SlideShare a Scribd company logo
1 of 2
1 2 8 C A R S H A L T O N D R . • L Y M A N , S C 2 9 3 6 5
P H O N E ( 8 6 4 ) 3 1 3 - 8 7 8 1 • E - M A I L K 1 S E R V I E @ G M A I L . C O M
KU R T S E R V I E S
EDUCATION_________________________________________________________________
Western Michigan University; Kalamazoo, MI 04/27/2007
 Haworth College of Business-Bachelor’s of Business Administration: Integrated
Supply Matrix Management – ISM2
(e.g. Purchasing, Operations, and Logistics
Management)
 ISM (Integrated Supply Chain Management): Encompasses all those activities
associated with moving goods from the raw materials stage through to the end
user, and includes systems management, manufacturing and assembly, sourcing
and procurement, production scheduling, order processing, inventory
management, warehousing, and customer service.
 Career Related Courses:
 Fundamentals of Circuits  Quality Assurance and Control
 SAP/ERP Configuration  Engineering Graphics
 Process and Materials Manufacturing  Purchasing Management
 Manufacturing Productivity  Logistics Management
 Production Management and Control  Materials Management Strategy
 TQM and Lean Principals  Process Reengineering
EMPLOYMENT_______________________________________________________________
Draexlmaier
Sub Project Manager 11/14 to Present
 Project lead for projects from the early investigations, design phase,
construction, and final implementation of the assembly, to include Invest,
Budget, and Timeline Responsibility
 Develop timetable, schedules, and LOP’s,coordinates bulk build plans,
equipment tryouts and implementation of process in new location for all process
transfers
 Coordinate Planning of production personnel, space requirement, and Plant
layout
 Develop the process flow of operations required to manufacture each component
 Develop the Operator Work Instructions for each manufacturing process
 Create line side presentation for new projects
 Oversee acquisition of new equipment/adjustment of existing equipment
 Interacts with engineering, production departments and Germany
 Perform time studies to qualify time estimates for production processes
Penske Logistics
OperationsSupervisor 04/01/11 to 1
 Penske delegate for BMW model changes, new supplier set ups, supply chain
changes, supplier moves, and special requests
 Develop and manage metrics to grade carriers, suppliers, cross-docks, and
employees
 Streamline processes and provide operational and IT improvements
 Supervise Logistics Planners for both shifts and conduct weekly and monthly
team meetings
 Attend meetings with BMW management to report on time pickup and delivery
performance,KPI’s, and discuss any other issues or special requests
 Handle all damaged freight claims and charge back carriers
 Facilitate weekly calls with Penske entities (routing center,IT, cross-docks,
carriers,carrier management) and suppliers
 Create reports from Penske’s corrective action reporting tool to identify problems
and address with appropriate parties
 Provide support with emergency shipments, excess planning, and vacation
coverage
Logistics Analyst 04/01/09 to 04/01/11
 Negotiate rates and enter workflows for tariffs to be put into the transportation
system.
 Analyze P & L of all transportation lanes and work with routing center and
planners to create more efficient routes.
 Analyze past due accounts payable and accounts receivable.
 Attend weekly calls with billing and BMW to facilitate changes and faster
payments.
 Research KPI’s weekly and report findings to BMW
 Facilitate the launching of BMW’s new manufacturing plant by providing data
and functional expertise in regards to transportation, warehousing, and new
supplier set up
 Implement three consolidation cross docks along the Texas/Mexico border and
one deconsolidation center near BMW
 Coordinate and troubleshoot the roll out of scanning at suppliers and all cross
docks
Logistics Planner 06/01/07 to 04/01/09
 Involved in Penske’s implementation of their new TMS system and trouble
shooting of the new launch
 Intricate part of Penske’s successfulimplementation of BMW’s new onsite 3PL
for Mexico/Texas suppliers
 Optimize Mexico/U.S. transportation lanes to BMW
 Work with Penske routing center to create more efficient routes
 Work with BMW packaging to transmit correct weight and dimensions
 Liaison between BMW material planners and suppliers
 Liaison between Penske’s routing center,carrier management group, and IT.
Parker Hannifin Aerospace 6/28/06 to 1/30/07
Purchasing Expeditor
 Follow up on orders with Suppliers
 Develop and train suppliers to improve on time delivery
 Develop an internal expediting process for buyers to follow
Michigan/Howell National Guard 12/18/03 to 03/16/05
Combat Truck Driver
 Drove 40’ flat bed military semi-trucks
 Delivered supplies throughout Iraq while under enemy attack
 Operated the M-249 machine gun and the M-16 rifle
 Gunner for convoy security
 Gun truck commander
 Completed leadership training
VOLUNTEER EXPERIENCE___________________________________________________
2002-2003 Alternative Spring Break Site Leader Sioux Falls, SD
 Completed leadership course at YMCA camp
 Planned a trip to work in a children’s hospital/school for kids with diseases and
impairments

