The Army’s Energy Programs
Savannah E-Week
February 2013
1
LTC Kevin Lovell, PMP
Office of Business Transformation
Army Energy Initiative Task Force
Agenda
2
- Army Strategic Situation: Drivers for Renewable
and Operational Energy Requirements
- Update on the Army Strategic Energy Situation
- Update on the Army’s Current Energy Initiatives
- Army Water and Waste Initiatives
- Army Goal to Deliver Army at Best Value and
Meet Senior Leader Goals
Over the Last 12 years, We Have Faced…
3
Persistent Conflict,
Natural Disasters,
Man Made Disasters,
Supported Foreign Governments,
Army Unit Global Repositioning,
and Base Realignment and Closure.
We have the most Effective Army
in our Nation’s History.
4
Aligning to the Army Leader’s Priorities
Readiness at Best Value
Business Transformation
• Define and Reengineer Critical End-to-End Processes
• Manage Business System IT Investments
• Improve Force Management
• Strengthen Financial Management
• Implement an Integrated Management System
OBT Plans, Prepares, Facilitates, and Monitors Execution of Actions within these Priorities
to Improve Army Business Operations in Support of Transforming the Institutional Army
Sec Army Priorities (14 Feb 12)
• Ensure a highly capable force within evolving
budgetary constraints
• Transform the Institutional Army
• Build the Army of 2020 (POM 14-18)
• Enhance Army activities in the Asia-Pacific Region
• Fund reset and modernization
• Champion Soldiers, Civilians, and Families
• Strengthen information assurance and cybersecurity
• Ensure accountability
• Develop energy solutions
• Finalize Arlington National Cemetery reforms
Chief of Staff of the Army Priorities (Jan 12)
• Provide trained, equipped, and ready forces to win the current fight while
maintaining responsiveness for unforeseen contingencies.
• Develop the force of the future, Army 2020 as part of Joint
Force 2020 – a versatile mix of capabilities, formations,
and equipment.
• Sustain our high-quality All-Volunteer Army – Soldiers, Civilians, and
Families, in the Active and Reserve Components.
• Adapt leader development to meet our future security challenges in an
increasingly uncertain and complex strategic environment.
• Foster continued commitment to the Army Profession, a noble and selfless
calling founded on the bedrock of trust.
USA/CMO & VCSA
• Integrated Management (PPBE/ACP)
• Portfolio Reviews
• Improving Force Management
55
Notional Path to 25% Renewable Energy by 2025
Reaching Army Goals
Requires:
• Enterprise Strategy
• Significant # of RE Projects
• Leverage 3d Party Financing
Army Energy Strategy Outlook
Energy Efficiency Gains: Appropriated funding,
ESPC, UESC
Traditional Energy
Renewable Energy: 3d Party Financing
Renewable Energy
NDAA 2010:
25% by 2025
(1 GW Target)
EP Act 2005
7.5% by 2013
%REofTotalEnergy
Army Progress: 0.5% in 2011
from 168 different projects
RE: Renewable Energy
The Army’s Energy Program:
A System-of-Systems Approach
 Holistically Address Challenges
 Culture Change
 Science and Technology Investments
6
Water Waste
Energy
BASING
Installation
OPERATIONAL ENERGY
Contingency
SOLDIER VEHICLES
Energy Initiatives Task
Force
Established September 15, 2011.
• Project Scale: Equal to or Greater than 10MW
• Stakeholders: Installations, Utilities, State
Governments, Local Communities
• Technology: Solar, Wind, Waste to Energy,
Biomass, and Geothermal
• Acquisition Methods: Use existing DoD land-use
and third-party financing authorities
Secretary of the Army
John M. McHugh
Army Energy Initiatives Task Force (EITF)
7
EITF Mission: Centrally plan and manage the Army’s Large
Scale, Renewable Energy projects using 3d Party Financing to
produce cost effective projects on Dept. of the Army land.
The EITF Team: Diversified Leaders
with a Deep Bench
8
Defense Logistical Command Department of Energy
Department of Air Force Department of Interior Department of Navy
National Renewable Energy Lab Pacific Northwest National LabU.S. Army Corp of Engineers
Savannah River National Laboratory
Partnerships
Alan King, Interim Director
Joyce VanSlyke
John Lushetsky
Kathleen Ahsing, Director
LTC Kevin Lovell
Alan King, Director
Douglas Waters
Erich Kurre
Heidi Hansen
Office of General Counsel
Executive Director
Planning Division Execution Division Outreach Division
EITF seeks to create a balanced pipeline of opportunities that will
serve three driving principles
EITF’s Balanced Enterprise Approach
9
The EITF is producing a process for developing large-scale renewable
energy projects that is clear, consistent and transparent. This process will
be described in a Renewable Energy Project Development Guide that
will detail the five phases of project development.
EITF’s Business Process
Purpose:
Identify and
prioritize
opportunities
Purpose:
Develop an
opportunity
into
a project
Purpose:
Secure a binding
agreement
Purpose:
Constructing
assets;
structuring
services
Purpose:
Manage
operations and
transition to
closure
10
Energy Initiatives UNCLASSIFIED 11
Installations
GREEN: Acquisition
ORANGE: Validation
BLUE: Initial Assessments
HI
AK
PR
Fort Riley
Sierra Army Depot
Tooele Army Depot
Joint Base Lewis-McChord
Fort Huachuca
Fort Belvoir
Fort Leonard Wood
Fort Benning
Fort Campbell
Fort Carson
Fort Bragg
Rock Island Arsenal
Anniston Army Depot
Hawthorne Army Depot
Yuma Proving Ground
Ft. Drum
Watervliet Arsenal
US Army Garrison Hawaii
Army Military Ocean
Terminal Concord
Ft. Hunter Liggett
Redstone Arsenal
Large-Scale Renewable Energy Opportunities
Ft. Bliss
Ft. Irwin
Ft. Detrick
Location: Ft. Irwin, CA
Project: 20 MW Solar
Path Forward: Competitive PPA
Location: Ft. Bliss, TX
Project: 20 MW Solar
Path Forward: Competitive
PPA through El Paso Electric
Location: Ft. Detrick, MD
