the station will
include a multi-purpose training tower to allow firefighters to train to the highest level.
The building will be designed to accommodate the East Leeds Young Firefighters Scheme which will be
relocated from Gipton fire station. This will be an independent facility providing students with a
classroom, fire engine storage and welfare provision. This unique scheme will continue to flourish in its
new home, enabling the youth of East Leeds access to a first class learning experience. An independent
community room will allow partner agencies to interact and share working experiences with WYFRS.
Built in 1937, Gipton Fire Station will merge with
Stanks Fire Station at York Road, Killingbeck.
Stanks Fire Station built in 1973.
Introduction to Project
Following a strategic review of services
through the Integrated Risk Management Plan
(IRMP) process, West Yorkshire Fire and
Rescue Service (WYFRS ) are implementing
the construction of a number of new fire
stations throughout West Yorkshire.
The construction of the new fire station at York
Road, Killingbeck is key in achieving full
implementation of the IRMP. It was imperative
that if this development, along with other new
fire station developments, was to be a success,
a comprehensive, early design brief would
need to be established. This would set down
the operational and functional characteristics of
the building and the associated ancillary areas.
Following the recent completion of new fire
station projects at Pontefract and Normanton,
WYFRS were keen to embody the success of
those projects into this and other new fire
station developments. However, it was clear
that operational requirements have moved
forward since and as such, a new approach
should be explored.
The development of the detailed design brief
took place over several months and was built
around input from all major stakeholders
including the eventual building users.
Outline showing the location of the new Killingbeck Fire Station site.
The Design
During the development of the design brief the
following key requirements became evident:
Size
Spaces must be compact yet retain operational
functionality. Oversized spaces should be
avoided.
Relationships
The internal spaces must be designed so as to
allow quick and efficient movement between
rooms and circulation routes, with particular
emphasis on routes to vehicle bays, to ensure
effective emergency turnout ability.
Value
Best value in construction costs must be
attained. Layouts should be simple and
straightforward, which will in turn promote
simple methods of construction. The design
successfully addresses all of the above key
requirements. In order for the fire service to
continue to provide the best possible level of
service to the community it is essential that
regular training is undertaken. The following
are essential requirements and are included in
the development:
• Training Tower
• Road Traffic Collision (RTC) Training Area
Use
The proposed development will provide for a
new operational fire station and will include a
separate annex for the Young Firefighter
Scheme which will relocate from Gipton Fire
Station. The fire station will be a two storey
building, which will provide all of the necessary
operational accommodation for the fire service
personnel and the associated vehicles.
The accommodation will comprise of a three
bay vehicle garage, offices, sleeping facilities,
rest and recreation areas. Ancillary to the
building there will be a service yard to the front
with further hard standing areas also at the
rear. Car parking for staff and visitors is
provided on the site.
Layout
The layout is mostly dictated by the operational
requirements of the fire station in order that it
can function efficiently, effectively and safely.
Operational requirements dictate that fire
service vehicles must have access to the rear
of the site thus allowing them to drive forwards
into the vehicle bays within the building. The
vehicles will then be in the required location
and in the correct orientation for the next
emergency turn out.
Appearance
The external walls will be constructed of clay
facing brickwork. Windows and doors will be of
colour coated aluminium construction with
interspersed coloured infill panels, which will
add an element of visual interest and provide
for a modern, commercial appearance.
Simplicity was key to achieving value hence
the ‘clean lines’ approach to the design. The
roof and fascias will be of colour coated metal
construction and will contribute in achieving the
desired appearance.
Certain aspects of the building are defined by
the nature of the use. For example the vehicle
access / egress doors are a fundamental
requirement to allow the functional operation of
the building. These are perhaps one of the
most prominent features that define the fire
station from other buildings.
Scale
Careful consideration has been given to the
scale of the building.
The overall maximum height of the fire
