EOP 430.51.4
Revision 03/28/05
Page 1 of 6
SF6 HANDLING PROCEDURE
PRINTED COPIES ARE NOT DOCUMENT CONTROLLED. FOR LATEST AUTHORIZED VERSION, PLEASE
REFER TO THE NATIONAL GRID’S INFONET SUBSTATION SERVICES WEB SITE
SUBSTATION MAINTENANCE
ELECTRICAL OPERATING PROCEDURE
A. PURPOSE AND SCOPE
This procedure establishes safe working practices for handling sulfur hexafluoride (SF6) gas and release
minimization practices. This document also specifies methods for handling of SF6 gas and removal,
handling, and disposal of hazardous by-products.
B. REFERENCES
1. National Grid USA Safety rules and procedures
2. National Grid USA Environmental Policy
3. Confined Space Entry
4. EPRI Guidelines for Safe Handling of SF6
5. DOT CFR 49 Chapter 1 Subchapter C
C. PREREQUISITES / CAUTIONS
1. Sulfur Hexafluoride Gas
a. Clean SF6 gas is an inert, stable, colorless, odorless, nontoxic, nonflammable gas. It is
approximately five times heavier than air and will displace air in confined areas. SF6 gas
contains no oxygen and will not support life. Confined areas must be force-ventilated when
working with SF6 gas.
b. The Occupational Safety and Health Administration (OSHA) regulation on air contaminants,
29 CFR 1910.1000, establishes that SF6 gas has no adverse effects when inhaled in the air at
a Threshold Limit Value (TLV) of 1000 ppm.
c. DOT regulations require equipment containing SF6 gas at pressures greater than 25 psig at
68° F. to be certified to transport compressed gas.
d. DOT regulations require cylinders of SF6 gas with a gross weight greater than 220 lbs. to
include a shipping paper. See Environmental Guidance 1110 document for additional
information.
e. The Environmental Protection Agency has identified Sulfur Hexafluoride as a greenhouse
gas, with a global warming potential 23,900 times the effect of an equal mass of Carbon
Dioxide, and an atmospheric lifetime of 3200 years. National Grid USA has entered into a
Memorandum of Understanding (MOU) with the USEPA requiring monitoring and reporting
of annual usage and leakage (emissions) amounts. This procedure is consistent with the
National Grid USA Environmental Policy in that it will help protect the environment for
future generations by making our contribution to minimizing climate change.
f. The venting of SF6 shall be minimized as much as possible. If discharge of small quantities is
necessary for test purposes (i.e., contamination or moisture analysis, etc.), such discharge is
to be kept to the minimum required to obtain a reading.
2. Decomposition Gasses and Solid By-Products
EOP 430.51.4
Revision 03/28/05
Page 2 of 6
SF6 HANDLING PROCEDURE
PRINTED COPIES ARE NOT DOCUMENT CONTROLLED. FOR LATEST AUTHORIZED VERSION, PLEASE
REFER TO THE NATIONAL GRID’S INFONET SUBSTATION SERVICES WEB SITE
SUBSTATION MAINTENANCE
ELECTRICAL OPERATING PROCEDURE
a. When exposed to sustained or intense electrical arcs, SF6 gas decomposes to form sulfur-fluoride
gases and metal-fluorides, which are toxic. If moisture is present, the decomposition by-products
may also include sulfur-oxyfluorides, hydrofluoric acid and sulfuric acid. The presence of these
by-products can be readily detected by a white or gray powdery substance or a very pungent odor
similar to rotten eggs.
b. All in-service SF6 equipment shall be assumed to contain decomposition by-products, unless the
gas has been tested as safe. When handling gas containing SF6 arc byproducts or solid by-
products the following cautions are applicable:
i. Personnel are to wear the appropriate protective clothing / equipment.
ii. OSHA regulations on respiratory protective equipment, 29 CFR 1910.134, require that
personnel wearing respiratory protective equipment be properly trained in the use of this
equipment, medically qualified, and mask fit tested.
3. Definitions / Terminology --
a. Reclaimer - A gas-handling unit equipped with a vacuum pump, storage tank(s), and filtration
equipment necessary to recycle SF6 gas.
i. The storage tank(s) on these carts is either a large central reservoir or one or more DOT-
approved cylinders.
ii. Reservoir-equipped carts shall not be transported over public roadways if the gas pressure is
above 25 psig, unless the cart is properly certified for transportation of compressed gas.
b. Transfer Cart - A cart used to invert and / or heat gas cylinders when filling equipment to
ensure the cylinder is thoroughly emptied.
D. PROCEDURE
Section A -- Handling of Sulfur Hexafluoride Gas:
1. The amount of SF6 gas voluntarily discharged into the atmosphere shall be minimized.
2. The Person in Charge is responsible for recording the instances of equipment being filled with SF6.
3. These instances of filling shall be recorded and entered into the appropriate substation maintenance
priority system program. The number of times a piece of equipment is filled with SF6 due to a leak
will be used to help prioritize repair of the leak or replacement of the equipment.
Section B -- Filling or Topping with SF6 from a Cylinder:
1. For small volume SF6 equipment and for topping off purposes, it may be more practical to fill the
EOP 430.51.4
Revision 03/28/05
Page 3 of 6
SF6 HANDLING PROCEDURE
PRINTED COPIES ARE NOT DOCUMENT CONTROLLED. FOR LATEST AUTHORIZED VERSION, PLEASE
REFER TO THE NATIONAL GRID’S INFONET SUBSTATION SERVICES WEB SITE
SUBSTATION MAINTENANCE
ELECTRICAL OPERATING PROCEDURE
enclosure directly from certified SF6 cylinders instead of using a gas handling apparatus. Refer to
EOP 430.51.4 “Adding SF6 to Station Equipment Procedure” for more details.
2. To facilitate the transfer of SF6 gas store cylinders indoors and preheat cylinders with a blanket
heater of appropriate design.
3. Prior to topping off, all filling pipe work, valves, etc. should be clean and dry. Cap off all hoses
after use to maintain cleanliness and dryness.
4. Loosely connect hose to gas compartment valve.
5. Partially open the gas cylinder valve.
6. Allow SF6 to flow through the hose and purge the air.
7. Seal all fittings as soon as the air is purged.
8. Open gas compartment valve and fill to the appropriate pressure.
CAUTION: Do not invert the gas cylinders to speed up the transfer of SF6 gas, unless the
filling apparatus is designed for this purpose. The gas cylinders may contain particulate