Project: 15 MW Solar
Path Forward: Competitive
PPA through DLA
Location: U.S. Army Garrison
Hawaii
Project: 52 MW Bio-Electric
Path Forward: Competitive
PPA through HECO
The EITF’s Initial Projects will provide over
100 MW of renewable energy for Army
security – a 10X increase over present
capabilities and moving the Army 10%
toward it’s 1 GW goal.
Location: Ft. Drum, NY
Project: 15-28 MW Biomass
Path Forward: Competitive
PPA through DLA
12
 Program established with Pilot Installations in Spring ‘11
 Establishing the baseline
̶ Energy Audits: Complete pilot installations
̶ Water Balance Assessments: Ongoing
̶ Material Flow Analysis: Ongoing
 Assessing the potential
 Planning the future
̶ Develop and Implement projects to improve
Energy, Water & Waste efficiency at
pilots installations over the next 8 years
National Renewable Energy Laboratory Innovation for Our Energy Future11
Renewable Energy Optimization (REO)
Utility Data from Platts Inc.
Geographical Information System (GIS) Data
Incentive Data from DSIREUSA.ORG
PV Wind Daylighting
Solar
Water
Heat
Concentrating
Solar PowerBiomass
AlgorithmAlgorithm
Life Cycle CostLife Cycle Cost
City Cost Adjustments from RS Means & Co.
OptimizationOptimization
• REO finds the least-cost combination of renewable energy
technologies to meet net zero goal
Water
Supply
Water Use
Losses
Irrigation
Cooling/
Process
Indoor building
Alternate water
On-site ground
On-site surface water
Municipal
The Army’s Net Zero Program:
Efficiency Improvement Efforts
Engineers in the Basing Power Team:
Technology, Acquisition, and Operation
 Situation: Base camps spread out over austere conditions with vulnerable resupply
convoys
 The Team:
 ASA(IE&E)
 G-3/5/7 Rapid Equipping Force (REF)
 Army G-4, the Logistics Initiative Agency, and the Army Logistics Community
 Efforts: Completed Case studies, developed solutions, purchased and delivered COTS
and GOTS equipment to resupply High Threat Remote Areas
 Results: Team Effort Increase Base Camp Security & Energy Efficiency
 Reduced Fuel Consumption by 33%
 Improved Resupply Reliability, Generator Efficiency, and Operation
Balanced generators with loads –
two generators taken offline
Hybrid Solutions to Increase operational
reliability & reduce fuel consumption
Resupply via air drops
13COTS: Commercial Off the Shelf; GOTS: Government Off the Shelf
Research & Development
 TARDEC – DOE Partnership
 Improved Turbine Engine Program
 Greater on-board power for combat vehicles
 Fuel Efficient Ground Vehicle Demonstrator
 Ground Systems Power & Energy Laboratory (GSPEL),
TARDEC
̶ Opened on 11 April 2012
̶ Eight state-of-the-art laboratories
̶ Will develop & test advanced vehicle technologies to
support Army ground system advances
Track Requirements & Fuel Consumption to Inform
Decision Making
Fuel Efficient Ground Vehicle
Demonstrator (FED-A)
Advanced Vehicle Power Technology
Alliance (AVPTA) with DoE
Ground Systems Power & Energy
Laboratory
14
Vehicle Power: Improving Life Cycle
Energy Costs
Soldier Power: Extend Range & Reduce Load
All Units deploying to Afghanistan in 2013 will have energy technologies to
extend dismounted Soldiers endurance & range
$0
$10
$20
$30
$40
$50
$60
FY05 FY06 FY07 FY08 FY09 FY10 FY11 FY12
(Est)
C-EBatteryDemands($M)
Rechargeable Vs Non-RechargeableC-EBatteries
Non-rechargeable
Rechargeable
 Rechargeable Batteries:
̶ One Soldier 72 hours: 70 batteries, 7 types, 16 lbs
̶ Dismounted platoon for 72 hours: >400 lbs of batteries
̶ Army shifting from non-rechargeable to rechargeable
batteries
̶ FY12: estimate 52% of spending for Communications-
Electronics rechargeable technology vs. 26% in FY05
15
̶ Equipped with advanced power capabilities
including power management devices, fuel
cells, & renewable energy alternatives to
reduce load the volume & weight
̶ Builds on previous unit deployments and
lessons learned
Propane Fuel Cell
Solar Stik
Advanced Medium Mobile Power
Sources (AMMPS)
Rucksack Enhanced Portable
Power System (REPPS)
Soldier Power Managers
1kW JP-8 generator
Modular Universal Battery Charger
16
Soldier Power: Suite of Advanced Power Equip.
17
Vision
The Army’s Generating Force, agile and versatile,
conducting effective and efficient business operations
to produce Readiness at Best Value for the Nation,
Now and in the Future.
Mission
To assist the Army in Transforming its Army Business Operations to more
effectively and efficiently use the Nation’s resources by improving the
Army’s business processes, transforming business systems information
technology, promoting resource-informed decision-making, and
achieving integrated management.
Office of Business Transformation (OBT)
OBT Support to the Army’s Energy Program
18
• Helped Develop the:
• Portfolio and Project Planning Process
• Performance Measurement Framework
• Supported Auditability Goals in the Process Development
• Incorporated Best Practices and recommendations for Army
Policy Refinement
• Helped Synchronize the Program’s efforts with the ‘12 ACP
• Tell the Army Story
OBT: Office of Business Transformation; EITF: Energy Initiatives Task Force
The Army is all about Soldiers. It’s not about equipment or things; we
are about people. America's Army is in a huge transition which calls
for us to think and lead in new ways.
– Army Chief of Staff GEN Odierno
Innovation and the Soldier:
The Key to Our National & Energy Security
19
Army Leaders and Engineers are Innovators.
Engineers Understand and Integrate
Users, Technology, and Equipment to
Produce Solutions!
The Army’s Energy Programs
Savannah E-Week
February 2013
20
LTC Kevin Lovell, PMP
US Army
Office of Business Transformation
Army Energy Initiative Task Force
Kevin.J.Lovell4.mil@mail.mil
O: 703-601-9190

