1. MICHAEL CHOI
0457 989 266 / choce2204@gmail.com
232/222 Bay Rd, SANDRINGHAM VIC, 3191
Currently Victoria Driver Licence
EDUCATION
• Currently attend Certificate III Engineering in Air-conditioning & Refrigeration
LICENCES
• Refrigerant Handling Licence (in progress)
• Electrical D licence (in progress)
SKILLS & ABILITIES
• Brazing and silver soldering • Refrigeration and Air-conditioning Theory
• Copper tube pipe work • Split system installations
• Duct work • Safe handling of plant and equipment
• Use of power tools • Quality and service focused
• Use of hand tools
ATTRIBUTES
• Honest • Punctual
• Reliable • Trustworthy
• Able to work pressure • Keen to learn and grow
• Keen to learn and grow • Working autonomously
EXPERIENCE
Energy Development Construction CO.,LTD Mar 2015 - Apr 2016
Mechanical Plumber
• Cooling & Heating Plumbing • Air-Conditioning
• Machinery Equipment construction • Water Pump with Plumbing
• Industrial water tube boiler and once through boiler and smoke tube packaged boiler
maintenance and installations
Human RHAC Plant CO. , Mar 2013 - Apr 2015
Refrigeration Mechanic
• Installing, servicing, and repairing heating and air conditioning
• Chiller systems in industrial, commercial and domestic
• Overhaul and maintenance for refrigeration piston compressor, centrifugal compressor
and absorption chiller, (Oil and gas charging, change filter, silica gel)
• Install ceiling cassette and wall-mounted, vertical air-conditioning
• Charge and discharge refrigerant (R-11,R-123,R-134A,R410A,H2O),absorption liquid by
Nitrogen
REFERENCE
John Capello 0422266607
2. Previous Projects
1500RT Absorption chiller change High pressure centrifugal chiller
steam gasket and cleaning absorber cleaning evaporator and condensor
discharge and charge brine
High pressure centrifugal chiller Installing 4way ceiling cassette air-con
change compressor oil and filters 410a
Installing 4way ceiling cassatte fancoil unit Centrifugal chiller
discharge refrigerant R-11
by Nitrogen
3. Previous Projects
400RT centrifugal chiller vaccuming Centrifugal chiller charging oil
after compressor overhaul
200RT absorption chiller leak test by r-22 Maintenance Smoke tube packaged boiler
with testo by hydrochloric acid
Maintenance Smoke tube packaged boiler Replacement cooling water pump bearing
by Hydrochloric acid