metal oxides, which can result in failures if transferred into the gas enclosure. Also, by
inverting the cylinders, liquid SF6 could be forced into the enclosure which, upon
evaporation, will result in over-pressure. The pumps of gas carts are designed for transfer of
gas and some can be damaged if liquid is passed through them.
Section C -- Removal of Sulfur Hexafluoride Gas from In-Service Equipment:
1) Prior to removal of gas, check the gas compartment and associated devices for leaks using an
approved halogen leak detector. Test the gas for arc byproducts if there is a possibility of an
internal failure.
2) Identify any components that must be repaired while SF6 gas is evacuated from equipment.
3) Obtain replacement parts as necessary to repair leaks.
4) Attach the hose from the SF6 Processing Cart to the gas compartment valve.
5) Draw a vacuum on the hose to remove air and moisture. Check for leaks.
6) Open the gas compartment valve.
7) Remove SF6 gas from the gas compartment via the processing cart filtration system as described in
the processing cart operating / maintenance instruction booklet.
EOP 430.51.4
Revision 03/28/05
Page 4 of 6
SF6 HANDLING PROCEDURE
PRINTED COPIES ARE NOT DOCUMENT CONTROLLED. FOR LATEST AUTHORIZED VERSION, PLEASE
REFER TO THE NATIONAL GRID’S INFONET SUBSTATION SERVICES WEB SITE
SUBSTATION MAINTENANCE
ELECTRICAL OPERATING PROCEDURE
8) Draw a vacuum on the gas compartment to complete the SF6 gas removal process. High level of
vacuums should not be drawn if equipment leaks will result contaminating the processing cart with
air.
9) Break vacuum with nitrogen or dry air as applicable.
10) SF6 Gas that is to be reused on the same equipment may be kept in the processing cart until
maintenance is complete.
a. If equipment is to be retired from use, SF6 gas must be transferred to DOT - approved
cylinders.
b. Reservoir - equipped gas carts must not be transported over public roadways if gas pressure
exceeds 25 psig at 68° F unless the cart is properly DOT certified for transportation of
compressed gas.
11) Clean interior of equipment in accordance with Section D prior to working on any internal parts.
12) When equipment is to be returned to service, seal all portholes and fittings.
13) Fill the equipment in accordance with Section E.
Section D -- Removal of Hazardous Solid By-Products:
1. After the SF6 gas has been removed from the gas compartment and prior to opening the gas
compartment's porthole(s), put on the following approved protective outerwear:
a. Clothing, protective, rainwear --
(In hot weather, a lighter weight poly-coated tyvek suit may be worn)
b. Glove, safety, disposable, polyethylene, large, clear
c. A supplied air respirator or a half-face or full-face reusable respirator, with two HEPA cartridges
for organic vapor / acid gas.
d. Goggles, chemical splash resistant, without vent, clear lens (if using half-face respirator) --
e. Disposable pullover boot.
2. Open the porthole(s) to gain access to the gas compartment.
3. Before entry, ventilate gas compartment with a 50 - cfm blower for at least one-half hour.
4. Test the compartment with an approved air monitor to verify a minimum of 20.9% oxygen
and no presence of combustible gases including carbon monoxide.
EOP 430.51.4
Revision 03/28/05
Page 5 of 6
SF6 HANDLING PROCEDURE
PRINTED COPIES ARE NOT DOCUMENT CONTROLLED. FOR LATEST AUTHORIZED VERSION, PLEASE
REFER TO THE NATIONAL GRID’S INFONET SUBSTATION SERVICES WEB SITE
SUBSTATION MAINTENANCE
ELECTRICAL OPERATING PROCEDURE
5. Using an approved halogen leak detector, perform checks at various low points within the
gas compartment to determine any presence of SF6 gas.
6. Continue ventilation in low point areas until the detector indicates that SF6 gas has been
purged.
7. Continue ventilation while work is being performed.
8. Remove contaminated powdery deposits using an approved vacuum cleaner equipped with
High-Efficiency Particle Arresting (HEPA) filters. NOTE: These deposits must be
removed promptly once the gas compartment is opened, since they readily absorb
moisture, becoming corrosive and sticky, and making their removal more difficult.
9. After using the vacuum, clean up any powdery residue using approved wipes.
10. Place powdery deposits contained in the vacuum cleaner disposal bag along with any wipes
and other contaminated materials in a plastic waste bag.
11. Upon completion of repair and/or maintenance work, seal all portholes of the gas compartment.
12. Remove protective outerwear.
13. Place disposable coveralls, gloves, boots, and respirator cartridges, and any other contaminated
materials in the plastic waste bag.
14. Secure bag with filament tape.
15. Place plastic waste bag in an appropriately sized container, such as a 55 - gallon drum or a 5 -
gallon can. SF6 by-products are corrosive and should not be placed directly in contact with a metal
storage container.
16. Wash face and hands following completion of work and before eating or drinking.
17. In the states of Massachusetts and New York the waste shall be labeled as non-hazardous waste. In
Rhode Island, New Hampshire and Vermont the waste shall be labeled as hazardous waste. The
label shall be filled out with the date and contents. In all states the same personnel protective
equipment shall be worn by employees since the waste is a corrosive solid and is regulated by
OSHA in the same manner in each state.
Section E Filling Equipment with Sulfur Hexafluoride Gas after servicing using a Gas
Handling Apparatus:
1. Obtain an SF6 gas reclaimer.
EOP 430.51.4
Revision 03/28/05
Page 6 of 6
SF6 HANDLING PROCEDURE
PRINTED COPIES ARE NOT DOCUMENT CONTROLLED. FOR LATEST AUTHORIZED VERSION, PLEASE
REFER TO THE NATIONAL GRID’S INFONET SUBSTATION SERVICES WEB SITE
SUBSTATION MAINTENANCE
ELECTRICAL OPERATING PROCEDURE
2. Connect hose to gas compartment valve and tighten all fittings.
3. Evacuate hose using vacuum pump. Check for leaks.
4. Evacuate equipment to the level and for the time specified by the manufacturer.
5. Break vacuum using SF6 gas.
6. Open gas compartment valve.
7. Fill and pressurize the equipment per manufacturer’s instructions.
8. Close gas compartment valve.
9. Using the vacuum pump and gas compressor reclaim the SF6 from the hose back into the
gas cart.
10. Disconnect hose from gas compartment valve and cap hose fitting.