More Related Content

What's hot

News Release: Commerce Resources Corp. Completes Preliminary Evaluation for ...
News Release:  Commerce Resources Corp. Completes Preliminary Evaluation for ...News Release:  Commerce Resources Corp. Completes Preliminary Evaluation for ...
News Release: Commerce Resources Corp. Completes Preliminary Evaluation for ...Commerce Resources Corp. (TSXv:CCE)
 
News Release: Commerce Resources Corp. Receives Grant for Environmental Studi...
News Release: Commerce Resources Corp. Receives Grant for Environmental Studi...News Release: Commerce Resources Corp. Receives Grant for Environmental Studi...
News Release: Commerce Resources Corp. Receives Grant for Environmental Studi...Commerce Resources Corp. (TSXv:CCE)
 
Integrating Renewable Energy into the Electricity Grid
Integrating Renewable Energy into the Electricity GridIntegrating Renewable Energy into the Electricity Grid
Integrating Renewable Energy into the Electricity GridPower System Operation
 
Integrated Resource Plan Public Scoping – Oct 24 2013
Integrated Resource Plan Public Scoping – Oct 24 2013Integrated Resource Plan Public Scoping – Oct 24 2013
Integrated Resource Plan Public Scoping – Oct 24 2013TVANews
 
Evolving Planning Process Drivers - Steve Herling, PJM Interconnection LLC
Evolving Planning Process Drivers - Steve Herling, PJM Interconnection LLCEvolving Planning Process Drivers - Steve Herling, PJM Interconnection LLC
Evolving Planning Process Drivers - Steve Herling, PJM Interconnection LLCEnergy Network marcus evans
 
Southern Energy Efficiency Center Final Report
Southern Energy Efficiency Center Final ReportSouthern Energy Efficiency Center Final Report
Southern Energy Efficiency Center Final ReportFlanna489y
 
Jan. 25th 2011 solar san diego
Jan. 25th 2011 solar san diegoJan. 25th 2011 solar san diego
Jan. 25th 2011 solar san diegoAaron Husak
 
Jeb Tyrie Full CV 2016
Jeb Tyrie Full CV 2016Jeb Tyrie Full CV 2016
Jeb Tyrie Full CV 2016jeb tyrie
 
The ScottMadden Energy Industry Update (Natural Gas Edition)
The ScottMadden Energy Industry Update (Natural Gas Edition)The ScottMadden Energy Industry Update (Natural Gas Edition)
The ScottMadden Energy Industry Update (Natural Gas Edition)ScottMadden, Inc.
 
The Energy Industry Update – November 2011
The Energy Industry Update – November 2011The Energy Industry Update – November 2011
The Energy Industry Update – November 2011ScottMadden, Inc.
 
Unlocking the potential of appalachian ethane
Unlocking the potential of appalachian ethaneUnlocking the potential of appalachian ethane
Unlocking the potential of appalachian ethaneAdvisian
 
PROGRESS IN DEFINING THE WATER-ENERGY NEXUS: WHAT’S NEXT?
PROGRESS IN DEFINING THE WATER-ENERGY NEXUS: WHAT’S NEXT?PROGRESS IN DEFINING THE WATER-ENERGY NEXUS: WHAT’S NEXT?
PROGRESS IN DEFINING THE WATER-ENERGY NEXUS: WHAT’S NEXT?U.S. Water Alliance
 

What's hot (20)

News Release: Commerce Resources Corp. Completes Preliminary Evaluation for ...
News Release:  Commerce Resources Corp. Completes Preliminary Evaluation for ...News Release:  Commerce Resources Corp. Completes Preliminary Evaluation for ...
News Release: Commerce Resources Corp. Completes Preliminary Evaluation for ...
 
Managing Generation Assets
Managing Generation AssetsManaging Generation Assets
Managing Generation Assets
 
News Release: Commerce Resources Corp. Receives Grant for Environmental Studi...
News Release: Commerce Resources Corp. Receives Grant for Environmental Studi...News Release: Commerce Resources Corp. Receives Grant for Environmental Studi...
News Release: Commerce Resources Corp. Receives Grant for Environmental Studi...
 
Integrating Renewable Energy into the Electricity Grid
Integrating Renewable Energy into the Electricity GridIntegrating Renewable Energy into the Electricity Grid
Integrating Renewable Energy into the Electricity Grid
 
44 ocea lmco-ascari
44 ocea lmco-ascari44 ocea lmco-ascari
44 ocea lmco-ascari
 
Integrated Resource Plan Public Scoping – Oct 24 2013
Integrated Resource Plan Public Scoping – Oct 24 2013Integrated Resource Plan Public Scoping – Oct 24 2013
Integrated Resource Plan Public Scoping – Oct 24 2013
 
Evolving Planning Process Drivers - Steve Herling, PJM Interconnection LLC
Evolving Planning Process Drivers - Steve Herling, PJM Interconnection LLCEvolving Planning Process Drivers - Steve Herling, PJM Interconnection LLC
Evolving Planning Process Drivers - Steve Herling, PJM Interconnection LLC
 
Southern Energy Efficiency Center Final Report
Southern Energy Efficiency Center Final ReportSouthern Energy Efficiency Center Final Report
Southern Energy Efficiency Center Final Report
 
Update on CCS Activities in Canada and Possible Topics for European Collabora...
Update on CCS Activities in Canada and Possible Topics for European Collabora...Update on CCS Activities in Canada and Possible Topics for European Collabora...
Update on CCS Activities in Canada and Possible Topics for European Collabora...
 