station building (over the two storey portion)
will be approximately 9.2m. The main
service yard is approximately 1,220m2
in
area and deep enough to allow the safe
manoeuvring of a typical fire service vehicle
along with providing enough space for
training activities.
The size of the service yard is based on the
typical minimum operational requirements
for a fire station of this nature.
The level of car parking provision has been
determined from the experiences of the Fire
Authority on other operational sites of
similar size. The provision for this scheme
is fourteen spaces for staff and nine spaces
for visitors.
Illustration of how the new station will look although there may be some minor changes on the completed
building.
Ground Floor Plan
The accommodation for the fire station is
located over two floors. The ground floor plan
shows the appliance bays on the left hand side
of the building accommodating two fire engines
and a spare bay. Beyond the engine house is
a separate annex which will provide the Young
Firefighter accommodation.
At the rear there is a covered wash area where
training and day to day routines can be carried
out.
The multi-use space / room is a facility that
local communities will be able to access on
request. Simple refreshment facilities will be
available within the room and a fully accessible
disabled toilet is located next to the entrance.
From the car parking areas the building is
easily accessed via level surfaces up to the
main entrance.
The internal rooms are constructed from
painted block work which provides a cost
effective and robust finish suitable for the
functions of an operational fire station.
First Floor
The first floor has been designed to
accommodate operational staff only and
incorporates welfare and rest facilities.
Young Firefighters Scheme
West Yorkshire Fire and Rescue Service
(WYFRS) currently operates a Young
Firefighters Scheme and as such, provision
has been made to provide dedicated
accommodation to allow the Young Firefighters
Scheme to be run from this site.
The Young Firefighters Scheme, originally
conceived in Wakefield, engages with schools
and youth groups across West Yorkshire. It
has proved highly successful and as such
WYFRS wishes to continue the implementation
of the scheme in the Killingbeck area.
The target audience for the scheme is young
people attending formal education aged
between 14 and 16 who have been identified
as being able to benefit from a practical
element to their learning that takes place
outside the traditional school environment.
The content of the course involves practical
lessons in skills such as using breathing
apparatus, search and rescue, operating
pumping appliances and associated
equipment, fire safety awareness and general
life skills.
Also covered is health and safety awareness,
risk assessments, first aid, working as a team,
problem solving and fire and road traffic
incident simulations.
The purpose built Young Firefighter suite will ensure
that we can continue to provide a first class learning
experience for the young people of East Leeds.
Access
The Fire Authority actively promotes a Disability
Equality Scheme (DES) throughout the entire
service.
The scheme design will take into account the
above commitment. It is anticipated that general
visitor traffic to and from the new fire station will
be from within the immediate local area. A
nominal amount of parking (eight spaces plus one
accessible parking space) for visitors is provided.
In addition there will be three dedicated drop off
bays allocated to the Young Firefighter suite.
Level access from the public footpaths is provided
up to the main entrances of both the fire station
and Young Firefighters buildings. From this point
level access can be gained to the whole ground
floors of the buildings. From the car parking areas
the buildings are easily accessed via level
surfaces up to the main entrances.
A fully accessible toilet is provided within the fire
station building in close proximity to the main
entrance. An accessible toilet is also provided in
the Young Firefighters accommodation.
Our Ambition:
Making West Yorkshire Safer
Our Aim:
Provide an excellent fire and rescue service
working in partnership to reduce death, injury,
economic loss and contribute to community
well being.
Proposed Programme
The following estimated timelines will show the
key dates for the project:
 Appoint building contractor
March 2014
 Construction commencement
August 2014
 Construction completion
September 2015
 Station operational
December 2015
Other West Yorkshire Fire and Rescue
Service fire stations under planned
construction:
 Carlton Road, Dewsbury
 South Kirkby Business Park, South
Kirkby
 Carlton Lane, Rothwell, Leeds
 Clough Lane, Rastrick
Contact
Project Co-ordinator:
Graham Heath
t 0113 2904807
e graham.heath@westyorksfire.gov.uk
Executive Architect
Frank Shaw Associates
www.frankshawassociates.co.uk
t 01246 233255
Building Contractor
Wildgoose Construction