More Related Content

What's hot

Tightness testing of gravity pipelines
Tightness testing of gravity pipelinesTightness testing of gravity pipelines
Tightness testing of gravity pipelinesVladimir Popovic
 
495265750-Hydro-Test-Procedure.docx
495265750-Hydro-Test-Procedure.docx495265750-Hydro-Test-Procedure.docx
495265750-Hydro-Test-Procedure.docxSharad Naik
 
Pressure Safety Valve Sizing - API 520/521/526
Pressure Safety Valve Sizing - API 520/521/526Pressure Safety Valve Sizing - API 520/521/526
Pressure Safety Valve Sizing - API 520/521/526Vijay Sarathy
 
Nfpa20 standard for the installation of stationary pumps for fire protection ...
Nfpa20 standard for the installation of stationary pumps for fire protection ...Nfpa20 standard for the installation of stationary pumps for fire protection ...
Nfpa20 standard for the installation of stationary pumps for fire protection ...Bowen Ngo
 
Erection Checklist for Solar Inverters, Solar Transformers & Solar String Com...
Erection Checklist for Solar Inverters, Solar Transformers & Solar String Com...Erection Checklist for Solar Inverters, Solar Transformers & Solar String Com...
Erection Checklist for Solar Inverters, Solar Transformers & Solar String Com...Gensol Engineering Limited
 