Hawaii Utility Integration Efforts
Hawaii Utility Integration EffortsHawaii Utility Integration Efforts
Hawaii Utility Integration Efforts
 
Jan. 25th 2011 solar san diego
Jan. 25th 2011 solar san diegoJan. 25th 2011 solar san diego
Jan. 25th 2011 solar san diego
 
Jeb Tyrie Full CV 2016
Jeb Tyrie Full CV 2016Jeb Tyrie Full CV 2016
Jeb Tyrie Full CV 2016
 
The ScottMadden Energy Industry Update (Natural Gas Edition)
The ScottMadden Energy Industry Update (Natural Gas Edition)The ScottMadden Energy Industry Update (Natural Gas Edition)
The ScottMadden Energy Industry Update (Natural Gas Edition)
 
Status of North American CO2 Capture and Storage (CCS) Projects - presentatio...
Status of North American CO2 Capture and Storage (CCS) Projects - presentatio...Status of North American CO2 Capture and Storage (CCS) Projects - presentatio...
Status of North American CO2 Capture and Storage (CCS) Projects - presentatio...
 
Presentation final2
Presentation final2Presentation final2
Presentation final2
 
The Energy Industry Update – November 2011
The Energy Industry Update – November 2011The Energy Industry Update – November 2011
The Energy Industry Update – November 2011
 
Wp final climate action plan oct 24 2013
Wp   final climate action plan oct 24 2013Wp   final climate action plan oct 24 2013
Wp final climate action plan oct 24 2013
 
Uic Strategy
Uic StrategyUic Strategy
Uic Strategy
 
Unlocking the potential of appalachian ethane
Unlocking the potential of appalachian ethaneUnlocking the potential of appalachian ethane
Unlocking the potential of appalachian ethane
 
PROGRESS IN DEFINING THE WATER-ENERGY NEXUS: WHAT’S NEXT?
PROGRESS IN DEFINING THE WATER-ENERGY NEXUS: WHAT’S NEXT?PROGRESS IN DEFINING THE WATER-ENERGY NEXUS: WHAT’S NEXT?
PROGRESS IN DEFINING THE WATER-ENERGY NEXUS: WHAT’S NEXT?
 

Viewers also liked

Derechos de autor. derecho...
Derechos de autor. derecho...Derechos de autor. derecho...
Derechos de autor. derecho...LDRD01
 
1. zikloko eduki multzoak eta ebaluazio irizpideak
1. zikloko eduki multzoak eta ebaluazio irizpideak1. zikloko eduki multzoak eta ebaluazio irizpideak
1. zikloko eduki multzoak eta ebaluazio irizpideakOstadarrasutan
 
High Endurance Last Level Hybrid Cache Design
High Endurance Last Level Hybrid Cache DesignHigh Endurance Last Level Hybrid Cache Design
High Endurance Last Level Hybrid Cache Designkeerthi thallam
 
Tunnel_and_Reservoir_Plan_Great_Lakes_Infrastructure_Forum
Tunnel_and_Reservoir_Plan_Great_Lakes_Infrastructure_ForumTunnel_and_Reservoir_Plan_Great_Lakes_Infrastructure_Forum
Tunnel_and_Reservoir_Plan_Great_Lakes_Infrastructure_ForumKevin Lovell, PMP
 
2011_SAME_Omaha_Post_FT_Carson_LEED_Construction_Program
2011_SAME_Omaha_Post_FT_Carson_LEED_Construction_Program2011_SAME_Omaha_Post_FT_Carson_LEED_Construction_Program
2011_SAME_Omaha_Post_FT_Carson_LEED_Construction_ProgramKevin Lovell, PMP
 
EPAM_Digital_Assurance_Accelerator
EPAM_Digital_Assurance_AcceleratorEPAM_Digital_Assurance_Accelerator
EPAM_Digital_Assurance_AcceleratorPeter Kartashov
 
137047338 informe-5-levantamiento-catastral
137047338 informe-5-levantamiento-catastral137047338 informe-5-levantamiento-catastral
137047338 informe-5-levantamiento-catastralAlex Castro Poma
 
Portafolio de objetos dibujados a mano alzada y en cad
Portafolio de objetos dibujados a mano alzada y en cadPortafolio de objetos dibujados a mano alzada y en cad
Portafolio de objetos dibujados a mano alzada y en cad3219082707
 
Triprockets' Top 10 Sydney bucketlist
Triprockets' Top 10 Sydney bucketlistTriprockets' Top 10 Sydney bucketlist
Triprockets' Top 10 Sydney bucketlistRizal Iskandar
 

Viewers also liked (20)

Derechos de autor. derecho...
Derechos de autor. derecho...Derechos de autor. derecho...
Derechos de autor. derecho...
 