More Related Content

Similar to Kurt Servies Resume

Similar to Kurt Servies Resume (20)

Ryan Bogle
Ryan BogleRyan Bogle
Ryan Bogle
 
Ryan Bogle-Resume
Ryan Bogle-ResumeRyan Bogle-Resume
Ryan Bogle-Resume
 
Cosmo Skotniski CV Public
Cosmo Skotniski CV PublicCosmo Skotniski CV Public
Cosmo Skotniski CV Public
 
Geoff Hollick-CV
Geoff Hollick-CVGeoff Hollick-CV
Geoff Hollick-CV
 
Veronica Bishun Res. Nov 22
Veronica Bishun Res. Nov 22Veronica Bishun Res. Nov 22
Veronica Bishun Res. Nov 22
 
Tyler Bloodworth Resume
Tyler Bloodworth ResumeTyler Bloodworth Resume
Tyler Bloodworth Resume
 
Manager 2017 TN
Manager 2017 TNManager 2017 TN
Manager 2017 TN
 
Vivek Balakrishnan_CV
Vivek Balakrishnan_CVVivek Balakrishnan_CV
Vivek Balakrishnan_CV
 
New Resume 2016
New Resume 2016New Resume 2016
New Resume 2016
 
Material controller cv anas
Material controller cv  anasMaterial controller cv  anas
Material controller cv anas
 
Nourhan Ghazy CV
Nourhan Ghazy CVNourhan Ghazy CV
Nourhan Ghazy CV
 
Nourhan Ghazy CV
Nourhan Ghazy CVNourhan Ghazy CV
Nourhan Ghazy CV
 
SCG Introduction Slides
SCG Introduction SlidesSCG Introduction Slides
SCG Introduction Slides
 
Rajdeep Mukherjee CV
Rajdeep Mukherjee CVRajdeep Mukherjee CV
Rajdeep Mukherjee CV
 
Resume_Buenrostro
Resume_BuenrostroResume_Buenrostro
Resume_Buenrostro
 
Logistics analyst
Logistics analystLogistics analyst
Logistics analyst
 
Logistics analyst fekadu_ambissa_1
Logistics analyst fekadu_ambissa_1Logistics analyst fekadu_ambissa_1
Logistics analyst fekadu_ambissa_1
 
Supply Chain Position Descriptions.pdf
Supply Chain Position Descriptions.pdfSupply Chain Position Descriptions.pdf
Supply Chain Position Descriptions.pdf
 