Inspection manual for piping
Inspection manual for pipingInspection manual for piping
Inspection manual for pipingKhiem Vo Duy
 
Hazard Assessment Methodology of Liquid Hydrocarbon Tank | Risk Assessment of...
Hazard Assessment Methodology of Liquid Hydrocarbon Tank | Risk Assessment of...Hazard Assessment Methodology of Liquid Hydrocarbon Tank | Risk Assessment of...
Hazard Assessment Methodology of Liquid Hydrocarbon Tank | Risk Assessment of...Gaurav Singh Rajput
 
Fully calculated firefighting systems with EN 12845 standard
Fully calculated firefighting systems with EN 12845 standardFully calculated firefighting systems with EN 12845 standard
Fully calculated firefighting systems with EN 12845 standardIsidoros Siderakis
 
Fire Pump Engines Overview
Fire Pump Engines OverviewFire Pump Engines Overview
Fire Pump Engines OverviewJames S Nasby
 
Guidebook of-bag-filter
Guidebook of-bag-filterGuidebook of-bag-filter
Guidebook of-bag-filtermkpq pasha
 
Painting procedure rev 0 (d 1157)
Painting procedure rev 0 (d 1157)Painting procedure rev 0 (d 1157)
Painting procedure rev 0 (d 1157)ghani386
 
Heat exchanger types and hydro testing
Heat exchanger types and hydro testingHeat exchanger types and hydro testing
Heat exchanger types and hydro testingwaqarahmed445
 

What's hot (20)

Tightness testing of gravity pipelines
Tightness testing of gravity pipelinesTightness testing of gravity pipelines
Tightness testing of gravity pipelines
 
495265750-Hydro-Test-Procedure.docx
495265750-Hydro-Test-Procedure.docx495265750-Hydro-Test-Procedure.docx
495265750-Hydro-Test-Procedure.docx
 
Pressure Safety Valve Sizing - API 520/521/526
Pressure Safety Valve Sizing - API 520/521/526Pressure Safety Valve Sizing - API 520/521/526
Pressure Safety Valve Sizing - API 520/521/526
 
Nfpa20 standard for the installation of stationary pumps for fire protection ...
Nfpa20 standard for the installation of stationary pumps for fire protection ...Nfpa20 standard for the installation of stationary pumps for fire protection ...
Nfpa20 standard for the installation of stationary pumps for fire protection ...
 
Gerand Flow Meter
Gerand Flow MeterGerand Flow Meter
Gerand Flow Meter
 
Erection Checklist for Solar Inverters, Solar Transformers & Solar String Com...
Erection Checklist for Solar Inverters, Solar Transformers & Solar String Com...Erection Checklist for Solar Inverters, Solar Transformers & Solar String Com...
Erection Checklist for Solar Inverters, Solar Transformers & Solar String Com...
 
Rim seal fire fraud
Rim seal fire fraudRim seal fire fraud
Rim seal fire fraud
 
Inspection manual for piping
Inspection manual for pipingInspection manual for piping
Inspection manual for piping
 
Chapter 09 - Measurement of Partial Discharge
Chapter 09 - Measurement of Partial DischargeChapter 09 - Measurement of Partial Discharge
Chapter 09 - Measurement of Partial Discharge
 
Pipe rack & rack piping
Pipe rack & rack pipingPipe rack & rack piping
Pipe rack & rack piping
 
Hrsg book
Hrsg bookHrsg book
Hrsg book
 
Hazard Assessment Methodology of Liquid Hydrocarbon Tank | Risk Assessment of...
Hazard Assessment Methodology of Liquid Hydrocarbon Tank | Risk Assessment of...Hazard Assessment Methodology of Liquid Hydrocarbon Tank | Risk Assessment of...
Hazard Assessment Methodology of Liquid Hydrocarbon Tank | Risk Assessment of...
 
Nitrogen purging
Nitrogen  purgingNitrogen  purging
Nitrogen purging
 
Fully calculated firefighting systems with EN 12845 standard
Fully calculated firefighting systems with EN 12845 standardFully calculated firefighting systems with EN 12845 standard
Fully calculated firefighting systems with EN 12845 standard
 
Fire Pump Engines Overview
Fire Pump Engines OverviewFire Pump Engines Overview
Fire Pump Engines Overview
 
Guidebook of-bag-filter
Guidebook of-bag-filterGuidebook of-bag-filter
Guidebook of-bag-filter
 
Painting procedure rev 0 (d 1157)
Painting procedure rev 0 (d 1157)Painting procedure rev 0 (d 1157)
Painting procedure rev 0 (d 1157)
 