1. zikloko eduki multzoak eta ebaluazio irizpideak
1. zikloko eduki multzoak eta ebaluazio irizpideak1. zikloko eduki multzoak eta ebaluazio irizpideak
1. zikloko eduki multzoak eta ebaluazio irizpideak
 
Sanchaita Pal
Sanchaita PalSanchaita Pal
Sanchaita Pal
 
DONATION FORM CHANGES
DONATION FORM CHANGESDONATION FORM CHANGES
DONATION FORM CHANGES
 
United National Bank
United National BankUnited National Bank
United National Bank
 
Resume 2015
Resume 2015Resume 2015
Resume 2015
 
High Endurance Last Level Hybrid Cache Design
High Endurance Last Level Hybrid Cache DesignHigh Endurance Last Level Hybrid Cache Design
High Endurance Last Level Hybrid Cache Design
 
Sanjay_Shah
Sanjay_ShahSanjay_Shah
Sanjay_Shah
 
Resume Jay a Woods
Resume Jay a WoodsResume Jay a Woods
Resume Jay a Woods
 
Pres gazette-juin16
Pres gazette-juin16Pres gazette-juin16
Pres gazette-juin16
 
CHOP Presentation
CHOP Presentation CHOP Presentation
CHOP Presentation
 
GERRY MC AUTOBODY
GERRY MC AUTOBODYGERRY MC AUTOBODY
GERRY MC AUTOBODY
 
Pres cd50-nov16
Pres cd50-nov16Pres cd50-nov16
Pres cd50-nov16
 
Tunnel_and_Reservoir_Plan_Great_Lakes_Infrastructure_Forum
Tunnel_and_Reservoir_Plan_Great_Lakes_Infrastructure_ForumTunnel_and_Reservoir_Plan_Great_Lakes_Infrastructure_Forum
Tunnel_and_Reservoir_Plan_Great_Lakes_Infrastructure_Forum
 
2011_SAME_Omaha_Post_FT_Carson_LEED_Construction_Program
2011_SAME_Omaha_Post_FT_Carson_LEED_Construction_Program2011_SAME_Omaha_Post_FT_Carson_LEED_Construction_Program
2011_SAME_Omaha_Post_FT_Carson_LEED_Construction_Program
 
Carlile_Computers
Carlile_ComputersCarlile_Computers
Carlile_Computers
 
EPAM_Digital_Assurance_Accelerator
EPAM_Digital_Assurance_AcceleratorEPAM_Digital_Assurance_Accelerator
EPAM_Digital_Assurance_Accelerator
 
137047338 informe-5-levantamiento-catastral
137047338 informe-5-levantamiento-catastral137047338 informe-5-levantamiento-catastral
137047338 informe-5-levantamiento-catastral
 
Portafolio de objetos dibujados a mano alzada y en cad
Portafolio de objetos dibujados a mano alzada y en cadPortafolio de objetos dibujados a mano alzada y en cad
Portafolio de objetos dibujados a mano alzada y en cad
 
Triprockets' Top 10 Sydney bucketlist
Triprockets' Top 10 Sydney bucketlistTriprockets' Top 10 Sydney bucketlist
Triprockets' Top 10 Sydney bucketlist
 

Similar to The Army's Energy Programs and Initiatives

Tips for Utilities and Regulators on Distribution Planning and Distributed En...
Tips for Utilities and Regulators on Distribution Planning and Distributed En...Tips for Utilities and Regulators on Distribution Planning and Distributed En...
Tips for Utilities and Regulators on Distribution Planning and Distributed En...Smart Grid Northwest
 
Utility Distribution Planning and Distributed Energy Resource Integration: EQ...
Utility Distribution Planning and Distributed Energy Resource Integration: EQ...Utility Distribution Planning and Distributed Energy Resource Integration: EQ...
Utility Distribution Planning and Distributed Energy Resource Integration: EQ...Smart Grid Northwest
 
Rolling Out the Quadrennial Technology Review Report
Rolling Out the Quadrennial Technology Review Report Rolling Out the Quadrennial Technology Review Report
Rolling Out the Quadrennial Technology Review Report US Department of Energy
 
Energy Master Planning - SEEC Forum Presentation 20190626
Energy Master Planning - SEEC Forum Presentation 20190626Energy Master Planning - SEEC Forum Presentation 20190626
Energy Master Planning - SEEC Forum Presentation 20190626Karly Zimmerman Fogg
 
TerraVerde Energy Master Planning
TerraVerde Energy Master PlanningTerraVerde Energy Master Planning
TerraVerde Energy Master PlanningAli Chehrehsaz
 
Energy Master Planning - SEEC Forum Presentation 20190626
Energy Master Planning - SEEC Forum Presentation 20190626Energy Master Planning - SEEC Forum Presentation 20190626
Energy Master Planning - SEEC Forum Presentation 20190626Karly Zimmerman Fogg
 
ERS at PSEG LI October 2015
ERS at PSEG LI October 2015ERS at PSEG LI October 2015
ERS at PSEG LI October 2015Zondits
 
Energy Storage Procurement in California - APR2014
Energy Storage Procurement in California - APR2014Energy Storage Procurement in California - APR2014
Energy Storage Procurement in California - APR2014Cedric Christensen
 
Energy Storage Opportunities and Challenges ECOFYS
Energy Storage Opportunities and Challenges ECOFYS Energy Storage Opportunities and Challenges ECOFYS
Energy Storage Opportunities and Challenges ECOFYS Andrew Gelston
 
Philadelphia Energy
Philadelphia EnergyPhiladelphia Energy
Philadelphia Energycrockettc
 
Wp accomplishments brochure
Wp accomplishments brochureWp accomplishments brochure
Wp accomplishments brochuremohammad1772
 
Tony Dover masccc 2013
Tony Dover masccc 2013Tony Dover masccc 2013
Tony Dover masccc 2013Jen Boudrie
 
DSP02110-2 Next Gen Energy Storage White Paper_INTER V1
DSP02110-2 Next Gen Energy Storage White Paper_INTER V1DSP02110-2 Next Gen Energy Storage White Paper_INTER V1
DSP02110-2 Next Gen Energy Storage White Paper_INTER V1Zach Pollock
 