Resume
ResumeResume
Resume
 
Hope LaVare Resume
Hope LaVare ResumeHope LaVare Resume
Hope LaVare Resume
 

Kurt Servies Resume

  • 1. 1 2 8 C A R S H A L T O N D R . • L Y M A N , S C 2 9 3 6 5 P H O N E ( 8 6 4 ) 3 1 3 - 8 7 8 1 • E - M A I L K 1 S E R V I E @ G M A I L . C O M KU R T S E R V I E S EDUCATION_________________________________________________________________ Western Michigan University; Kalamazoo, MI 04/27/2007  Haworth College of Business-Bachelor’s of Business Administration: Integrated Supply Matrix Management – ISM2 (e.g. Purchasing, Operations, and Logistics Management)  ISM (Integrated Supply Chain Management): Encompasses all those activities associated with moving goods from the raw materials stage through to the end user, and includes systems management, manufacturing and assembly, sourcing and procurement, production scheduling, order processing, inventory management, warehousing, and customer service.  Career Related Courses:  Fundamentals of Circuits  Quality Assurance and Control  SAP/ERP Configuration  Engineering Graphics  Process and Materials Manufacturing  Purchasing Management  Manufacturing Productivity  Logistics Management  Production Management and Control  Materials Management Strategy  TQM and Lean Principals  Process Reengineering EMPLOYMENT_______________________________________________________________ Draexlmaier Sub Project Manager 11/14 to Present  Project lead for projects from the early investigations, design phase, construction, and final implementation of the assembly, to include Invest, Budget, and Timeline Responsibility  Develop timetable, schedules, and LOP’s,coordinates bulk build plans, equipment tryouts and implementation of process in new location for all process transfers  Coordinate Planning of production personnel, space requirement, and Plant layout  Develop the process flow of operations required to manufacture each component  Develop the Operator Work Instructions for each manufacturing process  Create line side presentation for new projects  Oversee acquisition of new equipment/adjustment of existing equipment  Interacts with engineering, production departments and Germany  Perform time studies to qualify time estimates for production processes Penske Logistics OperationsSupervisor 04/01/11 to 1  Penske delegate for BMW model changes, new supplier set ups, supply chain changes, supplier moves, and special requests  Develop and manage metrics to grade carriers, suppliers, cross-docks, and employees  Streamline processes and provide operational and IT improvements  Supervise Logistics Planners for both shifts and conduct weekly and monthly team meetings  Attend meetings with BMW management to report on time pickup and delivery performance,KPI’s, and discuss any other issues or special requests  Handle all damaged freight claims and charge back carriers
  • 2.  Facilitate weekly calls with Penske entities (routing center,IT, cross-docks, carriers,carrier management) and suppliers  Create reports from Penske’s corrective action reporting tool to identify problems and address with appropriate parties  Provide support with emergency shipments, excess planning, and vacation coverage Logistics Analyst 04/01/09 to 04/01/11  Negotiate rates and enter workflows for tariffs to be put into the transportation system.  Analyze P & L of all transportation lanes and work with routing center and planners to create more efficient routes.  Analyze past due accounts payable and accounts receivable.  Attend weekly calls with billing and BMW to facilitate changes and faster payments.  Research KPI’s weekly and report findings to BMW  Facilitate the launching of BMW’s new manufacturing plant by providing data and functional expertise in regards to transportation, warehousing, and new supplier set up  Implement three consolidation cross docks along the Texas/Mexico border and one deconsolidation center near BMW  Coordinate and troubleshoot the roll out of scanning at suppliers and all cross docks Logistics Planner 06/01/07 to 04/01/09  Involved in Penske’s implementation of their new TMS system and trouble shooting of the new launch  Intricate part of Penske’s successfulimplementation of BMW’s new onsite 3PL for Mexico/Texas suppliers  Optimize Mexico/U.S. transportation lanes to BMW  Work with Penske routing center to create more efficient routes  Work with BMW packaging to transmit correct weight and dimensions  Liaison between BMW material planners and suppliers  Liaison between Penske’s routing center,carrier management group, and IT. Parker Hannifin Aerospace 6/28/06 to 1/30/07 Purchasing Expeditor  Follow up on orders with Suppliers  Develop and train suppliers to improve on time delivery  Develop an internal expediting process for buyers to follow Michigan/Howell National Guard 12/18/03 to 03/16/05 Combat Truck Driver  Drove 40’ flat bed military semi-trucks  Delivered supplies throughout Iraq while under enemy attack  Operated the M-249 machine gun and the M-16 rifle  Gunner for convoy security  Gun truck commander  Completed leadership training VOLUNTEER EXPERIENCE___________________________________________________ 2002-2003 Alternative Spring Break Site Leader Sioux Falls, SD  Completed leadership course at YMCA camp  Planned a trip to work in a children’s hospital/school for kids with diseases and impairments