More Related Content

Similar to killingbeck-new-build-pdf.pdf

News from BRICKER - May 2014
News from BRICKER - May 2014News from BRICKER - May 2014
News from BRICKER - May 2014
BRICKERProject
 
DCTT_Lyneham_Public_Consultation_Exhibition
DCTT_Lyneham_Public_Consultation_ExhibitionDCTT_Lyneham_Public_Consultation_Exhibition
DCTT_Lyneham_Public_Consultation_Exhibition
Stephen Harness
 
McNamara Profile Summary
McNamara Profile SummaryMcNamara Profile Summary
McNamara Profile Summary
Uzoma Nwakuche
 
Wetherill Park Planned Major Capital Works
Wetherill Park Planned Major Capital WorksWetherill Park Planned Major Capital Works
Wetherill Park Planned Major Capital Works
Markus Etting
 
Citec Group brochure 2016_lowres
Citec Group brochure 2016_lowresCitec Group brochure 2016_lowres
Citec Group brochure 2016_lowres
Austin Antony
 

Similar to killingbeck-new-build-pdf.pdf (20)

Baytree Dagenham Brochure
Baytree Dagenham BrochureBaytree Dagenham Brochure
Baytree Dagenham Brochure
 
News from BRICKER - May 2014
News from BRICKER - May 2014News from BRICKER - May 2014
News from BRICKER - May 2014
 
Chalcroft construction for the warehouse and logistics industries
Chalcroft construction for the warehouse and logistics industriesChalcroft construction for the warehouse and logistics industries
Chalcroft construction for the warehouse and logistics industries
 
CV (aug15).Rev1
CV (aug15).Rev1CV (aug15).Rev1
CV (aug15).Rev1
 
DCTT_Lyneham_Public_Consultation_Exhibition
DCTT_Lyneham_Public_Consultation_ExhibitionDCTT_Lyneham_Public_Consultation_Exhibition
DCTT_Lyneham_Public_Consultation_Exhibition
 
Case Study Freshwater Place - mySmart
Case Study Freshwater Place - mySmartCase Study Freshwater Place - mySmart
Case Study Freshwater Place - mySmart
 
The effectiveness of fire prevention and protection measures in high rise res...
The effectiveness of fire prevention and protection measures in high rise res...The effectiveness of fire prevention and protection measures in high rise res...
The effectiveness of fire prevention and protection measures in high rise res...
 
The effectiveness of fire prevention and protection measures in high rise res...
The effectiveness of fire prevention and protection measures in high rise res...The effectiveness of fire prevention and protection measures in high rise res...
The effectiveness of fire prevention and protection measures in high rise res...
 
McNamara Profile Summary
McNamara Profile SummaryMcNamara Profile Summary
McNamara Profile Summary
 
WPOE training complex facilitates hands-on education
WPOE training complex facilitates hands-on educationWPOE training complex facilitates hands-on education
WPOE training complex facilitates hands-on education
 
Appendices
AppendicesAppendices
Appendices
 
Case study on Leadenhall Building KUET BECM 2k15
Case study on Leadenhall Building KUET BECM 2k15Case study on Leadenhall Building KUET BECM 2k15
Case study on Leadenhall Building KUET BECM 2k15
 
Capability Statement
Capability StatementCapability Statement
Capability Statement
 
Wetherill Park Planned Major Capital Works
Wetherill Park Planned Major Capital WorksWetherill Park Planned Major Capital Works
Wetherill Park Planned Major Capital Works
 
Citec Group brochure 2016_lowres
Citec Group brochure 2016_lowresCitec Group brochure 2016_lowres
Citec Group brochure 2016_lowres
 
C4_Booklet
C4_BookletC4_Booklet
C4_Booklet
 
0609_PenRen
0609_PenRen0609_PenRen
0609_PenRen
 
New brochure 240311
New brochure 240311New brochure 240311
New brochure 240311
 
Gary Affleck Ward CV
Gary Affleck Ward CVGary Affleck Ward CV
Gary Affleck Ward CV
 
Active Connect Case Studies
Active Connect Case Studies Active Connect Case Studies
Active Connect Case Studies
 

Recently uploaded

Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
pritamlangde
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
MayuraD1
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
Kamal Acharya
 

Recently uploaded (20)

PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Basic Electronics for diploma students as per technical education Kerala Syll...
Basic Electronics for diploma students as per technical education Kerala Syll...Basic Electronics for diploma students as per technical education Kerala Syll...
Basic Electronics for diploma students as per technical education Kerala Syll...
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
 
Introduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdfIntroduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdf
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 

killingbeck-new-build-pdf.pdf

  • 1. New Build Project Killingbeck Fire Station Leeds District
  • 2. Station Commander Graham Heath Project Co-ordinator Leeds District Foreword The West Yorkshire Fire and Rescue Service (WYFRS) has been extremely successful over the last decade in reducing the amount of fire calls it receives. This has been achieved by a number of initiatives for example our Home Fire Safety Check for householders. This reduction, as well as a drive from Central Government for greater efficiency savings, has led us to look at how we can provide the best operational cover for the resources allocated. The relocation and merging of stations allows us to place those available resources in optimum geographical positions based on the risks communities face. It is part of a range of changes across the county that will enable us to continue to provide community protection and response services to the highest possible standards across the whole of West Yorkshire. The new site at Killingbeck will take up a prominent position at the gateway to East Leeds, adjacent to the A64 main arterial road. Access via York Road will allow good links to the surrounding communities, and a new right turn facility will allow quick access to Gipton, Harehills and Burmantofts utilising a revolutionary ‘green wave’ system which adjusts traffic lights to give a continuous right of way to fire engines responding to an emergency. The station will be staffed by 44 whole time firefighters delivering a 24 hour immediate response to the community. The new building has been designed with a modern appearance utilising brickwork and steel cladding and will become an easily recognised landmark welcoming commuters to the East Leeds area. The building will have two floors, the ground floor consisting of office space, equipment storage and a garage area, which will house two fire engines. The first floor will provide welfare facilities for on-call firefighters. A large area to the rear of the station will include a multi-purpose training tower to allow firefighters to train to the highest level. The building will be designed to accommodate the East Leeds Young Firefighters Scheme which will be relocated from Gipton fire station. This will be an independent facility providing students with a classroom, fire engine storage and welfare provision. This unique scheme will continue to flourish in its new home, enabling the youth of East Leeds access to a first class learning experience. An independent community room will allow partner agencies to interact and share working experiences with WYFRS. Built in 1937, Gipton Fire Station will merge with Stanks Fire Station at York Road, Killingbeck. Stanks Fire Station built in 1973.
  • 3. Introduction to Project Following a strategic review of services through the Integrated Risk Management Plan (IRMP) process, West Yorkshire Fire and Rescue Service (WYFRS ) are implementing the construction of a number of new fire stations throughout West Yorkshire. The construction of the new fire station at York Road, Killingbeck is key in achieving full implementation of the IRMP. It was imperative that if this development, along with other new fire station developments, was to be a success, a comprehensive, early design brief would need to be established. This would set down the operational and functional characteristics of the building and the associated ancillary areas. Following the recent completion of new fire station projects at Pontefract and Normanton, WYFRS were keen to embody the success of those projects into this and other new fire station developments. However, it was clear that operational requirements have moved forward since and as such, a new approach should be explored. The development of the detailed design brief took place over several months and was built around input from all major stakeholders including the eventual building users. Outline showing the location of the new Killingbeck Fire Station site.
  • 4. The Design During the development of the design brief the following key requirements became evident: Size Spaces must be compact yet retain operational functionality. Oversized spaces should be avoided. Relationships The internal spaces must be designed so as to allow quick and efficient movement between rooms and circulation routes, with particular emphasis on routes to vehicle bays, to ensure effective emergency turnout ability. Value Best value in construction costs must be attained. Layouts should be simple and straightforward, which will in turn promote simple methods of construction. The design successfully addresses all of the above key requirements. In order for the fire service to continue to provide the best possible level of service to the community it is essential that regular training is undertaken. The following are essential requirements and are included in the development: • Training Tower • Road Traffic Collision (RTC) Training Area
  • 5. Use The proposed development will provide for a new operational fire station and will include a separate annex for the Young Firefighter Scheme which will relocate from Gipton Fire Station. The fire station will be a two storey building, which will provide all of the necessary operational accommodation for the fire service personnel and the associated vehicles. The accommodation will comprise of a three bay vehicle garage, offices, sleeping facilities, rest and recreation areas. Ancillary to the building there will be a service yard to the front with further hard standing areas also at the rear. Car parking for staff and visitors is provided on the site. Layout The layout is mostly dictated by the operational requirements of the fire station in order that it can function efficiently, effectively and safely. Operational requirements dictate that fire service vehicles must have access to the rear of the site thus allowing them to drive forwards into the vehicle bays within the building. The vehicles will then be in the required location and in the correct orientation for the next emergency turn out.