Energy generation report. final 10 oct 14pptx...Philippine Energy Plan 2012 -...
Energy generation report. final 10 oct 14pptx...Philippine Energy Plan 2012 -...Energy generation report. final 10 oct 14pptx...Philippine Energy Plan 2012 -...
Energy generation report. final 10 oct 14pptx...Philippine Energy Plan 2012 -...alex regado
 
Solar and Energy Efficiency: Moving Towards and Integrated Approach
Solar and Energy Efficiency: Moving Towards and Integrated ApproachSolar and Energy Efficiency: Moving Towards and Integrated Approach
Solar and Energy Efficiency: Moving Towards and Integrated ApproachCenter for Sustainable Energy
 
DCP 4942_Alejandro Guzman_ POWER POINT USDA FINAL.pptx
DCP 4942_Alejandro Guzman_ POWER POINT USDA FINAL.pptxDCP 4942_Alejandro Guzman_ POWER POINT USDA FINAL.pptx
DCP 4942_Alejandro Guzman_ POWER POINT USDA FINAL.pptxalejandro guzman
 
Value of CSP with TES november 2014
Value of CSP with TES november 2014Value of CSP with TES november 2014
Value of CSP with TES november 2014Daniel Schwab
 

Similar to The Army's Energy Programs and Initiatives (20)

Tips for Utilities and Regulators on Distribution Planning and Distributed En...
Tips for Utilities and Regulators on Distribution Planning and Distributed En...Tips for Utilities and Regulators on Distribution Planning and Distributed En...
Tips for Utilities and Regulators on Distribution Planning and Distributed En...
 
Utility Distribution Planning and Distributed Energy Resource Integration: EQ...
Utility Distribution Planning and Distributed Energy Resource Integration: EQ...Utility Distribution Planning and Distributed Energy Resource Integration: EQ...
Utility Distribution Planning and Distributed Energy Resource Integration: EQ...
 
Rolling Out the Quadrennial Technology Review Report
Rolling Out the Quadrennial Technology Review Report Rolling Out the Quadrennial Technology Review Report
Rolling Out the Quadrennial Technology Review Report
 
Energy Master Planning - SEEC Forum Presentation 20190626
Energy Master Planning - SEEC Forum Presentation 20190626Energy Master Planning - SEEC Forum Presentation 20190626
Energy Master Planning - SEEC Forum Presentation 20190626
 
TerraVerde Energy Master Planning
TerraVerde Energy Master PlanningTerraVerde Energy Master Planning
TerraVerde Energy Master Planning
 
Energy Master Planning - SEEC Forum Presentation 20190626
Energy Master Planning - SEEC Forum Presentation 20190626Energy Master Planning - SEEC Forum Presentation 20190626
Energy Master Planning - SEEC Forum Presentation 20190626
 
General Session
General SessionGeneral Session
General Session
 
ERS at PSEG LI October 2015
ERS at PSEG LI October 2015ERS at PSEG LI October 2015
ERS at PSEG LI October 2015
 
Energy Storage Procurement in California - APR2014
Energy Storage Procurement in California - APR2014Energy Storage Procurement in California - APR2014
Energy Storage Procurement in California - APR2014
 
Scott Institute 101
Scott Institute 101Scott Institute 101
Scott Institute 101
 
Energy Storage Opportunities and Challenges ECOFYS
Energy Storage Opportunities and Challenges ECOFYS Energy Storage Opportunities and Challenges ECOFYS
Energy Storage Opportunities and Challenges ECOFYS
 
Philadelphia Energy
Philadelphia EnergyPhiladelphia Energy
Philadelphia Energy
 
Wp accomplishments brochure
Wp accomplishments brochureWp accomplishments brochure
Wp accomplishments brochure
 
Tony Dover masccc 2013
Tony Dover masccc 2013Tony Dover masccc 2013
Tony Dover masccc 2013
 
DSP02110-2 Next Gen Energy Storage White Paper_INTER V1
DSP02110-2 Next Gen Energy Storage White Paper_INTER V1DSP02110-2 Next Gen Energy Storage White Paper_INTER V1
DSP02110-2 Next Gen Energy Storage White Paper_INTER V1
 
Energy generation report. final 10 oct 14pptx...Philippine Energy Plan 2012 -...
Energy generation report. final 10 oct 14pptx...Philippine Energy Plan 2012 -...Energy generation report. final 10 oct 14pptx...Philippine Energy Plan 2012 -...
Energy generation report. final 10 oct 14pptx...Philippine Energy Plan 2012 -...
 
Solar and Energy Efficiency: Moving Towards and Integrated Approach
Solar and Energy Efficiency: Moving Towards and Integrated ApproachSolar and Energy Efficiency: Moving Towards and Integrated Approach
Solar and Energy Efficiency: Moving Towards and Integrated Approach
 
DCP 4942_Alejandro Guzman_ POWER POINT USDA FINAL.pptx
DCP 4942_Alejandro Guzman_ POWER POINT USDA FINAL.pptxDCP 4942_Alejandro Guzman_ POWER POINT USDA FINAL.pptx
DCP 4942_Alejandro Guzman_ POWER POINT USDA FINAL.pptx
 
Value of CSP with TES november 2014
Value of CSP with TES november 2014Value of CSP with TES november 2014
Value of CSP with TES november 2014
 