Heat exchanger types and hydro testing
Heat exchanger types and hydro testingHeat exchanger types and hydro testing
Heat exchanger types and hydro testing
 
NFPA 15 - 2006.pdf
NFPA 15 - 2006.pdfNFPA 15 - 2006.pdf
NFPA 15 - 2006.pdf
 
Instrumentation Cable
Instrumentation CableInstrumentation Cable
Instrumentation Cable
 

Similar to Sf6 handling procedure

internship report by usama
internship report by usamainternship report by usama
internship report by usamamuhammad usama
 
How toselecta fanorblower
How toselecta fanorblowerHow toselecta fanorblower
How toselecta fanorblowerhabib ghanbari
 
Performing Safety Modeling Analysis To Comply With LNG Facility Siting Requi...
 Performing Safety Modeling Analysis To Comply With LNG Facility Siting Requi... Performing Safety Modeling Analysis To Comply With LNG Facility Siting Requi...
Performing Safety Modeling Analysis To Comply With LNG Facility Siting Requi...BREEZE Software
 
Application of SF6 in Transmission and Distribution Networks
Application of SF6 in Transmission and Distribution NetworksApplication of SF6 in Transmission and Distribution Networks
Application of SF6 in Transmission and Distribution NetworksPower System Operation
 
Sealing the Unseen: Efficiency through Emission Control
Sealing the Unseen: Efficiency through Emission ControlSealing the Unseen: Efficiency through Emission Control
Sealing the Unseen: Efficiency through Emission ControlPGE India - PILOT Gaskets
 
API682 Mechanical Seal Plan and Requirements of Mechanical Seals
API682 Mechanical Seal Plan and Requirements of Mechanical SealsAPI682 Mechanical Seal Plan and Requirements of Mechanical Seals
API682 Mechanical Seal Plan and Requirements of Mechanical SealsElango Palaniappan
 
API 682 Seal piping plans.pdf
API 682 Seal piping plans.pdfAPI 682 Seal piping plans.pdf
API 682 Seal piping plans.pdfTeddy Setiady
 
Ultra safe brochure
Ultra safe brochureUltra safe brochure
Ultra safe brochureHerman Halim
 
Automated Nitrogen Drying
Automated Nitrogen DryingAutomated Nitrogen Drying
Automated Nitrogen DryingNathan Schaefer
 
Review paper on study and implementation of steam traps
Review paper on study and implementation of steam trapsReview paper on study and implementation of steam traps
Review paper on study and implementation of steam trapsIRJET Journal
 
200.22 monitoring airborne contaminants with the use of the drager accuro gas...
200.22 monitoring airborne contaminants with the use of the drager accuro gas...200.22 monitoring airborne contaminants with the use of the drager accuro gas...
200.22 monitoring airborne contaminants with the use of the drager accuro gas...No Kill Shelter Alliance
 
Chapter 51
Chapter 51Chapter 51
Chapter 51mcfalltj
 

Similar to Sf6 handling procedure (20)

Pipeline drying
Pipeline dryingPipeline drying
Pipeline drying
 
SPW_51_23
SPW_51_23SPW_51_23
SPW_51_23
 
internship report by usama
internship report by usamainternship report by usama
internship report by usama
 
Final Project work
Final Project workFinal Project work
Final Project work
 
How toselecta fanorblower
How toselecta fanorblowerHow toselecta fanorblower
How toselecta fanorblower
 
Gas cylinder
Gas cylinderGas cylinder
Gas cylinder
 
Enclosure with laminar flow and inert atmosphere
Enclosure with laminar flow and inert atmosphereEnclosure with laminar flow and inert atmosphere
Enclosure with laminar flow and inert atmosphere
 
Performing Safety Modeling Analysis To Comply With LNG Facility Siting Requi...
 Performing Safety Modeling Analysis To Comply With LNG Facility Siting Requi... Performing Safety Modeling Analysis To Comply With LNG Facility Siting Requi...
Performing Safety Modeling Analysis To Comply With LNG Facility Siting Requi...
 
Gmp eu annex 6
Gmp eu annex 6Gmp eu annex 6
Gmp eu annex 6
 
Vedanta Aluminium Ltd.
Vedanta Aluminium Ltd.Vedanta Aluminium Ltd.
Vedanta Aluminium Ltd.
 