  • 6. Appearance The external walls will be constructed of clay facing brickwork. Windows and doors will be of colour coated aluminium construction with interspersed coloured infill panels, which will add an element of visual interest and provide for a modern, commercial appearance. Simplicity was key to achieving value hence the ‘clean lines’ approach to the design. The roof and fascias will be of colour coated metal construction and will contribute in achieving the desired appearance. Certain aspects of the building are defined by the nature of the use. For example the vehicle access / egress doors are a fundamental requirement to allow the functional operation of the building. These are perhaps one of the most prominent features that define the fire station from other buildings.
  • 7. Scale Careful consideration has been given to the scale of the building. The overall maximum height of the fire station building (over the two storey portion) will be approximately 9.2m. The main service yard is approximately 1,220m2 in area and deep enough to allow the safe manoeuvring of a typical fire service vehicle along with providing enough space for training activities. The size of the service yard is based on the typical minimum operational requirements for a fire station of this nature. The level of car parking provision has been determined from the experiences of the Fire Authority on other operational sites of similar size. The provision for this scheme is fourteen spaces for staff and nine spaces for visitors. Illustration of how the new station will look although there may be some minor changes on the completed building.
  • 8. Ground Floor Plan The accommodation for the fire station is located over two floors. The ground floor plan shows the appliance bays on the left hand side of the building accommodating two fire engines and a spare bay. Beyond the engine house is a separate annex which will provide the Young Firefighter accommodation. At the rear there is a covered wash area where training and day to day routines can be carried out. The multi-use space / room is a facility that local communities will be able to access on request. Simple refreshment facilities will be available within the room and a fully accessible disabled toilet is located next to the entrance. From the car parking areas the building is easily accessed via level surfaces up to the main entrance. The internal rooms are constructed from painted block work which provides a cost effective and robust finish suitable for the functions of an operational fire station. First Floor The first floor has been designed to accommodate operational staff only and incorporates welfare and rest facilities.
  • 9. Young Firefighters Scheme West Yorkshire Fire and Rescue Service (WYFRS) currently operates a Young Firefighters Scheme and as such, provision has been made to provide dedicated accommodation to allow the Young Firefighters Scheme to be run from this site. The Young Firefighters Scheme, originally conceived in Wakefield, engages with schools and youth groups across West Yorkshire. It has proved highly successful and as such WYFRS wishes to continue the implementation of the scheme in the Killingbeck area. The target audience for the scheme is young people attending formal education aged between 14 and 16 who have been identified as being able to benefit from a practical element to their learning that takes place outside the traditional school environment. The content of the course involves practical lessons in skills such as using breathing apparatus, search and rescue, operating pumping appliances and associated equipment, fire safety awareness and general life skills. Also covered is health and safety awareness, risk assessments, first aid, working as a team, problem solving and fire and road traffic incident simulations. The purpose built Young Firefighter suite will ensure that we can continue to provide a first class learning experience for the young people of East Leeds.
  • 10. Access The Fire Authority actively promotes a Disability Equality Scheme (DES) throughout the entire service. The scheme design will take into account the above commitment. It is anticipated that general visitor traffic to and from the new fire station will be from within the immediate local area. A nominal amount of parking (eight spaces plus one accessible parking space) for visitors is provided. In addition there will be three dedicated drop off bays allocated to the Young Firefighter suite. Level access from the public footpaths is provided up to the main entrances of both the fire station and Young Firefighters buildings. From this point level access can be gained to the whole ground floors of the buildings. From the car parking areas the buildings are easily accessed via level surfaces up to the main entrances. A fully accessible toilet is provided within the fire station building in close proximity to the main entrance. An accessible toilet is also provided in the Young Firefighters accommodation. Our Ambition: Making West Yorkshire Safer Our Aim: Provide an excellent fire and rescue service working in partnership to reduce death, injury, economic loss and contribute to community well being. Proposed Programme The following estimated timelines will show the key dates for the project:  Appoint building contractor March 2014  Construction commencement August 2014  Construction completion September 2015  Station operational December 2015 Other West Yorkshire Fire and Rescue Service fire stations under planned construction:  Carlton Road, Dewsbury  South Kirkby Business Park, South Kirkby  Carlton Lane, Rothwell, Leeds  Clough Lane, Rastrick Contact Project Co-ordinator: Graham Heath t 0113 2904807 e graham.heath@westyorksfire.gov.uk Executive Architect Frank Shaw Associates www.frankshawassociates.co.uk t 01246 233255 Building Contractor Wildgoose Construction