Scott institute 101
Scott institute 101 Scott institute 101
Scott institute 101
 

The Army's Energy Programs and Initiatives

  • 1. The Army’s Energy Programs Savannah E-Week February 2013 1 LTC Kevin Lovell, PMP Office of Business Transformation Army Energy Initiative Task Force
  • 2. Agenda 2 - Army Strategic Situation: Drivers for Renewable and Operational Energy Requirements - Update on the Army Strategic Energy Situation - Update on the Army’s Current Energy Initiatives - Army Water and Waste Initiatives - Army Goal to Deliver Army at Best Value and Meet Senior Leader Goals
  • 3. Over the Last 12 years, We Have Faced… 3 Persistent Conflict, Natural Disasters, Man Made Disasters, Supported Foreign Governments, Army Unit Global Repositioning, and Base Realignment and Closure. We have the most Effective Army in our Nation’s History.
  • 4. 4 Aligning to the Army Leader’s Priorities Readiness at Best Value Business Transformation • Define and Reengineer Critical End-to-End Processes • Manage Business System IT Investments • Improve Force Management • Strengthen Financial Management • Implement an Integrated Management System OBT Plans, Prepares, Facilitates, and Monitors Execution of Actions within these Priorities to Improve Army Business Operations in Support of Transforming the Institutional Army Sec Army Priorities (14 Feb 12) • Ensure a highly capable force within evolving budgetary constraints • Transform the Institutional Army • Build the Army of 2020 (POM 14-18) • Enhance Army activities in the Asia-Pacific Region • Fund reset and modernization • Champion Soldiers, Civilians, and Families • Strengthen information assurance and cybersecurity • Ensure accountability • Develop energy solutions • Finalize Arlington National Cemetery reforms Chief of Staff of the Army Priorities (Jan 12) • Provide trained, equipped, and ready forces to win the current fight while maintaining responsiveness for unforeseen contingencies. • Develop the force of the future, Army 2020 as part of Joint Force 2020 – a versatile mix of capabilities, formations, and equipment. • Sustain our high-quality All-Volunteer Army – Soldiers, Civilians, and Families, in the Active and Reserve Components. • Adapt leader development to meet our future security challenges in an increasingly uncertain and complex strategic environment. • Foster continued commitment to the Army Profession, a noble and selfless calling founded on the bedrock of trust. USA/CMO & VCSA • Integrated Management (PPBE/ACP) • Portfolio Reviews • Improving Force Management
  • 5. 55 Notional Path to 25% Renewable Energy by 2025 Reaching Army Goals Requires: • Enterprise Strategy • Significant # of RE Projects • Leverage 3d Party Financing Army Energy Strategy Outlook Energy Efficiency Gains: Appropriated funding, ESPC, UESC Traditional Energy Renewable Energy: 3d Party Financing Renewable Energy NDAA 2010: 25% by 2025 (1 GW Target) EP Act 2005 7.5% by 2013 %REofTotalEnergy Army Progress: 0.5% in 2011 from 168 different projects RE: Renewable Energy
  • 6. The Army’s Energy Program: A System-of-Systems Approach  Holistically Address Challenges  Culture Change  Science and Technology Investments 6 Water Waste Energy BASING Installation OPERATIONAL ENERGY Contingency SOLDIER VEHICLES Energy Initiatives Task Force
  • 7. Established September 15, 2011. • Project Scale: Equal to or Greater than 10MW • Stakeholders: Installations, Utilities, State Governments, Local Communities • Technology: Solar, Wind, Waste to Energy, Biomass, and Geothermal • Acquisition Methods: Use existing DoD land-use and third-party financing authorities Secretary of the Army John M. McHugh Army Energy Initiatives Task Force (EITF) 7 EITF Mission: Centrally plan and manage the Army’s Large Scale, Renewable Energy projects using 3d Party Financing to produce cost effective projects on Dept. of the Army land.
  • 8. The EITF Team: Diversified Leaders with a Deep Bench 8 Defense Logistical Command Department of Energy Department of Air Force Department of Interior Department of Navy National Renewable Energy Lab Pacific Northwest National LabU.S. Army Corp of Engineers Savannah River National Laboratory Partnerships Alan King, Interim Director Joyce VanSlyke John Lushetsky Kathleen Ahsing, Director LTC Kevin Lovell Alan King, Director Douglas Waters Erich Kurre Heidi Hansen Office of General Counsel Executive Director Planning Division Execution Division Outreach Division
  • 9. EITF seeks to create a balanced pipeline of opportunities that will serve three driving principles EITF’s Balanced Enterprise Approach 9
  • 10. The EITF is producing a process for developing large-scale renewable energy projects that is clear, consistent and transparent. This process will be described in a Renewable Energy Project Development Guide that will detail the five phases of project development. EITF’s Business Process Purpose: Identify and prioritize opportunities Purpose: Develop an opportunity into a project Purpose: Secure a binding agreement Purpose: Constructing assets; structuring services Purpose: Manage operations and transition to closure 10
  • 11. Energy Initiatives UNCLASSIFIED 11 Installations GREEN: Acquisition ORANGE: Validation BLUE: Initial Assessments HI AK PR Fort Riley Sierra Army Depot Tooele Army Depot Joint Base Lewis-McChord Fort Huachuca Fort Belvoir Fort Leonard Wood Fort Benning Fort Campbell Fort Carson Fort Bragg Rock Island Arsenal Anniston Army Depot Hawthorne Army Depot Yuma Proving Ground Ft. Drum Watervliet Arsenal US Army Garrison Hawaii Army Military Ocean Terminal Concord Ft. Hunter Liggett Redstone Arsenal Large-Scale Renewable Energy Opportunities Ft. Bliss Ft. Irwin Ft. Detrick Location: Ft. Irwin, CA Project: 20 MW Solar Path Forward: Competitive PPA Location: Ft. Bliss, TX Project: 20 MW Solar Path Forward: Competitive PPA through El Paso Electric Location: Ft. Detrick, MD Project: 15 MW Solar Path Forward: Competitive PPA through DLA Location: U.S. Army Garrison Hawaii Project: 52 MW Bio-Electric Path Forward: Competitive PPA through HECO The EITF’s Initial Projects will provide over 100 MW of renewable energy for Army security – a 10X increase over present capabilities and moving the Army 10% toward it’s 1 GW goal. Location: Ft. Drum, NY Project: 15-28 MW Biomass Path Forward: Competitive PPA through DLA