Application of SF6 in Transmission and Distribution Networks
Application of SF6 in Transmission and Distribution NetworksApplication of SF6 in Transmission and Distribution Networks
Application of SF6 in Transmission and Distribution Networks
 
Sealing the Unseen: Efficiency through Emission Control
Sealing the Unseen: Efficiency through Emission ControlSealing the Unseen: Efficiency through Emission Control
Sealing the Unseen: Efficiency through Emission Control
 
Standard practices r9
Standard practices r9Standard practices r9
Standard practices r9
 
API682 Mechanical Seal Plan and Requirements of Mechanical Seals
API682 Mechanical Seal Plan and Requirements of Mechanical SealsAPI682 Mechanical Seal Plan and Requirements of Mechanical Seals
API682 Mechanical Seal Plan and Requirements of Mechanical Seals
 
API 682 Seal piping plans.pdf
API 682 Seal piping plans.pdfAPI 682 Seal piping plans.pdf
API 682 Seal piping plans.pdf
 
Ultra safe brochure
Ultra safe brochureUltra safe brochure
Ultra safe brochure
 
Automated Nitrogen Drying
Automated Nitrogen DryingAutomated Nitrogen Drying
Automated Nitrogen Drying
 
Review paper on study and implementation of steam traps
Review paper on study and implementation of steam trapsReview paper on study and implementation of steam traps
Review paper on study and implementation of steam traps
 
200.22 monitoring airborne contaminants with the use of the drager accuro gas...
200.22 monitoring airborne contaminants with the use of the drager accuro gas...200.22 monitoring airborne contaminants with the use of the drager accuro gas...
200.22 monitoring airborne contaminants with the use of the drager accuro gas...
 
Chapter 51
Chapter 51Chapter 51
Chapter 51
 

Recently uploaded

Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoordharasingh5698
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...tanu pandey
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Standamitlee9823
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfRagavanV2
 

Recently uploaded (20)

Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
 

Sf6 handling procedure

  • 1. EOP 430.51.4 Revision 03/28/05 Page 1 of 6 SF6 HANDLING PROCEDURE PRINTED COPIES ARE NOT DOCUMENT CONTROLLED. FOR LATEST AUTHORIZED VERSION, PLEASE REFER TO THE NATIONAL GRID’S INFONET SUBSTATION SERVICES WEB SITE SUBSTATION MAINTENANCE ELECTRICAL OPERATING PROCEDURE A. PURPOSE AND SCOPE This procedure establishes safe working practices for handling sulfur hexafluoride (SF6) gas and release minimization practices. This document also specifies methods for handling of SF6 gas and removal, handling, and disposal of hazardous by-products. B. REFERENCES 1. National Grid USA Safety rules and procedures 2. National Grid USA Environmental Policy 3. Confined Space Entry 4. EPRI Guidelines for Safe Handling of SF6 5. DOT CFR 49 Chapter 1 Subchapter C C. PREREQUISITES / CAUTIONS 1. Sulfur Hexafluoride Gas a. Clean SF6 gas is an inert, stable, colorless, odorless, nontoxic, nonflammable gas. It is approximately five times heavier than air and will displace air in confined areas. SF6 gas contains no oxygen and will not support life. Confined areas must be force-ventilated when working with SF6 gas. b. The Occupational Safety and Health Administration (OSHA) regulation on air contaminants, 29 CFR 1910.1000, establishes that SF6 gas has no adverse effects when inhaled in the air at a Threshold Limit Value (TLV) of 1000 ppm. c. DOT regulations require equipment containing SF6 gas at pressures greater than 25 psig at 68° F. to be certified to transport compressed gas. d. DOT regulations require cylinders of SF6 gas with a gross weight greater than 220 lbs. to include a shipping paper. See Environmental Guidance 1110 document for additional information. e. The Environmental Protection Agency has identified Sulfur Hexafluoride as a greenhouse gas, with a global warming potential 23,900 times the effect of an equal mass of Carbon Dioxide, and an atmospheric lifetime of 3200 years. National Grid USA has entered into a Memorandum of Understanding (MOU) with the USEPA requiring monitoring and reporting of annual usage and leakage (emissions) amounts. This procedure is consistent with the National Grid USA Environmental Policy in that it will help protect the environment for future generations by making our contribution to minimizing climate change. f. The venting of SF6 shall be minimized as much as possible. If discharge of small quantities is necessary for test purposes (i.e., contamination or moisture analysis, etc.), such discharge is to be kept to the minimum required to obtain a reading. 2. Decomposition Gasses and Solid By-Products
  • 2. EOP 430.51.4 Revision 03/28/05 Page 2 of 6 SF6 HANDLING PROCEDURE PRINTED COPIES ARE NOT DOCUMENT CONTROLLED. FOR LATEST AUTHORIZED VERSION, PLEASE REFER TO THE NATIONAL GRID’S INFONET SUBSTATION SERVICES WEB SITE SUBSTATION MAINTENANCE ELECTRICAL OPERATING PROCEDURE a. When exposed to sustained or intense electrical arcs, SF6 gas decomposes to form sulfur-fluoride gases and metal-fluorides, which are toxic. If moisture is present, the decomposition by-products may also include sulfur-oxyfluorides, hydrofluoric acid and sulfuric acid. The presence of these by-products can be readily detected by a white or gray powdery substance or a very pungent odor similar to rotten eggs. b. All in-service SF6 equipment shall be assumed to contain decomposition by-products, unless the gas has been tested as safe. When handling gas containing SF6 arc byproducts or solid by- products the following cautions are applicable: i. Personnel are to wear the appropriate protective clothing / equipment. ii. OSHA regulations on respiratory protective equipment, 29 CFR 1910.134, require that personnel wearing respiratory protective equipment be properly trained in the use of this equipment, medically qualified, and mask fit tested. 3. Definitions / Terminology -- a. Reclaimer - A gas-handling unit equipped with a vacuum pump, storage tank(s), and filtration equipment necessary to recycle SF6 gas. i. The storage tank(s) on these carts is either a large central reservoir or one or more DOT- approved cylinders. ii. Reservoir-equipped carts shall not be transported over public roadways if the gas pressure is above 25 psig, unless the cart is properly certified for transportation of compressed gas. b. Transfer Cart - A cart used to invert and / or heat gas cylinders when filling equipment to ensure the cylinder is thoroughly emptied. D. PROCEDURE Section A -- Handling of Sulfur Hexafluoride Gas: 1. The amount of SF6 gas voluntarily discharged into the atmosphere shall be minimized. 2. The Person in Charge is responsible for recording the instances of equipment being filled with SF6. 3. These instances of filling shall be recorded and entered into the appropriate substation maintenance priority system program. The number of times a piece of equipment is filled with SF6 due to a leak will be used to help prioritize repair of the leak or replacement of the equipment. Section B -- Filling or Topping with SF6 from a Cylinder: 1. For small volume SF6 equipment and for topping off purposes, it may be more practical to fill the
  • 3. EOP 430.51.4 Revision 03/28/05 Page 3 of 6 SF6 HANDLING PROCEDURE PRINTED COPIES ARE NOT DOCUMENT CONTROLLED. FOR LATEST AUTHORIZED VERSION, PLEASE REFER TO THE NATIONAL GRID’S INFONET SUBSTATION SERVICES WEB SITE SUBSTATION MAINTENANCE ELECTRICAL OPERATING PROCEDURE enclosure directly from certified SF6 cylinders instead of using a gas handling apparatus. Refer to EOP 430.51.4 “Adding SF6 to Station Equipment Procedure” for more details. 2. To facilitate the transfer of SF6 gas store cylinders indoors and preheat cylinders with a blanket heater of appropriate design. 3. Prior to topping off, all filling pipe work, valves, etc. should be clean and dry. Cap off all hoses after use to maintain cleanliness and dryness. 4. Loosely connect hose to gas compartment valve. 5. Partially open the gas cylinder valve. 6. Allow SF6 to flow through the hose and purge the air. 7. Seal all fittings as soon as the air is purged. 