  • 12. 12  Program established with Pilot Installations in Spring ‘11  Establishing the baseline ̶ Energy Audits: Complete pilot installations ̶ Water Balance Assessments: Ongoing ̶ Material Flow Analysis: Ongoing  Assessing the potential  Planning the future ̶ Develop and Implement projects to improve Energy, Water & Waste efficiency at pilots installations over the next 8 years National Renewable Energy Laboratory Innovation for Our Energy Future11 Renewable Energy Optimization (REO) Utility Data from Platts Inc. Geographical Information System (GIS) Data Incentive Data from DSIREUSA.ORG PV Wind Daylighting Solar Water Heat Concentrating Solar PowerBiomass AlgorithmAlgorithm Life Cycle CostLife Cycle Cost City Cost Adjustments from RS Means & Co. OptimizationOptimization • REO finds the least-cost combination of renewable energy technologies to meet net zero goal Water Supply Water Use Losses Irrigation Cooling/ Process Indoor building Alternate water On-site ground On-site surface water Municipal The Army’s Net Zero Program: Efficiency Improvement Efforts
  • 13. Engineers in the Basing Power Team: Technology, Acquisition, and Operation  Situation: Base camps spread out over austere conditions with vulnerable resupply convoys  The Team:  ASA(IE&E)  G-3/5/7 Rapid Equipping Force (REF)  Army G-4, the Logistics Initiative Agency, and the Army Logistics Community  Efforts: Completed Case studies, developed solutions, purchased and delivered COTS and GOTS equipment to resupply High Threat Remote Areas  Results: Team Effort Increase Base Camp Security & Energy Efficiency  Reduced Fuel Consumption by 33%  Improved Resupply Reliability, Generator Efficiency, and Operation Balanced generators with loads – two generators taken offline Hybrid Solutions to Increase operational reliability & reduce fuel consumption Resupply via air drops 13COTS: Commercial Off the Shelf; GOTS: Government Off the Shelf
  • 14. Research & Development  TARDEC – DOE Partnership  Improved Turbine Engine Program  Greater on-board power for combat vehicles  Fuel Efficient Ground Vehicle Demonstrator  Ground Systems Power & Energy Laboratory (GSPEL), TARDEC ̶ Opened on 11 April 2012 ̶ Eight state-of-the-art laboratories ̶ Will develop & test advanced vehicle technologies to support Army ground system advances Track Requirements & Fuel Consumption to Inform Decision Making Fuel Efficient Ground Vehicle Demonstrator (FED-A) Advanced Vehicle Power Technology Alliance (AVPTA) with DoE Ground Systems Power & Energy Laboratory 14 Vehicle Power: Improving Life Cycle Energy Costs
  • 15. Soldier Power: Extend Range & Reduce Load All Units deploying to Afghanistan in 2013 will have energy technologies to extend dismounted Soldiers endurance & range $0 $10 $20 $30 $40 $50 $60 FY05 FY06 FY07 FY08 FY09 FY10 FY11 FY12 (Est) C-EBatteryDemands($M) Rechargeable Vs Non-RechargeableC-EBatteries Non-rechargeable Rechargeable  Rechargeable Batteries: ̶ One Soldier 72 hours: 70 batteries, 7 types, 16 lbs ̶ Dismounted platoon for 72 hours: >400 lbs of batteries ̶ Army shifting from non-rechargeable to rechargeable batteries ̶ FY12: estimate 52% of spending for Communications- Electronics rechargeable technology vs. 26% in FY05 15 ̶ Equipped with advanced power capabilities including power management devices, fuel cells, & renewable energy alternatives to reduce load the volume & weight ̶ Builds on previous unit deployments and lessons learned
  • 16. Propane Fuel Cell Solar Stik Advanced Medium Mobile Power Sources (AMMPS) Rucksack Enhanced Portable Power System (REPPS) Soldier Power Managers 1kW JP-8 generator Modular Universal Battery Charger 16 Soldier Power: Suite of Advanced Power Equip.
  • 17. 17 Vision The Army’s Generating Force, agile and versatile, conducting effective and efficient business operations to produce Readiness at Best Value for the Nation, Now and in the Future. Mission To assist the Army in Transforming its Army Business Operations to more effectively and efficiently use the Nation’s resources by improving the Army’s business processes, transforming business systems information technology, promoting resource-informed decision-making, and achieving integrated management. Office of Business Transformation (OBT)
  • 18. OBT Support to the Army’s Energy Program 18 • Helped Develop the: • Portfolio and Project Planning Process • Performance Measurement Framework • Supported Auditability Goals in the Process Development • Incorporated Best Practices and recommendations for Army Policy Refinement • Helped Synchronize the Program’s efforts with the ‘12 ACP • Tell the Army Story OBT: Office of Business Transformation; EITF: Energy Initiatives Task Force
  • 19. The Army is all about Soldiers. It’s not about equipment or things; we are about people. America's Army is in a huge transition which calls for us to think and lead in new ways. – Army Chief of Staff GEN Odierno Innovation and the Soldier: The Key to Our National & Energy Security 19 Army Leaders and Engineers are Innovators. Engineers Understand and Integrate Users, Technology, and Equipment to Produce Solutions!
  • 20. The Army’s Energy Programs Savannah E-Week February 2013 20 LTC Kevin Lovell, PMP US Army Office of Business Transformation Army Energy Initiative Task Force Kevin.J.Lovell4.mil@mail.mil O: 703-601-9190