8. Open gas compartment valve and fill to the appropriate pressure. CAUTION: Do not invert the gas cylinders to speed up the transfer of SF6 gas, unless the filling apparatus is designed for this purpose. The gas cylinders may contain particulate metal oxides, which can result in failures if transferred into the gas enclosure. Also, by inverting the cylinders, liquid SF6 could be forced into the enclosure which, upon evaporation, will result in over-pressure. The pumps of gas carts are designed for transfer of gas and some can be damaged if liquid is passed through them. Section C -- Removal of Sulfur Hexafluoride Gas from In-Service Equipment: 1) Prior to removal of gas, check the gas compartment and associated devices for leaks using an approved halogen leak detector. Test the gas for arc byproducts if there is a possibility of an internal failure. 2) Identify any components that must be repaired while SF6 gas is evacuated from equipment. 3) Obtain replacement parts as necessary to repair leaks. 4) Attach the hose from the SF6 Processing Cart to the gas compartment valve. 5) Draw a vacuum on the hose to remove air and moisture. Check for leaks. 6) Open the gas compartment valve. 7) Remove SF6 gas from the gas compartment via the processing cart filtration system as described in the processing cart operating / maintenance instruction booklet.
  • 4. EOP 430.51.4 Revision 03/28/05 Page 4 of 6 SF6 HANDLING PROCEDURE PRINTED COPIES ARE NOT DOCUMENT CONTROLLED. FOR LATEST AUTHORIZED VERSION, PLEASE REFER TO THE NATIONAL GRID’S INFONET SUBSTATION SERVICES WEB SITE SUBSTATION MAINTENANCE ELECTRICAL OPERATING PROCEDURE 8) Draw a vacuum on the gas compartment to complete the SF6 gas removal process. High level of vacuums should not be drawn if equipment leaks will result contaminating the processing cart with air. 9) Break vacuum with nitrogen or dry air as applicable. 10) SF6 Gas that is to be reused on the same equipment may be kept in the processing cart until maintenance is complete. a. If equipment is to be retired from use, SF6 gas must be transferred to DOT - approved cylinders. b. Reservoir - equipped gas carts must not be transported over public roadways if gas pressure exceeds 25 psig at 68° F unless the cart is properly DOT certified for transportation of compressed gas. 11) Clean interior of equipment in accordance with Section D prior to working on any internal parts. 12) When equipment is to be returned to service, seal all portholes and fittings. 13) Fill the equipment in accordance with Section E. Section D -- Removal of Hazardous Solid By-Products: 1. After the SF6 gas has been removed from the gas compartment and prior to opening the gas compartment's porthole(s), put on the following approved protective outerwear: a. Clothing, protective, rainwear -- (In hot weather, a lighter weight poly-coated tyvek suit may be worn) b. Glove, safety, disposable, polyethylene, large, clear c. A supplied air respirator or a half-face or full-face reusable respirator, with two HEPA cartridges for organic vapor / acid gas. d. Goggles, chemical splash resistant, without vent, clear lens (if using half-face respirator) -- e. Disposable pullover boot. 2. Open the porthole(s) to gain access to the gas compartment. 3. Before entry, ventilate gas compartment with a 50 - cfm blower for at least one-half hour. 4. Test the compartment with an approved air monitor to verify a minimum of 20.9% oxygen and no presence of combustible gases including carbon monoxide.
  • 5. EOP 430.51.4 Revision 03/28/05 Page 5 of 6 SF6 HANDLING PROCEDURE PRINTED COPIES ARE NOT DOCUMENT CONTROLLED. FOR LATEST AUTHORIZED VERSION, PLEASE REFER TO THE NATIONAL GRID’S INFONET SUBSTATION SERVICES WEB SITE SUBSTATION MAINTENANCE ELECTRICAL OPERATING PROCEDURE 5. Using an approved halogen leak detector, perform checks at various low points within the gas compartment to determine any presence of SF6 gas. 6. Continue ventilation in low point areas until the detector indicates that SF6 gas has been purged. 7. Continue ventilation while work is being performed. 8. Remove contaminated powdery deposits using an approved vacuum cleaner equipped with High-Efficiency Particle Arresting (HEPA) filters. NOTE: These deposits must be removed promptly once the gas compartment is opened, since they readily absorb moisture, becoming corrosive and sticky, and making their removal more difficult. 9. After using the vacuum, clean up any powdery residue using approved wipes. 10. Place powdery deposits contained in the vacuum cleaner disposal bag along with any wipes and other contaminated materials in a plastic waste bag. 11. Upon completion of repair and/or maintenance work, seal all portholes of the gas compartment. 12. Remove protective outerwear. 13. Place disposable coveralls, gloves, boots, and respirator cartridges, and any other contaminated materials in the plastic waste bag. 14. Secure bag with filament tape. 15. Place plastic waste bag in an appropriately sized container, such as a 55 - gallon drum or a 5 - gallon can. SF6 by-products are corrosive and should not be placed directly in contact with a metal storage container. 16. Wash face and hands following completion of work and before eating or drinking. 17. In the states of Massachusetts and New York the waste shall be labeled as non-hazardous waste. In Rhode Island, New Hampshire and Vermont the waste shall be labeled as hazardous waste. The label shall be filled out with the date and contents. In all states the same personnel protective equipment shall be worn by employees since the waste is a corrosive solid and is regulated by OSHA in the same manner in each state. Section E Filling Equipment with Sulfur Hexafluoride Gas after servicing using a Gas Handling Apparatus: 1. Obtain an SF6 gas reclaimer.
  • 6. EOP 430.51.4 Revision 03/28/05 Page 6 of 6 SF6 HANDLING PROCEDURE PRINTED COPIES ARE NOT DOCUMENT CONTROLLED. FOR LATEST AUTHORIZED VERSION, PLEASE REFER TO THE NATIONAL GRID’S INFONET SUBSTATION SERVICES WEB SITE SUBSTATION MAINTENANCE ELECTRICAL OPERATING PROCEDURE 2. Connect hose to gas compartment valve and tighten all fittings. 3. Evacuate hose using vacuum pump. Check for leaks. 4. Evacuate equipment to the level and for the time specified by the manufacturer. 5. Break vacuum using SF6 gas. 6. Open gas compartment valve. 7. Fill and pressurize the equipment per manufacturer’s instructions. 8. Close gas compartment valve. 9. Using the vacuum pump and gas compressor reclaim the SF6 from the hose back into the gas cart. 10. Disconnect hose from gas compartment valve and cap hose fitting.